This document is an Addendum for the Royal Oak School District (ROS) 2025 Roofing Program at Royal Oak High School. The work includes roof replacement and restoration covering approximately 28,159 square feet across multiple roof areas. Key changes include revised insulation requirements, allowances, unit pricing, and alternates. Bids are due on November 12, 2024 by 11:00 AM with a non-mandatory pre-bid meeting held on November 5, 2024. The district reserves the right to issue contracts to multiple contractors, and the project is scheduled to be completed between June 16, 2025 and August 8, 2025.
The roof system will consist of a 60-mil, non-reinforced EPDM membrane fully adhered over two layers of insulation, with a minimum R-30 value. The contractor is responsible for protecting the installed roof membrane, and the project does not have prevailing wage requirements. The district will furnish asbestos reports, and liquidated damages may apply if the project is not substantially completed by the scheduled completion date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Package - Bid #25-02 Royal Oak School 2025 Roofing Program.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM 1
Royal Oak Schools 2025 Roofing Program
ADDENDUM 1 Page 1 of 2
ADDENDUM NO.: 1 DATE: 11/08/24
PROJECT IDENTIFICATION
PROJECT NAME: Royal Oak Schools - 2025 Roofing Program SITE ADDRESS: Royal Oak High School (1500 Lexington Blvd, Royal Oak, MI 48073)
ADDENDUM DESCRIPTION:
The following is a summary of changes to the drawings and specifications that shall be considered as a part of your Bid. Receipt of this Addendum shall be acknowledged in the Bid submission. This Addendum consists of 2 pages.
(Reference revised sheets A1.0, A2.0, A.2.2, A2.3, A3.0)
SUMMARY OF ADDENDUM:
Item Description
1.
ADD: A1.0 Cover Sheet, General Note:
Q. Protection and Cleaning of Installed Roof Membrane: The roofing contractor is responsible for protection of installed sections of new roof membrane from staining and discoloration. Strategies for protection of installed membrane may include, but are not limited to, use of roof membranes with manufacturer-applied protective film, full coverage of installed membrane with sealed tarps, sequencing of roof membrane installation in a manner to limit tear-off dust, dirt and debris migration, and limiting traffic on installed membrane. Upon completion of installation, stained membrane shall be cleaned to the satisfaction of the owner and shall maintain the manufacturer-published initial solar reflectance of the product.
2. This is not a prevailing wage project.
3.
RFIs Submitted by Contractors:
1. RFI 1: Are we going to change the insulation install, knowing the tapered iso will create a concern at the window on Area H and at the door jam on Area O due to the tapered height at those areas on top of the R-30 insulation?
RFI 1 Answer: Yes, the insulation height and R value is likely to change to be able to accommodate the door jam and wall vent on area O and the low windows on area H to allow proper drainage.
2. RFI 2: On Area K5, is the additional R-30 insulation over existing insulation on the recover. Or is it 1 layer of insulation mechanically fastened to the existing insulation (once membrane is removed) giving it a total of R-30 value?
RFI 2 Answer: Replace any/all damaged existing insulation and install additional insulation layer(s) to the existing to achieve the R30 requirements.
3. RFI 3: Is the roofing membrane to be reinforced or non-reinforced?
RFI 3 Answer: The membrane is to be non-reinforced. Note change: Detail 1.01 language to be changed to non-reinforced. Reference Sheet A3.0.
4. RFI 4: Is there a coverboard on this project?
RFI 4 Answer: No
5. RFI 5: Is there asbestos on this project?
RFI 5 Answer: Royal Oak Schools to furnish asbestos reports.
6. RFI 6: Regarding the full tapered roof areas. What R-value are we needing to meet and does it need to be min or avg or are we just figured a full tapered insulation system with NO base layers of insulation. Due to the height of the windows on area H and the door on area O. there is not a lot of room to work with only 3” of exposed flashing with the existing roof being 3”.
RFI 6 Answer: Attain R-Value for existing conditions.
7. RFI 7: For Area H (at the window) the height is about 6" of height from deck to flashing height.
The Min R-30 value and tapered will be about 11.7" thick. RFI 7 Answer: Sometimes an R30 cannot be obtained on certain applications. The contractor is to provide a suitable tapered system for proper drainage for this roof area even though an R30 is not achievable.
ADDENDUM 1
ADDENDUM 1 Page 2 of 2
8. 8. RFI 8: For Area O (at the door jam) the height is about 6" of height from deck to flashing height. The min R-30 value and tapered will be about 12" thick. RFI 8 Answer: Sometimes an R30 cannot be obtained on certain applications. The contractor is to provide a suitable tapered system for proper drainage for this roof area even though an R30 is not achievable.
4. CHANGE: A2.2 Roof Plan: Removed reference to KN1 on drawing. See markup in red.
5. CHANGE: A1.0, A2.0, A2.2: Underlayment “as required” language removed.
6. ADD: A2.3 Tapered saddles added to drawing.
DESIGN TEAM LEAD:
COMPANY: WeatherTech Consulting Group, Inc.
ADDRESS: 7747 Auburn Road, Utica, MI 48317
TELEPHONE: (586) 731-3095 FAX: (586) 731-6863
SHEET 1 OF 7
Cover Sheet
A1.0
OWNER:
Royal Oak Schools
1601 N Campbell Rd.
Royal Oak, MI 48067
PROJECT LOCATION:
See Project List
ROOFING CONSULTANTS:
WeatherTech Consulting Group, Inc.
7747 Auburn Rd.
Utica, MI 48317
CONTACT:
Jeff Synowiec
Director of Operations
Phone: (248) 545-0064
E-Mail: jeff.synowiec@royaloakschools.org
CONTACT:
Michelle Kerns
Bond Representative
Phone: (248) 921-3929
E-Mail: michelle.kerns@royaloakschools.org
CONTACT:
Ann Crippen
Project Manager
Phone: (586) 731-3095 x12
E-Mail: acrippen@wtcg.net
John McCaig, RRO
Site Contact
Jack Runkle, RA, NCARB
Design Review
Royal Oak Schools
2025 Roofing Project
Royal Oak Schools
1601 N Campbell Rd.
Royal Oak, MI 48067
A1.0
A2.0
A2.1
A2.2
A2.3
A3.0
A3.1
Cover Sheet
Roof Plan, Royal Oak High School Roof Areas G and H
Roof Plan, Royal Oak High School Roof Area K Section 5
Roof Plan, Royal Oak High School Roof Area L, Sections 1, 2, 3
Roof Plan, Royal Oak High School Roof Area O
Detail Sheet
Detail Sheet
ROS 2025 Design - A1.0 Cover Page
Review10/23/2024
PROJECT SUMMARY
SUMMARY OF WORK: Ref. Section 00 02 00
General: Royal Oak School District (ROS) 2025 Roof Program work for one (1) school covering approximately 28,159 sq. ft. Roofing work includes roof replacement and restoration required to remediate all work identified in the specifications and drawings inclusive of all Bid Documents requirements.
Schedules: Ref. “PROJECT WORK SCHEDULE” on this Sheet A1.0 - Cover Page.
BID SUMMARY:
Sealed bids should be submitted through Buildingconnect.com with the following link:
https://app.buildingconnected.com/public/5cc9d7f637c1a90018cb55dc. No physical bids will be accepted in person or via delivery service. Bids are to be submitted no later than 11:00 am
Tuesday, November 12, 2024. The District will not consider or accept a bid received after the date and time specified for bid submission. Bids will be publicly opened immediately following the close of receiving bids with the following virtual meeting link: meet.google.com/ojx-vuon-udr or phone number 727-386-7944 669055108
1. A non-mandatory pre-bid meeting has been scheduled for 2:00 pm. Tuesday, November 5, 2024 at Royal Oak High School 1500 Lexington Blvd. Royal Oak, MI 48073.
2. Bid documents are available online by going to the District's web site, www.royaloakschools.org and clicking on District/Departments/Finance and Current Bids. Bid documents will be placed on Buildingconnect.com with the following link:
https://app.buildingconnected.com/public/5cc9d7f637c1a90018cb55dc. Bidders are encouraged to visit the site.
3. Allowances Section 012100: Allowances will be defined on individual school roof plans under
“Allowances”. These allowances will be stated on the bid form.
4. Unit Pricing Section 004322: Unit Pricing for unit work is defined on the Unit Price Bid Form in
Section 000301. Unit Pricing bid values are entered by unit price individually on form.
5. Alternates Section 012300: Alternates are individually listed on school roof plans and bids for
Alternates. Alternated bid value are to be entered on Bid Form (Section 000300) as enumerated.
6. ROS reserves the right to issue contracts to multiple contractors.
7. Any questions regarding bid specifications must be received by 10am, Thursday, November 8, 2024. Questions/RFI's must be submitted via email to: acrippen@wtcg.net at the WeatherTech office. No response will be made to oral questions.
EXISTING ROOF SYSTEM CONSTRUCTION: Ref. Roof Plans
All existing roof system constructions were determined by test cuts and observation;
conditions may vary. Contractor responsible for confirming all existing roof system constructions and conditions.
NEW ROOF ASSEMBLY SUMMARY: Reference Roof Plans
1. Roof System: Ref. Roof Plan Schedules
a. Roof Membrane: EPDM, 60 mil, unreinforced and fully adhered.
b. Insulation: Min. two layers. Top layer must be adhered.
c. Underlayment: (as required) Modified base sheet, Ref. individual Roof Plans.
d. Deck: Multiple types, Ref. individual Roof Plans.
2. Roof System Performance:
a. Warranty: 20 yr. Materials manufacturer, No Dollar Limit (NDL) materials and installation.
b. Wind: FM Global (FMG): FM Standard 4470 Meets - Windstorm Classification FMG 90.
c. Fire: Underwriters Laboratory External Fire Resistance - Class "A".
d. Energy: Michigan Uniform Energy Code: R30 condition dependent
e. Drainage: Drainage Performance Acknowledgement
GENERAL SHEET NOTES
1. All work shall be executed in accordance with the appropriate document of the Contract
Documents.
2. Any conflicts between specifications and drawings shall be brought to the attention of the
Owner and Consultant immediately. In all situations the more restrictive and higher quality shall govern.
3. All dimensions to, of, and in existing building and roof shall be verified in the field by contractor. Field measure existing conditions to verify material quantities and dimensions prior to fabrication on component material.
4. Details shown are typical. Similar details apply to similar conditions unless otherwise indicated.
5. The drawings herein are related to an alteration/ restoration to an existing structure. The specified work was based upon as much observation, destructive testing, etc. as circumstances permitted.
GENERAL CONSTRUCTION DETAIL NOTES
Use the General Construction Details on Sheet A1.0 for detail construction description as applicable when any detail is not specifically called out in Key Notes for the applicable
Roof Area and Section. Detail drawings called out in General Construction Details can be found on Sheets A3.0 - A3.1. Contractor to provide Shop Drawing as necessary for field conditions not directly identified in Contract Documents.
A. Flashing Heights: Perimeters, curbs, penetrations shall be raised as necessary to meet the new insulation heights, tapered edge strip and tapered insulation height to meet typical industry standard of 8 in. base flashing height.
B. Drains Existing: Remove existing drain flashings. Furnish and install ½ inch per foot sloped tapered insulation sump area (8 ft. x 8ft. minimum) as detailed. Clean and reuse existing drains and accessories, replace all damaged, nonfunctional, incompatible, missing and broken drain components. Replace all plastic strainers with new cast iron. All replacement bowls, strainers, and clamping rings shall be cast iron. Provide new stainless-steel bolts. All nonmetallic drains strainers shall be replaced with fitted. Ref. Details 1.04, 1.05 and 1.06.
C. Tapered Insulation: Furnish and install new tapered insulation, crickets, saddles and kick-backs as designated on roof plan to provide a finished slope of 1/4 in/ ft. slope and a min length to width ratio of 3:1. All equipment w/ curb size greater than 24 in. shall have cricket install on up slope side. Contractor responsible for identifying and notifying Consultant and
Owner all existing tapered insulation not called out on plans for determination of unit costing.
Verify in Pre-bid Conference additional ponded areas identified on the roof and install as noted. Tapered plan is to be submitted and approved by WTCG prior to construction.
D. Curbs - Movable Equipment: Lift equipment from curbs; run new fully adhered membrane flashing up and over top of curb; install continuous sealing material over top of curb. Reset equipment and mechanically fasten to curb. Coordinate with Owner prior to moving equipment to install new flashings. Metal equipment flashing and/or counter flashing must extend a minimum of 3 in. past the termination of the base flashing; add metal counter flashing as required. Ref. Details 1.07 and 1.08.
E. Curbs - Non-Movable Equipment: Terminate new fully adhered membrane flashing at unit framing member. Metal equipment flashing and/or counter flashing must extend a minimum of 3 in. past the termination of the base flashing; add metal counter flashing as required. Ref.
Detail 1.09.
F. Round penetrations: All penetrations shall be cleaned down to surface where any sealant will contact; Install new prefabricated pipe boots or field wrap with membrane. Install draw band, sealants and rain collars as detailed. Ref. Details 1.10 and 1.11.
G. Heat Stacks: Install new metal jacks and collars. Reuse existing metal jacks and storm collars when approved by consultant. Clean surfaces and apply new field wrapped EPDM flashing. Reattach and reseal storm collars. Ref. Detail 1.12.
H. Steel Support Posts: Install split pipe boot or field wrap flashing with membrane. Terminate with draw band and sealant. Ref. Detail 1.14.
I. Prefabricated Pipe Chase Cover: Reuse existing pipe cover. Replace any damaged or missing clamping bands or sealants. Ref. Detail 2.04.
J. Gas Line and Conduit Support Blocks: Provide pressure treated wood blocking and support brackets. Install pads under all wood supports. Ref. Details 2.06 and 2.08.
K. Condensate Drain Lines: Reuse, repair or replace all damaged or unusable drain lines. Add additional drain line to extend minimum 4 ft. from equipment or to any drains within 20 ft.
Provide manufacturer's approved splash pan/pad/block where condensate drainage water would contact the roof membrane.
L. All Utility Service Lines (gas, water, electric, cable, etc.) to be raised as necessary to accommodate new insulation height and meet code requirements.
M. Abandoned Curbs & Penetrations: Owner will mark all equipment to be removed and the curb capped. Remove all equipment and curbs as designated by owner and identified at the prebid conference. Where directed, remove curbs flush to deck surface, install framing and matching decking material. For abandoned curbs to remain in place, install new base flashing and install new 24 gauge sloped metal cap. Provide interior protection when removing any equipment or penetration. All small round abandoned penetrations that have no utility service as confirmed by Owner shall be removed to deck patched according to deck type. Ref. Detail
2.03.
N. Pitch Pans: Pitch pans can only be used when approved by Consultant. In the event they are to used furnish and install new pitch pans, clean all penetrations down to original surface, blocking required at all pitch pans. Ref. Detail 1.15.
O. Vent Thru Roof Piping: Install PVC pipe extensions to all VTR piping prior to installation of new pipe boot flashing as needed to allow a minimum 8-inch flashing height. Attach screen wire mesh over the top of the pipe. Ref. Detail 1.13, PER CODE.
P. Walk Pads: Provide walk pads at all RTU access doors, roof access hatches and ladder access locations.
Royal Oak High School
1500 Lexington Blvd, Royal Oak, MI 48073
OTB10/24/2024
Project Manual
TABLE OF CONTENTS
00 00 00 COVER
00 01 10 TABLE OF CONTENTS
00 01 11 PROJECT DIRECTORY
BID REQUIREMENTS
00 01 12 INVITATION TO BID - ROS
00 01 13 INSTRUCTIONS TO BIDDERS - ROS
00 02 00 SUMMARY OF WORK
00 03 00 BID FORM
00 03 01 UNIT PRICE FORM
00 03 04 PAYMENT BOND
00 03 05 PERFORMANCE BOND
00 04 01 PARTIAL RELEASE OF LIEN
00 04 02 FINAL RELEASE OF LIEN
00 04 10 IRAN ECONOMIC SANCTIONS ACT - ROS
00 04 11 FAMILIAL DISCLOSURE STATEMENT - ROS
00 07 30 SUPPLEMENTAL CONDITIONS
00 43 22 UNIT PRICING INFORMATION
GENERAL REQUIREMENTS
01 06 00 REGULATORY REQUIREMENTS
01 14 19 USE OF SITE
01 21 00 ALLOWANCES
01 23 00 ALTERNATES
01 32 00 CONSTRUCTION SCHEDULE
01 32 13 WEB SITE & DOCUMENTS
01 35 01 SAFETY
01 42 16 TERMS AND DEFINITIONS
01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
01 74 23 FINAL CLEANING
01 77 00 CLOSE OUT
SITE WORK
02 41 19 SELECTIVE DEMOLITION
ROUGH CARPENTRY
06 10 00 ROUGH CARPENTRY
THERMAL AND MOISTURE PROTECTION
07 22 50 SINGLE PLY ROOF INSULATION
07 54 00 FULLY ADHERED EPDM ROOFING
07 62 00 SHEET METAL FLASHING AND TRIM
07 72 00 ROOF ACCESSORIES
07 90 00 SEALANTS
PLUMBING
22 14 26.13 ROOF DRAINS
DRAWINGS
Ref. Sheet A1.0 - Sheet Index
THESE DRAWINGS AND SPECIFICATIONS, AS INSTRUMENTS OF
SERVICE, ARE AND SHALL REMAIN THE PROPERTYOF
WEATHERTECH CONSULTING GROUP AND PROJECT OWNER,
WHETHER THE PROJECTS FOR WHICH THEY ARE MADE FOR ARE EXECUTED OR NOT. THESE
DRAWINGS AND SPECIFICATIONS SHALL NOT BE USED BY ANY PERSON OR ENTITY ON
OTHER PROJECTS WITHOUT THE WRITTEN CONSENT OF THE WEATHERTECH CONSULTING
GROUP. COPYRIGHT 2023.
DESCRIPTION
COPYRIGHT:
WeatherTech Consulting Group, Inc.
DATE
ISSUE
Drawn By: MD
Checked By: DM, AC, AW
WeatherTech
Consulting Group, Inc.
Roofing/Waterproofing Consultants
Corporate Office:
7747 Auburn Road
Utica, MI 48317
Phone #: 586-731-3095
Fax #: 586-731-6863
Email: weathertech@wtcg.net
Web Site: www.wtcg.net
SHEET TITLE
CLIENT
PROFESSIONAL
PROJECT
File Name:
ELECTRONIC STAMP
SHEET NO. SHEET TITLE
SHEET INDEX
DIRECTORY
PROJECT LIST
Royal Oak Schools
2025 Roofing Program
Royal Oak High School
1500 Lexington Blvd.
Royal Oak, MI 48073
WTProject No: ROSD-ROHS-25
Q. Protection and Cleaning of Installed Roof Membrane: The roofing contractor is responsible for protection of installed sections of new roof membrane from staining and discoloration.
Strategies for protection of installed membrane may include, but are not limited to, use of roof membranes with manufacturer-applied protective film, full coverage of installed membrane with sealed tarps, sequencing of roof membrane installation in a manner to limit tear-off dust, dirt and debris migration, and limiting traffic on installed membrane. Upon completion of installation, stained membrane shall be cleaned to the satisfaction of the owner and shall maintain the manufacturer-published initial solar reflectance of the product.
11/07/2024 Addendum 1
Annette Wurth Cross-Out
Roof Area G
88'-6" 57'
145'-6"
A
A
A
A
A A
Roof Area H
SHEET 2 OF 7
A2.0
ROS 2025 Design - A2.0 Royal Oak High School
THESE DRAWINGS AND SPECIFICATIONS, AS INSTRUMENTS OF
SERVICE, ARE AND SHALL REMAIN THE PROPERTYOF
WEATHERTECH CONSULTING GROUP AND PROJECT OWNER,
WHETHER THE PROJECTS FOR WHICH THEY ARE MADE FOR ARE EXECUTED OR NOT. THESE
DRAWINGS AND SPECIFICATIONS SHALL NOT BE USED BY ANY PERSON OR ENTITY ON
OTHER PROJECTS WITHOUT THE WRITTEN CONSENT OF THE WEATHERTECH CONSULTING
GROUP. COPYRIGHT 2023.
DESCRIPTION
COPYRIGHT:
WeatherTech Consulting Group, Inc.
DATE
ISSUE
Drawn By: MD
Checked By: DM, AC, AW
WeatherTech
Consulting Group, Inc.
Roofing/Waterproofing Consultants
Corporate Office:
7747 Auburn Road
Utica, MI 48317
Phone #: 586-731-3095
Fax #: 586-731-6863
Email: weathertech@wtcg.net
Web Site: www.wtcg.net
SHEET TITLE
Roof Plan
Royal Oak High School Roof Areas G and H
CLIENT
PROFESSIONAL
PROJECT
File Name:
ELECTRONIC STAMP
KEY PLAN
Royal Oak High School Roof Areas G and H
Scale:
" = 1'
Royal Oak High School - Royal Oak School District
Sheet Notes - Roof Area(s) G & H
WORK DESCRIPTION - ROOF REPLACEMENT
Work includes: Removal and disposal of existing roofing, insulation, flashing systems and all sheet metal flashings down to the surface of the deck, repair deteriorated decking, install new roof insulation, fully adhered EPDM single ply roof membrane including all flashing, new roof related sheet metal, and accessories as detailed in the specifications and drawings. Completed work shall comply with all Contract Documents and roofing manufacturer's requirements to receive the specified warrantied roof system.
Approx. Roof Area(s) G - 3,465 sq. ft.; H - 2,272 sq. ft.
1. EXISTING ROOF SYSTEM CONSTRUCTION
All existing roof system constructions were determined by test cuts and observation; conditions may vary. Contractor responsible for confirming all existing roof system constructions and conditions.
Roof Area(s) G & H Core Sample Results
a. Roof Membrane: BUR/CTP
b. Insulation:
1) First insulation layer approx. 3/4-inch perlite insulation.
2) Insulation: 1 1/4 inch ISO; Core thickness approx. 2 3/4-inches.
c. Underlayment: Vapor Barrier
d. Deck: Gypsum
2. Roof System: Roof Areas G & H; Ref. Detail 1.01.
a. Roof Membrane: EPDM, 60 mil, adhered to insulation.
b. Insulation: Maximum achievable R-Value; Min R30
1) First layer set-in-low-rise foam adhesive to base sheet over deck - repair as necessary; Second layer to adhere over first layer
2) Tapered insulation: 1/4 inch per foot tapered polyisocyanurate insulation; set-in low-rise foam adhesive. All joints staggered and offset between layers.
(contractor to verify correct tapered size with manufacturer)
c. Deck: Gypsum: Repair as necessary to comply w/ building codes.
d. Interior Ceiling: drop or closed ceilings
e. Underlayment: (as required) base sheet - mechanically attached or self-adhered
f. Building Height: Ground to building edge: 25ft
3. Warranty/Guarantee:
a. Manufacturer to provide a 20 year "No-Dollar-Limit" material and installation warranty covering the roof system, flashings and manufacturer's accessories.
4. Allowances: $5000 to be added to base bid for unforeseen deficiencies; this will be credit back to the client if not used.
5. Asbestos: Ref. to Section 024119 and Appendix 1: Asbestos testing results to be supplied by ROS selected 3rd party firm and will be incorporated into Appendix 1.
Refer to Appendix 1 for asbestos testing results.
6. Tapered Insulation Layout: The roofing contractor is responsible for the final insulation system layout. The roofing contractor shall provide a tapered insulation layout plan. Provided by the insulation manufacturer.
General Construction Details: Ref. A1.0
Use the General Construction Details on Sheet A1.0 for detail construction description as applicable when any detail is not specifically called out in Key
Notes for the applicable Roof Area and Section. Detail drawings called out in
General Construction Details can be found on Sheets A3.0 to A3.1. Contractor to provide Shop Drawing as necessary for field conditions not directly identified in
Contract Documents.
Key Notes: All detail references in Key Notes are considered typical and applicable to like conditions except as specifically amended on this Sheet. Refer to Sheet
A1.0 General Construction Detail Notes for applicable construction detail descriptions and Sheets A3.0 to A3.1 for construction detail drawings. Contractor to provide Shop Drawing as necessary for field conditions not directly identified in
Contract Documents.
1. Metal Edging: Furnish and install new 24 ga pre-finished metal edging to match color of existing and S -clips are to be used at joints. Ref. Photo 2297.
2. Counterflashing: Furnish and install new 24 ga pre-finished counterflashing to match color of existing. Ref. Photo 2254.
3. Wood Nailers: Furnish and install new wood nailers as required.
4. Logistics / Staging: (not marked on roof plan) Due to roof access points, travel will be necessary over other roof area(s). Existing roof area(s) traveled over are to use rigid insulation and plywood to cover.
5. Roof Sumps: Furnish and install 8ft x 8ft roof sumps for this application. Ref. Photo
2249.
6. Remove all Deleted Roof Items: curbs, pipes, etc. (if possible) and seal openings.
Ref. Photos 2250, 2251.
7. Expansion Joint: Furnish and install new expansion joint liner and batten insulation prior to installing new metal expansion joint. Standing seam metal joints are required.
Ref. Detail 1.02 and Photo 2256.
8. Wall Ladder (roof area H only): Wall ladder to be altered to accommodate insulation thickness and metal edge conditions. Add new rung covers. Ref. Photo 2247.
9. Pitch Pans (roof area H only): Furnish and install new metal covers on all pitch pans.
Ref. Photo 2262.
10.Roof Area H: Due to window height restrictions, R-30 may not be achievable. Roofing
Contractor to verify conditions and provide accordingly. Ref. Photos 2270, 2274.
11.Perimeter Safety Rail (roof area H only): Toe kick to be raised due to insulation requirements. Ref. Photo 2261.
12.Perimeter Edge Pipe (roof area H only): Resecure PVC pipe to new metal edge.
Ref. Photo 2269.
Symbol Legend
Symbol
Conduit, Vent
Pipe or Other
Penetration
W
GAS AD EJ
Slope
H
L
Notes
Symbol
Notes
Symbol
Notes
Equipment Unit on Curb
Roof Hatch on
Curb
Roof Ladder
Screen Support
Stanchion
Gas Line
Roof Ridges and
Valleys
Roof Drain
Overflow
Scupper
Tapered
Insulation or
Saddles
Insulated Pipe or
Heat Stack
Penetration
Ductwork or
Flanged
Abandoned
Equipment Curb
Walkway Pad
Railing or
Fancing
Area Divider
Roof Slope
New Roof Drain
Scupper
Key Notes
Metal Roof
Shingles or Clay
Titles
Revision
Elevation
Change
Expansion Joint
Pipe or Conduit on Support Block
Satellite Dish
Skylight on Curb
Equip. on Wood
Sleeper or
Support Curb
Pitch-Pan Pocket
AH S
Photos
Royal Oak Schools
1601 N Campbell Rd.
Royal Oak, MI 48067
Review10/23/2024
OTB10/24/2024
Royal Oak Schools
2025 Roofing Program
Royal Oak High School
1500 Lexington Blvd.
Royal Oak, MI 48073
WTProject No: ROSD-ROHS-25
2 2 2 2
11/07/2024 Addendum 1
Cross-Out
5'8'
10'8'
31'
13'
SHEET 3 OF 7
Roof Plan
Royal Oak High School
Roof Area K Section 5
A2.1
ROS 2025 Design - A2.0 Royal Oak High School
THESE DRAWINGS AND SPECIFICATIONS, AS INSTRUMENTS OF
SERVICE, ARE AND SHALL REMAIN THE PROPERTYOF
WEATHERTECH CONSULTING GROUP AND PROJECT OWNER,
WHETHER THE PROJECTS FOR WHICH THEY ARE MADE FOR ARE EXECUTED OR NOT. THESE
DRAWINGS AND SPECIFICATIONS SHALL NOT BE USED BY ANY PERSON OR ENTITY ON
OTHER PROJECTS WITHOUT THE WRITTEN CONSENT OF THE WEATHERTECH CONSULTING
GROUP. COPYRIGHT 2023.
DESCRIPTION
COPYRIGHT:
WeatherTech Consulting Group, Inc.
DATE
ISSUE
Drawn By: MD
Checked By: DM, AC, AW
WeatherTech
Consulting Group, Inc.
Roofing/Waterproofing Consultants
Corporate Office:
7747 Auburn Road
Utica, MI 48317
Phone #: 586-731-3095
Fax #: 586-731-6863
Email: weathertech@wtcg.net
Web Site: www.wtcg.net
SHEET TITLE
CLIENT
PROFESSIONAL
PROJECT
File Name:
ELECTRONIC STAMP
KEY PLAN
Royal Oak High School
Roof Area K Section 5
Scale:
" = 1'
Royal Oak High School - Royal Oak School District
Sheet Notes - Roof Area(s) K5
WORK DESCRIPTION - ROOF RECOVER
Work includes: The existing insulation is to remain in place. Remove and replace any deteriorated rigid insulation. Add new roof insulation to achieve R30. Remove all flashing systems and all sheet metal flashings, repair any deteriorated decking found, install new wood nailers, where required. Fully adhered EPDM single ply roof membrane including all flashing, new roof related sheet metal, and accessories as detailed in the specifications and drawings.
Approx. Roof Area K5 - 1,400 sq. ft.
1. EXISTING ROOF SYSTEM CONSTRUCTION
All existing roof system constructions were determined by test cuts and observation;
conditions may vary. Contractor responsible for confirming all existing roof system constructions and conditions.
Roof Area K5 Core Sample Results
a. Roof Membrane: EPDM
b. Insulation:
1) First insulation layer approx. 1 ½ inch ISO
2) Insulation: 1 1/2 inch ISO; Core thickness approx. 3-inches.
c. Underlayment: N/A
d. Deck: Metal
2. New Roof System: Roof Area K5 - Ref. Detail 1.01c.
a. Roof Membrane: EPDM, 60 mil, fully adhered to insulation.
b. Insulation: R30:
1) Disable existing roof membrane
2) Top layer mechanically attached over existing layers.
3) Furnish and install 6ftx6ft tapered sump
c. Deck: Metal: Repair as necessary to comply w/ building codes. (if needed)
d. Interior Ceiling: Closed under Deck; Interior Protection, as necessary
e. Building Height: Ground to building edge: 35 ft.
3. Warranty/Guarantee:
a. Manufacturer to provide a 20 year "No-Dollar-Limit" material and installation warranty covering the roof system, flashings and manufacturer's accessories.
4. Allowances: $2000 to be added to base bid for unforeseen deficiencies; this will be credit back to the client if not used.
5. Asbestos: Ref. to Section 024119 and Appendix 1: Asbestos testing results to be supplied by ROS selected 3rd party firm and will be incorporated into Appendix 1. Refer to Appendix 1 for asbestos testing results.
General Construction Details: Ref. A1.0
Use the General Construction Details on Sheet A1.0 for detail construction description as applicable when any detail is not specifically called out in Key Notes for the applicable
Roof Area and Section. Detail drawings called out in General Construction Details can be found on Sheets A3.0 to A3.1. Contractor to provide Shop Drawing as necessary for field conditions not directly identified in Contract Documents.
Key Notes: All detail references in Key Notes are considered typical and applicable to like conditions except as specifically amended on this Sheet. Refer to Sheet A1.0 General
Construction Detail Notes for applicable construction detail descriptions and Sheets A3.0 to A3.1 for construction detail drawings. Contractor to provide Shop Drawing as necessary for field conditions not directly identified in Contract Documents.
1. Metal Edging: Furnish and install new 24 ga pre-finished metal edging to match color of existing and S -clips are to be used at joints. Ref. Photo 2190.
2. Counterflashing: Furnish and install new 24 ga pre-finished counterflashing to match color of existing. Ref. Photo 2186.
3. Wood Nailers: Furnish and install new wood nailers as required.
4. Logistics / Staging: (not marked on roof plan) Due to roof access points, travel will be necessary over other roof area(s). Existing roof area(s) traveled over, are to use rigid insulation and plywood to cover.
5. Roof Sumps: Furnish and install 6ft x 6ft roof sumps for this application. Ref. Photo 2187.
Symbol Legend
Symbol
Conduit, Vent
Pipe or Other
Penetration
W
GAS AD EJ
Slope
H
L
Notes
Symbol
Notes
Symbol
Notes
Equipment Unit on Curb
Roof Hatch on
Curb
Roof Ladder
Screen Support
Stanchion
Gas Line
Roof Ridges and
Valleys
Roof Drain
Overflow
Scupper
Tapered
Insulation or
Saddles
Insulated Pipe or
Heat Stack
Penetration
Ductwork or
Flanged
Abandoned
Equipment Curb
Walkway Pad
Railing or
Fancing
Area Divider
Roof Slope
New Roof Drain
Scupper
Key Notes
Metal Roof
Shingles or Clay
Titles
Revision
Elevation
Change
Expansion Joint
Pipe or Conduit on Support Block
Satellite Dish
Skylight on Curb
Equip. on Wood
Sleeper or
Support Curb
Pitch-Pan Pocket
AH S
Photos
2186 2187
Royal Oak Schools
1601 N Campbell Rd.
Royal Oak, MI 48067
Review10/23/2024
OTB10/24/2024
Royal Oak Schools
2025 Roofing Program
Royal Oak High School
1500 Lexington Blvd.
Royal Oak, MI 48073
WTProject No: ROSD-ROHS-25
61'-6"
32'-6" 29'
A
A
SHEET 4 OF 7
Roof Plan
Royal Oak High School
Roof Area L Sections 1, 2 and 3
A2.2
ROS 2025 Design - A2.0 Royal Oak High School
THESE DRAWINGS AND SPECIFICATIONS, AS INSTRUMENTS OF
SERVICE, ARE AND SHALL REMAIN THE PROPERTYOF
WEATHERTECH CONSULTING GROUP AND PROJECT OWNER,
WHETHER THE PROJECTS FOR WHICH THEY ARE MADE FOR ARE EXECUTED OR NOT. THESE
DRAWINGS AND SPECIFICATIONS SHALL NOT BE USED BY ANY PERSON OR ENTITY ON
OTHER PROJECTS WITHOUT THE WRITTEN CONSENT OF THE WEATHERTECH CONSULTING
GROUP. COPYRIGHT 2023.
DESCRIPTION
COPYRIGHT:
WeatherTech Consulting Group, Inc.
DATE
ISSUE
Drawn By: MD
Checked By: DM, AC, AW
WeatherTech
Consulting Group, Inc.
Roofing/Waterproofing Consultants
Corporate Office:
7747 Auburn Road
Utica, MI 48317
Phone #: 586-731-3095
Fax #: 586-731-6863
Email: weathertech@wtcg.net
Web Site: www.wtcg.net
SHEET TITLE
CLIENT
PROFESSIONAL
PROJECT
File Name:
ELECTRONIC STAMP
KEY PLAN
Royal Oak High School
Roof Area L Sections 1, 2, 3 Scale:
" = 1'
Royal Oak High School - Royal Oak School District
Sheet Notes - Roof Area(s) L1, L2 and L3
WORK DESCRIPTION - ROOF REPLACEMENT
Work includes: Removal and disposal of existing roofing, insulation, flashing systems and all sheet metal flashings down to the surface of the deck, repair deteriorated decking, install new vapor barrier/base sheet, install new roof insulation, fully adhered
EPDM single ply roof membrane including all flashing, new roof related sheet metal, and accessories as detailed in the specifications and drawings. Completed work shall comply with all Contract Documents and roofing manufacturer's requirements to receive the specified warrantied roof system. Approx. Roof Area(s) L1 - 792 Sq. Ft., L2 - 7,567 Sq.
Ft., L3 - 1,381 Sq. Ft.
1. EXISTING ROOF SYSTEM CONSTRUCTION
All existing roof system constructions were determined by test cuts and observation; conditions may vary. Contractor responsible for confirming all existing roof system constructions and conditions.
Roof Area(s) L1, L2 and L3 Core Sample Results
a. Roof Membrane: BUR/CTP
b. Insulation:
1) First insulation layer approx. 3/4-inch perlite insulation.
2) Insulation: 1 ½ inch ISO; Core thickness approx. 3-inches.
c. Underlayment: Vapor Barrier
d. Deck: Gypsum
2. Roof System: Roof Area(s) L1, L2 and L3; Ref. Detail 1.01.
a. Roof Membrane: EPDM, 60 mil, adhered to insulation.
b. Insulation: Maximum achievable R-Value; Min R30
1) First layer set-in-low-rise foam adhesive to base sheet over deck - repair as necessary; Second layer to adhere over first layer
2) Tapered insulation: 1/4 inch per foot tapered polyisocyanurate insulation; set-in low-rise foam adhesive. All joints staggered and offset between layers.
(contractor to verify correct tapered size with manufacturer)
c. Deck: Gypsum: Repair as necessary to comply w/ building codes.
d. Interior Ceiling: drop or closed ceilings
e. Underlayment: (as required) base sheet - mechanically attached or self-adhered
f. Building Height: Ground to building edge: 35ft
3. Warranty/Guarantee:
a. Manufacturer to provide a 20 year "No-Dollar-Limit" material and installation warranty covering the roof system, flashings and manufacturer's accessories.
4. Allowances: $5000 to be added to base bid for unforeseen deficiencies; this will be credit back to the client if not used.
5. Asbestos: Ref. to Section 024119 and Appendix 1: Asbestos testing results to be supplied by ROS selected 3rd party firm and will be incorporated into Appendix 1.
Refer to Appendix 1 for asbestos testing results.
6. Tapered Insulation Layout: The roofing contractor is responsible for the final insulation system layout. The roofing contractor shall provide a tapered insulation layout plan. Provided by the insulation manufacturer.
General Construction Details: Ref. A1.0
Use the General Construction Details on Sheet A1.0 for detail construction description as applicable when any detail is not specifically called out in Key
Notes for the applicable Roof Area and Section. Detail drawings called out in
General Construction Details can be found on Sheets A3.0 to A3.1. Contractor to provide Shop Drawing as necessary for field conditions not directly identified in
Contract Documents.
Key Notes: All detail references in Key Notes are considered typical and applicable to like conditions except as specifically amended on this Sheet. Refer to Sheet
A1.0 General Construction Detail Notes for applicable construction detail descriptions and Sheets A3.0 to A3.1 for construction detail drawings. Contractor to provide Shop Drawing as necessary for field conditions not directly identified in
Contract Documents.
1. Metal Edging: Furnish and install new metal edging to match color of existing and S
-clips are to be used at joints. Ref. Photo 2114.
2. Counterflashing: Furnish and install new 24 ga pre-finished counterflashing to match color of existing. Ref. Photo 2132.
3. Wood Nailers: Furnish and install new wood nailers as required.
4. Logistics / Staging: (not marked on roof plan) Due to roof access points, travel will be necessary over other roof area(s). Existing roof area(s) traveled over, are to use rigid insulation and plywood to cover. Ref. Photo 2173.
5. Roof Sumps: Furnish and install 8ft x 8ft roof sumps for this application. Ref. Photo
2108.
6. Remove all Deleted Roof Items: curbs, pipes, etc. (if possible) and seal openings.
Ref. Photo 2046.
7. Expansion Joint: Furnish and install new expansion joint liner and batten insulation prior to installing new metal expansion joint. Standing seam metal joints are required.
Ref. Detail 1.02 and Photos 2105 and 2117.
8. Hot Pipe: Furnish and install new metal sleeve and umbrella, in lieu of pitch pan. Ref.
Photos 2163 and 2164.
9. Wall Ladders: Wall ladders to be altered to accommodate insulation thickness and metal edge conditions. Add new rung covers. Ref. Photos 2065, 2170.
10.Pitch Pans: Furnish and install new metal covers on all installed pitch pans. Ref.
Photo 2110.
11.Exterior Metal Piping: Protect exterior metal piping. Roofing contractor liable for all damage. Ref. Photo 2098.
Symbol Legend
Symbol
Conduit, Vent
Pipe or Other
Penetration
W
GAS AD EJ
Slope
H
L
Notes
Symbol
Notes
Symbol
Notes
Equipment Unit on Curb
Roof Hatch on
Curb
Roof Ladder
Screen Support
Stanchion
Gas Line
Roof Ridges and
Valleys
Roof Drain
Overflow
Scupper
Tapered
Insulation or
Saddles
Insulated Pipe or
Heat Stack
Penetration
Ductwork or
Flanged
Abandoned
Equipment Curb
Walkway Pad
Railing or
Fancing
Area Divider
Roof Slope
New Roof Drain
Scupper
Key Notes
Metal Roof
Shingles or Clay
Titles
Revision
Elevation
Change
Expansion Joint
Pipe or Conduit on Support Block
Satellite Dish
Skylight on Curb
Equip. on Wood
Sleeper or
Support Curb
Pitch-Pan Pocket
AH S
Photos
2046 2065
Royal Oak Schools
1601 N Campbell Rd.
Royal Oak, MI 48067
Review10/23/2024
OTB10/24/2024
Royal Oak Schools
2025 Roofing Program
Royal Oak High School
1500 Lexington Blvd.
Royal Oak, MI 48073
WTProject No: ROSD-ROHS-25
2098 2105
2108 2110
2114 2117
2132 2163
2164 2170
L2
L3
L1
11/07/2024 Addendum 1
Annette Wurth Cross-Out
Oval
A A
A A
A
62' 88' 10'
160'
SHEET 5 OF 7
ROS 2025 Design - A2.0 Royal Oak High School
THESE DRAWINGS AND SPECIFICATIONS, AS INSTRUMENTS OF
SERVICE, ARE AND SHALL REMAIN THE PROPERTYOF
WEATHERTECH CONSULTING GROUP AND PROJECT OWNER,
WHETHER THE PROJECTS FOR WHICH THEY ARE MADE FOR ARE EXECUTED OR NOT. THESE
DRAWINGS AND SPECIFICATIONS SHALL NOT BE USED BY ANY PERSON OR ENTITY ON
OTHER PROJECTS WITHOUT THE WRITTEN CONSENT OF THE WEATHERTECH CONSULTING
GROUP. COPYRIGHT 2023.
DESCRIPTION
COPYRIGHT:
WeatherTech Consulting Group, Inc.
DATE
ISSUE
Drawn By: MD
Checked By: DM, AC, AW
WeatherTech
Consulting Group, Inc.
Roofing/Waterproofing Consultants
Corporate Office:
7747 Auburn Road
Utica, MI 48317
Phone #: 586-731-3095
Fax #: 586-731-6863
Email: weathertech@wtcg.net
Web Site: www.wtcg.net
SHEET TITLE
CLIENT
PROFESSIONAL
PROJECT
File Name:
ELECTRONIC STAMP
KEY PLAN
Royal Oak High School
Roof Area O
Scale:
" = 1'
Royal Oak High School - Royal Oak School District
Sheet Notes - Roof Area O
WORK DESCRIPTION - ROOF REPLACEMENT
Work includes: Removal and disposal of existing roofing, insulation, flashing systems and all sheet metal flashings down to the surface of the deck, repair deteriorated decking, install new roof insulation, fully adhered EPDM single ply roof membrane including all flashing, new roof related sheet metal, and accessories as detailed in the specifications and drawings. Completed work shall comply with all Contract Documents and roofing manufacturer's requirements to receive the specified warrantied roof system. Approx. Roof Area O 11,282 sq. ft.
1. EXISTING ROOF SYSTEM CONSTRUCTION
All existing roof system constructions were determined by test cuts and observation;
conditions may vary. Contractor responsible for confirming all existing roof system constructions and conditions.
Roof Area O #1 Core Sample Results
a. Roof Membrane: BUR/CTP
b. Insulation:
1) First insulation layer approx. 1/2-inch perlite insulation.
2) Insulation: 1 ½ inch ISO; Core thickness approx. 2 3/4-inches.
c. Underlayment: Vapor Barrier
d. Deck: Gypsum
Roof Area O #2 Core Sample Results
a. Roof Membrane: BUR/CTP (coal tar pitch)
b. Insulation:
1) First insulation layer approx. 1/2 inch perlite insulation.
2) Insulation: 1 1/4 inch ISO; Core thickness approx. 2 1/2-inches.
c. Underlayment: Vapor Barrier
d. Deck: Gypsum
2. Roof System: Roof Area O; Ref Detail 1.01.
a. Roof Membrane: EPDM, 60 mil, adhered to insulation.
b. Insulation: Maximum achievable R-Value; Min R30 and R30 Value may not be achievable (due to wall vent height and roof access door) Ref. Photos 1974 and 1992
1) First layer set in set-in-low-rise foam adhesive to base sheet over deck - repair as necessary; Second layer to adhere over first layer
2) Tapered insulation: 1/8 inch per foot tapered polyisocyanurate insulation; set-in low-rise foam adhesive. All joints staggered and offset between layers. (contractor to verify correct tapered size with manufacturer)
c. Deck: Gypsum: Repair as necessary to comply w/ building codes.
d. Interior Ceiling: drop ceiling
e. Underlayment: Base sheet - mechanically attached or self-adhered
f. Building Height: Ground to building edge: 35ft
3. Warranty/Guarantee:
a. Manufacturer to provide a 20 year "No-Dollar-Limit" material and installation warranty covering the roof system, flashings and manufacturer's accessories.
4. Allowances: $5000 to be added to base bid for unforeseen deficiencies; this will be credit back to the client if not used.
5. Asbestos: Ref. to Section 024119 and Appendix 1: Asbestos testing results to be supplied by ROS selected 3rd party firm and will be incorporated into Appendix 1. Refer to Appendix 1 for asbestos testing results.
6. Tapered Insulation Layout: The roofing contractor is responsible for the final insulation system layout. The roofing contractor shall provide a tapered insulation layout plan prior to project startup. Provided by the insulation manufacturer.
General Construction Details: Ref. A1.0
Use the General Construction Details on Sheet A1.0 for detail construction description as applicable when any detail is not specifically called out in Key Notes for the applicable
Roof Area and Section. Detail drawings called out in General Construction Details can be found on Sheets A3.0 to A3.1. Contractor to provide Shop Drawing as necessary for field conditions not directly identified in Contract Documents.
Key Notes: All detail references in Key Notes are considered typical and applicable to like conditions except as specifically amended on this Sheet. Refer to Sheet A1.0 General
Construction Detail Notes for applicable construction detail descriptions and Sheets A3.0 to A3.1 for construction detail drawings. Contractor to provide Shop Drawing as necessary for field conditions not directly identified in Contract Documents.
1. Metal Edging: Furnish and install new 24 ga pre-finished metal edging to match color of existing and S -clips are to be used at joints. Ref. Photo 2004.
2. Counterflashing: Furnish and install new 24 ga pre-finished counterflashing to match color of existing. Ref. Photos 1955, 2003.
3. Wood Nailers: Furnish and install new wood nailers as required.
4. Logistics / Staging: (not marked on roof plan) Due to roof access points, travel will be necessary over other roof area(s). Existing roof area(s) traveled over, are to use rigid insulation and plywood to cover. Ref. Photo 2021.
5. Roof Sumps: Furnish and install 12ft x 12ft roof sumps for this application. Ref. Photos 1983 and 1984.
6. Remove all Deleted Roof Items: curbs, pipes, etc. (if possible) and seal openings. Ref.
Photo 2002.
7. Expansion Joint: Furnish and install new expansion joint liner and batten insulation, prior to installing new metal expansion joint. Standing seam metal joints are required. Ref. Detail
1.02 and Photos 2005 and 2010.
Symbol Legend
Symbol
Conduit, Vent
Pipe or Other
Penetration
W
GAS AD EJ
Slope
H
L
Notes
Symbol
Notes
Symbol
Notes
Equipment Unit on Curb
Roof Hatch on
Curb
Roof Ladder
Screen Support
Stanchion
Gas Line
Roof Ridges and
Valleys
Roof Drain
Overflow
Scupper
Tapered
Insulation or
Saddles
Insulated Pipe or
Heat Stack
Penetration
Ductwork or
Flanged
Abandoned
Equipment Curb
Walkway Pad
Railing or
Fancing
Area Divider
Roof Slope
New Roof Drain
Scupper
Key Notes
Metal Roof
Shingles or Clay
Titles
Revision
Elevation
Change
Expansion Joint
Pipe or Conduit on Support Block
Satellite Dish
Skylight on Curb
Equip. on Wood
Sleeper or
Support Curb
Pitch-Pan Pocket
AH S
Photos
1955 1983
Royal Oak Schools
1601 N Campbell Rd.
Royal Oak, MI 48067
Review10/23/2024
OTB10/24/2024
Royal Oak Schools
2025 Roofing Program
Royal Oak High School
1500 Lexington Blvd.
Royal Oak, MI 48073
WTProject No: ROSD-ROHS-25
Roof Plan
Royal Oak High School
Roof Area O
A2.3
6 6
20041992 door wall vent
11/07/2024 Addendum 1
Annette Wurth Line
Annette Wurth Line
Annette Wurth Line
Annette Wurth Line
Annette Wurth Line
Annette Wurth Line
Annette Wurth Line
Annette Wurth Line
Annette Wurth Line
Annette Wurth Line
Annette Wurth Line
Annette Wurth Line
Annette Wurth Line
Annette Wurth Line
Annette Wurth Line
Line
1.05
1.06
ROOF DRAIN
SCALE: N.T.S
PREFABRICATED METAL CURB
SCALE: N.T.S
1.12
MECHANICAL UNIT
BASE OF UNIT EXTENDS 1/2''
MINIMUM BEYOND TOP OF CURB
1-
" x
" NEOPRENE FOAM
SEALING STRIP
1"
1'' MINIMUM BELOW TOP OF
CURB
FLASHING RECEIVER
FASTENERS
COUNTERFLASHING
FLASHING MEMBRANE
WOOD CURB
ALTERNATE OPTION:
NOTE 1 - THE CURBS, TOP WOOD
NAILER AND SEAL STRIP ARE TO BE
SUPPLIED BY THE CURB
MANUFACTURER.
NOTE 2 - WHEN POSSIBLE, THE
MECHANICAL UNITS SHOULD NOT BE
SET UNTIL THE ROOF MEMBRANE AND
FLASHING HAVE BEEN INSTALLED.
NOTE 3 - WHERE THE SKYLIGHT,
SCUTTLE OR SMOKE VENT FRAME
OVERLAPS THE BASE FLASHING AT
LEAST 3 INCHES, THE REMOVABLE
SHEET-METAL COUNTERFLASHING IS
NOT REQUIRED.
8'' MINIMUM
WOOD NAILER
CURB
2 X 6 MIN. WOOD NAILER
ATTACHED TO SUBSTRATE --
OVERALL THICKNESS TO MATCH
INSULATION
STRUCTURAL DECK
ROOF INSULATION
SEAM PLATES AND
FASTENERS
EPDM MEMBRANE
SEALANT (IF REQUIRED FOR
THE SPECIFIC SYSTEM)
ADHERED MEMBRANE
FLASHING
REMOVABLE SHEET- METAL
COUNTERFLASHING
GASKETED FASTENERS MIN.
TWO FASTENERS PER SIDE
1-
" x
" NEOPRENE FOAM
SEALING STRIP
EQUIPMENT FRAME
BONDING ADHESIVE
PREMOLDED CORNER
NON-REMOVABLE EQUIPMENT CURB FLASHING
SCALE: N.T.S
1.14
NAILABLE OR NON-NAILABLE STRUCTURAL DECK
8" MIN.
SECUREMENT FASTENED AT
BASE OF CURB
ALTERNATE BASE FASTENING
EPDM BASE FLASHING ADHERED W/ BONDING
ADHESIVE - TUCK FLASHING UP AND BEHIND
BOTTOM OF UNIT SKIRT.
EXISTING CURB IS REQUIRED TO EXTEND MIN.
8" ABOVE THE EPDM MEMBRANE.
2" MIN.
3"
" MIN.
MANUFACTURER APPROVED BATTEN BAR
FASTENED 12" O.C., MAX.
3" SEAM TAPE
EPDM BASE FLASHING ADHERED W/
BONDING ADHESIVE
EPDM MEMBRANE
3" SEAM TAPE
EPDM MEMBRANE
FASTENER AND PLATE @ 12" O.C.
ROOF INSULATION
EPDM MUST EXTEND 2" MIN. ABOVE PLATE
4" MIN.
NON-REMOVABLE EQUIPMENT UNIT
POLYURETHANE SEALANT
METAL COUNTERFLASHING SEE NOTES 1
AND 2
NOTE 1 - WHEN BASE OF UNIT PROVIDES LESS THAN 4" COVERAGE OVER TOP OF FLASHING,
INSTALL SEPARATE COUNTERFLASHING AS SHOWN.
NOTE 2 - COUNTERFLASHING TO BE 24 GAGE GALVANIZED STEEL, 24 GAGE PRE-FINISHED
GALVANIZED STEEL, .032" MILL FINISHED ALUMINUM OR 26 GAGE STAINLESS STEEL. SEE
SCHEDULE(S) ON THE ROOF PLAN(S) FOR SPECIFIC TYPE OF METAL REQUIRED IN EACH ROOF
AREA.
2" MIN.
REMOVABLE EQUIPMENT CURB FLASHING
SCALE: N.T.S
NAILABLE OR NON-NAILABLE STRUCTURAL DECK
8" MIN.
1-
" x
" NEOPRENE FOAM SEALING STRIP
SELF-FLASHING EQUIPMENT UNIT
FASTEN FLASHING 8" O.C. WITH ROOFING
NAILS
EPDM BASE FLASHING ADHERED W/ BONDING
ADHESIVE - WRAP FLASHING UP AND OVER
TOP OF CURB MIN. 2"
EXISTING CURB IS REQUIRED TO EXTEND MIN.
8" ABOVE THE EPDM MEMBRANE.
2" MIN.
3"
" MIN.
3" SEAM TAPE
EPDM MEMBRANE
FASTENER AND PLATE @ 12" O.C.
ROOF INSULATION
EPDM MUST EXTEND 2" MIN. ABOVE PLATE
SECUREMENT FASTENED AT
BASE OF CURB
ALTERNATE BASE FASTENING
MANUFACTURER APPROVED BATTEN BAR
FASTENED 12" O.C., MAX.
3" SEAM TAPE
EPDM BASE FLASHING ADHERED W/
BONDING ADHESIVE
EPDM MEMBRANE
#12 STAINLESS STEEL SCREWS WITH EPDM
BACKED S.S. WASHERS @ 12" O.C.
1.11
OVERFLOW DRAIN
SCALE: N.T.S
SIDE VIEW:
1.15
THROUGH ROOF CONDUIT/PIPE FLASHING
2 PC COLLAR
SCALE: N.T.S
9" SEAM TAPE FLASHING - SEE NOTE 1
STRUCTURAL DECK
ROOF INSULATION
24 GA. GAL. SHEET METAL RAIN COLLAR FLASHING
OVERLAPPING FLASHING COLLAR BY 3" TO 4" MIN. -
RAIN COLLAR TO BE 8" MIN. ABOVE ROOFING.
ROOF INSULATION
4" WIDE TREATED WOOD BLOCKING TO MATCH
HEIGHT OF INSULATION
CONTINUOUS BEAD OF SEALANT
CONTINUOUS BEAD OF LAP SEALANT
CONTINUOUS BEAD OF WATER BLOCK
FASTENER @ 12" O.C. W/ SEALANT
5" SEAM TAPE FLASHING - SEE NOTE 2
" MIN. CLEARANCE BETWEEN FLASHING COLLAR AND
CONDUIT.
STAINLESS STEEL DRAWBAND
SEALANT
8" MIN.
THROUGH ROOF CONDUIT/PIPE FLASHING
SCALE: N.T.S
HEAT STACK FLASHING
SCALE: N.T.S
STRUCTURAL DECK
FASTENER AND PLATE @ 12" O.C.
3"
EPDM MEMBRANE
24 GA. GAL. SHEET METAL RAIN COLLAR FLASHING
OVERLAPPING FLASHING COLLAR BY 3" TO 4" MIN. -
RAIN COLLAR TO BE 8" MIN. ABOVE ROOFING.
STAINLESS STEEL DRAWBAND
SEALANT
SEALANT
EPDM BASE FLASHING ADHERED W/ BONDING
ADHESIVE
EXISTING CURB IS REQUIRED TO EXTEND MIN. 8"
ABOVE THE EPDM MEMBRANE.
3" SEAM TAPE
EPDM MUST EXTEND 2" MIN. ABOVE PLATE
PRE-FABRICATED PIPE FLASHING
SCALE: N.T.S
8" MIN.
STRUCTURAL DECK
3" MIN.
3"
ROOF INSULATION
EPDM MEMBRANE
ROOF INSULATION
STRUCTURAL DECK
FIBERGLASS BATT INSULATION
1" MIN.
ROOF INSULATION
PRE-FABRICATED EPDM MEMBRANE BOOT
FLASHINGS MIN. 8"
SEALANT
EPDM MUST EXTEND 2" MIN. ABOVE PLATE
PIPE PENETRATION
PIPE PENETRATION
STRUCTURAL DECK
3"
EPDM MEMBRANE
STAINLESS STEEL DRAWBAND
3" SEAM TAPE
FASTENER AND PLATE @ 12" O.C.
HEAT STACK PENETRATION
HIGH HEAT RATED SEALANT
STAINLESS STEEL DRAWBAND
24 GA. GALV SHEET METAL RAIN COLLAR
FLASHING OVERLAPPING FLASHING COLLAR BY
3" TO 4" MIN. - RAIN COLLAR TO BE 8" MIN. ABOVE
ROOFING.
SEALANT
EPDM BASE FLASHING ADHERED W/ BONDING
ADHESIVE
EXISTING CURB IS REQUIRED TO EXTEND MIN. 8"
ABOVE THE EPDM MEMBRANE.
EPDM MUST EXTEND 2" MIN. ABOVE PLATE
FASTENER AND PLATE @ 12" O.C.
3" SEAM TAPE
8" MIN.
3" SEAM TAPE
STAINLESS STEEL DRAWBAND
SEALANT
8" MIN.
STRUCTURAL DECK
ROOF INSULATION
EPDM MUST EXTEND 2" MIN. ABOVE PLATE
FIELD FABRICATED PIPE FLASHING
SCALE: N.T.S
3"
EPDM MEMBRANE
PRE-FABRICATED EPDM MEMBRANE BOOT
FLASHINGS MIN. 8"
FASTENER AND PLATE @ 12" O.C.
PIPE PENETRATION
EPDM MEMBRANE
CONTINUOUS BEAD OF WATERBLOCK
1" DOWN.
CONTINUOUS BEAD OF WATERBLOCK
1" DOWN.
CONTINUOUS BEAD OF WATERBLOCK
1" DOWN.
PITCH-PAN POCKET TO NAILER
SCALE: N.T.S
1" MIN.1" MIN. 1" MIN.
1.04
ROOF DRAIN SUMP
SCALE: N.T.S
1.07
1.08
1.09 1.10
1.13
48"
192"
48"
ROOF DRAIN
ROOF DRAIN SUMP. TAPERED AT A MIN.
PER FOOT
CENTER LINE DRAIN
SLOPE SLOPE
48"
48"
192"
48"
48"48"
SLOPE
SLOPE
SLOPE SLOPE
SLOPE
48"
CONTINUOUS BEAD OF SEALANT
TAPERED ROOF INSULATION - MIN.
" PER FOOT TAPER
STAINLESS STEEL CLAMPING RING BOLTS - REPLACE IF
MISSING, DAMAGED OR NON-STAINLESS STEEL BOLTS
STRUCTURAL DECK
DRAIN BOWL
DRAIN PIPING
ROOF INSULATION
48"
1" MIN.
EPDM MEMBRANE
CLAMPING RING - REMOVE ALL BITUMINOUS MATERIALS
- REPLACE IF MISSING OR BROKEN DURING REMOVAL
CAST IRON DRAIN STRAINER - REPLACE IF MISSING OR
BROKEN. PLASTIC DRAIN STRAINER ARE ONLY ALLOWED
WITH APPROVED BY CONSULTANT IN WRITING.
NOTE - CONTRACTORS TO INSTALL TAPERED INSULATION. DO NOT SHAVE ROOF INSULATION TO
MATCH DRAIN INSULATION HEIGHT TO DRAIN BOWL HEIGHT.
192"
48" 48" 48"48"
CONTINUOUS BEAD OF SEALANT
TAPERED ROOF INSULATION - MIN.
" PER FOOT TAPER
STAINLESS STEEL CLAMPING RING BOLTS - REPLACE IF
MISSING, DAMAGED OR NON-STAINLESS STEEL BOLTS
STRUCTURAL DECK
DRAIN BOWL
DRAIN PIPING
ROOF INSULATION
48"
1" MIN.
EPDM MEMBRANE
CAST IRON DRAIN STRAINER - REPLACE IF MISSING OR
BROKEN. PLASTIC DRAIN STRAINER ARE ONLY ALLOWED
WITH APPROVED BY CONSULTANT IN WRITING.
NOTE - CONTRACTORS TO INSTALL TAPERED INSULATION. DO NOT SHAVE ROOF INSULATION TO
MATCH DRAIN…