Addendum 1 to Hartwick Pines State Park Lift Station Improvements
This Addendum document issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration Design and Construction Division, provides clarifications and modifications to the bidding documents for the Hartwick Pines State Park Lift Station Improvements project (File Number 751/23403.CTS). The project involves the replacement of two lift stations and associated components at the campground facility. A mandatory pre-bid meeting was held on March 28, 2024, at 11:00 AM with representatives from DTMB, Michigan Department of Natural Resources (MDNR), and the professional services firm Wade Trim, Inc. serving as Project Director. The bid submission deadline is April 10, 2024, at 2:00 PM via SIGMA VSS in Adobe PDF format, with bids due electronically and no late submissions accepted. The anticipated pre-construction kickoff meeting and Notice to Proceed are scheduled for June 2024, with substantial completion required by March 26, 2025, and final completion by April 25, 2025. Liquidated damages are assessed at $800 per day following the substantial and final completion dates.
Key project clarifications include that the contractor must salvage the existing aluminum hatch on the sewage lift station wet well for the Owner's benefit, maintain roadway access at all times for DNR use, and provide engineer-approved equipment equivalents to specified Flygt models. The SCADA/telemetry system shall utilize a cellular autodialer based on Mission Control technology with an included antenna, eliminating the need for landline installation. The bid includes a $20,000 allowance for provisionary or contingency scope as directed by the Project Director and Professional Services Consultant (PSC). Bid security equal to five percent of the base bid is required, and the contractor must obtain all permits from LARA and other required agencies while maintaining 100 percent on-site supervision. Working hours are restricted to normal business days Monday through Friday during normal business hours unless written permission is granted, with a concurrent campground electrical system upgrade project expected to impact water and electrical availability through mid-May 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPEC 23403.pdf | ||
| DWGS 23403 3of3.pdf | ||
| DWGS 23403 1of3.pdf | ||
| DWGS 23403 2of3.pdf | ||
| Advertisement 23403.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 10/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. No. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
4/5/2024
PROJECT NAME
Hartwick Pines State Park Lift Station Improvements
FILE NUMBER
751/23403.CTS
PROFESSIONAL
Wade Trim, Inc.
PROJECT DIRECTOR
Chris Schanbeck
BID OPENING DATE:
4/10/2024
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
General:
1. On-site prebid meeting sign-in sheet is attached.
2. Mandatory prebid meeting agenda is attached.
Clarifications:
1. Contractor shall salvage existing aluminum hatch on sewage lift station wet well to Owner.
2. Roadways shall remain open at all times for DNR use.
3. Sewage lift station/above-ground valve vault and pumps are based on Flygt models. Contractor may provide an engineer-approved equivalent for consideration.
4. SCADA/telemetry shall be a cellular autodialer based on a Mission Control system. An antenna will be included with the system. No installation of a landline for autodialer is necessary.
Questions:
1. Where does the force main pump to from the effluent tank?
The force main from the effluent tank pumps to a two-zone drainfield located to the northwest of the effluent lift station.
2. Is there some place on-site to get rid of the effluent water?
Yes, the residual sewage and effluent wastewater may be disposed of in the septic tanks adjacent to the effluent lift station.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Wade Trim, Inc. DATE: 4/5/2024
APPROVED BY:
PROJECT DIRECTOR: DATE: Click to enter date
MANDATORY PRE-BID MEETING
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
Project: Hartwick Pines State Park Campground, Lift Station Improvements
File Number: 751/23403.CTS
Date & Time: Thursday, March 28, 2024, at 11:00am
A. Introductions and Sign-in Sheet
Chris Schanbeck / DTMB Project Director Ken Dao / DTMB Field Rep Scott Cook / MDNR Field Planner Mike Signorello / MDNR Mitch Babcock / MDNR Quinn Ridley / Wade Trim (PSC Representative)
All attendees are to sign-in. Individuals can represent only one firm that may submit a bid.
B. Project Scope: Replacement of 2 lift stations and various associated components as specified in the contract documents.
C. Addendum will be issued to document any questions, issues or changes to the contract documents that arise during bidding. All questions or issues shall be submitted via email including any items discussed in this meeting that are not documented in addendum 1. The sign-in sheet will be issued in addendum 1.
D. Bid Submissions
1. Execute and include all required forms and documents. Refer to Bidder’s Checklist.
a. Note the allowance, $20,000, to be included in the bid for provisionary or contingency scope as directed in writing from the PSC and Project Director.
b. Bid Security equal to five percent (5%) of the base bid is required.
2. Bids shall be submitted electronically in Adobe PDF format to SIGMA VSS. Do not wait until the last minute.
E. Items to be provided by Contractor after notification of award including but not limited to:
1. Performance and Payment Bonds,
2. Proof of Insurance including Builder’s Risk and
3. Additional documentation requested.
F. Schedule
1. April 3, 2024, 4:00pm, any questions must be submitted. Email to qridley@wadetrim.com.
2. April 10, 2024, 2:00pm, Bids are due on SIGMA VSS.
3. June 2024, Anticipated Pre-construction Kickoff Meeting and Notice to Proceed to be confirmed after contract is executed.
4. March 26, 2025 substantial completion. April 25, 2025 final completion.
5. Liquidated damages specified at $800 per day after substantial and final completion.
G. Permits - The contractor is responsible for obtaining and paying for all permits required by LARA, or any other agency as required. The Contractor is responsible for scheduling all inspections.
H. The Contractor is responsible for managing and supervising the work and must be on site 100% of time.
RFP 751/23243.CTS PRE-PROPOSAL MEETING 3/28/2024
I. Special Working Conditions – Department of Natural Resources. Refer to Appendix II for additional detailed information.
1. Working hours shall be during normal business hours during normal business days (Monday through Friday). Additional weekday hours or work on weekends or State Holidays is NOT allowed unless specific written permission is granted. Work is permitted during the month of September.
2. A separate campground electrical system upgrade construction project will be underway concurrently with this project and should be completed by mid-May 2025. Some coordination of shared space, site access control and general planning effort shall be expected. Electrical power will NOT be available at the campground until the system upgrade is completed.
Water will NOT be available at the campground until the system upgrade is completed but may be trucked from other locations within the park. The schedule for the electrical system startup may delay the final commissioning of the lift stations.
3. Site controls & staging
J. PSC to review technical and any additional scope information.
K. Comments – Questions – Walk Through