This is Addendum 1 to RFP #388-21 for Design-Build Services for the Dawson County Etowah River Park Canoe Launch, issued by Dawson County, Georgia on August 10, 2021. The project involves designing and building a canoe launch facility at the Etowah River Park, with the primary scope including the replacement of existing steps with a new ramp that ends at the same elevation and location as the current stairs. A mandatory pre-proposal conference was scheduled for August 2, 2021, at the Etowah River Park. The IFB closing date was August 19, 2021, at 10:30 AM EST, with addendum submissions due by August 11, 2021. The County intends for this to be a fall project and has indicated that river access may be closed completely to the public during construction, with the contractor required to detail the timeframe in the construction schedule.

Dawson County has not established a set budget for this project and is open to cost-saving designs that meet all required scope, laws, ordinances, rules, and regulations. The Design/Build bidder will not be responsible for the cost of acquiring additional land for the proposed solution. An engineered Erosion and Sedimentation Plan is required to be submitted with the variance application to the Georgia Department of Natural Resources, Environmental Protection Division, as the foundation of the steps will be replaced within the buffer zone. The County provided tax boundary information and a canoe put-in plat and directed bidders to streamstats.usgs.gov for river flow rate and elevation change data, as this information is not available on file. All other dates, specifications, terms, and conditions remain as posted in the original IFB document.

Text of this file

RFP #388-21 Design-Build Services for the Dawson County Etowah River Park Canoe Launch

RFP #388-21 DESIGN-BUILD SERVICES FOR THE DAWSON COUNTY

ETOWAH RIVER PARK CANOE LAUNCH

ADDENDUM #1

IFB Closing Date: August 19, 2021, at 10:30AM, EST

IFB Issue Date: June 20, 2021

Addendum Due Date: August 11, 2021

Addendum Release Date: August 10, 2021

By: Melissa Hawk, Purchasing Manager

The following are amendments to the RFP #388-21 Design-Build Services for The Dawson

County Etowah River Park Canoe Launch:

1. The County must amend the language located on Page 11 regarding the notification from Ga

Department of Natural Resources, Environmental Protection Division. We received notification by email on August 4, 2021 that an engineered Erosion and Sedimentation Plan for this project must be submitted with the variance application being that the foundation of the steps is being replaced within the buffer. The specifications currently call for an Erosion

Control Survey and Erosion and Sediment Control Plans.

2. The Design/Build bidder will not be responsible for the cost of acquiring more land for the proposed solution.

3. All dates, other specifications, terms and conditions remain the same as posted in the IFB document.

The following are questions and answers to the RFP #388-21 Design-Build Services for The

Dawson County Etowah River Park Canoe Launch:

QUESTION: Can Owner provide plat or tax parcel boundary to illustrate property limits in area of proposed work?

ANSWER: The Etowah River Park tax boundary and the canoe put-in plat are attached.

QUESTION: Will the new ramp end at the same elevation as the current stairs? If not how much lower would the county like the ramp to go?

ANSWER: The County’s end-result intent is to end the ramp in the same location as the end of the stairs.

QUESTION: Will the river access be closed completely to the public during construction?

ANSWER: The County will allow the river’s access to be closed completely to the public;

however, the Contractor must detail the timeframe in the construction schedule. As mentioned, the County’s intent is for this to be a fall project.

RFP #388-21 Design-Build Services for the Dawson County Etowah River Park Canoe Launch

QUESTION: What is the estimated budget for this project?

ANSWER: The County does not currently have a set budget for this project; hence, the need for the cost estimation, scheduling and controls and the final construction cost and detailed cost schedule during the design phases. The County is open to all cost saving designs that still meet all required scope, laws, ordinances, rules and regulations.

QUESTION: Does the county have any information on the flow rate or elevation changes of the river at this location to determine what type of turn down is need to prevent scour?

ANSWER: No, the County does not have this information on file. However, streamstats.usgs.gov is a good reference in determining drainage basins, flood, and peak flow statistics. They also have links that may be helpful in design.

Company Name Signature of Authorized Representative

Title Date

THIS DOCUMENT MUST BE COMPLETED AND SUBMITTED AS PART OF YOUR PROPOSAL

mhawk Text Box

Other files

File Type Posted
Award Information —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .