This Addendum No. 1 document, issued by Foresite Design Inc. on November 6, 2026, modifies the RFP 2627-04 for Troy School District's Larson Middle School 2027 Track Renovations project located in Troy, Michigan. The addendum provides clarifications and modifications to the original bid documents for a comprehensive athletic track field replacement project. Key revisions include updated bid submission deadlines to 11:00 AM Local Time on Friday, November 13, 2026; email address corrections to purchasingoffice@troy.k12.mi.us; reclassification of specification sections between bid categories (moving Field Event Construction from Category A to Category B, and adding Lawn specifications to Category D); and clarification that pavement between the track and fencing shall be concrete rather than asphalt. The addendum includes a new Section 32 9230 – Lawn specification detailing seeding requirements, maintenance protocols, and a two-year warranty beginning at acceptance. Site visits must be scheduled in advance with Mark Paulus at lecoleplanners3@gmail.com or (248) 880-6791. Questions should be directed to lecoleplanners3@gmail.com or through BuildingConnected.com.
The project encompasses a six-lane, 400-meter all-weather track surface with associated athletic facilities including high jump, long jump with sand pit, shot put pad, and field event areas. Multiple bid categories address Earthwork/Site Utilities, Asphalt and Concrete, and Landscaping work. The addendum addresses critical scope questions regarding topsoil placement, subgrade preparation, temporary irrigation costs, fence installation sequencing, and contractor responsibilities for various work elements. This is not a prevailing wage project. The seeding specifications require application between August 15 and October 15, with an athletic field seed blend of 80% Kentucky Bluegrass and 20% Perennial Ryegrass, applied at 110 pounds per acre. Contractors must provide a comprehensive maintenance program including mowing at least twice weekly at 3 to 3.5 inches height, fall and spring aeration, and specialized fertility programs. Receipt of Addendum No. 1 must be noted on the proposal form, with failure to do so potentially subjecting bidders to disqualification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Advertisement For Bid - RFP #2627-04 Larson MS 2027 Track Renovations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 1
Project: RFP NUMBER 2627-04 – TROY SCHOOL DISTRICT LARSON MIDDLE SCHOOL
2027 TRACK RENOVATIONS
Bid Due date: 11:00 AM Local Time, Friday, November 13, 2026 (REVISED)
This Addendum is issued as modifications to the RFP previously issued to provide clarifications to the scope of work. This Addendum supersedes the original RFP. This along with the RFP becomes the bid documents.
I. General Information
1. For questions e-mail lecoleplanners3@gmail.com or through Buildingconnected.com.
2. Any bidder requesting to visit the site should contact Mark Paulus at lecoleplanners3@gmail.com or (248) 880-6791 to schedule a time. No bidder shall visit the building without scheduling it with Mark Paulus.
3. Addendum #1 as prepared by Foresite Design Inc. dated November 6, 2026 (attached)
4. Advertisement Paragraph 2, Revise Sentence 3. “Bids are to be submitted no later than 11:00 AM Local Time FRIDAY, NOVEMBER 13, 2026.”
5. Bid Package. Page 1, Revise email address: “purchasingoffice@troy.k12.mi.us”
6. Bid Package. Page 2, Revise Article 1.2. “DUE DATE FOR PROPOSALS: 11:00 a.m. Local
Time, November 13. 2026.”
7. Bid Package. Page 2, Revise Article 2.1. “The Due Date for receipt of Proposals is:
Friday, November 13. 2026 at 11:00 a.m. Local Time (the “Due Date”)
8. Bid Package. Page 7. Bid Category A – Earthwork/Site Utilities. Basic Specification
Section. Delete 11 6840 Field Event Construction.
9. Bid Package. Page 8. Bid Category B – Asphalt and Concrete. Basic Specification
Section. Add 11 6840 Field Event Construction.
10. Bid Package. Page 9, Bid Category D – Landscaping, Basic Specification Sections, Add
329230 Lawn.
II. Questions & Answers
Q1. Native planting area: whose scope is it, and which specification supplies (seed mix, rate, maintenance)? Specification section 32 9230 Lawn is missing.
A1. This addendum includes specification section 32 9230 which specifies the native planting area seed application, maintenance, and warranty. Specification section is included in bid category D. Refer to sheet LD1.06 for native seed mix.
mailto:lecoleplanners3@gmail.com
Q2. What bid category places the topsoil, and with what mix: 31 2005 (Category A, sand/peat blend) or 32 9119 (Category D)?
A2. Bid Category D – Landscaping places the topsoil. The topsoil shall be installed per specification section 31 2005 – Earthwork (Athletics) and furnished per specification section 32 9119 – Topsoil.
Q3. Does Category A leave subgrade 2" or 4" below finish grade?
A3. Bid Category A is responsible to leave the lawn and sod area 4” below finish grade.
Q4. Does Category A haul off the current vegetation and separate the stockpiled topsoil?
A4. Bid Category A is responsible for separating the stockpiled topsoil and haul off the vegetation.
Q5. Water source and meter for temporary irrigation. Who pays for the water?
A5. The temporary irrigation shall be obtained from a nearby fire hydrant and the cost of all items for the temporary irrigation is the responsibility of Bid Category D – Landscaping.
Q6. Is there a current irrigation system? How will sod be kept alive? As soon as temporary irrigation is removed the sod will die.
A6. Bid Category D – Landscaping shall provide temporary irrigation until the District directs the contractor to remove.
Q7. Is the warranty 1 year (specifications) or 2 years (RFP and contract), and does it start at completion or at lawn acceptance?
A7. All warranties shall be 2 years and it starts at acceptance.
Q8. Will the Landscape Architect allow summer seeding for general restoration and Alternate #1, or should those be scheduled for the August 15 – October 15 window?
A8. The seeding shall be placed per the specification August 15 to October 15 and approved by Foresite Design Inc.
Q9. Is the intent for the fence posts in the sidewalk to be installed prior to the concrete sidewalk being poured or do we need to figure core drilling for those fence posts?
A9. Gates, corners, and all terminal posts shall be installed prior to concrete. Line posts may be cored post concrete installation. Protect all posts from concrete slurry.
Q10. Are prevailing wages required for this project?
A10. This is not a prevailing wage project.
Q11. Please confirm the height of the fence.
A11. The fence height is 4’ high.
Q12. Is the Plexitrac Accelerator manufacturer by ICP Building Solutions Group acceptable?
A12. This is not acceptable.
Q13. The fence supplier has informed us that domestically manufactured schedule 40 pipe is basically non-existent as the primary manufacturer of that pipe no longer makes pipe for the fencing industry. Please advise if SS40, a pipe made specifically for the fence industry, is an acceptable substitution.?
A13. SS40 may be bid as a voluntary alternate. Product must meet or exceed performance criteria outlined in the specifications.
Q14. Is the trench drain supposed to be installed by Bid Category B – Asphalt and Concrete or Bid Category A Earthwork/Site Utilities?
A14. The trench drain shall be installed by bid category B Asphalt and Concrete including the concrete encasement. Bid Category A Earthwork/Site Utilities shall connect the piping to the trench drain.
Q15. What bid category is responsible for street sweeping?
A15. Each contractor is responsible for street sweeping and clean up from their own work.
Q16. What bid category is responsible for per permit?
A16. Bid Category A – Earthwork/Site Utilities per the proposal form as an allowance.
Q17. What bid category is responsible for private utility locating?
A17. Bid Category A – Earthwork/Site Utilities per include work scope item #1
Q18. What bid category is responsible for the undercutting allowance?
A18. Bid Category A – Earthwork/Site Utilities per the proposal form.
Q19. What bid category is responsible of placement of the topsoil?
A19. Bid category D – Landscaping.
Q20. Since the track is new, is there a need for track surface protection?
A20. Each contractor must provide track surface protection for the own work per the specification after placement of the new track surfacing.
END
FORESITE DESIGN, Inc. | 26777 Central Park Blvd, Suite 125 | Southfield, MI 48076 | foresitedesign.com
ADDENDUM NO. 1
Issue Date: November 6, 2026
Project Name: Troy School District
2027 Larson Track Renovation
This Addendum is issued prior to the receipt of Bids to clarify, modify or interpret the Bid Documents by additions, deletions, clarifications, or corrections. This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents. All requirements contained in the Contract Documents shall apply to this Addendum. All incidental work necessary to complete the work shall be included in the Contractor’s Proposal even though not particularly mentioned. Parts of the Specifications and Drawings referred to herein supersede previously issued data and shall form a part of the Bid Documents.
Receipt of this Addendum should be noted on the proposal form; failure to do so may subject Bidder to disqualification.
NEW OR REVISED DOCUMENTS ISSUED WITH THIS ADDENDUM
Project Manual Documents: Section 32 9230
Drawings: L1.01, LD1.01
PROJECT MANUAL DOCUMENTS DELETED OR REVISED
Item No. 1 Refer to Section 32 9230 – Lawn (New Issue)
DRAWINGS DELETED OR REVISED
Item No. 1 Reference: Drawing L1.01 Site Plan (re-issued)
A. Revised pavement between track and fencing to be concrete in lieu of asphalt
Item No. 2 Reference: Drawing LD1.01 Track & Field Event Details (re-issued)
A. Revised track section detail to clarify that pavement between the track and fence shall be concrete, not asphalt.
END OF ADDENDUM NO. 1
cc: FDI File
TROY SCHOOL DISTRICT 2027 TRACK RENOVATIONS
LARSON MIDDLE SCHOOL BID PACKAGE 1A
TROY, MICHIGAN ADDENDUM #1
©FORESITE DESIGN, INC. 32 9230 - 1
LAWN
SECTION 32 9230 - LAWN
PART 1 GENERAL
1.1 SUMMARY
A. This Section is a part of the entire set of Contract Documents and shall be coordinated with the applicable provisions of the other parts.
B. Related Sections:
1. Section 31 2000 Earthwork - Athletics
2. Section 32 9119 Topsoil.
1.2 SCOPE
A. The work under this section of the specifications shall consist of furnishing all labor, materials and equipment necessary for seeding and services required to complete all lawn maintenance as specified herein.
1.3 QUALITY ASSURANCE
A. Submit to Landscape Architect for prior approval, samples and certified analysis of fertilizer.
B. Submit to Landscape Architect for prior approval the resume of the turf grass consultant to be employed.
C. Grass seed shall meet the tolerance for germination and purity of the Official Seed Analysis of North America.
D. The Contractor, and its Subcontractors, shall provide a staff adequate to coordinate and expedite the work properly and shall maintain competent supervision of its own work to insure compliance with contract requirements.
E. Submit all seed tags after completion of seeding.
1.4 SUBMITTALS
A. Product Data: Submit data for seed mix, fertilizer, mulch and other accessories.
B. Submit seed vendor’s certification for required grass seed mixture, identifying percentage by weight, and percentage of purity, germination, and weed seed for each grass species.
©FORESITE DESIGN, INC. 32 9230 - 2
C. Manufacturer’s Certificate: Certify products meet or exceed specified requirements.
1.5 DELIVERY, STORAGE AND HANDLING
A. Deliver grass seed in original containers showing analysis of seed mixture, percentage of pure seed, year of production, net weight, date of packaging and location of packaging. Damaged packages are not acceptable.
B. Deliver fertilizer in waterproof bags showing weight, chemical analysis, and name of manufacturer.
1.6 EXISTING CONDITIONS
A. Turfgrass establishment contractor shall inspect finish grade for acceptability. Beginning work means acceptance of existing conditions.
PART 2 PRODUCTS
2.1 SEED
A. Seed shall be provided from one of the following suppliers:
1. EcoGreen Supply- 616-877-5326.
2. John Deere Landscapes - (800) 347-4272 (now Site One Landscapes).
3. TurfGrass, Inc. - (248) 437-1427 (now Residex).
4. Commerce Corp. - (800) 243-4769- closed (now BFG).
5. Rhino Seed & Supply - (800) 482-3130.
6. Michigan State Seed Solutions - (800) 647-8873 (now Lacrosse Seeds).
7. Tri Turf - (800) 636-7039.
B. Contractors shall seed all areas disturbed during construction and not otherwise developed or indicated to be sodded. Topsoiling, finish grading and fertilization is to remain the same.
*Seed shall be new crop, cleaned, and comprising of the following varieties:
1. Athletic Field Seed blend shall consist of a minimum of 3 of the listed bluegrass varieties and one of the listed ryegrass varieties. Blend shall be 80% Kentucky Bluegrass and 20% Perennial Ryegrass by weight. Only Elite bluegrasses (according to NTEP characteristics ratings) will be allowed on Athletic surfaces. No “named common” types will be accepted. Enhanced Elite varieties will be allowed at same seeding rates.
2. General Seeding Areas: “Varieties Named” blend shall be 50-60% Kentucky Bluegrass and 40-50% Perennial Ryegrass by weight for irrigated fields. A “Varieties Named” blend of 60-70% bluegrass, 30-40% perennial ryegrass for non-irrigated fields, and a blend of 20-40% bluegrass, 20-40% perennial rygrass and 20-30% creeping red fescue for general turf areas.(VNS-varieties not stated- blends will not be accepted).
©FORESITE DESIGN, INC. 32 9230 - 3
3. Athletic Fields
Seed Varieties Purity Germination
Shannon Kentucky Bluegrass 95% 85%
Lunar Kentucky Bluegrass 95% 85%
SPF 30 Kentucky Bluegrass 95% 85%
Fullback Kentucky Bluegrass 95% 85%
Midnight Kentucky Bluegrass 95% 85%
Hampton Kentucky Bluegrass 95% 85%
Gaelic Kentucky Bluegrass 95% 85%
BlueBank Kentucky Bluegrass 95% 85%
Noble Kentucky BluegrasS 95% 85%
Touchdown Kentucky Bluegrass 95% 85%
Salinas Perennial Ryegrass 95% 85%
Gray Star Perennial Ryegrass 95% 85%
Sox Fan Perennial Ryegrass 95% 85%
4. General Seeding Areas
Seed Variety Purity Germination
Shannon or Bluestar Kentucky Bluegrass 98% 85%
Gaelic or Corsair Kentucky Bluegrass 98% 85%
Lunar or Avalanche Kentucky Bluegrass 98% 85%
Gray Star or Salinas Perennial Ryegrass 98% 90%
SoxFan or Showtime Perennial Ryegrass 98% 90%
Charger 2 Perennial Ryegrass 98% 90%
Oracle Creeping Red Fescue 98% 85%
2.2 COMMERCIAL FERTILIZER
A. Fertilizer shall be uniform in composition, free-flowing and suitable for application with approved spreader, granular or pelleted with 50 percent (50%) of total nitrogen derived from a synthetic or natural organic material, delivered in original unopened containers with the analysis, type and trade name attached to each container. The composition shall be:
1. Fertilizer "A": applied at the time of seeding at 50 lbs. per 8000 square feet.
a. 16-32-4 (14.3% Ammoniacal Nitrogen, 1.7% Urea Nitrogen, 32% Phosphorus, 4% Available Potassium (SOP).
2. Fertilizer "B": applied 3-4 weeks after seeding at 50 lbs. per 8,000-10,000 square feet.
©FORESITE DESIGN, INC. 32 9230 - 4
a. 22-16-6 (6.3% Ammoniacal Nitrogen, 15.7% Urea Nitrogen, 16% Phosphorus, 6% Soluble Potassium.
3. Fertilizer “C” for enhanced establishment program (seed in lieu of sod).
a. 5-5-5 with Mycorrhiza (1.7% Ammoniacal Nitrogen, 3.3% Water Insoluble Nitrogen, 5% Available Phosphorus, 5% Available Potassium, 4% Calcium, 2.5% Magnesium,.2% Copper, 5% Iron,.2% Manganese,.2% Zinc, complete Mycorrhiza and Bacterial Package.
4. Fertilizer “D” for enhanced establishment program (seed in lieu of sod).
a. 15-0-7 with Broad Spectrum Innoculant (bacterial package(.75% Ammoniacal
Nitrogen, 3.75% Urea Nitrogen, 3.50% other water soluble nitrogen, 7% water insoluble nitrogen, 7% soluble potash, 1% Calcium,.5% Magnesium, 1% Sulphur,.1% Copper, 1% Iron,.5% Manganese,.1% Zinc. 100% slow release nitrogen derived from Feather Meal and Methylated Urea.
B. Complete Soil testing for both fertility (including micronutrients, CEC, pH) and particle size is required on all new establishment sites.
C. A critical establishment fertilizer application comes at planting whereas fertilizer in a ratio of 2-4-1 is applied directly adjacent to the seed to compensate for the seeds inability to extract phosphorus and other nutrients out of the soil Usually approx. 1lb. of P205 is applied with ½ lb. of N and ¼- ½ lb of K20 is applied. An analysis of 16-32-4 would be an example.
Fertilizer ingredients with lower chloride index are preferred at seeding, such as Ammonium Sulfate and Sulfate of Potash.
PART 3 EXECUTION
3.1 PREPARATION
A. Protect existing underground improvements from damage.
B. Remove all foreign materials, plants, roots, stones, and debris larger than 1" in any dimension from site. Do not bury foreign material.
C. Loosen soil to a depth of six inches (6) in lawn areas by approved method of scarification and grade to remove ridges and depressions. Remove all stones or foreign matter from top two inches (2") of soil.
1. Soil testing will occur to identify fertility and soil texture characteristics.
2. Following rotovating, entire area to be worked with a landscape tool designed to smooth and firm seed bed equal to a drill landscaping tool.
3. Seed is to be applied by seed drill in two passes at approximately opposing 45 degree angles on every surface where feasible. There will be areas where only parallel rows are possible- these areas should still receive parallel passes.
4. At planting apply fertilizer “A” (or Alternates “C” and “D”).
5. If above steps have had rain in sufficient quantity to cause soil to recompact, entire steps are to be done prior to seeding.
©FORESITE DESIGN, INC. 32 9230 - 5
D. Where no grades are shown, areas shall have a smooth and continual grade between existing or fixed controls and elevations shown on plans. Roll, scarify, rake and level as necessary to obtain true, even lawn surfaces. All finish grades shall meet approval of the Owner.
E. Grade lawn areas to finish grades, filling as needed or removing surplus dirt and floating areas to a smooth, uniform grade as indicated on grading plans. All lawn areas shall slope to drain.
3.2 AT SEEDING FERTILIZER
A. Broadcast spread fertilizer “A” (or Alternates “C” and “D”) after seeding at a rate of 2 lbs. of Phosphorus per 1000 square feet. (Apply Alternate “C” at 50 lbs. per 5000 square feet and Alternate “D” at 50 lbs. per 10,000 square feet.).
3.3 MOWING
A. Contractor shall mow the field(s) at least twice a week once the blades reach a minimum 3” in height. Mowing will heights will be at least 3 to 3.5” above grade. Heights will be adjusted.
Contractor shall be responsible for mowing a minimum 15 cuttings until approved by Owner and Landscape Architect.
3.4 AERATION
A. The contractor shall aerate the field(s) at least one time in the spring and once in the fall.
Additional procedures may be needed if required by the turf grass consultant at no additional charge. Contractor shall notify the Owner’s Representative a minimum 72 hours in advance of scheduled aeration.
3.5 SEEDING
A. Seeding shall be applied at a rate of 110 lbs per acre, or 2-3 lbs. per 1000 square feet on all Athletic field surfaces. All General seeding areas (Non-Athletic) shall be applied at 200 lbs. per acre or 4-5 lbs. per 1000 square feet. Application shall be accomplished in two directions, at opposing 45 degrees, utilizing one half of the total quantity during each seeding application.
3.6 ESTABLISHMENT FERTILITY PROGRAM
A. At seeding apply Fertilizer “A” at 2 lbs. Phosphorus per 1000 square feet. (50 lbs. per 8000 square feet).
B. 14-21 days after seeding, apply Fertilizer “B” at 1 lbs. Phosphorus per 1000 square feet. (50 lbs per 8,000 square feet).
©FORESITE DESIGN, INC. 32 9230 - 6
C. 42 days after seeding, apply Fertilizer “B” at 1 lbs. Nitrogen per 1000 square feet. (50 lbs. per 11,000 square feet).
3.7 ALTERNATE FERTILITY PROGRAM FOR ENHANCED ESTABLISHMENT (SOD ALTERNATIVE)
A. At seeding, apply Fertilizer “C” at 50 lbs. per 3500 square feet and Fertilizer “D” at 50 lbs. per 7500 square feet.
B. 21 days after seeding apply Fertilizer “D” at 50 lbs. per 7500 square feet.
C. 49 days after seeding apply Fertilizer “D” at 50 lbs. per 7500 square feet.
D. 84 days after seeding apply Fertilizer “D” at 50 lbs. per 7500 square feet.
3.8 ALTERNATE FERTILIZATION
A. Contractor shall fertilize the field(s) utilizing the fertilization guide provided. Actual products and the rate of application shall be adjusted by the turf grass consultant to be employed by the lawn maintenance contractor.
B. General Fertility Recommendations for Athletic Fields Without Irrigation.
1. 3-4 lbs. Nitrogen, 1.5 lbs. Potassium per season
Time of Year Rate
(lb. N/1000 ft²)
Fertilizer Ratio (N-P-K)
Examples to Purchase
Nitrogen Source
May 20-30 1.25 2-0-1 23-0-17 33-0-8 (60%Poly-coated)
> 50% soluble Nitrogen
September 1-10 1.25 2-0-1 23-0-17 33-0-8 (60% Poly-coated)
> 50% soluble Nitrogen
November 1-10 1.25 2-0-1 23-0-17 33-0-8 (60% Poly-coated)
< 50% soluble Nitrogen
©FORESITE DESIGN, INC. 32 9230 - 7
C. General Fertility Recommendations Forathletic Fields with Irrigation.
1. 5-6 lbs. Nitrogen, 2 lbs of Potassium per season
Time of Year Rate
(lb. N/1000ft2)
FFertilizer Ratio (N-P-K)
Examples to Purchase
Nitrogen Source
April 1 0.75 3-2-1 22-16-6 >50% soluble Nitrogen
May 25 0.60 2-0-1 23-0-17 24-0-10
>50% soluble Nitrogen
July 1 0.50 2-0-1 23-0-17 24-0-10
>50% soluble Nitrogen
August 25 0.50 2-0-1 23-0-17 24-0-10
>50% soluble Nitrogen
October 1 0.50 2-0-1 23-0-17 24-0-10
>50% soluble Nitrogen
November 15 0.50 3-2-1 22-16-6 >50% soluble Nitrogen
D. Please Note: Mow to match growth rate. Mowing frequently will be less during summer months as fertility levels will be lower and growth rate less. Obviously, this translates to an overall weaker turf stand, but without irrigation it is difficult to produce high quality turf in sandy loam and loamy sand soils. The mowing height should be 2.5-3”, and should be mowed with a rotary mower.
3.9 SEEDING
A. Dates of Seeding:
1. Grass seed shall be sown in the fall from August 15th until October 15th or in the spring between March 1st and May 15th or at such other times as approved by the Landscape Architect. All seeding is to be done in dry or moderately dry soil and at times when the wind does not exceed a velocity of five (5) miles per hour.
2. If special conditions exist, which may warrant a variance in the above dates, submit a written request to the Landscape Architect stating the conditions and proposed variance. Permission for the variance will be given if, in the opinion of the Landscape Architect, the variance is warranted.
B. Seed Application:
1. Immediately before sowing the seed, the earth surface shall be re-worked until it is a fine, pulverized, smooth seedbed, showing not more than 1/4" variance from grade.
2. Irrigate lightly a minimum two (2) times to reduce air pockets in soil.
3. Apply seed mixture, as specified, at a rate of two and one half to four (2.5-4) lbs/1000
sq. ft. Apply seed in two directions where possible at a rate of 1.25-2 lbs. /1000 sq. ft. in each direction with seeder, using a cultipacker type seeder such as Brillion (or equal) mounted on tractor. Seed shall be uniformly spread over the previously fine graded and
©FORESITE DESIGN, INC. 32 9230 - 8
fertilized topsoil. The surface shall be dry when seed is planted. Hand sew seed around each irrigation system head. Hydro-seeding is not acceptable.
4. Do not let the field dry out but do not irrigate to the point of puddles. Irrigation needs to run syringe cycles hourly and adjust according to rain events.
5. After seeding, cover area with germination blanket. Include manufacturer’s recommended flat top stakes every 5 square yards (sides and center of blanket).
6. Cut holes in germination blanket around irrigation heads.
7. Remove the germination blanket after 12-15 days, do not allow seedlings to penetrate blanket. If seedlings have penetrated through, remove blanket immediately.
8. Mulching: Biodegradable wood excelsior, straw, or coconut-fiber mat enclosed in a photodegradable plastic mesh. Include manufacturer’s recommended steel wire staples, 6 inches (150mm) long.
a. Contractor shall return to site six (6) weeks after installation to remove mesh.
9. During the three week germination period, the field surface is to be kept moist. Do not let the field dry out but do not irrigate to the point of puddles.
10. Complete seed to soil contact is essential for germination and establishment. Cultipacker or approved similar equipment may be used to cover the seed and to firm the seed bed in one operation. In areas inaccessible to cultipacker, the seeded ground shall be lightly raked and rolled in two directions with a water ballast roller. Extreme care shall be taken during seeding and raking to insure that the seed in not raked from one spot to another.
11. The seeded areas are to be protected, watered, mowed, rolled and otherwise maintained until Owner Acceptance.
C. Post Seeding Fertilizer: Supply fertilizer “B” when grass reaches height of one (1) inch or 3 weeks after seeding at.75-1 lbs Phosphorus per 1000 square feet. See fertilization charts in
3.6 A, this spec section.
D. Maintenance.
1. Maintenance will be by Contractor. Contractor will visit the site to implement maintenance, watering etc. and to make written comments and recommendations. The contractor is responsible to fill any depressions do to setting of trenches.
2. Maintenance of all lawns consists of mowing, watering and repairing erosion.
Maintenance of lawns shall commence when any portion of the seeding has been completed. Seeded lawns shall never reach a height of three (3) inches prior to a cutting and shall be cut to a height of two (2) inches.
3. If, for reasons beyond the Sub-contractor's control, the height of the grass has exceeded three (3) inches, the mower blades shall be raised so that at no time will more than 1/3 of the grass leaf surface be removed. The Owner will accept the lawns after a uniform cover of grass is established and/or a minimum of one (1) year from date of seed application.
a. Mowing frequency shall be twice a week. Height will be determined at later date.
b. Mowing can begin, as soon as, surface is stable. Mowing will train grass to grow horizontally and promote root growth. Do not, under any circumstance, allow new turf to grow to heights greater than 4 inches.
4. Contractor shall notify the Owner through the Landscape Architect in writing one (1) week in advance of the final lawn cutting to allow the Owner and the Landscape Architect to inspect the lawns and schedule his maintenance work.
©FORESITE DESIGN, INC. 32 9230 - 9
5. If an infestation of weeds or crab grass develops prior to acceptance of the lawn, the Contractor shall treat the infestation by hand weeding or chemical control. The chemical control shall be furnished and installed by the contractor as recommended by the manufacturer and approved by the Landscape Architect. At least two weeks shall elapse after chemical control is applied before a request or inspection for acceptance is made to the Landscape Architect.
E. Guarantee.
1. Seeded Lawns:
a. It is the responsibility of the Contractor to establish a dense lawn of permanent grasses, free from lumps, depressions and settlement. Any part of the area that fails to show a uniform germination shall b re-seeded and such re-seeding shall continue until a dense lawn is established. Damage to seeded areas resulting from erosion shall be repaired by the Contractor.
b. The Contractor shall be responsible for rolling of the field, as necessary, to provide a safe, smooth playable surface free of undulations, high spots and low spots. This shall include topdressing and fill of settlement areas, including inequalities related to drainage and irrigation trenches and utilities prior to acceptance by the Owner.
The Contractor shall further guarantee sod material and workmanship for a period of not less than one (1) year from the date of final acceptance.
2. Excavation Areas:
a. It is the responsibility of the Contractor to repair all areas to the expectation of the
Owner and Landscape Architect.
3.10 SATISFACTORY TURF
A. Turf installations shall meet the following criteria as determined by Architect:
1. Satisfactory Seeded Turf: At end of maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface irregularities, with coverage exceeding 90 percent over an 10 square foot and bare spots not exceeding 5 by 5 inches.
2. Use specified materials to reestablish turf that does not comply with the requirements and continue watering and maintenance until turf is satisfactory.
END OF SECTION 32 9230
LEGEND
EXISTING PROPOSED
.2
DRAINAGE STRUCTURE
FENCE
SPOT ELEVATION
STORM DRAIN
LIGHT POLE
ELECTRICAL
WATER
TELEPHONE DRAINAGE STRUCTURE
CHAINLINK FENCE - SEE PLANS FOR HT.
SPOT GRADE
6" PERFORATED DRAINTILE
8" PERFORATED DRAINTILE
LIGHT POLE
ELECTRICAL
WATER
TELEPHONE
ALL-WEATHER SURFACE
OVER ATHLETIC VIRGIN ASPHALT
OVER LIMESTONE BASE
ATHLETIC VIRGIN ASPHALT OVER
LIMESTONE BASE
REINFORCED CONCRETE
OVER COMPACTED SAND BASE
MASON SAND
STORM DRAIN
FLAT DRAIN
IRRIGATION
IRRIGATION
PROPERTY
LIMITS OF CONSTRUCTION
SANITARY
GAS
DRAINAGE SWALE
TOPSOIL AND SOD
XXX.XX AS-BUILT SPOT ELEVATION
TOP OF WALL ELEVATION
TOP OF CURB ELEVATION
TOP OF TRENCH ELEVATIONT/T=XXX.XX
MATCH EXISTING ELEVATION
ORNAMENTAL FENCE - SEE PLANS FOR HT.
4" PERFORATED DRAINTILE
CRUSHED LIMESTONE
ATHLETIC MEAL
80'
REINFORCED CONCRETE
OVER 21AA LIMESTONE BASE
LAWN RESTORATION
NATIVE PLANTINGS
XXX.XX
T/W=XXX.XX
T/C=XXX.XX
T/T=XXX.XX
ME ± XXX.XX
4' FENCE
OPENING
NEW 4' GALV.
C/L FENCE (TYP.)
NEW 4' GALV. C/L
FENCE (TYP.)
NEW H-STYLE
GOALPOST
NEW H-STYLE
GOALPOST
CENTERLINE OF
FIELD
NEW REINFORCED
CONCRETE PAD FOR
OWNER PROVIDED SHED
NEW REINFORCED
CONCRETE APRON
NEW 12' DOUBLE
GATE
NEW 4' GALV. C/L
FENCE (TYP.)
NEW ALL-WEATHER
SURFACE HIGH JUMP
NEW 9' CONCRETE
WALKWAY
NEW SHOT PUT
PAD, RING AND
TOE BOARD
L A
N E
M
A
L L W
E A
T H
E R
S U
R F A
C E
A
S P H
A L T
T R
A C
K
L A
N E
M
A
L L W
E A
T H
E R
S U
R F A
C E
A
S P H
A L T
T R
A C
K
NEW 6'-6" CONCRETE
WALKWAY
NEW CONCRETE LONG JUMP
AND SAND PIT W/ ALL
WEATHER SURFACE RUNWAY
NEW RADIUS
MONUMENT
NEW RADIUS
MONUMENT
NEW TRENCH
DRAIN
EX. FENCE TO
REMAIN
EXISTING TREES
TO REMAIN, TYP.
PROPOSED LAWN
RESTORATION, SEE
LANDSCAPE PLAN
PROPOSED LAWN
RESTORATION, SEE
LANDSCAPE PLAN
PROPOSED LAWN
RESTORATION, SEE
LANDSCAPE PLAN
NEW REINFORCED
CONCRETE PAD FOR
RELOCATED BLEACHERS -
CENTERED WITH THE FIELD
BASE BID:
TOPSOIL AND SOD FIELD
ALTERNATE:
TOPSOIL AND SEED FIELD
FIELD CONNECT
NEW 4' GALV. C/L
FENCE TO
EXISITING FENCE
NEW CATCH BASIN
(TYP.)
4' FENCE
OPENING
CONTRACTOR SHALL INCLUDE AN ALLOWANCE FOR UNDERCUTTING
AND REPLACEMENT OF UNSUITABLE SUBGRADE MATERIAL IN THE
AMOUNT OF 600 CUBIC YARDS. ALLOWANCE TO INCLUDE EXCAVATION
AND REMOVAL FROM SITE OF UNSUITABLE MATERIALS, AND IMPORT,
PLACEMENT AND COMPACTION OF DENSE GRADED 21AA LIMESTONE
AGGREGATE BASE. ALLOWANCE IS TO BE INCLUDED IN CONTRACTOR'S
BASE BID COST. ADDITIONS OR DEDUCTIONS SHALL BE MADE BASED
ON THE UNIT PRICE OF THE ALLOWANCE, WITH PAYMENT TO
CONTRACTOR BEING BASED ON ACTUAL QUANTITIES AND MATERIALS
USED.
CONTRACTOR SHALL INCLUDE AN ALLOWANCE FOR PLACEMENT OF
TENSAR TRIAX (OR APPROVED EQUAL) GEOGRID FOR SUBGRADE
STABILIZATION IN THE AMOUNT OF 1,200 SQUARE YARDS. ALLOWANCE
IS TO BE INCLUDED IN CONTRACTOR'S BASE BID COST. ADDITIONS OR
DEDUCTIONS SHALL BE MADE BASED ON THE UNIT PRICE OF THE
ALLOWANCE, WITH PAYMENT TO CONTRACTOR BEING BASED ON
ACTUAL QUANTITIES AND MATERIALS USED.
NEW 4' GALV.
C/L FENCE (TYP.)
NATIVE PLANTING AREA,
SEE LANDSCAPE PLAN
NOTES:
1. NOTES AND LEGEND SHALL APPLY TO ALL SHEETS AND ALL SITES
2. CONTRACTOR SHALL BE SOLELY RESPONSIBLE AND MAKE EVERY EFFORT TO LOCATE EXISTING
UNDERGROUND UTILITIES. THIS SHALL INCLUDE CONSULTING WITH ALL LOCAL UTILITY COMPANIES AND
USING A SIGNAL LOCATOR PRIOR TO EXCAVATION. ANY AND ALL REPAIRS SHALL BE COMPLETED WITHIN 48
HRS. OR THE OWNER SHALL HAVE THE REPAIR WORK COMPLETED AT THE CONTRACTORS EXPENSE.
3. TOPSOIL AND SEED ALL AREAS DISTURBED AND NOT OTHERWISE DEVELOPED. ALL WORK I.E. DEMOLITION
AND REMOVALS, DRAINAGE WORK, STONE AND ASPHALT, FENCING, TRACK SURFACE, ETC. SHALL BE
COMPLETED BY DATE AS NOTED IN CONTRACT DOCUMENTS. ALL LAWN AREAS SHALL SLOPE TO DRAINAGE
STRUCTURES.
4. ALL CONTOURS AND SPOT GRADES REFER TO FINISH GRADE OF LAWN, ASPHALT, CONCRETE, OR SYNTHETIC
TURF. DO NOT FACTOR IN THE ALL-WEATHER SURFACE DEPTH.
40' 80'
SCALE: 1" = 40'-0"
00 40' 80'
SCALE: 1" = 40'-0"
N
SHEET NO.
DATE SCALE
DWN. BY CHK BY
SHEET TITLE
OWNER
PROJECT
ISSUED
10/21/26
LARSON
MIDDLE SCHOOL
2027 TRACK
RENOVATION
BP 2627-04
TROY SCHOOL DISTRICT
TROY, MI
REVISIONS
DLD JB
01/09/26 50% CD OWNER REVIEW
DRAWINGS ARE PROPERTY OF FORESITE DESIGN, INC. AND ARE
NOT TO BE USED, REPRODUCED, OR PUBLISHED IN PART OR
WHOLE, WITHOUT EXPRESSED WRITTEN PERMISSION FROM
FORESITE DESIGN, INC.
COPYRIGHT 2026.
10/14/26 95% OWNER REVIEW
10/21/26 BID SET
11/06/26 ADDENDUM NO.1
SITE PLAN
1" = 40'-0"
L1.01
AutoCAD SHX Text
8 DT
AutoCAD SHX Text
SYCAMORE DR. (60 FT. WIDE-PUBLIC)
AutoCAD SHX Text 110 M
AutoCAD SHX Text
START
AutoCAD SHX Text
START
AutoCAD SHX Text
START
AutoCAD SHX Text
START
AutoCAD SHX Text 100 M
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FINISH
AutoCAD SHX Text
COMMON
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FINISH
AutoCAD SHX Text
ALTERNATE
AutoCAD SHX Text 100 M
REGRADE AND
COMPACT EXISTING
SUBGRADE
1-1/2" WEARING COURSE (VIRGIN)
TACK
13MM ALL-WEATHER
TRACK SURFACE
4" BITUMINOUS PAVEMENT
SCALE 3"=1'-0"
C
2-1/2" LEVELING COURSE (VIRGIN)
**NOTE: SEE
SPECIFICATION
FOR MIX DESIGN
8" AGGREGATE
BASE
TRACK SECTION
SCALE 1/4"=1'-0"
22' - ALL-WEATHER SURFACE
NEW TOPSOIL
AND SOD
NEW 6" DRAINTILE
1% SLOPE
4" PROPOSED ASPHALT
(2 LIFTS)
1 1/2" WEARING COURSE
2 1/2" LEVELING COURSE
OVER 8" STONE BASE
NEW CONC.
WALKWAY
COMPACTED
SUBGRADE
NEW CATCH
BASIN
23' - ASPHALT 9' CONC.
NEW 4' GALV.
C/L FENCE
3'
TRACK DIMENSION
SCALE 1/4"=1'-0"
42"
(TYP.)
42"
(TYP.)
VARIES - REFER TO DIM PLAN
6" MIN.
L A
N E
L A
N E
L A
N E
L A
N E
L A
N E
L A
N E
NOTE:
267.397' DISTANCE BETWEEN
RADIUS POINTS
123.083'
122.580'
122.083'
123.750'
RADIUS TO EDGE
OF ASPHALT
RADIUS TO EDGE OF
ALL-WEATHER SURFACE
RADIUS TO 2"
PAINT LINE
RADIUS TO
MEASURE LINE
22' ALL WEATHER TRACK SURFACE 6" MIN.
26'-4"
18" SAND PIT
2'
6" CONCRETE WITH
MEDIUM BROOM FINISH
4' ALL-WEATHER
SURFACE OVER
CONCRETE
16" TAKE-OFF
BOARD (TYP.)
LD1.02
LD1.01TIE DRAINAGE OF
TRAY INTO PROPOSED
PIT DRAINTILE (TYP.)
6" PERFORATED
DRAINTILE
LD1.01
LONG JUMP DETAIL
SCALE 1"=10'-0"
SAND CATCHER
GRATE
TOPSOIL
AND SEED
2'-6"13'2'-6"
18'
6" PERF. DRAINTILE AND
PEASTONE BACKFILL
4 OZ. NONWOVEN
FILTRATION FABRIC
PRE-FABRICATED SAND
CATCHER LONG JUMP PIT
W/ COVER LEDGES AND
ALUM. COVER
SAND (±18" DEPTH)
6" CONCRETE
WITH MED.
BROOM FINISH (TYP.)
COMPACTED
STONE BASE
LONG JUMP PIT/RUNWAY SECTION
SCALE 1/4"=1'-0"
COMPACTED
SUBGRADE
LD1.01
2'
1'-4"
6" REINFORCED
CONCRETE RUNWAY
4" COMPACTED
STONE BASE
UNDISTURBED
SUBGRADE
REVERSIBLE POLYBOARD
(SET LEVEL WITH TOP OF
ALL WEATHER SURFACE)
ALUMINUM TRAY
13MM ALL
WEATHER
SURFACE
TAKE-OFF BOARD SECTION
SCALE 1"=1'-0"
LD1.01
6" CONCRETE RUNWAY
NOTE:
1. TAKE-OFF BOARD AND TRAY MUST BE INSTALLED PRIOR TO INSTALLATION OF
THE ALL-WEATHER SURFACE. SEE MFR. CUT SHEET FOR TRAY INSTALLATION.
2. ARTIFICIAL RUNWAY SURFACE SHOULD BE TRIMMED EVEN WITH THE INSIDE EDGE
OF THE TRAY.
3. THE TOP OF THE TAKE-OFF BOARD SHALL BE LEVEL WITH TOP OF ALL-WEATHER
SURFACE. ADJUST AS REQUIRED FOR DIFFERENT SURFACE THICKNESS.
CONCRETE FOUNDATION
SAND BASE
SAME ELEVATION
POLYBOARD
TAKE-OFF BOARD
ALUMINUM TRAY
13MM ALL-WEATHER
SURFACE
TAKE-OFF BOARD SECTION
NTS
13MM ALL WEATHER
SURFACE
REINFORCED
CONCRETE W/ MEDIUM
BROOM FINISH
COMPACTED
SUBGRADECOMPACTED MDOT
CLASS II SAND
TOPSOIL
AND SEED
6"X6" 10/10
WWF
CONCRETE - WIDTH VARIES
CONCRETE RUNWAY SECTION
SCALE 1"=1'-0"
4' ALL-WEATHER SURFACE
FIELD INSTALL 1/2"
TRACK SURFACING TO
RECESSED ALUM. LID
SAND PIT COVER & LEDGE DETAIL
SCALE 3/4"=1'-0"
ALUM. LID
OVER SAND PIT
SAND
CATCHER
GRATES
SAND
WIDTH VARIES
COMPACTED
MDOT CLASS II
SAND
5" CONCRETE WITH
LIGHT BROOM FINISH.
SAWCUT CONTROL
JOINTS EQUALLY
CONCRETE SECTION DETAIL
SIDEWALK N.T.S.
STANDARD CONCRETE SIDEWALK
UNDISTURBED
SUBGRADE
LD1.02
HIGH JUMP LAYOUT
SCALE 1"=30'-0"
100'
ALL-WEATHER
SURFACE HIGH JUMP
LD1.02
TRACK SECTION
SCALE 1/4"=1'-0"
22' - ALL-WEATHER SURFACE
NEW TOPSOIL
AND SOD
NEW 6" DRAINTILE
1% SLOPE
4" PROPOSED ASPHALT
(2 LIFTS)
1 1/2" WEARING COURSE
2 1/2" LEVELING COURSE
OVER 8" STONE BASE
LAWN
RESTORATION
COMPACTED
SUBGRADE
NEW CATCH
BASIN
23' - ASPHALT
CONCRETE SECTION DETAIL
BLEACHER & STORAGE PAD N.T.S.
#4 TIES AT 18" O.C.
EACH WAY OR WWF
6X6-W2.9XW2.9
REFER TO PLANS
FOR ELEVATIONS
COMPACTED MDOT
CLASS II SAND
SHEET NO.
DATE SCALE
DWN. BY CHK BY
SHEET TITLE
OWNER
PROJECT
ISSUED
10/21/26
LARSON
MIDDLE SCHOOL
2027 TRACK
RENOVATION
BP 2627-04
TROY SCHOOL DISTRICT
TROY, MI
REVISIONS
DLD JB
01/09/26 50% CD OWNER REVIEW
DRAWINGS ARE PROPERTY OF FORESITE DESIGN, INC. AND ARE
NOT TO BE USED, REPRODUCED, OR PUBLISHED IN PART OR
WHOLE, WITHOUT EXPRESSED WRITTEN PERMISSION FROM
FORESITE DESIGN, INC.
COPYRIGHT 2026.
10/14/26 95% OWNER REVIEW
10/21/26 BID SET
11/06/26 ADDENDUM NO.1
TRACK & FIELD
EVENT DETAILS
AS NOTED
LD1.01
File details come from the government source that posted it. Updated .