Addendum_1 Atlanta SSB Metal Siding.pdf

PDF 1 MB Posted

Attached to
591/25191. AGY; Atlanta SSB Metal Siding and Soffit Install
Solicitation number
RFQ-171-250000000543-2
Issued by
Macomb County, Ann Arbor City, Michigan

About this file

This document is Addendum #1 for the Atlanta SSB Metal Siding Installation project, issued by the Michigan Department of Transportation (MDOT), specifically the TSMO, Fleet and Facilities Services division. The project is located at the MDOT Atlanta Garage in Atlanta, Michigan, with the project number S000125CON. The addendum provides clarifications and changes to the original bid documents, including specifications for metal wall panels, fastener installation, synthetic underlayment, and project timeline. The contract time is set at 60 calendar days from the Notice-to-Proceed, with liquidated damages of $200 per calendar day after substantial completion.

The addendum addresses several key questions from potential bidders, including clarifications on approved manufacturers, installation instructions for fasteners, and acceptable underlayment materials. Notably, the document specifies that material approvals must be submitted 7 days before the bid, and approved equals will not be determined during the submittal process. The project involves installing metal wall panels, metal door panels, synthetic felt, metal fascia wrap, and vented soffit at the Atlanta Garage facility. The attached drawings provide elevation views and construction notes for the metal siding installation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #1

Project Name: Atlanta SSB Metal Siding Installation Issuance Date: August 6, 2025 Project Location: MDOT Atlanta Garage/ 13490 M-32/M-33, Atlanta, MI 49709 MDOT Project Number: S000125CON

This addendum is issued to inform bidders of changes, clarifications, and additions to the drawings and/or specifications. Provide all labor, materials, equipment, services, and supervision as necessary to complete the work stated herein. All costs associated with the work in this addendum shall be included in the bid price and are considered part of the contract. All work shall be in accordance with the original bid documents and the information indicated below:

Q and A:

Q: On page 00-6 of SECTION 00100 INSTRUCTIONS TO BIDDERS Item #19.

- Can you clarify that manufacturers other than ones listed are acceptable and will be approved in the submittal process, as long as they are equal or better than the ones listed.

A: Materials won’t be approved in the submittal process. Need to be approved 7 Days before bid as stated in paragraph

Q: On page 00-7 of SECTION 00100 INSTRUCTIONS TO BIDDERS Item #23.

Per your stated intent, can you change it to read, Work of all trades as specified in the Contract

Documents must be completed in 45 calendar days from the date of Notice-to-Proceed, or when submittals are approved, (whichever is later), except for minor replacement, correction, or adjustment items which do not interfere with the complete operation and utilization of all parts of the Contract Work?

A: We cannot change to this wording. However the project will be given 60 days from Notice-to-Proceed to be completed.

Q: On page 01-5, SECTION 01100 PROJECT PROCEDURES #3-(b) Temporary Fence.

This will add unnecessary cost. Can this be removed?

A: Temporary Fence not required for this project.

Q: In SECTION 07400 - 1 METAL SIDING - PART 2 - PRODUCTS 2.01 METAL WALL PANELS - A.

Some manufacturers recommend that the screws be installed in the flat. Can this be changed to read “Fasteners to be installed per the manufacturers installation instructions”?

A: Yes. The fasteners for metal siding are to be installed per the manufacturer’s installation instructions.

Q: In SECTION 07400 - 1 METAL SIDING - PART 2 - PRODUCTS 2.01 METAL WALL

PANELS - D.

Can this be clarified as the approved equal can be determined during the submittal process, as long as they are equal or better than the ones listed?

A: Approved equal will not be approved during submittal process.

Q: SECTION 07400 - 3 METAL SIDING - 2.07 SYNTHETIC UNDERLAYMENT

In some applications roofing underlayment does not meet code or is not recommended to be used on walls/under siding. To ensure that inspections can be passed and codes can be met, can typical housewrap such as Tyvek, Typar, or other standard housewraps be used under the metal siding?

A: Correct synthetic underlayment can be determined and installed per manufacturer’s recommendations.

Specification Change:

23. CONTRACT TIME; LIQUIDATED DAMAGES: Work of all trades as specified in the Contract Documents must be completed in 60 calendar days from the date of Notice-to-Proceed except for minor replacement, correction, or adjustment items which do not interfere with the complete operation and utilization of all parts of the Contract Work.

This Contract Time is of the essence and liquidated damages for each Calendar Day that expires after this Substantial Completion of the entire Work must be in the amount of $ 200.00. Liquidated damages are not a penalty, are cumulative and represent a reasonable estimate of the Owner’s extra costs and damages, which are difficult to estimate with accuracy in advance.

DRAWING:

Please see the attached drawing below for the correction to the fascia (Change in red cloud)

ACKNOWLEDGE RECEIPT OF ADDENDUM ON BID SUMMARY

AutoCAD SHX Text

FACILITIES OPERATIONS

AutoCAD SHX Text

BUREAU OF FIELD SERVICES

AutoCAD SHX Text

ATLANTA, MICHIGAN 49709

AutoCAD SHX Text

ATLANTA SALT STORAGE BUILDING

AutoCAD SHX Text

METAL WALL PANEL INSTALL

AutoCAD SHX Text

AutoCAD SHX Text 13490 M-32/M-33

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text

ELEVATIONS

AutoCAD SHX Text

C&T BUILDING-8885 RICKS RD.

AutoCAD SHX Text

LANSING, MICHIGAN

AutoCAD SHX Text

DEPARTMENT OF

AutoCAD SHX Text

OFFICE OF FACILITIES

AutoCAD SHX Text

MANAGEMENT AND BUDGET

AutoCAD SHX Text

APRIL 10, 2025

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

S000125CON

AutoCAD SHX Text

PRELIM.

AutoCAD SHX Text

CONST.

AutoCAD SHX Text

FINAL REC.

AutoCAD SHX Text

DR

AutoCAD SHX Text

CHK'D

AutoCAD SHX Text

APPR

AutoCAD SHX Text

MDOT APPROVAL

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

RECOMMENDED FOR

AutoCAD SHX Text

APPROVAL BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

WEST ELEVATION

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

SOUTH ELEVATION

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

EAST ELEVATION

AutoCAD SHX Text

NORTH ELEVATION

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text 198'-0"

AutoCAD SHX Text 72'-0""

AutoCAD SHX Text 72'-0"

AutoCAD SHX Text 198'-0"

AutoCAD SHX Text 24'-0"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

2. CONTRACTOR IS OBLIGATED TO VERIFY AND/OR ESTABLISH ALL DIMENSIONS, ELEVATIONS

AutoCAD SHX Text

AND CONDITIONS IN THE FIELD.

AutoCAD SHX Text

3. IF THE EXISTING FIELD CONDITIONS DO NOT PERMIT THE INSTALLATION OF THE WORK IN

AutoCAD SHX Text

ACCORDANCE WITH THE DETAILS SHOWN, THE CONTRACTOR SHALL NOTIFY THE MDOT PROJECT

AutoCAD SHX Text MANAGER IMMEDIATELY AND PROVIDE INFORMATION OF EXISTING CONDITIONS. FINAL INSTALLATION

AutoCAD SHX Text

SHALL BE IN ACCORDANCE WITH THE INSTRUCTIONS OF THE MDOT PROJECT MANAGER.

AutoCAD SHX Text

4. COMPLY WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS FOR INSTALLATIONS OF

AutoCAD SHX Text

ALL MATERIALS UNLESS MORE STRINGENT REQUIREMENTS ARE SPECIFIED.

AutoCAD SHX Text

OTHER HAZARDOUS PRODUCTS ARE USED IN THEIR WORK.

AutoCAD SHX Text

MET. SUBCONTRACTORS SHALL VERIFY TO THE GENERAL CONTRACTOR THAT NO ASBESTOS OR

AutoCAD SHX Text

RESPONSIBILITY OF THE CONTRACTOR TO CERTIFY TO THE OWNER THAT THIS REQUIREMENT

AutoCAD SHX Text

ON THIS PROJECT OR USED DURING THE CONSTRUCTION OF THE PROJECT. IT SHALL BE THE

AutoCAD SHX Text

5. NO PRODUCTS CONTAINING ASBESTOS OR OTHER HAZARDOUS MATERIALS SHALL BE INSTALLED

AutoCAD SHX Text

1. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, AND RELATED SERVICES

AutoCAD SHX Text NEEDED FOR THE COMPLETE METAL WALL PANEL INSTALLATION AND RELATED ITEMS AT THE ATLANTA

AutoCAD SHX Text SALT STORAGE BLDG. IN ACCORDANCE WITH THE DESIGN PLANS, SPECIFICATIONS, STATE AND LOCAL

AutoCAD SHX Text

CODES, OR AS NEEDED TO COMPLETE THE WORK AT NO ADDITIONAL COST TO THE OWNER.

AutoCAD SHX Text

INSTALL METAL

AutoCAD SHX Text

WALL PANELS

AutoCAD SHX Text

2'-1.5" NEW

AutoCAD SHX Text

INSTALL METAL

AutoCAD SHX Text

WALL PANELS (TYP)

AutoCAD SHX Text 2'-1.5"

AutoCAD SHX Text

SOFFIT (TYP)

AutoCAD SHX Text

CONSTRUCTION NOTES:

AutoCAD SHX Text

2. INSTALL SYNTHETIC FELT OVER T1-11 IN PREPARATION OF NEW METAL WALL

AutoCAD SHX Text

3. INSTALL NEW 29 GA. METAL WALL PANELS AND ALL RELATED ACCESSORIES.

AutoCAD SHX Text

PANELS.

AutoCAD SHX Text

4. INSTALL NEW 26 GA. METAL FASCIA WRAP.

AutoCAD SHX Text

INSTALL METAL

AutoCAD SHX Text

WALL PANELS (TYP)

AutoCAD SHX Text

INSTALL METAL

AutoCAD SHX Text

WALL PANELS (TYP)

AutoCAD SHX Text 4'

AutoCAD SHX Text

SOFFIT (TYP)

AutoCAD SHX Text 16'-6"

AutoCAD SHX Text

2X10 FASCIA-WRAP

AutoCAD SHX Text

IN METAL (TYP)

AutoCAD SHX Text

2X10 FASCIA-WRAP

AutoCAD SHX Text

IN METAL (TYP)

AutoCAD SHX Text

5. INSTALL NEW VENTED SOFFIT

AutoCAD SHX Text 16'-2"

AutoCAD SHX Text 5'-10"

AutoCAD SHX Text 16'-2"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 16'-6"

AutoCAD SHX Text 9'-10"

AutoCAD SHX Text

1. REPLACE FASCIA BOARD AND WOOD SIDING WHERE NEEDED.

AutoCAD SHX Text 2'-1.5"

AutoCAD SHX Text

SOFFIT (TYP)

AutoCAD SHX Text

INSTALL METAL

AutoCAD SHX Text

DOOR PANELS (TYP)

AutoCAD SHX Text

LEAN TO ROOF

CushingV Cloudy

Insert from: "Atlanta SSB Metal Siding Elevations-Addendum.pdf"
Sheets and Views
Model

File details come from the government source that posted it. Updated .