This document is an Addendum to a solicitation for the New Kent County Family Court Building Bid Pack 5B project in Dover, Delaware. The project is being managed by the State of Delaware's Office of Management and Budget, Division of Facilities Management. The Addendum provides clarifications, revisions, and supplemental information to the previously issued Project Manual, Drawings, and Addenda, including changes to the Life Safety Plan, Floor Plans, Reflected Ceiling Plans, Elevations, Details, and Finish Plans. It also includes a Pre-Bid Meeting Agenda that covers the project description, bidder requirements, bid procedures, and other pertinent details. The bid is due on July 11, 2024.

The Addendum includes several allowances, with amounts ranging from $15,000 to $100,000 for the various bid packages. It also requires bidders to submit a bid bond, subcontractor list, non-collusion statement, drug testing affidavit, and contractor qualifications affidavit with their bids. The project is subject to prevailing wage rates and a 2% closeout document fee. Successful bidders will need to obtain a City of Dover business license, and there will be concurrent work occurring on the site during this contract.

Text of this file

415/445 S. GOVERNORS AVE, DOVER, DE 19901 NEW KENT COUNTY FAMILY COURT BUILDING

June 25, 2024 #MJ0208000001

TEVEBAUGH ARCHITECTURE BID PACK 5B - ADDENDUM 01

TA PROJECT NO. 20004.1 00 91 01 - 1

DOCUMENT 00 91 01

BID PACK 5B - ADDENDUM 01

1. PROJECT INFORMATION

A. Project Name: New Kent County Family Court Building

B. Owner: State of Delaware

C. Architect: Tevebaugh Architecture

D. Architect Project Number: #20004.1

E. Date of Addendum: 6/25/24

2. NOTICE TO BIDDERS

A. This Addendum is issued to all registered plan holders pursuant to the Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda. Portions of the Addendum affecting the Contract Documents shall be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement.

B. The Bidder shall acknowledge receipt of this Addendum to the Architect / Owner by properly completing the Bid Form.

C. The date for receipt of bids is not changed by this Addendum, at the same time and location.

3. ATTACHMENTS

A. This addendum includes the following attached Documents and Specification Sections:

1. Pre-bid Meeting Sign In Sheet

2. Pre-bid Meeting Agenda/Minutes

3. 00 41 13 Bid Forms

4. RFI LOG

5. Courthouse Drawings:

a. A001 - LIFE SAFETY PLAN - LEVEL 1 – CHANGES HAVE BEEN CLOUDED

b. A101 - FLOOR PLAN - LEVEL 1– CHANGES HAVE BEEN CLOUDED

c. A101A - FLOOR PLAN - LEVEL 1 - DETAILED CONSTRUCTION – CHANGES HAVE BEEN CLOUDED

d. A101B - FLOOR PLAN - LEVEL 1 - DIMENSIONING PLAN– CHANGES HAVE BEEN CLOUDED

e. A111 - REFLECTED CEILING PLAN - LEVEL 1 – CHANGES HAVE BEEN CLOUDED

f. A112 - REFLECTED CEILING PLAN - LEVEL 2 – CHANGES HAVE BEEN CLOUDED

g. A113 - REFLECTED CEILING PLAN - LEVEL 3 – CHANGES HAVE BEEN CLOUDED

h. A411 – ENLARGED PLAN & RCP – PUBLIC CORRIDORS – CHANGES HAVE BEEN CLOUDED

i. A412 – INTERIOR ELEVATIONS – PUBLIC CORRIDORS – CHANGES HAVE BEEN CLOUDED

j. A415 – ENLARGED PLAN & RCP – PUBLIC CORRIDORS – CHANGES HAVE BEEN CLOUDED

k. A422 – COURTROOM ELEVATIONS – CHANGES HAVE BEEN CLOUDED

l. A423 – TRUANCY COURTROOM & REMOTE TESTIMONY ROOMS ENALRGED PLANS & ELEVATIONS –

CHANGES HAVE BEEN CLOUDED

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE, DOVER, DE 19901

#MJ0208000001 June 25 ,2024

BID PACK 5B - ADDENDUM 01 TEVEBAUGH ARCHITECTURE

00 91 01 - 2 TA PROJECT NO. 20004.1

m. A441 – ENLARGED PLANS & ELEVATIONS – PUBLIC WAITING – CHANGES HAVE BEEN CLOUDED

n. A453 - ENLARGED PLANS & ELEVATIONS - TOILET ROOMS – CHANGES HAVE BEEN CLOUDED

o. A508 – MILLWORK PLANS & ELEVATIONS – ENTRY FRAMES

p. A534 – INTERIOR DETAILS – CHANGES HAVE BEEN CLOUDED

q. A543 – DETAILS – CEILING – CHANGES HAVE BEEN CLOUDED

r. A545 – DETAILS - CEILING – CHANGES HAVE BEEN CLOUDED

s. A552 - INTERIOR PLAN DETAILS – CHANGES HAVE BEEN CLOUDED

t. A801 – FINISH PLAN – LEVEL 1 – CHANGES HAVE BEEN CLOUDED

u. A810 – FINISH SCHEDULE – 1ST FLOOR – CHANGES HAVE BEEN CLOUDED

v. A820 - FINISH LEGEND & DETAILS – CHANGES HAVE BEEN CLOUDED

6. Parking Garage Drawings:

a. GA301 - BUILDING SECTIONS – CHANGES HAVE BEEN CLOUDED

b. GAS101 – STAIR/ELEVATOR TOWER A ENLARGED PLANS – CHANGES HAVE BEEN CLOUDED

c. GAS102 – STAIR/ELEVATOR TOWER A ELEVATIONS AND SECTIONS – CHANGES HAVE BEEN

CLOUDED

7. Courthouse Specifications:

a. 00 41 13 -Bid Forms

4. REVISIONS TO PREVIOUS ADDENDA

A. No changes to previous Addenda.

5. REVISIONS TO SPECIFICATIONS

A. With the exception of specification sections being issued for the first time, or with major revisions the attached specification sections have text emboldened for additions and stricken for items that have been deleted.

a. 00 41 13 Bid Forms

6. REVISIONS TO DRAWING SHEETS

1. Courthouse Drawings:

a. A001 - LIFE SAFETY PLAN - LEVEL 1 – CHANGES HAVE BEEN CLOUDED

b. A101 - FLOOR PLAN - LEVEL 1– CHANGES HAVE BEEN CLOUDED

c. A101A - FLOOR PLAN - LEVEL 1 - DETAILED CONSTRUCTION – CHANGES HAVE BEEN CLOUDED

d. A101B - FLOOR PLAN - LEVEL 1 - DIMENSIONING PLAN– CHANGES HAVE BEEN CLOUDED

e. A111 - REFLECTED CEILING PLAN - LEVEL 1 – CHANGES HAVE BEEN CLOUDED

f. A112 - REFLECTED CEILING PLAN - LEVEL 2 – CHANGES HAVE BEEN CLOUDED

g. A113 - REFLECTED CEILING PLAN - LEVEL 3 – CHANGES HAVE BEEN CLOUDED

h. A411 – ENLARGED PLAN & RCP – PUBLIC CORRIDORS – CHANGES HAVE BEEN CLOUDED

i. A412 – INTERIOR ELEVATIONS – PUBLIC CORRIDORS – CHANGES HAVE BEEN CLOUDED

j. A415 – ENLARGED PLAN & RCP – PUBLIC CORRIDORS – CHANGES HAVE BEEN CLOUDED

k. A422 – COURTROOM ELEVATIONS – CHANGES HAVE BEEN CLOUDED

l. A423 – TRUANCY COURTROOM & REMOTE TESTIMONY ROOMS ENALRGED PLANS & ELEVATIONS –

CHANGES HAVE BEEN CLOUDED

m. A441 – ENLARGED PLANS & ELEVATIONS – PUBLIC WAITING – CHANGES HAVE BEEN CLOUDED

n. A453 - ENLARGED PLANS & ELEVATIONS - TOILET ROOMS – CHANGES HAVE BEEN CLOUDED

415/445 S. GOVERNORS AVE, DOVER, DE 19901 NEW KENT COUNTY FAMILY COURT BUILDING

June 25, 2024 #MJ0208000001

TEVEBAUGH ARCHITECTURE BID PACK 5B - ADDENDUM 01

TA PROJECT NO. 20004.1 00 91 01 - 3

o. A508 – MILLWORK PLANS & ELEVATIONS – ENTRY FRAMES

p. A534 – INTERIOR DETAILS – CHANGES HAVE BEEN CLOUDED

q. A543 – DETAILS – CEILING – CHANGES HAVE BEEN CLOUDED

r. A545 – DETAILS - CEILING – CHANGES HAVE BEEN CLOUDED

s. A552 - INTERIOR PLAN DETAILS – CHANGES HAVE BEEN CLOUDED

t. A801 – FINISH PLAN – LEVEL 1 – CHANGES HAVE BEEN CLOUDED

u. A810 – FINISH SCHEDULE – 1ST FLOOR – CHANGES HAVE BEEN CLOUDED

v. A820 - FINISH LEGEND & DETAILS – CHANGES HAVE BEEN CLOUDED

2. Parking Garage Drawings:

a. GA301 - BUILDING SECTIONS – CHANGES HAVE BEEN CLOUDED

b. GAS101 – STAIR/ELEVATOR TOWER A ENLARGED PLANS – CHANGES HAVE BEEN CLOUDED

c. GAS102 – STAIR/ELEVATOR TOWER A ELEVATIONS AND SECTIONS – CHANGES HAVE BEEN

CLOUDED

3. BIDDER’S QUESTIONS:

See RFI Log

END OF SECTION

Pre-Bid Meeting Agenda

Date: June 18, 2024 Project: Kent County Family Court Bid Pack 5B Project #: MJ0208000001G Purpose: Review and discuss important related topics pertaining to the bidding requirements of the project with perspective bidders.

Location: S. Governors and Water Streets, Dover, De

Agenda:

Topics for Discussion

Item A Introductions Item B Project Description Item C Allowable Prime Bidders Item D Cost and Availability of Bidding Documents Item E Subcontractor Listing Item F Confirmation of Bid Date and Procedures Item G RFI’s (Request for Interpretation) Item H Substitutions Item I Bid Forms Item J Last Date for Addendums Item K Allowances Item L Unit Prices Item M Alternates Item N Bonds Item O Building Permits Item P Staging Area Item Q Liquidated Damages Item R Time of Completion Items S Questions and Answers Item T Visit the Site of Construction

A. Introductions

1. Individual Introductions:

a) Owner: State of Delaware, Office of Management and Budget, Division of Facilities Management

b) Architects: Tevebaugh Architecture

c) Civil Engineer: Verdantas

d) Mechanical/Electrical Engineer: WSP USA

e) Construction Manager: Wohlsen Construction

f) Contractor Sign in Sheet

B. Project Description

The project involves, but not limited to, Interior Glass and Glazing, Access Flooring, Interior Stone and Tile, Resinous Matrix Terrazo Flooring, Acoustical and Wood Ceilings, Resinous Flooring, Carpet and Resilient Flooring, Painting and Coatings, Specialties Work new Kent County Family Court located in Dover, Delaware.

1. Project Location: 415/445 S. Governors Ave. Dover, DE 19904

2. Owner: State of Delaware. Office of Management and Budget, Division of Facilities

Management, Haslet Armory,122 Martin Luther King Jr. Blvd. South, Dover, DE 19901

a) Consultant(s) to describe summary of their work

C. Allowable Prime Bidders:

1. Trade Contractors

D. Cost and Availability of Bidding Documents

1. The cost of the Bidding Documents per set are defined in the Advertisement to Bid.

2. Bid Documents may be obtained from Wohlsen Construction and may be examined at our office.

3. Only those Bidders on the Bidder Lists prepared by Wohlsen shall be copied via addenda, clarifications, or other bid revisions. Only those who have downloaded or purchased documents will be on the bidders list.

E. Subcontractor listing

Establish Now /Will be listed on new bid form sent in addendum

F. Confirmation of Bid Date & Procedures

1. Current Bid Date: July 11, 2024 @ 2:00 P.M. Bids are to be delivered to State of

Delaware, Division of Facilities Management, Haslet Armory, 122 Martin Luther King Jr. Blvd. South, Dover, De. 19901. Bids will be opened and read aloud in the conference room. Bidder bears the risk of late delivery. Any bids received after the stated time will be returned unopened.

a) No electronic bids allowed.

G. RFI’s (Request for Interpretation)

1. Submit all questions in writing to DVandegrift@wohlsen.com no later than ten (10) days prior to bid due date.

2. Phone calls and verbal statements are not allowable and are not binding per the

General Conditions.

H. Substitutions

1. Product substitutions during Bidding are defined in Division 01, Section 01 60 00

Product Requirements.

2. Bidders must submit a request for substitution fifteen (15) days prior to the bid date.

Physical samples of substitutions should be sent to Tevebaugh Architects, 2 Mill Road, Wilmington, De 19806.

3. Any approved substitutions during the bidding phase will be issued via Addendum.

I. Bid Forms

All of the following shall be submitted in a sealed envelope on or prior to the bid date.

1. Bid Bond

2. Completed Bid Form including all Alternates, Acknowledgement of Addendums, and

Allowances. Do not revise the bid form.

3. Subcontractors Listing Form.

4. Affidavit of Contractor Qualifications.

5. Non-Collusion Certificate.

6. Drug Testing mailto:DVandegrift@wohlsen.com

J. Last Date for Addendums

1. Last date will be July 9, 2024

K. Allowances

1. Include specified amount for allowance.

L. Unit Prices

1. None

1. Alternates

M. Bonds

1. Bid Bond 10% Base Bid amount plus add alternates and submitted with Bid Form.

Form provided.

2. Performance Bond 100% of the Contract amount. Form provided.

3. Payment Bond 100% of the Contract amount. Form provided.

N. Building Permits

1. Review status of building permits. No fees should be associated with the building permit, however, fees associated with electrical, plumbing, etc... should be anticipated by the Contractor.

O. Staging Area

1. Review locations on site where trailers, equipment, offices, and trucks may be stored and/or located.

2. Telephone, water, sewer and power

P. Liquidated Damages

Q. Time of Completion

1. Substantial Completion per schedule.

R. Questions/Answers

1. All questions up until the last date for RFI’s must be submitted in writing to

DVandegrift@wohlsen.com. Only written Addendums become a part of the bidding documents.

S. Visit The Site of Construction

Future visits- Please check in at Wohlsen’s field office- from 7:00 am-3:30 pm

Enclosure: (1) Pre-Bid Meeting Sign-in Sheet

(2) Pre-Bid Meeting Agenda (for distribution to bidders)

Successful bidder will need to obtain a City of Dover business license.

There will be concurrent work on the site during this contract.

Each successful bidder will include 2% for closeout documents on their schedule of values.

This is a Prevailing wage rate project.

mailto:DVandegrift@wohlsen.com

415/445 S. GOVERNORS AVE. DOVER, DE 19904 NEW KENT COUNTY FAMILY COURT BUILDING

June 25, 2024 #MJ0208000001

TEVEBAUGH ARCHITECTURE

TA PROJECT NO. 20004.1 BID FORM BID FORM

00 41 13 - 1

NEW KENT COUNTY FAMILY COURT BUILDING

415/445 S. GOVERNORS AVE., DOVER, DE 19904

#MJ208000001G-BID PACK 5B – CONTRACT 5.1B INTERIOR GLASS & GLAZING

BID FORM

For Bids Due: JULY 11, 2024 To: State of Delaware, Office of Management and

Budget, Division of Facilities Management

122 Martin Luther King Blvd. South, 2nd Floor

Dover, DE 19901

Name of Bidder:

Delaware Business License No.: Taxpayer ID No.:

(Other License Nos.):

Phone No.: ( ) - Fax No.: ( ) -

The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the work described by the aforesaid documents for the lump sum itemized below:

ALLOWANCE NO. 1 – Construction Manager Discretion and approved by the Owner Eighty Thousand Dollars ($80,000) included in above bid.

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

BID FORM TEVEBAUGH ARCHITECTURE

00 41 13 – 2 TA PROJECT NO. 20004.1

NEW KENT COUNTY FAMILY COURT BUILDING

415/445 S. GOVERNORS AVE., DOVER, DE 19904

I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.

This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to this Bid.

The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.

This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.

Should I/We be awarded this contract, I/We pledge to complete all the work required in conformance with the Pre-Bid Construction

Schedule, or with the then current and approved Project Construction Schedules as amended from time to time by the Construction

Manager.

The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws; that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken action in restraint of free competitive bidding.

Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.

I am / We are an Individual / a Partnership / a Corporation

By Trading as

(Individual’s / General Partner’s / Corporate Name)

(State of Corporation)

Business Address:

Witness: By:

( Authorized Signature )

(SEAL)

( Title )

Date:

ATTACHMENTS

Sub-Contractor List

Non-Collusion Statement

Affidavit of Employee Drug Testing Program

Affidavit of Contractor Qualifications

Bid Security

(Others as Required by Project Manuals)

June 25, 2024 #MJ0208000001

00 41 13 - 3

NEW KENT COUNTY FAMILY COURT BUILDING

415/445 S. GOVERNORS AVE., DOVER, DE 19904

#MJ208000001G-BID PACK 5B – CONTRACT 5.1B INTERIOR GLASS & GLAZING

SUBCONTRACTOR LIST

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier contractors, and submit it with your bid.

Subcontractor Category Subcontractor Address (City & State) Subcontractors tax-payer ID # or Delaware Business license #

1.INTERIOR GLASS and GLAZING

A.

B.

C.

2.

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

00 41 13 – 4 TA PROJECT NO. 20004.1

#MJ208000001G-BID PACK 5B – CONTRACT 5.1B INTERIOR GLASS & GLAZING

NON-COLLUSION STATEMENT

This is to certify that the undersigned bidder has neither directly nor indirectly, entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this proposal submitted this date (to the Office of Management and Budget, Division of Facilities Management).

All the terms and conditions of (MJ0208000001G Bid Pack 5B) have been thoroughly examined and are understood.

NAME OF BIDDER:

AUTHORIZED REPRESENTATIVE

(TYPED):

(SIGNATURE):

TITLE:

ADDRESS OF BIDDER:

E-MAIL: ______________________________________________________________

PHONE NUMBER:

Sworn to and Subscribed before me this day of 20 .

My Commission expires . NOTARY PUBLIC .

THIS PAGE MUST BE SIGNED AND NOTARIZED FOR YOUR BID TO BE CONSIDERED.

June 25, 2024 #MJ0208000001

00 41 13 - 5

AFFIDAVIT

OF

EMPLOYEE DRUG TESTING PROGRAM

4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects requires that Contractors and Subcontractors implement a program of mandatory drug testing for Employees who work on Large Public Works

Contracts funded all or in part with public funds.

We hereby certify that we have in place or will implement during the entire term of the contract a Mandatory Drug Testing Program for our employees on the jobsite, including subcontractors, that complies with this regulation:

Contractor/Subcontractor Name:

Contractor/Subcontractor Address:

Authorized Representative (typed or printed):

Authorized Representative (signature):

Title:

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

00 41 13 – 6 TA PROJECT NO. 20004.1

CONTRACTOR QUALIFICATIONS

We hereby certify that we will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration of the contract term.

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, after a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.

Contractor Name:

Contractor Address:

June 25, 2024 #MJ0208000001

00 41 13 - 1

NEW KENT COUNTY FAMILY COURT BUILDING

415/445 S. GOVERNORS AVE., DOVER, DE 19904

#MJ208000001G-BID PACK 5B – CONTRACT 5.2B ACCESS FLOORING

Phone No.: ( ) - Fax No.: ( ) -

The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the

ALLOWANCE NO. 1 – Construction Manager Discretion and approved by the Owner Twenty Thousand Dollars ($20,000)

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.

This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to

The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.

This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.

Should I/We be awarded this contract, I/We pledge to complete all the work required in conformance with the Pre-Bid Construction

Schedule, or with the then current and approved Project Construction Schedules as amended from time to time by the Construction

The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws; that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.

(SEAL)

Non-Collusion Statement

Affidavit of Employee Drug Testing Program

Affidavit of Contractor Qualifications

June 25, 2024 #MJ0208000001

00 41 13 - 3

NEW KENT COUNTY FAMILY COURT BUILDING

415/445 S. GOVERNORS AVE., DOVER, DE 19904

#MJ208000001G-BID PACK 5B – CONTRACT 5.2B ACCESS FLOORING

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier

Subcontractor Category Subcontractor Address (City & State) Subcontractors tax-payer ID #

1. ACCESS FLOORING

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

#MJ208000001G-BID PACK 5B – CONTRACT 5.2B ACCESS FLOORING

This is to certify that the undersigned bidder has neither directly nor indirectly, entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this proposal submitted this date (to

All the terms and conditions of (MJ0208000001G Bid Pack 5B) have been thoroughly examined and are understood.

June 25, 2024 #MJ0208000001

4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects requires that Contractors and Subcontractors implement a program of mandatory drug testing for Employees who work on Large Public Works

We hereby certify that we have in place or will implement during the entire term of the contract a Mandatory Drug Testing Program

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

We hereby certify that we will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, after a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.

June 25, 2024 #MJ0208000001

00 41 13 - 1

NEW KENT COUNTY FAMILY COURT BUILDING

415/445 S. GOVERNORS AVE., DOVER, DE 19904

#MJ208000001G-BID PACK 5B – CONTRACT 5.3B INTERIOR STONE & TILE

Phone No.: ( ) - Fax No.: ( ) -

The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the

ALLOWANCE NO. 1 – Construction Manager Discretion and approved by the Owner One Hundred Thousand Dollars

($100,000) included in above bid.

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.

This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to

The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.

This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.

Should I/We be awarded this contract, I/We pledge to complete all the work required in conformance with the Pre-Bid Construction

Schedule, or with the then current and approved Project Construction Schedules as amended from time to time by the Construction

The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws; that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.

(SEAL)

Non-Collusion Statement

Affidavit of Employee Drug Testing Program

Affidavit of Contractor Qualifications

June 25, 2024 #MJ0208000001

00 41 13 - 3

NEW KENT COUNTY FAMILY COURT BUILDING

415/445 S. GOVERNORS AVE., DOVER, DE 19904

#MJ208000001G-BID PACK 5B – CONTRACT 5.3B INTERIOR STONE & TILE

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier

Subcontractor Category Subcontractor Address (City & State) Subcontractors tax-payer ID #

1.INTERIOR STONE & TILE

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

#MJ208000001G-BID PACK 5B – CONTRACT 5.3B INTERIOR STONE & TILE

This is to certify that the undersigned bidder has neither directly nor indirectly, entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this proposal submitted this date (to

All the terms and conditions of (MJ0208000001G Bid Pack 5B) have been thoroughly examined and are understood.

June 25, 2024 #MJ0208000001

4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects requires that Contractors and Subcontractors implement a program of mandatory drug testing for Employees who work on Large Public Works

We hereby certify that we have in place or will implement during the entire term of the contract a Mandatory Drug Testing Program

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

We hereby certify that we will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, after a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.

June 25, 2024 #MJ0208000001

00 41 13 - 1

NEW KENT COUNTY FAMILY COURT BUILDING

415/445 S. GOVERNORS AVE., DOVER, DE 19904

#MJ208000001G-BID PACK 5B – CONTRACT 5.4B RESINOUS MATRIX TERRAZZO FLOORING

Phone No.: ( ) - Fax No.: ( ) -

The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the

ALLOWANCE NO. 1 – Construction Manager Discretion and approved by the Owner Ninety Five Thousand Dollars

($95,000) included in above bid.

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.

This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to

The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.

This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.

Should I/We be awarded this contract, I/We pledge to complete all the work required in conformance with the Pre-Bid Construction

Schedule, or with the then current and approved Project Construction Schedules as amended from time to time by the Construction

The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws; that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.

(SEAL)

Non-Collusion Statement

Affidavit of Employee Drug Testing Program

Affidavit of Contractor Qualifications

June 25, 2024 #MJ0208000001

00 41 13 - 3

NEW KENT COUNTY FAMILY COURT BUILDING

415/445 S. GOVERNORS AVE., DOVER, DE 19904

#MJ208000001G-BID PACK 5B – CONTRACT 5.4B RESINOUS MATRIX TERRAZZO FLOORING

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier

Subcontractor Category Subcontractor Address (City & State) Subcontractors tax-payer ID #

1.RESINOUS MATRIX

TERRAZZO FLOORING

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

#MJ208000001G-BID PACK 5B – CONTRACT 5.4B RESINOUS MATRIX TERRAZZO FLOORING

This is to certify that the undersigned bidder has neither directly nor indirectly, entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this proposal submitted this date (to

All the terms and conditions of (MJ0208000001G Bid Pack 5B) have been thoroughly examined and are understood.

June 25, 2024 #MJ0208000001

4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects requires that Contractors and Subcontractors implement a program of mandatory drug testing for Employees who work on Large Public Works

We hereby certify that we have in place or will implement during the entire term of the contract a Mandatory Drug Testing Program

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

We hereby certify that we will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, after a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.

June 25,2024 #MJ0208000001

00 41 13 - 1

NEW KENT COUNTY FAMILY COURT BUILDING

415/445 S. GOVERNORS AVE., DOVER, DE 19904

#MJ208000001G-BID PACK 5B – CONTRACT 5.5B ACOUSTICAL & WOOD CEILINGS

Phone No.: ( ) - Fax No.: ( ) -

The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the

ALLOWANCE NO. 1 – Construction Manager Discretion and approved by the Owner One Hundred Thousand Dollars

($100,000) included in above bid.

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.

This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to

The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.

This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.

Should I/We be awarded this contract, I/We pledge to complete all the work required in conformance with the Pre-Bid Construction

Schedule, or with the then current and approved Project Construction Schedules as amended from time to time by the Construction

The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws; that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.

(SEAL)

Non-Collusion Statement

Affidavit of Employee Drug Testing Program

Affidavit of Contractor Qualifications

June 25,2024 #MJ0208000001

00 41 13 - 3

NEW KENT COUNTY FAMILY COURT BUILDING

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier

Subcontractor Category Subcontractor Address (City & State) Subcontractors tax-payer ID #

1.ACOUSTICAL & WOOD

CEILINGS

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

This is to certify that the undersigned bidder has neither directly nor indirectly, entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this proposal submitted this date (to

All the terms and conditions of (MJ0208000001G Bid Pack 5B) have been thoroughly examined and are understood.

June 25,2024 #MJ0208000001

4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects requires that Contractors and Subcontractors implement a program of mandatory drug testing for Employees who work on Large Public Works

We hereby certify that we have in place or will implement during the entire term of the contract a Mandatory Drug Testing Program

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

We hereby certify that we will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, after a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.

June 25, 2024 #MJ0208000001

00 41 13 - 1

NEW KENT COUNTY FAMILY COURT BUILDING

415/445 S. GOVERNORS AVE., DOVER, DE 19904

#MJ208000001G-BID PACK 5B – CONTRACT 5.6B RESINOUS FLOORING

Phone No.: ( ) - Fax No.: ( ) -

The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the

ALLOWANCE NO. 1 – Construction Manager Discretion and approved by the Owner Fifteen Thousand Dollars ($15,000)

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.

This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to

The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.

This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.

Should I/We be awarded this contract, I/We pledge to complete all the work required in conformance with the Pre-Bid Construction

Schedule, or with the then current and approved Project Construction Schedules as amended from time to time by the Construction

The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws; that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.

(SEAL)

Non-Collusion Statement

Affidavit of Employee Drug Testing Program

Affidavit of Contractor Qualifications

June 25, 2024 #MJ0208000001

00 41 13 - 3

NEW KENT COUNTY FAMILY COURT BUILDING

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier

Subcontractor Category Subcontractor Address (City & State) Subcontractors tax-payer ID #

1.RESINOUS FLOORING

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

This is to certify that the undersigned bidder has neither directly nor indirectly, entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this proposal submitted this date (to

All the terms and conditions of (MJ0208000001G Bid Pack 5B) have been thoroughly examined and are understood.

June 25, 2024 #MJ0208000001

4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects requires that Contractors and Subcontractors implement a program of mandatory drug testing for Employees who work on Large Public Works

We hereby certify that we have in place or will implement during the entire term of the contract a Mandatory Drug Testing Program

NEW KENT COUNTY FAMILY COURT BUILDING 415/445 S. GOVERNORS AVE. DOVER, DE 19904

#MJ0208000001 June 25, 2024

We hereby certify that we will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, after a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.

415/445 S. GOVERNORS AVE. DOVER, DE 19904 NEW KENT COUNTY FAMILY C

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
Wage Rates —
RFP - Public Works —
Specifications —
Drawings —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .