Addendum 1 24170.pdf
PDF 252 KB Posted
- Solicitation number
- RFP 171 240000001736 2
- Issued by
- Luce County, Mcbride Village, Michigan
About this file
This is Addendum No. 1 to a Request for Proposal issued by the Michigan Department of Technology, Management and Budget (DTMB), Design and Construction Division, for professional design services related to the Laundresses' Quarters Historic Structures Report at Mackinac Island State Park. The project seeks an architectural or engineering firm to develop a Historic Structures Report for the facility, with services including documentation of existing conditions, contract document development, design options with 90% phase estimates, and submission of 50% and 90% phase documents for owner review. The proposal must include Phase 100 design services, a graphic bar-chart schedule indicating the proposed timeline in weeks, documentation of proposed meetings (on-site, face-to-face, telephone, or electronic), agendas and minutes for all project meetings, and itemized reimbursable expenses including topographical survey, soil boring, geotechnical reports, and travel costs. A pre-proposal meeting was held on Friday, April 19, 2024, at Mackinac Island State Park Field Office. Questions must be emailed to the project director by 3:00 p.m. on Wednesday, May 1, 2024. Proposals are due by 2:00 p.m. EST on Thursday, May 9, 2024, with contract award anticipated by the end of May 2024 and report development scheduled for summer 2024.
Proposals will be evaluated on a combined scoring basis of 80% technical qualifications and 20% cost, with pricing structured as a not-to-exceed billable rate plus reimbursables format. Reimbursable expenses must be specifically itemized, including costs for topographical surveys, soil boring, geotechnical reports, LARA and SESC plan review fees, and travel expenses, with mileage reimbursement limited to actual miles exceeding 100 miles each way from the proposer's office. Consultants and testing costs should be included as reimbursable expenses. Proposers must submit signed Certification of a Michigan Based Business and Responsibility Certification forms. Site access will be provided during normal business hours upon contract award, with advance notice required for any site visits. The pre-proposal meeting attendance record and agenda are attached to the addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAMPLE Billable Rate Contract (Rev 221207).pdf | ||
| Project Statement 24170.pdf | ||
| RFP Billable Rate 24170.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 2/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL
ADDENDUM NO. 1
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.
Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
May 1, 2024
PROJECT NAME
Laundresses’ Quarters – Historic Structures Report
FILE NUMBER
751/24170.ABG
PROJECT DIRECTOR
Alan Goschka, AIA
PROPOSAL DUE DATE:
Thursday, May 9, 2024
ADDENDUM ITEMS:
See attached Meeting Attendance Record
See attached Pre-Proposal Meeting Agenda
APPROVED BY:
Alan Goschka, AIA
PROJECT DIRECTOR DATE 05-01-2024
GRETCHEN WHITMER
GOVERNOR
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT & BUDGET
LANSING
MICHELLE LANGE
DIRECTOR
PRE-PROPOSAL MEETING AGENDA
MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
Design and Construction Division
3111 W. St. Joseph Street Lansing, MI 48917
Project: Laundresses’ Quarters – Historic Structures Report File Number: 751/24170.ABG Contract Order Number: Y-TBD Meeting Date and Time: Friday, April 19, 2024, at 11:00 am local time Meeting Place: Mackinac Island State Park Field Office
PROJECT REPRESENTATIVES
Project Director: Field Representative:
Alan Goschka, AIA Brian Guigue
DTMB-DCD DTMB-DCD
3111 W St Joseph St 3111 W St Joseph St Lansing, MI 48917 Lansing, MI 48917 517-388-3489 517-281-4994 goschkaa@michigan.gov guigueb@michigan.gov
Facility Representatives:
Myron Johnson Steve Brisson Mackinac Island State Park Commission Mackinac Island State Park Commission Mainland Park Manager Director PO Box 370 207 W Sinclair Mackinac Island, Michigan 49757 Mackinaw City, Michigan 49701 906-847-6609 231-436-4100 Johnsonm54@michigan.gov brissons@michigan.gov
Introductions and Sign-In Sheet
A. Request for Proposals – Standard Not-to-Exceed RFP, with Part I Technical portion and
Part II Cost portion.
1. Technical – Qualification format includes: General Information; Understanding of the Project and Tasks; Personnel; Management Summary, Work Plan & Schedule; Budget Analysis and References. See Section II-1 through 6.
2. Cost – Not to Exceed Billable Rate plus reimbursables format. See Section III-1 through 2. See Section III 2-A, B, C and D of RFP for samples.
3. Proposals must include Phase 100 Study.
4. Include consultants and testing as reimbursable expenses.
5. Include signed Certification of a Michigan Based Business and Responsibility
Certification forms.
6. Proposals will be evaluated by an Ad Hoc Advisory Committee and scored based on the combined 80% Technical portion and 20% Cost portion.
B. Project Scope
1. Design services for Phases 100 Study. The Mackinac Island State Park Commission is seeking professional design services to develop an Historic Structures Report for the Laundresses’ Quarters located on Mackinac Island.
2. Reference Project Statement for anticipated scope of work
3. Professional services shall include, but are not limited to:
Document existing conditions and verify all base information required for proper design.
Contract Document development that meets the approval of the MSHP, DTMB and all related Code requirements.
Provide 90% Phase 100 estimates of construction costs for developed design options.
Submittal of 50% and 90% Phase 100 documents for Owner review.
Provide a biweekly progress summary email to the project team, briefly documenting the prior 2-week’s progress by the PSC and display the initial project schedule and current schedule status.
4. Proposals shall include:
Phase 100 design services required to provide the necessary study documents and design layout options.
A graphic bar-chart schedule (in weeks) indicating the PSC’s proposed timeline for services based on a proposed PSC Contract start date. For scheduling purposes, assume 7 calendar days each Owner review submission.
Clear documentation of the number of meetings proposed, indicating whether the meetings are proposed to be on-site, face to face, by telephone, or in specific electronic format. The PSC shall provide agendas and meeting minutes for all project meetings, including meetings held in electronic format. The PSC shall identify and itemize as a reimbursable expense all reimbursable and travel expenses in the PSC Cost Proposal.
Reimbursable expenses listed specifically for topographical survey, soil boring and geotechnical report (if required), LARA plan review fees, SESC plan review fees (if required) and travel (noting that mileage can only be charged for actual miles over 100 miles each way from the PSC’s office).
C. Site Visits
1. Accessibility to the site – consider this as your only opportunity to walk the site before bidding.
D. Schedule
1. E-mail questions to goschkaa@michigan.gov no later than 3:00 p.m., Wednesday, May 1, 2024. DO NOT send questions in through SIGMA as they do not get to the project directors from SIGMA.
2. If necessary, an addendum will be posted on the SIGMA VSS website no later than COB, May 2, 2024.
3. Proposals are due on Thursday, May 9, 2024, no later than 2:00 p.m. EST to issuing office and on SIGMA VSS.
4. Ad Hoc Advisory Committee will review proposals and award contract by the end of May 2024.
5. Report developed Summer 2024.
E. Budget
1. PSC is to provide cost estimates at 90% Phases 100 developed plans options.
F. Other Items
1. Access to Site Upon Contract Award
a. Normal business hours for facility, or hours in which work can take place.
b. Provide notice to the facility prior to any site visits.
G. RFP Questions