This is Construction Bid Addendum No. 1 issued by the Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design and Construction Division for the DSC McLouth Steel Gibraltar Plant Superfund Site Countywide Landfill Subarea Leachate Disposal Services project (File Number 761/19404.SAR). The addendum was issued on August 12, 2019, with a bid opening date of August 21, 2019. A mandatory pre-bid walk-through meeting was held on August 1, 2019, at the site, with an attendance record attached to this addendum. The project involves leachate disposal services for a superfund site landfill, and the addendum incorporates interpretations, clarifications, and modifications to the original bidding documents. Project Director Sadi Rayyan oversaw this procurement.

The addendum addresses seven key questions submitted by bidders regarding treatment facility requirements. Critical clarifications include that successful bidders must utilize treatment facilities regulated by the Great Lakes Water Authority (GLWA) only if treated water is discharged to GLWA, and bidders must comply with all federal, state, and local regulations governing transport, treatment, storage, and disposal of landfill leachate, including all permitting requirements and discharge limits. The addendum confirms that EGLE staff will likely conduct a site visit to the treatment facility prior to waste deliveries. No specific pricing, set-asides, or funding source information is provided in this addendum document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 12/17)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

CONSTRUCTION BID ADDENDUM NO. 1

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

8/12/2019

PROJECT NAME

DSC McLouth Steel Gibraltar Plant Superfund Site Countywide Landfill Subarea Leachate Disposal Services

FILE NUMBER

761/19404.SAR

PROFESSIONAL

NA

PROJECT DIRECTOR

Sadi Rayyan

BID OPENING DATE:

8/21/2019

ADDENDUM ITEMS:

I. Additional Information

The meeting attendance record from the mandatory walk-through held on August 1, 2019 at the site is attached to this addendum.

II. Questions

Q1. Do you have a sign-in sheet or a list of contractors that attended the pre-bid meeting?

A1. See attached.

Q2. Is the contract winner required to utilize a treatment facility that is currently CERCLA approved since the landfill is a superfund site? If yes, is the current CERCLA approval letter to be submitted with the bid?

A2. No.

Q3. Is the contract winner required to utilize a treatment facility that is regulated by the Great Lakes Water Authority

(GLWA)?

a. If so, is the treatment facility required to have notified the GLWA of their intention to accept and treat PFAS laden material from Countywide Landfill?

b. If not, is the treatment facility required to notify the local POTW of their intention to accept and treat PFAS laden material from Countywide Landfill?

A3. The successful bidder is required to utilize a treatment facility that is regulated by the Great Lakes Water Authority (GLWA) only if the treated water is discharged to the GLWA. The successful bidder must follow any and all pertinent federal, state and local regulations dealing with the transport, treatment, storage and disposal of the landfill leachate, including but not limited to all permitting requirements, including meeting discharge limits established by the facility that accepts the treated leachate.

Q4. Is the contract winner required to utilize a treatment facility that has treatment equipment on site that is also permitted by the GLWA or other governing agency to accept and treat PFAS?

a. If yes, is documented proof of equivalent treatment to be submitted with the bid?

b. If yes, is the treatment facility’s current discharge permit indicating the acceptance and treatment for

PFAS to be submitted with the bid?

A4. See A3 above.

Q5. Is the treatment facility required to show analytical proof of their capability of treating PFAS, i.e. weekly discharge monitoring results that are below 60 ppt for PFOS and 2,300 ppt PFOA which is the current limit set by GLWA?

http://www.michigan.gov/SIGMAVSS

A5. See A3 above.

Q6. Is the winner required to provide a certificate of destruction for PFAS compounds?

A6. See A3 above.

Q7. Will MDEQ and EPA perform a site visit to the treatment facility prior to shipments of waste being delivered to the facility?

A7. EGLE staff will likely perform a site visit to the treatment facility prior to shipments of waste being delivered to the facility.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: NA DATE: Click to enter date

APPROVED BY: Sadi Rayyan

PROJECT DIRECTOR: DATE: 8/12/2019