Addendum 1 (Design) - 22184.doc
DOC document 35 KB Posted
- Solicitation number
- RFP - 171 - 220000001686
- Issued by
- Ionia County, Michigan
About this file
This document is Addendum 1 (Design) for a state contract opportunity issued by the Michigan Department of Technology, Management, and Budget (DTMB) for the Ionia Eastbound Scale - Demolish and Construct a New Weigh Station project. The addendum provides additional details and clarifications for the professional services contractor (PSC) to include in their proposal, such as requirements for a survey, soil borings and geotechnical reporting, septic system application and test hole, and subcontracting material testing. It also includes references to attached site-related documents and the pre-proposal meeting attendance sheet. The proposal is due on April 7, 2022 for this project located in Ionia County, Michigan.
The addendum specifies that the reimbursable costs for the PSC should include the additional survey, soil borings, septic system application, and material testing requirements. It also notes the availability of site-related documents and the pre-proposal meeting attendance sheet for reference. No further details are provided on pricing terms, set asides, funding sources, or other salient contract information.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DMB-406 (R 3/11)
STATE OF MICHIGAN
Date Issued: March 31, 2022
Department of Technology, Management and Budget
Design and Construction Division File No: 551/22184.CAK P.O. Box 30026 Department: MSP
Lansing, MI 48909 Project Name: Ionia Eastbound Scale – Demolish and Construct a New Weigh Station Proposal Due Date: April 7, 2022
ADDENDUM NO. 1
TO:
All Design Professionals
SUBJECT:
Ionia Eastbound Scale – Demolish and Construct a New Weigh Station Item 1. The Professional Services Contractor (PSC) should include as a reimbursable cost a survey as required for the new building, septic system, scale pit and concrete paving on either side of the scale.
Item 2. The PSC should include as a reimbursable cost soil borings and geo-technical reporting as required for all areas with subgrade work. The use of ground penetrating radar to identify unknown subgrade conditions and utilities is also recommended.
Item 3. The PSC should include as a reimbursable expense the cost for processing a septic system application and a test hole as required by the County Health Department.
Item 4. The PSC should include the cost as a reimbursable expense of subcontracting material testing as required by the specifications during construction.
Item 5. Refer to the following attachments for site-related reference: Alignment Report, Road Base-Plan, Road Base-Plan Soil Borings, and EB Low Level Inspection Light Layout.
Item 6. The Pre-Proposal Meeting Attendance Sheet is attached for reference.
ACKNOWLEDGEMENT: A copy of this Addendum, properly signed in the space provided below, must be acknowledged and returned with the bidder's proposal for submission of a valid proposal. The changes and information shall become part of the contract documents. (Authority: 1984 PA 431)
Firm Name
PSC's Signature
Date
Sincerely, Chris Kulhanek, RA DTMB – Design and Construction C:\Documents\Word\Forms\Addendum.doc