Addendum 1 Appendix V - part 2 of 9.pdf
PDF 5 MB Posted
- Solicitation number
- RFQ - 171 - 230000000416
- Issued by
- Ionia County, Michigan
About this file
This document is an addendum to a solicitation for the Richard A. Handlon Correctional Facility (MTU) in Ionia, Michigan, issued by the Michigan Department of Technology, Management and Budget. The solicitation requests bids for Wi-Fi cabling infrastructure at the facility. Interested bidders must submit proposals electronically through the SIGMA VSS system by the 2:00 PM deadline. No hard copies will be accepted. Bidders are advised to contact the SIGMA help desk if they experience any issues with the electronic submission process. The contract term and any renewal options are not specified in the document.
The document provides details on the asbestos testing that was conducted at various locations within the facility. The testing identified the presence of some asbestos-containing materials, including roofing, insulation, and other building components. Bidders should review the testing results carefully and account for any necessary abatement or remediation measures in their proposals. Pricing terms, set-asides, funding sources, and other key commercial details are not included in this addendum.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
�.��+�/�0�� 1�
2���"�$���"�#"$���34
���� 5��������+�")*"�$� ��-����6�.����")*"�$��
� �"�#��*�5��7��*)���,������"���)�8��")"���
� �� 4�+)��9�����7"$#9����:��"����:�34431�
� 8")�������3� ;��0� ��� ��:�*�/�������
��*� ���)��"�� �!� ���&����*� ��������� �����"�"�$� ��")*"�$� '����"�)��� 9"�#� �� ��&���� �!� !"�*"�$�� !��� ���� "��
!������ *��"�"���� ��$��*"�$� ���#� ��")*"�$�� � (#�� ��&���� �!� !"�*"�$�� !����"�#��*�5��7��*)���,������"���)�
8��")"��� �����")*"�$�� ���� �����#�*� ��� �#"�� ��&����� � (#�� �����")*"�$�� �����5'��)����� #�*��+)��*� #�*��
8��*� ����$��� ���� #�*�� ���������� +�")*"�$�� ������ 7����� <��� ������ 7����� < �� ����*� #�����
7���"��)��������9������#������7���"��)����� ����$�� #�*�� 2����'"�#��
�-")"���� ����$�� #�*�<���(�9���������(�9�������#��=�#"�)�� ����$�����)�������=�#"�)�� ����$��< 3��
(#"�� ������'���� 9��� ���� &��!��'�*� ��"�$� *�������"-�� '��#�*�� ��� )������ '����"�)�� )�����*� "�� #"**���
�&���������#������������)"'"��*�������"�������9)�&������&"&���#������*"��������"�*����*������&��������#��9"���
���� ���*")�������-��)��� � �5������"-"�"��� �#���9"))� *"������'����"�)�� �#��� �����"�� ������������ "�� &����'�*�
@����'�*A���������"�����������'����������*����*����)"�����*���*������*"��*����������9����������
)����� *�� ���� #��"����� ��� ��))� "!� �#���� ���� B����"���� ��� ��''����� ��$��*"�$� �#"�� ��&����� � :�� #��� ����� ��
� �5(��:52 �(� (:���,.� C2(5�( ��:�,��
� ,#�"���&#������D��������,�:����
� 5��������%�&���'��������$���
5����#'�����
Ambulance Shed
Yard Shelter
Greenhouse #2
Vehicle Storage Enclosure
Vehicle Storage 24
Gas Shed
Generator Building
Greenhouse #1
Sally Port
Tower East
Tower North
Weight Pit
Horticulture Grow
Food Storage Storage Shed #1
RC Ground Post 2
RC Ground Post 1
Yard Bathroom
Horticulture Storage
School Storage Guard Shack
N
Phone Shack
Locksmith
Blood Shed
Out Buildings Locations Site Map - Richard A. Handlon Correctional Facility
PROJECT NO.:
171757
DATE: 11/27/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Gravel Floor, Wood & Plastic Walls, Metal Ceiling Exterior – Metal Roof
LOCATION(S): Ambulance Shed
SAMPLING DATE(S): 01/23/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: -- SAMPLE LOCATIONS -- CHAIN OF CUSTODY -- ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul at ed
Li m it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to s or
Pr es um
No Asbestos Detected -- -- -- -- -- -- -- -- -- --
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Wood Floor, Wood Walls, Wood Ceiling Exterior – Plastic Siding, Shingle Roof
LOCATION(S): Blood Shed
SAMPLING DATE(S): 11/01/18
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um ed
Rubber Membrane Floor NF -- -- X 101 --102 X -- -- NQ NO
Roof Shingles NF -- -- X 201 -- 202 X -- -- NQ NO
| ���������� | |
| � | �� |
0�1! /�� 2���
��� ��#3,�#$ 4��"$%5 �6
7� $
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� 8������$2 #�9"&, /% ��;7���< 2 #��"&, /%
��!&,�#�5
7���<
8������$2 #�9"&, /% ��;7���< 2 #��"&, /%
��!&,�#�5
7���<
8������$2 #�9"&, /% �:���,���;3��%% �;7���<
4 9
8������$2 #�9"&, /% �:���,���;3��%% �;7���<
4 9
*#��1%��%�
��������������������� 4"���,$ =�,$"#.5 ��& ,�� ,1 �".#�� ,1
�"�&"�"�1 �#��1%"% �
�#��1%�% ��,9 ,!�$ +�4 ��,�>" /%�1 �0* ?6#��,"!
���� $?�5
�?9"#��?�
#�1 �& >�5 !�1 ,��, $/��$5 9/��5
&1
,�%� #%"&"�"�1 9 , �#��1�"���
6#��,�,����" # ,�%� #%"&"�"�1
&1 ��,�"9"���" #5 ���, >��5 &1 2@�*05 26�� �#1 �.�#�1
9�$�,��
9 , # # �9,"�&�� ,.�#"����1 �#��1%"%�
/#��,��"#�1 ,�A/�%��
�#��1B�$ &1 *#��1�"���5 6#�� C�1! /��5
6#"�"�� 9, !
0�.�
0,"#��$
0�
OrderID: 161821935
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Concrete Floor, Wood Walls, Wood Ceiling Exterior – Plastic Siding, Tar Paper & Shingle Roof
LOCATION(S): Food Storage
SAMPLING DATE(S): 01/23/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um ed
Light Fixtures, (Assumed) NF -- -- X NS -- -- -- 2 YES
Shingle NF -- -- X 101 -- 102 X -- -- NQ NO
Tar Paper NF -- -- X 201 --202 X -- -- NQ NO
| ���������� | |
| � | �� |
0�1! /�� 2��� �
��� ��#3,�#$ 4��"$%5 �6
���8 ���4*3�
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� 8������$2 #�9"&, /% �����,����3��%%
2 #� 8������$2 #�9"&, /% �����,����3��%%
2 #� 8������$2 #�9"&, /% �����,��)�3��%%
2 #� 8������$2 #�9"&, /% �����,��)�3��%%
*#��1%��%�
��� 4"���,$ =�,$"#.5 ��& ,�� ,1 �".#�� ,1
�"�&"�"�1 �#��1%"% �
�#��1%�% ��,9 ,!�$ +�4 ��,�>" /%�1 �0* ?6#��,"!
���� $?�5
�?9"#��?�
#�1 �& >�5 !�1 ,��, $/��$5 9/��5
&1
,�%� #%"&"�"�1 9 , �#��1�"���
6#��,�,����" # ,�%� #%"&"�"�1
&1 ��,�"9"���" #5 ���, >��5 &1 2@�*05 26�� �#1 �.�#�1
9 , # # �9,"�&�� ,.�#"����1 �#��1%"%�
/#��,��"#�1 ,�A/�%��
�#��1B�$ &1 *#��1�"���5 6#�� 6#$"�#�� �"%5 2@�*0 ����5 *�����5 �)�)5 ��5 �D ����(�5
6#"�"�� 9, !
0�.�
0,"#��$
OrderID: 161901557
DATE: 11/27/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Concrete Floor, Fence Walls, Metal Ceiling Exterior – Fence Walls, Metal Roof
LOCATION(S): Gas Shed
SAMPLING DATE(S): 11/01/18
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: -- SAMPLE LOCATIONS -- CHAIN OF CUSTODY -- ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Concrete Floors, Metal Walls, Metal Ceiling Exterior – Metal Walls, Metal Roof
LOCATION(S): Generator Building
SAMPLING DATE(S): 11/01/18
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um ed
Duct Caulk NF -- -- X 101 --102 X -- -- NQ NO
Duct Gasket NF -- -- X 201 -- 202 X -- -- NQ NO
Fire Door NF -- -- X NS -- -- -- 2 YES
Electrical Units NF -- -- X NS -- -- -- 10 YES
Vibration Dampening Cloth NF -- -- X 501 -- 502 -- -- -- NQ NO
| ���������� | |
| � | �� |
0�1! /�� 2���
��� ��#3,�#$ 4��"$%5 �6
3�#�,�� , 7�$.�
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� 8������$2 #�9"&, /% ��;3,�1 2 #��"&, /%
8/��
2 #� 8������$2 #�9"&, /% ��;3,�1 2 #��"&, /%
8/��
2 #� 8������$2 #�9"&, /% ��;3,�1� 2 #��"&, /%
8/�� 3�% ��
2 #� 8������$2 #�9"&, /% ��;3,�1� 2 #��"&, /%
8/�� 3�% ��
2 #� 8������$2 #�9"&, /% �:���,���;3��%%�;7��� 2 #��"&, /%
8�!��#"#.
2 #� 8������$2 #�9"&, /% �:���,���;3��%% �;7���
8�!��#"#.
�#��1%��%�
������������� 4"���,$ ��,$"#.5 ��& ,�� ,1 �".#�� ,1
�"�&"�"�1 �#��1%"% �
�#��1%�% ��,9 ,!�$ +�4 ��,��" /%�1 �0�
6#��,"!
�5
9"#��
#�1 �& ��5 !�1 ,��, $/��$5 9/��5
&1
,�%� #%"&"�"�1 9 , �#��1�"���
6#��,�,����" # ,�%� #%"&"�"�1
&1 ��,�"9"���" #5 ���, ���5 &1 2���05 26�� �#1 �.�#�1
9 , # # �9,"�&�� ,.�#"����1 �#��1%"%�
/#��,��"#�1
�#��1��$ &1 �#��1�"���5 6#�� ��1! /��5
6#"�"��
9, !
0�.�
0,"#��$
OrderID: 161821933
DATE: 11/27/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Gravel Floor, Plexiglass Walls Exterior – Plexiglass Walls, Plexiglass Roof
LOCATION(S): Green House #1
SAMPLING DATE(S): 01/23/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: -- SAMPLE LOCATIONS -- CHAIN OF CUSTODY -- ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um
Fire Door NF -- -- X NS -- -- -- 2 YES
DATE: 11/27/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Gravel Floor, Plexiglass Walls, Plexiglass Ceiling Exterior – Plexiglass Roof
LOCATION(S): Greenhouse #2
SAMPLING DATE(S): 01/23/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: -- SAMPLE LOCATIONS -- CHAIN OF CUSTODY -- ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Wood Floor, Wood Panel Walls, Wood Ceiling Exterior – Brick Face Walls, Metal Roof
LOCATION(S): Guard Shack
SAMPLING DATE(S): 01/23/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um ed
Roll On Floor, Tan With Blue And White Flecks NF -- -- X 101 -- 102 X -- -- NQ NO
4” Cove, Black NF -- -- X 201 -- 202 X -- -- NQ NO
Exterior Caulk NF -- -- X 301 -- 302 X -- -- NQ NO
Roof Caulk NF -- -- X 401 -- 402 X -- -- NQ NO
| ���������� | |
| � | �� |
0�1! /�� 2��� �
��� ��#3,�#$ 4��"$%5 �6
3�*48
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� 8������$2 #��"&, /% 2 #��"&, /%
4 ��
2 #� 8������$2 #��"&, /% 2 #��"&, /%
4 ��
2 #� 8������$2 #��"&, /% 2 #��"&, /%
2 #� 8������$2 #��"&, /%
2 #� 8������$2 #��"&, /% 2 #��"&, /%
2 #� 8������$2 #��"&, /%
2 #� 8������$2 #��"&, /% 2 #��"&, /%
2 #� 8������$2 #��"&, /% 2 #��"&, /%
2 #� 8������$2 #��"&, /%
3,�1
4 �
2 #� 8������$2 #��"&, /%
3,�1 2 #��"&, /%
4 �
4"���,$ ��,$"#.5 ��& ,�� ,1 �".#�� ,1
�"�&"�"�1 �#��1%"% �
�#��1%�% +�4 " /%�1 �0* �6#��,"!
���� $��5
#�1 �5 !�1 ,��, $/��$5 �/��5
&1
,�%� #%"&"�"�1 �#��1�"���
6#��,�,����" # ,�%� #%"&"�"�1
&1 ��,�"�"���" #5 ��5 &1 �*05 26�� �#1 �.�#�1
,.�#"����1 �#��1%"%�
/#��,��"#�1 ,�E/�%��
�#��1F�$ &1 *#��1�"���5 6#�� "���5 2+
6#"�"��
0�.�
0,"#��$
OrderID: 161901564
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Concrete Floor, Plexiglass Walls & Ceiling Exterior – Plexiglass Walls & Roof
LOCATION(S): Horticulture Grow Greenhouse
SAMPLING DATE(S): 01/23/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um ed
Joint Filler, Foam, Grey NF -- -- X 101 -- 102 X -- -- NQ NO
Caulk, White NF -- -- X 201 -- 202 X -- -- NQ NO
| ���������� | |
| � | �� |
0�1! /�� 2��� �
��� ��#3,�#$ 4��"$%5 �6
��426+����4� 34��
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� �������$2 #��"&, /% ���3,�1 2 #��"&, /%
.,�1
2 #� �������$2 #��"&, /% ���3,�1 2 #��"&, /%
.,�1
2 #� �������$2 #��"&, /% 2 #��"&, /%
2 #� �������$2 #��"&, /% 2 #��"&, /%
4"���,$ ��,$"#.5 ��& ,�� ,1 �".#�� ,1
�"�&"�"�1 �#��1%"% �
�#��1%�% +�4 " /%�1 �0* �6#��,"!
���� $��5
#�1 �5 !�1 ,��, $/��$5 �/��5
&1
,�%� #%"&"�"�1 �#��1�"���
6#��,�,����" # ,�%� #%"&"�"�1
&1 ��,�"�"���" #5 ��5 &1 2��*05 26�� �#1 �.�#�1
,.�#"����1 �#��1%"%�
/#��,��"#�1
�#��1��$ &1 *#��1�"���5 6#�� 6#$"�#�� �"%5 2��*0 ����5 *�����5 �)�)5 ��5 ����(�5
6#"�"��
0�.�
0,"#��$
OrderID: 161901555
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Concrete Floor, Wood Walls, Wood Ceiling Exterior – Plastic Siding, Wood Roof
LOCATION(S): Horticulture Storage Shed
SAMPLING DATE(S): 01/23/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um ed
Tar Paper NF -- -- X 201 -- 202 X -- -- NQ NO
| ���������� | |
| � | �� |
0�1! /�� 2��� �
��� ��#3,�#$ 4��"$%5 �6
��426+����4� ���4*3�
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� �������$2 #��"&, /% �����,����3��%%
2 #� �������$2 #��"&, /% �����,����3��%%
2 #� �������$2 #��"&, /%
2 #� �������$2 #��"&, /%
*#��1%��%�
4"���,$ ��,$"#.5 ��& ,�� ,1 �".#�� ,1
�"�&"�"�1 �#��1%"% �
�#��1%�% +�4 ��,� " /%�1 �0*
6#��,"!
�5
#�1 �& �5 !�1 ,��, $/��$5 �/��5
&1
,�%� #%"&"�"�1 �#��1�"���
6#��,�,����" # ,�%� #%"&"�"�1
&1 ��,�"�"���" #5 ���, ��5 &1 2��*05 26�� �#1 �.�#�1
,.�#"����1 �#��1%"%�
/#��,��"#�1
�#��1 &1 *#��1�"���5 6#�� 6#$"�#�� �"%5 2��*0 ����5 *�����5 �)�)5 ��5 ����(�5
6#"�"��
0�.�
0,"#��$
OrderID: 161901567
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Concrete Floor, Wood, Plaster, Metal Walls, 12” Tile, Wood, Metal Ceiling Exterior – Metal Walls, Metal Roof
LOCATION(S): Locksmith
SAMPLING DATE(S): 11/01/18
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um ed
12 X12 Ceiling Tile, White NF -- -- X 101 --103 X -- -- NQ NO
Plaster W/Texture NF X -- -- 201 -- 203 X -- -- NQ NO
Carpet Mastic NF -- -- X 301 --302 X -- -- NQ NO
Wall Caulk, White NF -- -- X 401 --402 X -- -- NQ NO
6” Cove Base, Black NF -- -- X 501 --502 X -- -- NQ NO
Drywall & Joint Compound NF -- -- X 601 --603 X -- -- NQ NO
Toilet Gasket NF -- -- X NS -- -- -- 1 YES
Fire Door NF -- -- X NS -- -- -- 5 YES
Electrical Switch NF -- -- X NS -- -- -- 1 YES
| ���������� | |
| � | �� |
0�1! /�� 2���
��� ��#3,�#$ 4��"$%5 �6
3�,�.�
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� 8������$2 #�9"&, /% 3��%%
3,�1
�"��5
2 #� 8������$2 #�9"&, /% 3��%%
3,�1
�"��5
2 #� 8������$2 #�9"&, /% 3��%%
3,�1
�"��5
2 #� 8������$2 #�9"&, /% 3��%%
3,�1
0��%��, 2 #� 8������$2 #�9"&, /% 3��%%
3,�1
0��%��, 2 #� 8������$2 #�9"&, /% 3��%%
3,�1
0��%��, 2 #� 8������$2 #�9"&, /% 2 #��"&, /%
2 #� 8������$2 #�9"&, /% 2 #��"&, /%
2 #� 8������$2 #�9"&, /% 2 #��"&, /%
+�/��5
2 #� 8������$2 #�9"&, /% 2 #��"&, /%
+�/��5
2 #� 8������$2 #�9"&, /% 2 #��"&, /%
+ ��&�%�5
2 #� 8������$2 #�9"&, /% 2 #��"&, /%
+ ��&�%�5
2 #� 8������$2 #�9"&, /%
3,�1
8,1����
2 #� 8������$2 #�9"&, /%
3,�1
2 #� 8������$2 #�9"&, /%
3,�1 2 #��"&, /%
2 #� 8������$2 #�9"&, /%
4 9
0���, 6#"�"��
9, !
0�.�
0,"#��$
| ���������� | |
| � | �� |
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� 8������$2 #�9"&, /%
4 9
0���, �#��1%��%�
���� 4"���,$ ��,$"#.5 ��& ,�� ,1 �".#�� ,1
�"�&"�"�1 �#��1%"% �
�#��1%�% ��,9 ,!�$ +�4 ��,��" /%�1 �0� �6#��,"!
���� $��5
��9"#����
#�1 �& ��5 !�1 ,��, $/��$5 9/��5
&1
,�%� #%"&"�"�1 9 , �#��1�"���
6#��,�,����" # ,�%� #%"&"�"�1
&1 ��,�"9"���" #5 ���, ���5 &1 2���05 26�� �#1 �.�#�1
9 , # # �9,"�&�� ,.�#"����1 �#��1%"%�
/#��,��"#�1
�#��1��$ &1 �#��1�"���5 6#�� ��1! /��5
6#"�"��
9, !
0�.� 0,"#��$
OrderID: 161821928
OrderID: 161821928
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Concrete Floor, No Walls, Wood Ceiling Exterior – No Walls, Tar Paper & Shingled Wood Roof
LOCATION(S): Phone Shack
SAMPLING DATE(S): 01/23/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um ed
Tarp Layer NF -- -- X 201 -- 202 X -- -- NQ NO
| ���������� | |
| � | �� |
0�1! /�� 2��� �
��� ��#3,�#$ 4��"$%5 �6
0��2�
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� �������$2 #��"&, /% �����,���;3��%%
2 #� �������$2 #��"&, /% �����,���;3��%%
2 #� �������$2 #��"&, /%
2 #� �������$2 #��"&, /%
*#��1%��%�
4"���,$ ��,$"#.5 ��& ,�� ,1 �".#�� ,1
�"�&"�"�1 �#��1%"% �
�#��1%�% +�4 ��,� " /%�1 �0*
6#��,"!
�5
#�1 �& �5 !�1 ,��, $/��$5 �/��5
&1
,�%� #%"&"�"�1 �#��1�"���
6#��,�,����" # ,�%� #%"&"�"�1
&1 ��,�"�"���" #5 ���, ��5 &1 2��*05 26�� �#1 �.�#�1
,.�#"����1 �#��1%"%�
/#��,��"#�1
�#��1 &1 *#��1�"���5 6#�� 6#$"�#�� �"%5 2��*0 ����5 *�����5 �)�)5 ��5 ����(�5
6#"�"��
0�.�
0,"#��$
OrderID: 161901552
DATE: 11/27/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Concrete Floor, Wood & Metal Walls W/ Foamboard Cover, Metal Ceiling Exterior – Metal Walls, Metal Roof
LOCATION(S): Pole Barn
SAMPLING DATE(S): 11/01/18
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: -- SAMPLE LOCATIONS -- CHAIN OF CUSTODY -- ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Wood Floor, Wood Walls, Wood Ceiling Exterior – Wood Walls, Wood Roof W/ Tar Paper & Shingles
LOCATION(S): RC Ground Post #1
SAMPLING DATE(S): 01/23/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um ed
2’ X 2’ Floor Tile, White NF -- -- X 101 --102 X -- -- NQ NO
2’ X 2’ Floor Tile, Grey NF -- -- X 201 -- 202 X -- -- NQ NO
Shingle NF -- -- X 301 -- 302 X -- -- NQ NO
Tar Paper NF -- -- X 401 -- 402 X -- -- NQ NO
| ���������� | |
| � | �� |
0�1! /�� 2��� �
��� ��#3,�#$ 4��"$%5 �6
4+ 34��2� 0���
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� �������$2 #��"&, /% 2 #��"&, /%
2 #� �������$2 #��"&, /% 2 #��"&, /%
2 #� �������$2 #��"&, /% ��;3,�1 2 #��"&, /%
.,�1
2 #� �������$2 #��"&, /% ��;3,�1 2 #��"&, /%
.,�1
2 #� �������$2 #��"&, /% �����,���;3��%%��;4�$��������,�#.�
2 #� �������$2 #��"&, /% �����,���;3��%%��;�����
2 #� �������$2 #��"&, /%
2 #� �������$2 #��"&, /%
*#��1%��%�
4"���,$ =�,$"#.5 ��& ,�� ,1 �".#�� ,1
�"�&"�"�1 �#��1%"%�
�#��1%�% +�4 ��,� " /%�1 �0*
6#��,"!
�5
#�1 �& �5 !�1 ,��, $/��$5 �/��5
&1
,�%� #%"&"�"�1 �#��1�"���
6#��,�,����" # ,�%� #%"&"�"�1
&1 ��,�"�"���" #5 ���, ��5 &1 2��*05 26�� �#1 �.�#�1
,.�#"����1 �#��1%"%�
/#��,��"#�1
�#��1 &1 *#��1�"���5 6#�� � ,,"% "���5 2+
6#"�"��
0�.�
0,"#��$
OrderID: 161901544
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Fiberglass Floor, Fiberglass Walls, Fiberglass Ceiling Exterior – Fiberglass Walls, Fiberglass Roof
LOCATION(S): RC Ground Post #2
SAMPLING DATE(S): 01/23/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um ed
Fiber Glass NF -- -- X 101 --102 X -- -- NQ NO
Caulk, White NF -- -- X 201 -- 202 X -- -- NQ NO
Floor Tile, Debris NF -- -- X 301 -- 302 X -- -- NQ NO
| ���������� | |
| � | �� |
0�1! /�� 2��� �
��� ��#3,�#$ 4��"$%5 �6
4�+� 34��2� 0���
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� �������$2 #��"&, /% �����,����3��%%(����#���"�����".�
2 #� �������$2 #��"&, /% �����,����3��%%(����"��
2 #� �������$2 #��"&, /% �����,����3��%%����"��
2 #� �������$2 #��"&, /% ���3��%%� 2 #��"&, /%
2 #� �������$2 #��"&, /% ���3,�1���".� 2 #��"&, /%
�"��5
2 #� �������$2 #��"&, /% 2 #��"&, /%
�"��5
2 #� �������$2 #��"&, /% ���3,�1���".� 2 #��"&, /%
�"��5
2 #� �������$2 #��"&, /%
�"��5
*#��1%��%�
4"���,$ �,$"#.5 ��& ,�� ,1 �".#�� ,1
�"�&"�"�1 �#��1%"% �
�#��1%�% +�4 " /%�1 �0* �6#��,"!
���� $��5
#�1 �5 !�1 ,��, $/��$5 �/��5
&1
,�%� #%"&"�"�1 �#��1�"���
6#��,�,����" # ,�%� #%"&"�"�1
&1 ��,�"�"���" #5 ��5 &1 2��*05 26�� �#1 �.�#�1
,.�#"����1 �#��1%"%�
/#��,��"#�1
�#��1G�$ &1 *#��1�"���5 6#�� "���5 2+
6#"�"��
0�.�
0,"#��$
OrderID: 161901549
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Wood Floor, Fake Wood Walls, Metal Deck Exterior – Metal Walls, Metal Roof
LOCATION(S): Sally Port
SAMPLING DATE(S): 01/24/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um ed
2’ X 2’ Floor Tile NF -- -- X 101 -- 102 X -- -- NQ NO
4” Cove Base, Black NF -- -- X 201 --202 X -- -- NQ NO
2’ X 4’ Ceiling Tile NF -- -- X 301 -- 302 X -- -- NQ NO
Assumed Roof Material NF -- -- X NS -- -- -- 80 SF YES
Fake Wood Wall NF -- -- X 501 -- 502 X -- -- NQ NO
| ���������� | |
| � | �� |
0�1! /�� 2��� �
��� ��#3,�#$ 4��"$%5 �6
0�4�
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� �������$2 #��"&, /% ��;3,�1 2 #��"&, /%
.,�1
2 #� �������$2 #��"&, /% ��;3,�1 2 #��"&, /%
.,�1
2 #� �������$2 #��"&, /% 2 #��"&, /%
2 #� �������$2 #��"&, /% 2 #��"&, /%
2 #� �������$2 #��"&, /% 2 #��"&, /%
2 #� �������$2 #��"&, /% 2 #��"&, /%
2 #� �������$0�,�"�� 2 #��"&, /%
C �
C�"�����".�
2 #� �������$0�,�"�� 2 #��"&, /%
C �
3,�1�C�"��
2 #� �������$2 #��"&, /%
2 #� �������$2 #��"&, /% );+���/� %��);�, �#�3,�1
4"���,$ ��,$"#.5 ��& ,�� ,1 �".#�� ,1
�"�&"�"�1 �#��1%"% �
�#��1%�% +�4 ��,�>" /%�1 �0*
6#��,"!
�5
#�1 �& >�5 !�1 ,��, $/��$5 �/��5
&1
,�%� #%"&"�"�1 �#��1�"���
6#��,�,����" # ,�%� #%"&"�"�1
&1 ��,�"�"���" #5 ���, >��5 &1 2��*05 26�� �#1 �.�#�1
,.�#"����1 �#��1%"%�
/#��,��"#�1 ,�E/�%��
�#��1F�$ &1 *#��1�"���5 6#�� � ,,"%>"���5 2+
6#"�"��
0�.�
0,"#��$
OrderID: 161901533
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Concrete Floor, Wood Walls, Wood Ceiling Exterior – Metal Siding, Wood Roof W/ Tar Paper & Shingles
LOCATION(S): School Storage
SAMPLING DATE(S): 01/23/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um ed
Tar Paper NF -- -- X 201 -- 202 X -- -- NQ NO
| ���������� | |
| � | �� |
0�1! /�� 2��� �
��� ��#3,�#$ 4��"$%5 �6
���4*3�
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� �������$2 #��"&, /% �����,���;3��%%
2 #� �������$2 #��"&, /% �����,���;3��%%
2 #� �������$2 #��"&, /%
2 #� �������$2 #��"&, /%
*#��1%��%�
4"���,$ ��,$"#.5 ��& ,�� ,1 �".#�� ,1
�"�&"�"�1 �#��1%"% �
�#��1%�% +�4 ��,�>" /%�1 �0* ?6#��,"!
���� $?�5
#�1 �& >�5 !�1 ,��, $/��$5 �/��5
&1
,�%� #%"&"�"�1 �#��1�"���
6#��,�,����" # ,�%� #%"&"�"�1
&1 ��,�"�"���" #5 ���, >��5 &1 2@�*05 26�� �#1 �.�#�1
,.�#"����1 �#��1%"%�
/#��,��"#�1 ,�A/�%��
�#��1B�$ &1 *#��1�"���5 6#�� 6#$"�#�� �"%5 2@�*0 ����5 *�����5 �)�)5 ��5 �D ����(�5
6#"�"��
0�.�
0,"#��$
OrderID: 161901562
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Concrete Floor, Bock Walls, Wood Ceiling Exterior – Brick Face Walls, Wood Roof W/ Tar Paper & Shingles
LOCATION(S): Shooting Range
SAMPLING DATE(S): 01/24/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um ed
Caulk, White NF -- -- X 101 --102 X -- -- NQ NO
Glue, Tan NF -- -- X 201 -- 202 X -- -- NQ NO
Toilet Gasket, Assumed NF -- -- X -- -- -- -- 1 YES
Electrical Switch, Assumed NF -- -- X -- -- -- -- 1 YES
Drop Insulation NF -- -- X 501 -- 503 X -- -- NQ NO
Exterior Caulk, Grey NF -- -- X 601 -- 602 -- -- 2 8 SF YES
Braided Wire, Assumed NF -- -- X -- -- -- -- 6 SF YES
Shingle NF -- -- X 801 -- 802 X -- -- NQ NO
Tar Paper NF -- -- X 901 -- 902 X -- -- NQ NO
| ���������� | |
| � | �� |
0�1! /�� 2��� �
��� ��#3,�#$ 4��"$%5 �6
�����623 4*23�
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� �������$2 #��"&, /% 2 #��"&, /%
2 #� �������$2 #��"&, /% 2 #��"&, /%
2 #� �������$2 #��"&, /% 2 #��"&, /%
3�/�
2 #� �������$2 #��"&, /% 2 #��"&, /%
3�/�
2 #� �������$2 #��"&, /%
2 #� �������$2 #��"&, /%
2 #� �������$2 #��"&, /%
�; +�,1% �"��2 #��"&, /%
.,�1
�; +�,1% �"��2 #��"&, /%
.,�1
2 #� �������$2 #��"&, /% �����,���;3��%%��;��"��� �����3,��#
2 #� �������$2 #��"&, /% �����,���;3��%%��;
2 #� �������$2 #��"&, /%
2 #� �������$2 #��"&, /%
6#"�"��
0�.�
0,"#��$
| ���������� | |
| � | �� |
4"���,$ ��,$"#.5 ��& ,�� ,1 �".#�� ,1
�"�&"�"�1 �#��1%"% �
�#��1%�% +�4 ��,��" /%�1 �0* �6#��,"!
���� $��5
#�1 �& ��5 !�1 ,��, $/��$5 �/��5
&1
,�%� #%"&"�"�1 �#��1�"���
6#��,�,����" # ,�%� #%"&"�"�1
&1 ��,�"�"���" #5 ���, ���5 &1 �*05 26�� �#1 �.�#�1
,.�#"����1 �#��1%"%�
/#��,��"#�1
�#��1��$ &1 *#��1�"���5 6#�� 6#$"�#�� �"%5 �*0 ����5 *�����5 �)�)5 ��5 ����(�5
6#"�"��
0�.� 0,"#��$
OrderID: 161901558
OrderID: 161901558
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Gravel Floor, No Walls Exterior – Metal Roof
LOCATION(S): Shooting Range Pavilion
SAMPLING DATE(S): 01/24/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um
Gasket, White NF -- -- X 101 -- 102 X -- -- NQ NO
| ���������� | |
| � | �� |
0�1! /�� 2��� �
��� ��#3,�#$ 4��"$%5 �6
�����623 4*23� 0*�6��6�2
| ��� | ����������� | ����������� |
| �������������������� �!!�����" | #�����$�� | �� |
2 #� �������$2 #��"&, /% 2 #��"&, /%
3�%���
2 #� �������$2 #��"&, /% 2 #��"&, /%
3�%���
*#��1%��%�
�� 4"���,$ ��,$"#.5 ��& ,�� ,1 �".#�� ,1
�"�&"�"�1 �#��1%"% �
�#��1%�% +�4 ��,� " /%�1 �0*
6#��,"!
�5
#�1 �& �5 !�1 ,��, $/��$5 �/��5
&1
,�%� #%"&"�"�1 �#��1�"���
6#��,�,����" # ,�%� #%"&"�"�1
&1 ��,�"�"���" #5 ���, ��5 &1 2��*05 26�� �#1 �.�#�1
,.�#"����1 �#��1%"%�
/#��,��"#�1 ,�A/�%��
�#��1B�$ &1 *#��1�"���5 6#�� 6#$"�#�� �"%5 2��*0 ����5 *�����5 �)�)5 ��5 �D ����(�5
6#"�"��
0�.�
0,"#��$
OrderID: 161901566
DATE: 11/18/2019
SHEET: 1 1
PROJECT Richard A. Handlon Correctional Facility (MTU), 1728 Bluewater Highway, Ionia, MI 48846
CLIENT Michigan Department of Technology, Management and Budget
CONTRACTOR --
ENGINEER/ARCHITECT --
ASBESTOS TESTING – SURVEY, SAMPLING AND ANALYSIS
ASBESTOS INSPECTOR: M. Plummer REVIEWED BY: Allen Howard
ACCREDITATION NO.: A51770
Testing was performed by qualified personnel in accordance with generally accepted industry practice, Materials Testing Consultants procedures and the above referenced standards. This report is applicable only to the items and location(s) listed herein. Building materials not listed herein are to be presumed asbestos containing materials. This report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Comments: Interior – Wood Floor, Wood Walls, Wood Ceiling Exterior – Wood Walls, Wood Roof W/ Tar Paper & Shingles
LOCATION(S): Storage Shed #1
SAMPLING DATE(S): 01/23/19
CODE OR STANDARD: EPA AHERA 40CFR, Subpart E, 763.80-.8; EPA NESHAP 40 CFR 61; OSHA 29 CFR 1926.1101 (K)(S)
MTC PROCEDURE: ASB-0004.0 Asbestos Survey and Bulk Sampling ANALYSIS BY: EMSL Analytical, Inc. METHOD: EPA 600/R-93/116 PLM
ATTACHMENTS: X SAMPLE LOCATIONS X CHAIN OF CUSTODY X ANALYSIS REPORT
TEST RESULTS
Survey and Sampling Asbestos
Analysis Assessment
Presumed Asbestos Containing Material
Fr ia bl e
Su rf ac in g M at er ia l
Th er m al
S ys te m s In su la tio n
M at er ia l M is ce lla ne ou s
M at er ia l
Sa m pl e
N um be rs
(N S=
N o
Sa m pl es
N on e D et ec te d
B el ow R eg ul it
A sb es to s
Es tim at ed
Q ua nt iti es
R eg ul at ed A sb es to s
C on ta in in g
M at er ia l >1
A sb es to um ed
Rubber Floor NF -- -- X 101 --102 X -- -- NO YES
Shingle NF -- -- X 201 --202 X -- -- NQ NO
Tar Paper NF -- -- X 301 --302 X -- -- NQ NO
| ���������� | |
| � | �� |
0�1! /�� 2��� �
��� ��#3,�#$ 4��"$%5 �6
���4*3�
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .