_Addendum 1 - Church Corners.pdf

PDF 988 KB Posted

Attached to
Church Corners Inn Abatement and Limited Interior Demolition
Solicitation number
Bid No 27-01
Issued by
Hartford County, Connecticut

About this file

This is Addendum 1 to the bid documents for the Town of East Hartford's Church Corners Inn Abatement and Limited Interior Demolition project (Bid No. 27-01), issued on August 18, 2026. The addendum clarifies critical scope details and contractor responsibilities for the selective interior demolition and hazardous materials abatement work at 860 Main Street. Key revisions address utility infrastructure, site security requirements, monitoring protocols, floor finish removal scope, and contract timeline. The contractor is responsible for connecting to existing water service and providing temporary power through either connection to the power company or generator rental, including all associated fees and monthly costs. Site security requires the contractor to provide 6-foot-high chain link temporary fencing with blue scrim around the entire site and submit a logistics plan based on the included boundary and topographic survey. Tighe & Bond will provide part-time monitoring, adjustable based on the contractor's schedule and abatement requirements. Floor finish removal is included down to subfloors throughout the building, with scope determined by the Hazardous Materials Report and reference drawings. Roof work is excluded from this project phase. The construction timeline is approximately three months. The addendum incorporates two new appendices: photographs of the water meter and supply location and a boundary and topographic survey dated June 12, 2023, prepared by Martin Surveying Associates, LLC.

The survey documentation provides detailed site mapping including property boundaries, underground utilities, topographic features, and existing infrastructure. The site encompasses approximately 0.378 acres at the intersection of Main Street (US Route 5) and Connecticut Boulevard (US Route 44), with adjacent properties including the US Post Office and a four-story brick building at 860 Main Street. Underground utilities documented include water mains (10-inch and 14-inch), gas mains (4-inch and 6-inch), sanitary tile, and electrical and telecommunications lines. The survey was prepared pursuant to Connecticut State Agency regulations with Class A-2 horizontal accuracy, Class V-2 vertical accuracy, and Class T-2 topographic accuracy, based on RTK GPS observations from June 9, 2025. All contractors are required to contact Call-Before-You-Dig at 1-800-922-4455 prior to any excavation or utility work.

View the file

Other files

File Type Posted
Bid No 27-01_Sep_24_26_solicitation_doc.pdf PDF
Bid No 27-01_Aug_28_26_solicitation_doc.pdf PDF
Bid No 27-01_Sep_10_26_solicitation_doc.pdf PDF
Bid No 27-01_Oct_8_26_solicitation_doc.pdf PDF
Bid No 27-01_Sep_1_26_solicitation_doc.pdf PDF
Bid No 27-01_Oct_23_26_solicitation_doc.pdf PDF
Bid No 27-01_Sep_11_26_solicitation_doc.pdf PDF
Bid No 27-01_Oct_16_26_solicitation_doc.pdf PDF
Bid No 27-01_Aug_27_26_solicitation_doc.pdf PDF
Bid No. 27-01 - Church Corners Inn Abatement and Limited Interior Demo.pdf.crdownload CRDOWNLOAD file
Bid No 27-01_Aug_3_26_solicitation_doc.pdf PDF
Bid No 27-01_Aug_24_26_solicitation_doc.pdf PDF
Bid No 27-01_Sep_16_26_solicitation_doc.pdf PDF
Bid No. 27-01 - Project Manual - Church Corners Inn.pdf PDF
Bid No 27-01_Oct_13_26_solicitation_doc.pdf PDF
Bid No. 27-01 - Project Manual - Church Corners Inn.pdf.crdownload CRDOWNLOAD file
Bid No 27-01_Nov_3_26_solicitation_doc.pdf PDF
Bid No 27-01_Oct_27_26_solicitation_doc.pdf PDF
VendorChangeDetailsReport_Bid No 27-01_v1_Aug_19_26.pdf PDF
Bid No 27-01_Oct_15_26_solicitation_doc.pdf PDF
Bid No. 27-01 - Drawings - Church Corners Inn Abatement.pdf PDF
Bid No 27-01_Oct_7_26_solicitation_doc.pdf PDF
Bid No 27-01_Oct_2_26_solicitation_doc.pdf PDF
Bid No. 27-01 - Church Corners Inn Abatement and Limited Interior Demo.pdf PDF
Bid No 27-01_Sep_4_26_solicitation_doc.pdf PDF
Bid No 27-01_Sep_17_26_solicitation_doc.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Town of East Hartford

CHURCH CORNERS INN ABATEMENT AND LIMITED INTERIOR DEMOLITION

Bid No. 27-01

Issued AUGUST 18, 2026

The following summarizes revisions to the Bid Documents included in Addendum No. 1 for the

CHURCH CORNERS INN ABATEMENT AND LIMITED INTERIOR DEMOLITION (Bid No.

27-01).

# Question DIV Response

Water, power utilities provided or not?

Contractor shall be responsible for connecting to the existing water service and providing on site distribution. The existing water is to be utilized at the meter per the attached photographs. The existing distribution is not reliable and assumed to be in chronic disrepair.

It is up to the contractor to provide power from the power company or with a generator.

Contractor is responsible for connection fees, generator rental and fuel, temporary panels, distribution, and monthly costs as applicable.

What site security is expected? Temporary or permanent fencing?

6’ high chain link temporary fencing with blue scrim is to be provided around the entire site by the contractor. Contractor is responsible for securing the building and the provision of site access. Contractor shall submit a logistics plan based on the survey included in this addendum.

Tighe and Bond providing full-time or part-time monitoring?

Tighe & Bond Response: We have included part-time monitoring in our proposal. This could change depending on the contractor’s schedule, i.e. if they need pre- or post-abatement visuals or air sampling every day.

Are the floors included?

Floor finish removal down to the subfloors is included throughout the building. Refer to the Hazardous Materials Report and Reference drawings to determine which floors contain hazardous materials.

01 3233 Part 3 D 5, calls for photographing foundations and footings in place before removal. Are there plans to remove any foundations or footings?

No, strike this note as it does not apply.

6 Is the Roof included? Not at this time.

7 What is the Contract Time? Approximately 3 months for Construction.

ADD the following Appendix to the Project Manual:

1. Appendix B: Photographs of Water Meter/Supply

2. Appendix C: Boundary & Topographic Survey dated 6/12/2023

B

Christopher Williams Architects, LLC CWA Project no. 2

APPENDIX B

CHAIN LINK FENCE

G R

AN

IT

E C

U R

B

G R

AN

IT

E C

U R

B

MS

FOUND

3 "

PINE

CA

F.F.E.=42.31'

F.F.E.=42.32'

METAL FENCE

M E

TA

L FE

N C

E

C O

N C

. C U

R B

C O

N C

. C U

R B

CONC. CURB

METAL

GUARD RAIL

MH PAVED

TF= 39.73'

GV

W G

WG

'C' CB

TF= 38.86'

INV.=35.56'C' CB

TF= 37.97'

15" RCP =35.87

EM

BUTTON

BOX

AD

TF= 39.39'

INV.=35.69

CONC. CURB

PA

VE

R S

C O

N C

. W

AL

K

C O

N C

. C U

R B

CONC. WALK

CONC. RAMP

B

IT

. P A

V E

M E

N T

C O

N C

. L

AN

D

IN

G

PA

VE

R

S

BUTTON

BOX

PA

VE

R S

PAVERS

PAVERS

CONC. WALK

CONC. WALK

B

IT

.P A

R K

IN

G

#860 MAIN ST

4 STORY

BRICK BUILDING

LOCUST COURT

#3 LOCUST COURT

N/F

TOWN OF EAST HARTFORD

8OLUME �4� PA)E �3�

MAP/LOT� �3/33�A

M A

IN

S

T R

E E

T

(U S R

T E

B

IT

. D R

IV

E

W A

Y

#846 MAIN ST

N/F

U S A POST OFFICE

8OLUME ��4 PA)E ��3

MAP/LOT� �3/334

CONNECTICUT BLVD.

(US RTE. 44)

ENCLOSED CONC.

DUMPSTER PAD

WITH CHAIN LINK FENCE

BIT. PAVEMENT

CONC. STEPS &

LANDING

M

ET

A L

S

TA

IR

C A S E

M

ET

A L

S

TA

IR

C A S E

ELEC.

EQUIPMENT

SHRUB

.1

6.8'

.9

16.2'

.1

0.3'

.0

42.9'

21.8'

.2

28.9'

48.4'

39.26'

39.33'

39.56'39.55'

39.84' 39.94' 39.83'

39.89'

39.68'

39.41'

39.94'

39.90'

39.46'

39.43'

38.61'

38.51'

38.70'

39.45'

38.25'

38.30'

38.94'

38.50'

38.40'

40.15'

39.72'

39.41'

38.9'

38.3'

38.6'

38.2'

38.8'

38.5'

39.2'

38.5'

39.4'

CH

AI

N

LI

NK

F

EN

CE

#846 MAIN ST

1 STORY

BRICK BUILDING

39.1' 39.3' 39.6'

METAL

FENCE

METAL

FENCE

G

G

G

G

G

G G

G

G

G

G

6" G

AS

M

AI

N

4" GAS

6" G

AS

M

AI

N

SS

SS

SS

SS

SS

8" T

IL

E

(S

AN

IT

AR

Y)

G

G

W

W

W

W

W

W

W

W

W

W

W

" W

AT

ER

M

AI

N

" W

AT

ER

M

AI

N

T

T

T

T

T

6" G

AS

M

AI

N

T T

T

T

T

T

T T

T T

E

E

E

E

E

S 86°01'34" E 125.07'

S

°3

'4

" E 9

.6

S 79°25'24" W 55.96'

N 85°59'24" W 128.58'

N

5°

'0 6"

E

.0

0'

C O

N C

. W

AL

K

18.8'

4.

9'

44.6'

CONC. STEPS &

LANDING

39.49

PA

VE

R S

39.43

39.33

39.40

F.E.=41.85'

F.E.=41.38'39.75'

40.10'

TOP OF STEP

EL.=41.8

TOP OF STEP

EL.=41.2

TOP OF LANDING

EL.=42.5

1.9'

APPROX MH

(PAVED OVER)

WG

H.H.

TR

D O

U

BL

E

YE

LL

O

W L

IN

ESI

N

G

LE

W H

IT

E

LI

N

E

SI

N

G

LE

W H

IT

E

LI

N

E

SI

N

G

LE

W H

IT

E

LI

N

E

SI

N

G

LE

W H

IT

E

LI

N

E

STOP BAR

S

TO

P B

A R

BC.=37.95'

TC.=38.46

BC.=38.03'

TC.=38.46

BC.=38.41'

TC.=38.58

BC.=39.22'

TC.=39.71

R C

P

DMH

TF.=38.96

15" RCP =32.66 (S)

12" RCP =32.86 (W)

" R

C P

LAT:41.76902994

LON:72.64284985

TR

D O

U

BL

E

YE

LL

O

W L

IN

E

SI

N

G

LE

W H

IT

E

LI

N

E

SI

N

G

LE

W H

IT

E

LI

N

E

SI

N

G

LE

W H

IT

E

LI

N

E

SI

N

G

LE

W H

IT

E

LI

N

E

STOP BAR

S

TO

P B

A R

70147

THIS DOCUMENT AND COPIES THEREOF ARE VALID ONLY IF THEY BEAR THE SIGNATURE

AND EMBOSSED SEAL OF THE DESIGNATED LICENSED PROFESSIONAL. UNAUTHORIZED

ALTERATIONS TO THIS PLAN RENDER THE DECLARATION HEREON NULL AND VOID.

TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY

CORRECT AS NOTED HEREON.

DEAN MARTIN LICENSE NO.

MAP NOTES:

1. THIS MAP AND SURVEY HAVE BEEN PREPARED PURSUANT TO THE REGULATIONS

OF CONNECTICUT STATE AGENCIES SECTIONS 20-300b-1 THROUGH 20-300b-20 AND

"THE MINIMUM STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF

CONNECTICUT" ADOPTED JUNE 21, 1996; AMENDED OCTOBER 26, 2018.

2. THE TYPE OF SURVEY PERFORMED AND THE MAPPED FEATURES DEPICTED

HEREON ARE IN ACCORDANCE WITH THE REQUIREMENTS OF A

BOUNDARY/TOPOGRAPHIC SURVEY.

3. THE BOUNDARY DETERMINATION/OPINION IS BASED UPON A RESURVEY OF MAP

REFERENCES B & C.

4. THE HORIZONTAL BASELINE CONFORMS TO A CLASS A-2 ACCURACY.

THE VERTICAL BASELINE CONFORMS TO A CLASS V-2 ACCURACY.

THE TOPOGRAPHIC FEATURES CONFORM TO A CLASS T-2 ACCURACY.

5. THE NORTH ARROW AND BEARINGS ARE BASED UPON THE CONNECTICUT STATE

COORDINATE SYSTEM N.A.D. 1983 (2011). THE ELEVATIONS ARE BASED UPON THE

NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88) USING GEOID 12B.

COORDINATES AND ELEVATIONS WERE DETERMINED FROM RTK GPS

OBSERVATIONS MADE ON JUNE 9, 2025, USING SUPERIOR RTK NETWORK (ORANGE

BASE), HAVING THE FOLLOWING VALUES:

LATITUDE = N 41° 40' 2471724"

LONGITUDE= W -72° 42' 5225236"

ELLIPSOID HEIGHT = 41.749M

6. UNDERGROUND UTILITIES, STRUCTURES AND FACILITY LOCATIONS DEPICTED AND

NOTED HEREON HAVE BEEN COMPILED, IN PART FROM OBSERVABLE SURFACE

EVIDENCE WHILE CONDUCTING THE FIELD SURVEY, RECORD MAPPING SUPPLIED

BY THE RESPECTIVE COMPANIES OR GOVERNMENTAL AGENCIES, AND FROM

OTHER SOURCES. THESE LOCATIONS MUST BE CONSIDERED AS APPROXIMATE IN

NATURE. ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE, THE

EXISTENCE WHICH IS UNKNOWN TO MARTIN SURVEYING ASSOCIATES, LLC.. ALL

CONTRACTORS ARE REQUIRED TO CONTACT CALL-BEFORE-YOU-DIG AT

1-800-922-4455 FOR LOCATION AND OR STAKEOUT OF ANY UTILITY PRIOR TO ANY

EXCAVATION.

DATE:

SCALE:

SHEET:

REVISIONS:

DRAWN BY:

"C-L" CATCH BASIN

MAIL BOX

MSA PROJECT NO:

GUY ANCHOR

GAS METER

CHECKED BY:

IRON PIN (FOUND)

MONUMENT (FOUND)

SIGN

MANHOLE

"C" CATCH BASIN

U/G ELEC. LINE

UTILITY POLE

CHAIN LINK FENCE

T

LEGEND:

POST

LIGHT POLE

WATER GATE

UNDERGROUND

OVERHEAD UTILITIES

EVERGREEN TREES

GAS VALVE

DECIDUOUS TREES

WG

TREE LINE

SHRUB/BUSH

E

W

PIPING (San.,Stm.)

WATER LINE

U/G TELE. LINE

G U/G GAS LINE

Rebar/Drill Hole (To Be Set)

201 CHRISTIAN LANE BERLIN, CT 06037

860-832-9328

CBX

C A

TRAFFIC CONTROL

HAND HOLE

BUTTON BOX

A.C. UNIT FLAG POLE

TRAFFIC LIGHT

POLE BOX

GUARD RAIL

BOUNDARY LINE

EM

WATER METER

GM

GV

WM

TRANSFORMER

ELEC. METER

DRAINAGE MANHOLE

SANITARY MANHOLE

ELEC. MANHOLE

TELE. MANHOLE

B O

U N

D A

R Y

T

O

PO

G R

A

PH

IC

S

U R

VE

Y

LA

N

D O

F

TO

W N

O F

EA

ST

H A

R

TF

O R

D

A

SS

ES

SO

R M

A P/

LO

T

/3

-A

M A

IN

S

TR

EE

T

EA

ST

H

A R

TF

O

R D

, C O

N N

EC

TI

C U

T

D.M.

K.R.

25-059

1"=20'

06-12-2023

SCALE:1"=20'

SITE LOCATION MAP (NOT TO SCALE)

SITE

SUBJECT PARCEL

XXXXX S.F. ±

0.378 ACRES ±

VOL. 4156 PG. 030

WWW. MARTINSURVEY.COM

MAP REFERENCES:

A. "PROPERTY OF THE UNITED STATES OF AMERICA #850 MAIN ST. EAST HARTFORD

CONNECTICUT SCALE 1"=20' JAN. 1962, JOHNAN H. MILLER".

B. "PROPERTY OF DR. JAMES L. CORTHOUTS 860 MAIN STREET & CHURCH CORNERS

EAST HARTFORD CONNECTICUT SCALE 1"= 20' SEPTEMBER 7, 1965, HANS S.

JENSEN REGISTERED LAND SURVEYOR."

C. "LAND LEASED FROM THE TOWN OF EAST HARTFORD HARTFORD EAST ELDERLY

APARTMENTS LIMITED PARTNERSHIP MAIN STREET AT LOCUST COURT EAST

HARTFORD, CONN. DATE 12-23-82, SCALE 1"=30', F A HESKETH & ASSOCIATES."

APPENDIX C

http://WWW.MartinSurvey.com

2508 Church Corners Abatement Demo Addendum #1
24x36

_Short Version RFP_CHURCH CORNERS

File details come from the government source that posted it. Updated .