Addendum 1_ARFP EDD2700000001.pdf
PDF 579 KB Posted
- Attached to
- Networking, Enterprise & Technologies
- Solicitation number
- ARFP 0402 EDD2700000001 2
- Issued by
- Kanawha County, West Virginia
About this file
This addendum modifies the Agency Request for Proposals (ARFP) for Networking, Enterprise & Technologies issued by the West Virginia Department of Education (WVDE). The solicitation (ARFP EDD2700000001) seeks a single prime vendor to establish an eight-year statewide master contract providing networking equipment, cybersecurity solutions, virtualization infrastructure, cloud services, structured cabling, installation, and E-Rate program administration across 18 product categories. The original solicitation closing date has been modified to December 16, 2026, at 2:00 PM ET. The addendum provides vendor questions and agency responses, as well as revised Exhibit A and B pricing sheets. The contract will be effective July 1, 2027, and includes an initial four-year term with four optional one-year renewal extensions. Proposals must be submitted in two separate sealed envelopes—one for technical qualifications and one for cost—delivered physically to the Department of Education Building 6, Room 700, 1900 Kanawha Boulevard East, Charleston, West Virginia 25305. Products and services will be delivered to the Department of Education Office of Assessment at the same location, with equipment stored at a West Virginia facility operated by the prime vendor until installation is ready to proceed.
The cost evaluation will compare vendors' proposed pricing against published manufacturer MSRP or VAP (whichever is lower) as of the proposal submission date, with vendors proposing a guaranteed minimum discount percentage per manufacturer per category in Exhibit B. Partial bids are permitted; vendors may enter "No Bid" for manufacturers or categories not offered, with unbid items receiving an evaluated price equal to the highest responsive bid submitted for that item. E-Rate pricing requirements and mandatory 45-day price holds post-funding commitment apply. The prime vendor must independently meet all mandatory qualifications, including five years of statewide educational agency experience, valid E-Rate SPIN and current annual SPAC certification, an established West Virginia office, relevant contractor licensing, and financial capacity to maintain $1 million to $3 million in accounts receivable. No subcontractor qualifications may substitute for prime vendor requirements. The contract includes no cost or pricing information in technical proposals, separate discount structures by manufacturer and category (not by product type or term length), and application of the same discount to entire manufacturer catalogs within awarded categories, plus future products added during the contract term.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ARFP EDD2700000001_Solicitation Documents.pdf | ||
| NET Cost Sheets_Exhibit A & B.xlsx | XLSX spreadsheet | |
| Final_ARFP_0402_EDD2700000001_1_WV_ARFP_FORM.PDF | ||
| Addendum 1_ NET Exhibit A and B.xlsx | XLSX spreadsheet | |
| Final_ARFP_0402_EDD2700000001_2_WV_ARFP_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proc Folder: 2084520
State of West Virginia Agency Request for Proposals
Educational
Doc Description: Networking , Enterprise & Technologies
Proc Type: Agency Master Agreement
Date Issued Solicitation Closes
2026-11-13 2026-12-16 14:00
BID RECEIVING LOCATION
PROCUREMENT OFFICER
DEPARTMENT OF EDUCATION
BLDG 6, RM 700
1900 KANAWHA BLVD E
CHARLESTON
us
VENDOR
WV 25305
Vendor Customer Code:
Vendor Name :
Address:
Street:
City :
State:
Principal Contact :
Vendor Contact Phone:
FOR INFORMATION CONTACT THE BUYER
Michelle L Childers
(304) 558-2686 michelle.childers@k12.wv.us
Vendor Signature X
Solicitation No
ARFP 0402 EDD2700000001
Country:
Extension:
FEIN#
All offers subject to all terms and conditions contained in this solicitation
Date Printed : Nov 13, 2026 Page: 1
Zip:
Reason for Modification:
Addendum 1 to provide:
1. Modify the solicitation close date.
2. Q&A
3. Revised Pricing Pages
Version Phase
DATE
FORM ID: WV-PRC-ARFP-002 2020/05
INVOICE TO
DEPARTMENT OF EDUCATION
BLDG 6, RM 700
1900 KANAWHA BLVD E
CHARLESTON WV 25305
us
Line Comm Ln Desc
Networking, Enterprise & Technologies
Comm Code Manufacturer
86132200
Extended Description:
Networking , Enterprise & Technologies
Qty
SHIP TO
DEPARTMENT OF EDUCATION
OFFICE OF ASSESSMENT
1900 KANAWHA BLVD E, BLDG 6 RM 850
CHARLESTON WV 25305
us
Unit of Measure Unit Price
Specification Model#
See attached specifications and Exhibit A & B - cost proposal sheets
Online responses are prohibited.
!SCHEDULE OF EVENTS
Event Date
Total Price
Date Printed : Nov 13, 2026 Page: 2 FORM ID: WV-PRC-ARFP-002 2020/05
EDD2700000001
Document Phase
Draft
Document Description
Networking, Enterprise & Technologies
ADDITIONAL TERMS AND CONDITIO S
See attached document(s) for additional Terms and Conditions
Page
SOLICITATION NUMBER: ARFQ EDD2700000001
Addendum Number: No.01
The purpose of this addendum is to modify the so licitation identified as ("Solicitation") to reflect the change(s) identified and described below.
Applicable Addendum Category:
I / ] Modify bid opening date and time
Modify specifications of product or service being sought
[ / I Attachment of vendor questions and responses
Attachment of pre-bid sign-in sheet
Correction of error
Other
Description of Modification to Solicitation:
Addendum issued to publish and distribute the attached documentation to the vendor community.
1) The purpose of this addendum is to modify the solicitation close date to December 16, 2026, at
2:00 PM ET.
2) To provide the vendor questions and agency responses.
3) To attach revised pricing pages: Addendum 1_NET Cost Sheets_Exhibit A & B
No additional changes.
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herei n by reference.
Terms and Conditions:
1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith.
Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be subm itted with the bid to expedite document processing.
Revised 6/8/20 I 2
ATTACHMENT A
Revised 6/8/20 I 2
ARFP EDD2700000001 | Agency Response Form
West Virginia Department of Education | Page 1
VENDOR QUESTIONS
Agency Response Form
ARFP EDD2700000001
Question 1 | Five-year experience requirement Reference: Section 4.4.2.1 The RFP requires five years of experience implementing and managing projects comparable in scope and complexity for a statewide educational agency.
Will WVDE accept equivalent experience providing large-scale networking, cybersecurity, enterprise infrastructure, and technology integration services to West Virginia state agencies or other governmental entities?
If not, please explain why comparable government-sector experience would not satisfy the underlying technical and operational requirements.
AGENCY RESPONSE
No. WVDE will not consider general government-sector experience alone to be equivalent to the required experience. The RFP requires a minimum of five years of experience implementing and managing projects comparable in scope and complexity for a statewide educational agency.
While experience providing large-scale networking, cybersecurity, enterprise infrastructure, or technology integration services to state agencies or other governmental entities may demonstrate relevant technical capabilities, it does not, by itself, demonstrate the required experience working within an educational environment.
The requirement is intended to ensure the prime vendor has demonstrated experience with the technical, operational, administrative, and programmatic considerations associated with large-scale educational technology projects. General governmental experience may be included as additional evidence of qualifications but will not substitute for the required education-sector.
Question 2 | Subcontractor qualifications Reference: Sections 4.4.2 and 4.5.1.2 May a prime contractor satisfy specific mandatory qualifications through qualified subcontractors that possess the required E-Rate credentials, educational experience, or installation capabilities?
If so, please identify which mandatory requirements may be satisfied through subcontractors and what documentation must be submitted.
AGENCY RESPONSE
No. The prime vendor must meet all mandatory qualifications specified in the RFP independently. Qualifications, credentials, experience, or capabilities held by a subcontractor may not be used to satisfy a mandatory requirement of the prime vendor.
While subcontractors may perform portions of the work as permitted by the RFP, their qualifications do not substitute for the qualifications required of the prime vendor. The prime vendor must provide the required documentation demonstrating its own compliance with each mandatory qualification.
Question 3 | E-Rate SPIN registration Reference: Section 4.4.2.2
West Virginia Department of Education | Page 2
Must the prime contractor possess its own valid SPIN at the time of proposal submission, or may the prime contractor utilize a qualified E-Rate subcontractor possessing a valid SPIN?
If the prime contractor must possess its own SPIN, may registration be completed before contract award rather than before proposal submission?
AGENCY RESPONSE
The prime vendor must possess its own valid Service Provider Identification Number (SPIN) at the time of proposal submission. The prime contractor may not rely upon the SPIN of a subcontractor, partner, affiliate, or other entity to satisfy this mandatory requirement. Obtaining or completing registration for a SPIN after proposal submission will not satisfy the requirement. The SPIN must be issued to and held by the prime vendor as of the proposal submission deadline. Subcontractors with their own SPINs may be utilized where otherwise permitted by the RFP;
however, a subcontractor's SPIN does not substitute for the prime vendor's required SPIN.
Question 4 | SPAC certification Reference: Section 4.4.2.3 Must the prime contractor independently maintain the required annual SPAC certification, or may E-Rate administrative responsibilities be performed by a qualified subcontractor?
AGENCY RESPONSE
The prime vendor must independently maintain its own required annual Service Provider Annual Certification (SPAC) associated with its own SPIN. This is a mandatory requirement of the prime vendor and may not be satisfied through the SPAC certification, E-Rate qualifications, or administrative capabilities of a subcontractor.
A qualified subcontractor may perform E-Rate-related projects, where permitted by the RFP; however, the use of a subcontractor does not relieve the prime vendor of its responsibility to maintain its own required SPAC certification.
Question 5 | Educational implementation references Reference: Section 4.4.2.7 Will WVDE accept comparable enterprise technology implementations performed for state government agencies, public institutions, or other large governmental organizations as evidence of the vendor's qualifications?
If not, please identify the specific technical or operational characteristics that require the experience to have been obtained in an educational environment.
AGENCY RESPONSE
No. The prime vendor must demonstrate the educational experience required by the RFP. Comparable enterprise technology implementations performed for state government agencies, public institutions, or other governmental organizations may demonstrate relevant technical capabilities; however, such experience will not substitute for the required experience supporting educational agencies.
The education experience requirement is intended to ensure that the prime vendor has demonstrated experience implementing and managing technology solutions within an educational environment and understands the requirements that apply to education-sector projects, including requirements applicable to the Schools and Libraries program for E-Rate.
Experience obtained in other governmental environments may be included as additional evidence of the prime vendor's overall qualifications, but it will not satisfy or replace the mandatory educational experience requirement stated in the RFP.
Question 6 | Prime contractor and subcontractor structure Reference: Sections 4.5.1.2 and 4.6
West Virginia Department of Education | Page 3
May a technology integrator serve as prime contractor while subcontracting E-Rate program administration, structured cabling, installation, and other specialized services to qualified firms?
Please confirm whether subcontractor qualifications and experience will be considered in the technical evaluation.
AGENCY RESPONSE
No. A technology integrator may not serve as the prime vendor and rely upon a subcontractor to satisfy the mandatory qualifications required of the prime vendor, particularly those related to E-Rate program administration.
The prime vendor must independently possess and demonstrate the required E-Rate qualifications, experience, and administrative capabilities specified in the RFP. E-Rate program administration may not be subcontracted for the purpose of allowing an otherwise unqualified prime vendor to meet a mandatory requirement.
Subcontractors may be utilized to perform specific specialized services, such as structured cabling, installation, or other services, only where permitted by the RFP. However, the qualifications or experience of a subcontractor will not be substituted for the mandatory qualifications or experience required of the prime vendor.
Question 7 | Manufacturer participation Reference: Sections 4.3 and 5.3.4 Is the prime contractor required to provide products from every manufacturer identified in Exhibits A and B?
Alternatively, may the vendor propose only those manufacturers for which it possesses authorized reseller relationships?
Will proposing fewer manufacturers negatively affect technical or cost evaluation scores?
AGENCY RESPONSE
Per section 4.5.1.2.1 in the goals, the vendor will be scored on manufacturers and resellers they have a relationship with at time of bid. The prime vendor is not required to use all manufacturers identified in Exhibits A and B.
However, to provide the most choice a large selection of manufacturers is encouraged. You may propose manufactures using the Other category on the exhibits. You may enter “No Bid” on any category of service you will not be bidding upon. Please reference addendum question 59 as to the evaluation of proposals.
Question 8 | Product-category participation Reference: Sections 4.3 and 5.3.4 Must a vendor propose products and services in all 18 categories to qualify for award?
If partial category participation is permitted, please explain how such proposals will be evaluated against proposals covering all categories.
AGENCY RESPONSE
The prime vendor is not required to propose services in all categories. However, to provide the agency the most choice, a large selection of manufacturers is encouraged. Proposals offering the most brands and categories will be scored higher in the technical, per 4.5.1.2.1. As to No Bid categories, please reference addendum question 59 as to the evaluation of proposals.
Question 9 | Authorized reseller documentation Reference: Sections 4.5.1.2 and 7.2 Must manufacturer authorization letters be submitted with the proposal, or may authorization be verified before contract award?
Will existing manufacturer partnership agreements or distributor authorization arrangements be accepted?
West Virginia Department of Education | Page 4
AGENCY RESPONSE
The prime vendor must provide, with its proposal, a list of all current manufacturer and reseller relationships for which the prime vendor is authorized to sell products, solutions, or services. The list must identify each manufacturer or reseller and provide a brief description of the products, solutions, and services available through that relationship. The relationships identified must be current as of the proposal submission deadline and must be held by the prime vendor.
Existing manufacturer partnership agreements or distributor authorization arrangements may be identified as part of the prime vendor's response, provided they represent current relationships and demonstrate the prime vendor's authorization to offer the applicable products, solutions, or services.
Manufacturer or reseller relationships established after the proposal submission deadline may not be used to satisfy this requirement.
Question 10 | Product substitutions Reference: Sections 4.6.9 and 4.6.10 Exhibit A identifies specific manufacturer products and model numbers.
May vendors propose current-generation replacement products that meet or exceed the stated minimum functional requirements?
Please confirm how product substitutions will be evaluated when a listed product has reached end-of-sale status.
AGENCY RESPONSE
For purposes of bid evaluation, Vendors must price the manufacturer products and configurations identified in the revised Exhibit A. Vendors may not independently substitute a different product or model in an Exhibit A evaluation line. The new, revised Exhibit A/B will go out with this addendum.
Following contract award, new products and models added to a Manufacturer’s catalog will be automatically included under the Contract when they fall within an approved product category, as provided in Section 4.6.10.
Project-specific substitutions remain subject to the written approval and E-Rate service-substitution requirements contained in Sections 4.6.29 and 4.6.49.
Question 11 | End-of-sale products Reference: Exhibit A and Lifecycle Verification worksheet The supplied workbook includes lifecycle information identifying certain products as end- of-sale or requiring additional verification.
Will WVDE review and update the evaluation product list to ensure that all products used in pricing comparisons are currently available for purchase?
AGENCY RESPONSE
Yes. WVDE has reviewed the Exhibit A evaluation products and issued a revised Exhibit A/B workbook with this addendum. Products confirmed as discontinued or unavailable for purchase will be replaced with currently available products or representative configurations meeting or exceeding the applicable minimum requirements.
The Lifecycle Verification worksheet was an internal working document and was not intended to be included as part of the solicitation. It has been removed from the revised workbook, along with all other internal or non-response worksheets.
Question 12 | Manufacturer MSRP verification Reference: Sections 4.6.2–4.6.9 Some manufacturers do not publish consistent, publicly accessible MSRP information for all enterprise products.
West Virginia Department of Education | Page 5
Will WVDE accept official manufacturer quotations, authorized distributor pricing documentation, or other verifiable manufacturer pricing sources when publicly available MSRP information does not exist?
AGENCY RESPONSE
Yes. When a publicly accessible MSRP or commercial catalog price is not available, WVDE will accept other current, verifiable pricing documentation, including:
• An official Manufacturer quotation or price list;
• An official Manufacturer portal extract or screenshot;
• Pricing documentation from an authorized distributor; or
• Other written pricing documentation traceable to the Manufacturer or its authorized distribution channel.
The documentation must identify the Manufacturer, product or SKU, applicable price, and date of the pricing information. WVDE reserves the right to request additional verification. Vendor-generated pricing that cannot be independently verified may not be accepted.
For purposes of the resulting Contract, the applicable price baseline remains the Manufacturer’s or Vendor’s current commercial MSRP/VAP at the time of quote, less the awarded discount, or a lower available price.
Question 13 | E-Rate eligible pricing Reference: Section 4.6 and Exhibit A How will WVDE evaluate products containing both E-Rate-eligible and ineligible components?
Will vendors be permitted to separately identify and price those components so that the cost evaluation reflects the actual eligible amount?
AGENCY RESPONSE
Vendors should use the E-Rate Eligible % field to indicate the eligible portion of each product or service: 100% for fully eligible items, 0% for ineligible items, or the applicable percentage for partially eligible items. Vendors do not need to separately price eligible and ineligible components. The percentage is informational, is not scored, and does not affect the Total Contract Price used for evaluation. WVDE will use the information to assess the overall percentage of E-Rate-eligible versus ineligible products offered.
Question 14 | Mini-Bid competition Reference: Sections 4.3 and 4.6.40–4.6.52 The solicitation provides for secondary manufacturer competition through the Mini-Bid process.
Will the prime contractor be permitted to submit competing manufacturer solutions that satisfy the eligible entity's functional requirements?
Or will the eligible entity specify the manufacturer before the Mini-Bid is conducted?
AGENCY RESPONSE
The Mini-Bid process is a required E-Rate process when more than one eligible manufacturer who can fulfill the project requirements is listed on the contract. This is known as a multiple award schedule. The prime vendor will submit quotes/BOMs (Bill of Materials) for each qualified manufacturer so the eligible entity may use it in the Mini- Bid evaluation process.
Question 15 | Prime contractor participation in Mini-Bids Reference: Sections 4.6.40–4.6.52 Please clarify whether the awarded prime contractor may recommend products, prepare configurations, and assist eligible entities in evaluating competing manufacturer solutions without compromising the independence of the Mini- Bid process.
West Virginia Department of Education | Page 6
AGENCY RESPONSE
E-Rate rules require if you are using a state master contract where more than one manufacturer can provide “equivalent” equipment, you must conduct a mini-bid among all product lines in that “Category.” E-Rate rules prohibit bidding vendors from providing the equipment list that will become part of the mini-bid. Manufacturers are allowed to answer general questions about the products and services they sell in response to applicant inquiries, but they may not prepare any parts or specification sheet that will be used for conducting a competitive mini bid.
The eligible entity will prepare a Project Needs Assessment ahead of time which outlines the requirements of the project. The prime vendor will then prepare a quote and bill of materials (BOMs) list for each manufacturer on our contract with the products and services that will ensure project completion. The eligible entity will then use the quote/BOMs and conduct a mini bid evaluation to select the successful manufacturer on their own.
Question 16 | Statewide educational experience Reference: Section 4.4.2.1 Will WVDE consider a vendor's collective experience through predecessor companies, mergers, acquisitions, or affiliated operating companies when evaluating the five-year experience requirement?
AGENCY RESPONSE
No. The prime vendor must independently meet the requirement in Section 4.4.2.1 and demonstrate at least five (5) years of experience implementing and managing projects comparable in scope and complexity for a statewide educational agency. Experience obtained through predecessor companies, mergers, acquisitions, or affiliated operating companies will not be considered unless the experience is directly attributable to the same legal entity submitting the proposal.
Question 17 | West Virginia office Reference: Section 4.4.2.4 Must the prime contractor maintain a physical West Virginia office at the time proposals are submitted?
Will an existing office operated by an affiliated company satisfy this requirement?
AGENCY RESPONSE
Yes, a current office located in West Virginia is required at bid proposal time. An office operated by an affiliated company will not satisfy this requirement.
Question 18 | Cost evaluation methodology Reference: Sections 5.3.4 and 7.6 Please explain how the total cost evaluation will account for differences in the number of manufacturers and product categories proposed by each vendor.
Will all vendors be evaluated against an identical representative product basket, or will each vendor's proposed product coverage determine its evaluation total?
How will zero-priced entries indicating nonparticipation be treated?
AGENCY RESPONSE
Per section 4.5.1.2.1 in the goals, the vendor will be scored on manufacturers and resellers they have a relationship with at time of bid. The prime vendor is not required to use all manufacturers identified in Exhibits A and B.
However, to provide the most choice a large selection of manufacturers is encouraged. You may propose manufactures using the Other category on the exhibits. You may enter “No Bid” on any category of service you will
West Virginia Department of Education | Page 7
Question 19 | Spreadsheet formulas Reference: Exhibits A and B Will WVDE provide a final protected evaluation workbook with verified formulas and clearly identified vendor-entry fields?
Please confirm whether vendors may correct formula errors or must request an official revised workbook.
AGENCY RESPONSE
West Virginia Department of Education will not provide a revised workbook for any errors or omissions on the part of the bidder. Please carefully review all formulas, entries, costs, and related information are all correct before submitting your final cost proposals. It is the applicant’s responsibility to verify all information submitted is what you intended. However, after reviewing the spreadsheet we have discovered a few items that do need revision.
Hence, a revised Exhibit A and B spreadsheet will issued along with the Q&A Addendum.
Question 20 | Prime contractor financial responsibility Reference: Sections 4.5.1.2 and 4.6 The solicitation requires the prime contractor to demonstrate financial capacity to fulfill orders and manage payment cycles.
Please identify the financial documentation required and whether the agency has established minimum financial thresholds.
AGENCY RESPONSE
Vendors must describe their financial capacity to perform the Contract, including the ability to purchase and hold products, maintain operations during installation, funding, or payment delays, and carry approximately $1 million to $3 million in accounts receivable associated with large public-sector contracts. Vendors must also disclose any bankruptcy, insolvency, receivership, or debt restructuring proceedings within the past five years.
Supporting documentation is not required but may be submitted to substantiate the Vendor’s financial capacity.
Vendors should not submit confidential, proprietary, or otherwise sensitive information, as submitted documentation may be subject to disclosure under applicable FOIA requirements.
Question 21 | Separate technical and cost proposals Reference: Sections 5.4 and 7.5 The solicitation requires separate technical and cost proposals.
Please confirm the required electronic submission procedure, including whether separate sealed electronic files are acceptable through wvOASIS or whether physical sealed envelopes are mandatory.
AGENCY RESPONSE
Electronic bid submissions through wvOASIS are prohibited for this solicitation. Vendors must submit their proposal in two separate parts: (1) the Technical Proposal and (2) the Cost Proposal. Each proposal must be placed in a separate sealed envelope/package and clearly identified as either “Technical Proposal” or “Cost Proposal.”
The separately sealed proposals must be physically delivered to the bid receiving location identified in the solicitation by the specified bid opening date and time. Separate electronic files submitted through wvOASIS will not be accepted.
Question 22 | Evaluation of E-Rate expertise Reference: Section 7.2 E-Rate program administration accounts for 25 of the 70 available technical points.
West Virginia Department of Education | Page 8
Will WVDE award credit for E-Rate expertise provided by an identified, committed subcontractor?
If so, will subcontractor experience receive the same consideration as experience possessed directly by the prime contractor?
AGENCY RESPONSE
No. E-Rate program administration experience must be held directly by the prime vendor submitting the proposal. A prime vendor may not rely upon the qualifications or experience of a subcontractor to satisfy the E-Rate experience requirements or to receive the associated technical evaluation points. Evaluation credit will be based on the E-Rate experience demonstrated by the prime vendor.
Question 23 | Definition of "statewide educational agency" Reference: Sections 4.4.2.1, 4.4.2.7, and 4.4.1.2 Section 4.4.2.1 requires five years of experience "for a statewide educational agency," while Section 4.4.2.7 accepts implementations for "a state education agency, school district(s), or comparable educational entities of similar size."
Will experience serving large school districts, regional education service agencies (such as ESCs or BOCES), or multi-district E-Rate consortia satisfy Section 4.4.2.1?
If not, please define "statewide educational agency" as used in Section 4.4.2.1.
AGENCY RESPONSE
The requirements of Sections 4.4.2.1 and 4.4.2.7 are separate and must each be satisfied. Section 4.4.2.1 requires at least five (5) years of experience implementing and managing projects comparable in scope and complexity for a statewide educational agency. Experience with school districts, regional education service agencies, ESCs, BOCES, or multi-district E-Rate consortia may be relevant to Section 4.4.2.7 but may not be substituted for the statewide educational agency experience required under Section 4.4.2.1. For purposes of this requirement, “statewide educational agency” refers to an educational agency operating at the state level and having statewide responsibilities and/or providing services on a statewide basis.
Question 24 | Measuring the five-year experience period Reference: Sections 4.4.2.1 and 4.4.1.2 Is the five-year requirement measured cumulatively across multiple contracts, or must a single engagement have lasted five years?
Must the experience fall within a specific look-back period, such as the "past 5 years" referenced in Section 4.4.1.2?
AGENCY RESPONSE
The five (5) year experience requirement must be demonstrated through a single qualifying contract or engagement that lasted at least five (5) years. Experience from multiple shorter contracts or engagements may not be combined to satisfy this requirement. In addition, consistent with Section 4.4.2.1, the Vendor must demonstrate prior experience developing and successfully implementing projects for a statewide educational agency within the past five (5) years. Therefore, the Vendor must demonstrate both the required five-year duration of qualifying experience and statewide educational agency experience within the applicable five-year look-back period.
Question 25 | SPIN and SPAC legal entity Reference: Sections 4.4.2.2 and 4.4.2.3 Must the SPIN and SPAC belong to the same legal entity (matching FEIN) that signs the proposal and holds the contract?
Or may the prime contractor use the SPIN of a wholly owned affiliate under common ownership for E-Rate invoicing?
West Virginia Department of Education | Page 9
AGENCY RESPONSE
Yes. The SPIN and current SPAC must belong to the prime vendor that submits the proposal and will hold the resulting contract. The prime vendor must independently maintain its own SPIN and SPAC under the same legal entity identified in the proposal. A SPIN or SPAC belonging to a parent company, wholly owned affiliate, subcontractor, or other related entity may not be used to satisfy this requirement or for E-Rate invoicing under the resulting contract.
Question 26 | West Virginia office – qualifying arrangements and proof Reference: Section 4.4.2.4 Does a West Virginia-based employee working from a registered home office, or a leased shared or co-working office, satisfy the requirement that the vendor "have an office in West Virginia"?
May the West Virginia office of a named subcontractor or teaming partner satisfy this requirement on the prime contractor's behalf?
What documentation will WVDE accept as proof (for example, a lease, WV State Tax Department registration, or a Secretary of State local office address)?
AGENCY RESPONSE
The West Virginia office must be an office of the prime vendor submitting the proposal and holding the resulting contract. An office maintained by a subcontractor, teaming partner, parent company, affiliate, or other related entity will not satisfy this requirement on behalf of the prime vendor.
A West Virginia-based employee working remotely from a home office does not, by itself, satisfy the requirement.
Likewise, use of a shared or co-working location does not, by itself, establish that the prime vendor maintains a West Virginia office.
The prime vendor must provide documentation sufficient to demonstrate that it maintains an established business office in West Virginia. Acceptable documentation may include a lease or other evidence of occupancy, applicable West Virginia business or tax registration identifying the West Virginia office, or other official documentation establishing the prime vendor’s business presence at the identified West Virginia location.
Question 27 | WV Contractor License and RCDD Reference: General Terms and Conditions 7 and Section 4.6.22 Which West Virginia contractor license classification(s) does WVDE expect for cabling and installation work (for example, electrical or specialty low voltage)?
Is proof of the license required with the proposal, or only from the apparent successful vendor upon request?
May the RCDD sign-off required by Section 4.6.22 be provided by an RCDD employed by a named subcontractor?
AGENCY RESPONSE
The RCDD providing the required review and sign-off must be part of the prime vendor’s team and may not be supplied through a subcontractor or teaming partner. The RCDD requirement in Section 4.6.22 is separate from West Virginia contractor or trade licensing requirements. An RCDD is a professional design credential demonstrating expertise in telecommunications and ICT infrastructure design; it is not a contractor license or state engineering license.
The prime vendor must possess and maintain all West Virginia contractor and trade licenses required for the cable, electrical, telecommunications, low-voltage, and installation work performed under the contract. Where the scope of work requires an Electrical Contractor license under West Virginia law, the prime vendor must possess the applicable West Virginia Electrical Contractor license. The prime vendor is responsible for ensuring compliance with all applicable West Virginia licensing requirements for the specific work being performed. You may provide a copy of the contractor’s license with the bid proposal.
West Virginia Department of Education | Page 10
Question 28 | Installer background checks Reference: Section 4.4.2.6 Please describe the background check process under W. Va. Code §18-5-15c(e).
Does it apply equally to prime contractor staff, subcontractor staff, and manufacturer field engineers? Is the check performed once statewide or separately by each county board? Who bears the cost?
Must checks be completed before contract award, or only before personnel enter a school facility?
AGENCY RESPONSE
The background-check requirement applies to personnel of the prime vendor, subcontractors, and manufacturer personnel who will require onsite access to schools and facilities. Background checks are not required to be completed prior to proposal submission or contract award; however, all required background checks must be complete and verified before the contract start date of July 1, 2027. Personnel who have not satisfied the applicable background-check requirements will not be permitted on school grounds as addressed by W. Va. Code § 18-5- 15c(e).
All costs are the prime vendor’s responsibility, and the background checks must be completed annually by June 30th with the WV state certification office. This certification will provide access to all schools and facilities in each county school district. Each applicant will complete Forms 7 and 11, submit the proper fees, and complete an annual required background check with fingerprints.
Question 29 | Financial documentation for privately held vendors Reference: Section 4.5.1.2.2 and Instructions to Vendors §15 For privately held vendors, will WVDE accept audited financial statements, a bank reference letter, a Dun & Bradstreet report, or a parent company guarantee?
Because the entire response becomes public record, may confidential financial statements be provided after bid opening upon request rather than in the proposal?
AGENCY RESPONSE
As mentioned in Question 20, Prime Vendors must describe their financial capacity to perform the Contract, including the ability to purchase and hold products, maintain operations during installation, funding, or payment delays, and carry approximately $1 million to $3 million in accounts receivable associated with large public-sector contracts. Vendors must also disclose any bankruptcy, insolvency, receivership, or debt restructuring proceedings within the past five years.
Supporting documentation is not required but may be submitted to substantiate the Vendor’s financial capacity.
Vendors should not submit confidential, proprietary, or otherwise sensitive information, as submitted documentation may be subject to disclosure under applicable FOIA requirements.
Question 30 | Litigation and termination disclosure Reference: Section 4.4.1.1.6 For a vendor with a parent company and affiliates, should contract terminations and litigation be disclosed for the bidding legal entity only, or for the entire corporate family?
Should routine commercial collection matters be included?
AGENCY RESPONSE
Disclosure is required for the bidding legal entity only, meaning the prime vendor company submitting the proposal and entering into the resulting contract. Disclosures for a parent company, affiliates, subsidiaries, or other related entities are not required unless those entities are themselves the bidding legal entity. Routine commercial collection matters do not need to be disclosed unless they affect your status as an E-Rate provider.
West Virginia Department of Education | Page 11
Question 31 | MSRP vs. VAP effective date and verification Reference: Sections 4.6.2–4.6.3 and Exhibits A and B The Exhibit instructions allow "MSRP or VAP, whichever is lower." Please confirm the effective date to be used for MSRP/VAP (for example, list price as of the proposal due date).
Must a vendor's VAP be publicly verifiable, given the Exhibit A field "Public Site to Verify Model #/List Price"?
AGENCY RESPONSE
The applicable MSRP or VAP shall be the price in effect as of the proposal submission date. The vendor must use MSRP or VAP, whichever is lower. Any VAP used must be verifiable through a publicly accessible source, quote, published price documentation, or another means that allows WVDE to independently verify the model and applicable price.
Question 32 | Discount structure within a category Reference: Section 4.6.9.3 and Exhibit B Exhibit B allows one discount percentage per manufacturer per category, which then applies to hardware, licenses, support, and 1-, 3-, and 5-year terms alike.
Please confirm that the Exhibit B discount is a guaranteed minimum, and that deeper discounts may be offered on individual quotes or Mini-Bids.
May vendors propose separate discounts within a category (for example, hardware vs. subscriptions vs. support)?
AGENCY RESPONSE
Yes. The discount percentage proposed in Exhibit B represents the guaranteed minimum discount for that manufacturer and category. Vendors may offer deeper discounts on individual quotes submitted during the Mini- Bid process. Any pricing and discounts offered during a Mini-Bid must remain valid through 45 days after the applicant receives its Funding Commitment Decision Letter (FCDL) from USAC.
Vendors may not propose separate discount percentages within the same manufacturer/category for hardware, licenses, subscriptions, support, or different term lengths. The single discount percentage provided in Exhibit B will apply to all applicable products and services within that manufacturer/category.
Question 33 | Scope of the category discount Reference: Exhibit B and Section 4.6.10 Please confirm that a manufacturer's Exhibit B discount applies to that manufacturer's entire catalog within the category, not only the sample items listed in Exhibit A (for example, all indoor and outdoor Wi-Fi 5/6/7 access points and both physical and virtual controllers in Wireless LAN).
Please also confirm that the same discount applies to products added later under Section 4.6.10.
AGENCY RESPONSE
Yes. The discount percentage provided in Exhibit B applies to the manufacturer’s entire catalog of products and services within the applicable category and is not limited to the sample items identified in Exhibit A. For example, within the Wireless LAN category, the manufacturer’s established discount would apply to all eligible products within that category, including applicable indoor and outdoor access points and physical and virtual controllers.
The same discount will also apply to any new products added to the manufacturer’s applicable category during the contract term in accordance with Section 4.6.10. The established Exhibit B discount remains the guaranteed minimum discount for the manufacturer/category throughout the contract term. Vendors may offer greater discounts through individual quotes or Mini-Bids but may not reduce the established minimum discount.
West Virginia Department of Education | Page 12
Question 34 | Rates and discounts over the eight-year term Reference: General Terms and Conditions 12 Discount percentages are firm for the life of the contract. Are professional services and block-hour rates in Exhibit B also fixed for all eight possible years, or may rates be adjusted at renewal by mutual agreement?
Will WVDE consider increased discounts at renewal?
AGENCY RESPONSE
Yes. WVDE will consider increased discount percentages at the time of contract/extension renewal. Any increase in the discount would provide more favorable pricing to WVDE and participating applicants. At no time will the discount drop below the original discount percentage proposed during the competitive bidding process.
Professional services and block-hour rates identified in Exhibit B shall remain firm during the applicable contract term and will not be subject to routine or recurring adjustments. Pricing may be reviewed in connection with a contract renewal and may be adjusted only by mutual agreement of the parties and with WVDE approval. Any approved adjustment must be finalized prior to execution of the applicable renewal. During the active contract term, all established pricing and guaranteed minimum discounts shall remain in effect unless otherwise expressly permitted by the Contract.
Question 35 | What constitutes "cost information" in the technical proposal Reference: Sections 5.4 and 6.1 Please confirm that the following may appear in the technical proposal without being treated as cost information: a list of authorized manufacturers, manufacturer authorization letters, sample bill-of-materials formats with prices redacted, and a statement that hourly rates appear in Exhibit B.
Is any discount percentage, including "up to X%," considered cost information that must appear only in the sealed cost proposal?
AGENCY RESPONSE
A list of authorized manufacturers, manufacturer authorization letters, sample bill-of-materials formats with all pricing and discount information redacted, and a statement directing the evaluator to Exhibit B for hourly rates may be included in the technical proposal, provided they contain no cost or pricing information.
Any discount percentage, including language such as “up to X%,” is considered cost information and must be included only in the separately sealed cost proposal. The solicitation states that cost information included in the technical proposal will result in disqualification.
Question 36 | Price hold after FCDL Reference: Section 4.6.4 The Mini-Bid purchase price "holds for 45 days after applicant receives the FCDL." FCDLs often arrive several months after the Mini-Bid.
If the manufacturer's MSRP increases between the Mini-Bid and the FCDL, may the then- current MSRP less the contracted discount apply, provided the discount percentage is unchanged? Or must the Mini-Bid dollar price be held through FCDL plus 45 days?
AGENCY RESPONSE
The dollar price quoted during the Mini-Bid process must remain firm through 45 days after the applicant receives its Funding Commitment Decision Letter (FCDL) from USAC. The applicant uses the vendor’s Mini-Bid quote and associated Bill of Materials (BOM) to establish the pricing included in its E-Rate Form 471 funding application.
Therefore, the pricing upon which the funding application is based must be held for this limited period. Any subsequent increase in MSRP does not change the Mini-Bid price during this price-hold period. However, if the
West Virginia Department of Education | Page 13 applicant does not begin the project process by submitting a Purchase Order (PO) within the 45-day timeframe, all pricing will revert to current MSRP pricing less the discount.
Question 37 | Manufacturer pricing obligations Reference: Sections 4.6.5, 4.6.6, and 1.1 Sections 4.6.5 and 4.6.6 place obligations on "the Manufacturer," but the State contracts only with the prime contractor.
Please confirm that the prime contractor is responsible for passing these prices through and is not warranting the manufacturer's pricing to all other state and local entities nationwide.
Please also clarify how "comparable quantities" will be determined.
AGENCY RESPONSE
The prime vendor is responsible for working directly with its manufacturers to address and resolve any pricing matters necessary to meet the pricing requirements of the contract. The prime vendor remains responsible for ensuring that the required pricing is honored. This requirement applies to the pricing offered to WVDE and participating applicants under this contract. It does not require the prime vendor to warrant or extend the same pricing to other state or local governmental entities nationwide.
For purposes of Sections 4.6.5 and 4.6.6, “comparable quantities” will be based on a quantity of one (1) for each individual product or service being compared.
Question 38 | Delivery and freight Reference: Section 4.6.8 Please confirm that F.O.B. Destination pricing to approximately 850 sites, including remote rural sites, must be fully included in product pricing.
May freight be shown separately on E-Rate quotes as an ineligible line item where USAC requires it?
AGENCY RESPONSE
In accordance with Mandatory 4.6.52, the prime vendor must receive and store all products at its facility until all products for the project have been received and installation can proceed, unless the eligible entity makes prior alternative arrangements.
For product-only orders that do not require the prime vendor to receive and store the products for installation, products may be shipped F.O.B. Destination directly to the applicant. In all cases, shipping and freight charges must be included in the product pricing and may not be listed as a separate line item on the quote.
Question 39 | FCC Form 470 Reference: Section 1.1 and Mini-Bid Mandatories Will WVDE post, or has it posted, an FCC Form 470 for this RFP so that eligible entities can cite this State Master Contract on their FCC Form 471? If so, please provide the Form 470 number and funding year(s).
If not, is each county expected to post its own Form 470, and how does the Mini-Bid under Section 4.6.44 relate to each applicant's 28-day competitive bidding requirement?
AGENCY RESPONSE
The West Virginia Department of Education has posted a Form 470 in EPC as required under E-Rate requirements.
The FCC Form 470 number is: 270002035 filed on October 14, 2026. As this is a State Master Contract, the applicants will reference the newly created contract number in EPC once a final signed agreement has been signed
West Virginia Department of Education | Page 14 with the prime vendor. The applicants will not file their own Form 470 when using the State Master Contract. The 28-day requirement does not apply when the applicants use the provided State Master Contract.
As to 4.6.44, any manufacturer that is part of this contract via the Prime Vendor must be evaluated for pricing comparison for equivalent equipment/services per E-Rate competitive bidding guidelines regarding Mini bids.
Question 40 | Minimum manufacturers in a Mini-Bid Reference: Sections 4.6.44 and 4.5.1.4.2.1 Must the prime contractor present a minimum number of manufacturers in each Mini-Bid?
What process applies when only one manufacturer on the contract can meet the need, such as a county that has standardized on a single manufacturer as in the Section 4.5.1.4.2.1 scenario?
AGENCY RESPONSE
During the Mini-Bid process, the prime vendor must ensure that all manufacturers available under the State Master Contract that can provide equivalent equipment and/or services responsive to the applicant’s requirements are represented by a quote or Bill of Materials (BOM) for evaluation. This requirement applies even when the applicant has standardized on a particular manufacturer.
If only one manufacturer available under the State Master Contract provides the required equipment or services, then a competitive Mini-Bid among manufacturers is not required.
Question 41 | Invoicing timing and the 30-day acceptance period Reference: Sections 4.6.30, 4.6.33, and 4.6.37 Equipment may not be invoiced until after a 30-day post-installation acceptance period. Please confirm how this applies:
(a) to BEAR versus SPI invoicing;
(b) when the 30-day period would push invoicing past the USAC invoice deadline or service delivery deadline; and
(c) to equipment that has been delivered but not installed because the applicant is not ready.
AGENCY RESPONSE
The 30-day post-installation testing and acceptance period applies regardless of whether the applicant elects BEAR or SPI invoicing. Network equipment must be installed and the required 30-day testing period completed before payment may be invoiced. If products are ordered before funding has been approved, the applicant is still entitled to ensure the equipment is working correctly. After the 30 days with no issues, applicant will pay the total amount in full.
If completion of the 30-day testing period would extend beyond the applicable USAC service delivery deadline or invoice deadline, the applicant must file the appropriate extensions. Testing must commence following installation and cannot be waived or shortened solely to meet an E-Rate deadline.
Equipment should not be delivered until the applicant has indicated that it is ready for installation to proceed.
Question 42 | SPI reimbursement denials not caused by the vendor Reference: Section 4.6.35 If USAC denies or reduces reimbursement for reasons not caused by the vendor (for example, applicant eligibility, discount-rate changes, or PIA findings), may the vendor invoice the applicant for the unreimbursed portion?
AGENCY RESPONSE
The prime vendor may invoice the applicant for any unreimbursed portion resulting from a USAC denial or reduction due to the applicant’s error or omission. Under the BEAR method, the applicant pays the vendor in full and
West Virginia Department of Education | Page 15 subsequently seeks reimbursement from USAC. Under the SPI method, if USAC denies or reduces reimbursement for reasons not attributable to the vendor, such as applicant eligibility, discount-rate adjustments, or PIA findings, the vendor may invoice the applicant for the unreimbursed portion. In all cases, the applicant remains responsible for its required non-discounted share and for any additional amounts for which it is contractually responsible.
Question 43 | Product storage Reference: Section 4.6.52 Must the storage facility be located in West Virginia?
May storage, handling, and staging be billed as a separate line item? If not, should those costs be built into pricing, given General Terms and Conditions 15 (no additional fees) and the free-services restriction in Section 4.6.54?
AGENCY RESPONSE
The storage facility must be located in West Virginia. Pursuant to Section 4.6.52, the prime vendor is responsible for receiving and storing all products at its facility until the products are ready for installation. Storage, handling, and staging may not be billed as separate line items, nor should additional pricing be incorporated into product or service costs for these activities.
This is the start of the file's text. The full file is on GovTribe.