This document is an Addendum 1 Cover Document for Bid No. 07-25 issued by the City of DeBary, Florida, covering two separate collapsed pipe replacement projects at 430 Summerhaven Drive and 408/410 N Pine Meadow Drive. The addendum, dated June 10, 2025, provides updated bid documentation for a construction project involving drainage infrastructure rehabilitation, with a bid submission deadline of June 30, 2025. The addendum includes revised bid forms, construction site plans, and specific instructions for contractors regarding survey and layout requirements, performance and payment bonds, utility coordination with Duke Energy, and technical specifications for pipe removal, backfill, and compaction.
The addendum outlines detailed technical requirements for the project, including specific guidelines for survey work, property line staking, and construction easements. Contractors are required to employ a professional land surveyor for layout and staking, provide as-built documentation, and use a certified testing laboratory for density testing of backfill materials. The project specifications mandate precise construction methods, such as saw-cutting existing pavement, removing and disposing of existing infrastructure, and achieving specific compaction densities (98% of modified proctor under pavement and 95% elsewhere). The City will secure temporary construction easements and pay Duke Energy for temporary power pole support, indicating a comprehensive approach to managing the infrastructure replacement project.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
June 10, 2025
City of DeBary - Bid No. 07-25 430 Summerhaven Drive and 408/410 N Pine Meadow Drive
Collapsed Pipe Replacement Project
ADDENDUM 1 – COVER DOCUMENT
BID DATE – JUNE 30, 2025
The following items and attached documents are hereby included to amend and supplement the Contract Bid Documents of the City of DeBary, 430 Summerhaven Drive – Collapsed Pipe Replacement Project, Bid No. 07-25.
BID DOCUMENTS INCLUDED IN ADDENDUM 1 ARE LISTED BELOW;
Addendum 1 – Cover Document
Construction Site Plan – 408/410 N Pine Meadow Drive
Bid Form – Addendum 1
Item No. 1 – Addendum 1 – Bid No. 07-25 includes two separate projects; the 430 Summerhaven Drive Collapsed Pipe project and the 408/410 N Pine Meadow Drive Collapsed Pipe Project. The Contract Bid documents for the 408/410 N Pine Meadow Project are included with this Addendum 1.
Item No. 2 – Addendum 1 – The Bid Form - Addendum 1, shall be the document submitted with the Bidder’s Proposal. The Bid Form issued with the Advertisement for Bids on June 4, 2025 shall be deleted from the Contract Documents.
Item No. 3 – Addendum 1 – Pay Item 101-1 – Performance and Payment Bonds – Payment to the Contractor for providing Performance and Payment Bonds as required according to the Instructions to Bidders, Article 18 shall made be from Pay Item Pay Item 101-1.
Item No. 4 – Addendum 1 – Survey and Construction Layout and As-Built Drawings – Pay Item 101-2 and Pay Item A-101-2
The Contractor shall have a professional land surveyor provide layout and staking of the drainage easement shown on the Construction Plan for 430 Summerhaven Drive.
Payment to the Contractor for this survey work shall be made under Pay Item 101-2.
The Contractor shall have a professional land surveyor provide layout and staking of the property line that separates 408 N Pine Meadow Drive from 410 N Pine Meadow Drive. A parallel ten foot offset line will be staked on each side of the property line and the Contractor shall work within the 20 width to remove and replace the existing stormwater pipe. The City will secure a Temporary Construction Easement from the Property Owner for the 10 feet space on each side of the property line.
As-Built Documentation shall be provided by a professional Land Surveyor and shall include documentation of the pipe invert elevations at points of connection to structures, notation of the type of pipe installed and top elevations of the structures at each end of the replaced pipe.
Item No. 5 – Addendum 1 - Pay Item 110-4 – Remove and Disposal of Existing Asphalt Pavement and 24” Corrugated Metal Pipe. The Contractor shall saw cut the existing asphalt pavement 6” inside the drainage easement line and also the concrete curb as required for removal and disposal of the asphalt pavement, concrete curb and the existing corrugated metal pipe.
Item No. 6 – Addendum 1 - Pay Item No. 1050-1 and A – 1050-1 – Utility Coordination - Refer to Special Provisions Article 17 – Contractor to coordinate with Duke Energy. City will pay Duke Energy for temporary support of power poles as required.
Item No. 7 – Addendum 1 - Backfill and compaction of pipe trenches shall be done in 12” maximum lifts and the Contractor shall employ a certified testing laboratory for density testing of each 12” lift. Compaction density shall be 98% of modified proctor under pavement and 95% of modified proctor otherwise.
END OF ADDENDUM 1 – COVER DOCUMENT