Addendum 1 23148.pdf
PDF 2 MB Posted
- Solicitation number
- RFQ - 171 - 230000000812
- Issued by
- Grand Traverse County, Lowell City, Michigan
About this file
This document is an Addendum for a state and local contract opportunity related to the Cedar Campground Septic Tank Replacement project at Ludington State Park in Michigan. The project involves replacing the existing septic tanks and dosing chamber in the Cedar Campground, which are leaking, with new septic tanks, dosing station, controls, and pumps. The project can start in November 2023 and must be completed by May 1, 2024. Bids are due electronically on October 25, 2023 at 2:00 pm. No alternates are allowed, and prevailing wages are required. The addendum includes clarifications on the scope of work, site access during construction, and restoration requirements for roads, parking areas, and landscaping.
The addendum also provides details on the construction materials, including select granular fill and asphalt paving requirements. It specifies that the contractor is responsible for locating, protecting, and replacing any existing utilities owned by Ludington State Park as necessary. The contractor is also responsible for any dewatering required during excavation and construction. Surplus excavated materials become the property of the contractor to dispose of off-site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4910 Stariha Drive Muskegon, MI 49441 t. 231-798-0101 f. 231-798-0337 www.preinnewhof.com page 1 of 1 S:\2023\2230227 State of Michigan DTMB\CDS\addendum 2023-10-16.docx
Addendum No. 1 Owner: State of Michigan - DNR
Project Title: Ludington State Park - Cedar Campground Septic Tank Replacement
File #: 751/23148.GAG Date of Addendum: October 18, 2023
Notice to Prospective Bidders In accordance with Article 1 of the General Conditions, this Addendum is hereby issued as part of the Contract Documents.
Minutes of the Mandatory Prebid meeting are enclosed.
Project Specifications:
1. Builders Risk Insurance is not required.
2. All disturbed lawn areas, aggregate, concrete, and asphalt roads must restored following the work in accordance with the enclosed Sections 31 22 00 Earthwork and 32 92 00 Restoration.
HMA roads and parking areas disturbed during construction must be saw cut prior to restoration. The full width of the roadway must be removed and replaced if disturbed, partial lane restoration will not be accepted.
3. Correction of the Specifications: Section 33 36 00 Part 2 – Products B. Starter and Capacitor shall be sized to support a 1 HP, 230V, 1-Phase dosing pump.
4. Section 33 36 00 Part 2A: Extended base is required for all tanks. If documentation and calculations are provided from the manufacturer of the tanks showing the dry weight of the tanks exceed the buoyant force seen at the site with the water level is at the ground surface while the tanks are empty, the extended bases may be waived.
Project Drawings:
1. Clarification of the drawing and specifications, the distribution valve located at the drain field is existing, no work on the distribution valve is included in this project.
2. Correction of the Drawings. The pump horsepower is listed incorrectly on the drawings. The pump horsepower is to be 1 hp.
Matthew R. Hulst
Enclosures: Minutes of Prebid Meeting Section 31 22 00 Section 32 92 00 c: Plan Holders
Project Name: Cedar Campground Septic Improvements Project Number: 2230227
SECTION 31 22 00
EARTHWORK
-s:\2023\2230227 state of michigan dtmb\cds\312200 earthwork.doc-10/18/23 Page 1
PART 1 - GENERAL
1.01 DESCRIPTION:
A. The work includes earthwork for site earthwork, miscellaneous exterior concrete, structures, asphalt or concrete pavement, rough site grading, and excavating, trenching, and backfill for utilities.
1.02 REFERENCES:
A. American Society for Testing and Materials, latest edition (ASTM).
B. American Association of State Highway and Transportation Officials (AASHTO).
C. Michigan Department of Transportation (MDOT), "2020 Standard Specifications for
Construction".
D. Sitework is subject to the requirements of 1994 PA 451, Part 91 as amended "Soil Erosion and
Sedimentation Control Act" and other state, county, and municipal or township regulations promulgated under the authority thereof.
1.03 DEFINITIONS:
A. Borrow: Material required for earthwork construction differing from the plus or minus quantity of suitable material available from required excavation grading or cutting. Borrow may be necessary even though not shown on the Drawings.
B. Cohesive Material: Fine grained material which produces resistance to displacement by mutual attraction between particles of the mass, involving forces of molecular origin (i.e. clays are considered cohesive).
C. Granular or Cohesionless Material: Coarse grained materials having no cohesion, which derive their resistance to displacement from internal stability (i.e. sands are considered cohesionless).
D. Maximum Density: Maximum dry weight in pounds per cubic foot of an established material determined in accordance with a specified procedure.
E. Optimum Moisture: Percentage of water by weight at maximum density.
F. Proof Rolling: Applying test loads over the rough grade or subgrade surface by means of a heavy pneumatic tire roller or other approved means, to locate and permit timely correction of deficiencies likely to adversely affect performance of the structure.
G. Rock Excavation: Naturally occurring material consisting of boulders or rock weighing 400 pounds (approximately one cubic yard) or more and all solid or ledge rock, slate, shale, sandstone and other hard materials that require continuous use of pneumatic tools, heavy rippers or continuous drilling and blasting for removal. Pavements are not included.
H. Rough Grade: Earth grade before placing structure or landscaping.
I. Structures: Buildings, foundations, slabs, tanks, curbs, or other man-made stationary features occurring above or below ground surface.
J. Subbase: The layer of specified material of designed thickness placed on the subgrade as a part of the structure.
-s:\2023\2230227 state of michigan dtmb\cds\312200 earthwork.doc-10/18/23 Page 2
K. Subgrade: Undisturbed or compacted earth grade upon which a structure is to be placed.
L. Suitable Excavated Material: Mineral (inorganic) soil free of cinders, refuse, sod, boulders, rocks, pavement, soft or plastic clays, vegetable or other organic material and capable of being compacted as specified and meeting the required gradation standard specified. Moisture content has no bearing on the suitability of materials to be used.
M. Fly Ash Fill: Also know as controlled low strength material (CLSM) is a lean concrete mixture proportioned, batched, transported, placed and tested in accordance with the recommendations in ACI Report 229R-94.
1.04 SUBMITTALS:
A. Test Reports: Submit the following reports directly to (ENGINEER) from the testing services, with copy to CONTRACTOR.
1. Test reports on borrow material.
2. Verification of suitability of each fill material, in accordance with specified requirements.
3. One optimum moisture-maximum density curve for each type of soil encountered or used as fill.
B. Samples: Deliver sample of proposed fill material to testing laboratory at least one (1) week prior to beginning of fill work.
1.05 QUALITY ASSURANCE:
A. Codes and Standards: Perform excavation work in compliance with applicable requirements of authorities having jurisdiction.
B. Testing and Inspection Service: Testing of earthwork shall be arranged and paid for by the
OWNER.
C. When additional testing of materials is necessary because of their failure by test or inspection to meet specification requirements, the cost of the additional testing shall be paid for by the
CONTRACTOR.
1.06 JOB CONDITIONS:
A. If during progress of the work, testing indicates that materials do not meet specified requirements, remove defective work and replace at no cost to the OWNER.
B. Protect and preserve all public and private property including existing vegetation, landscape features, monuments or other survey markers within, along and adjacent to the work area.
C. Moisture content has no bearing on the suitability of material to be used.
1. The moisture content of a material, however, may be such that its use will require extensive manipulation to achieve required compaction.
2. It is the contractor's responsibility to determine the economics of using or disposing and replacing of such materials.
3. Materials determined by the contractor to be uneconomical for use may be disposed of off-site or on-site in areas approved by the ENGINEER and replaced with other material at no additional cost to the OWNER.
D. Use of Explosives: Use of explosives is not permitted.
PART 2 - PRODUCTS
-s:\2023\2230227 state of michigan dtmb\cds\312200 earthwork.doc-10/18/23 Page 3
2.01 MATERIALS:
A. Fill:
1. Select Granular Material: MDOT 902, Class II or IIa limited to 1.0 inch maximum size.
PART 3 - EXECUTION
3.01 PREPARATION:
A. Topsoil:
1. Remove from all areas of new construction where the surface will be disturbed and stockpile on site in designated areas.
2. If quantity of stockpiled topsoil is insufficient, provide additional topsoil as required to complete landscape work.
B. Utilities:
1. Before starting excavation establish location and extent of underground utilities occurring in work area.
2. Notify utility companies to remove and relocate lines which are in conflict with design locations.
3. Several utilities, including but not limited to electric, water main, sanitary sewer, and storm sewer are owned by Ludington State Park. It shall be the Contractor’s responsibility to locate, protect and as necessary, replace these utilities.
4. Certain underground utilities such as sewers may require removal and subsequent replacement in lieu of supporting or bracing during the proposed construction, or the Contractor may elect this option when temporary provisions to maintain essential services have been previously approved by the Engineer.
5. Unless otherwise specified, any utilities removed during the proposed construction shall be replaced by the Contractor. Materials and installation shall be equal to or better than original construction in every way. Salvaged materials may be reused when they are in good condition, and a satisfactory installation can be accomplished in the judgment of the Engineer.
6. Replacement of existing utilities shall be considered included in the major items of work and no separate payment will be made for this work.
C. Landscaping: Protect Plantings and other features to remain as part of final landscaping.
3.02 EXCAVATION:
A. Excavate as required for construction of the work. Utilize or dispose of excavated materials as required.
1. Protect excavation and adjacent structures by shoring, bracing, sheet piling or other methods as required.
2. Remove unsuitable material to firm underlying soils beneath footings, floor slabs, paved areas and walks.
B. Preparation of Subgrade:
1. Compact top 12 inches of subgrade under footings, slabs, pavement and walks to 95% maximum density unless otherwise specified.
2. Over excavate the subgrade under footings, slabs, pavement and walks as required if directed by Engineer if unsuitable soils are present and backfill to original subgrade elevation with granular fill material.
3. Compact top 12 inches under landscaped areas to 85% maximum density.
C. Stockpile excavated materials. Place, grade, and shape stockpiles for proper drainage.
1. Locate and retain soil materials away from edge of excavations, Do not store within drip line of trees indicated to remain.
-s:\2023\2230227 state of michigan dtmb\cds\312200 earthwork.doc-10/18/23 Page 4
2. Dispose of excess excavated soil material and materials, not acceptable for use as backfill or fill, off-site at no additional cost to OWNER.
D. Utilities:
1. The width of the trench for utilities installation shall be ample to permit the pipe to be laid and joined properly and the pipe embedment material and backfill to be placed and compacted as specified. Trenches shall be of sufficient extra width when required as will permit the convenient placing of trench supports, sheeting, and bracing.
2. The trench shall be excavated to a depth required for the proper installation of the pipe and placing of the pipe embedment material as specified. Any part of the bottom of the trench excavated below the specified subgrade shall be refilled with approved MDOT Class II granular materials compacted to 95% of maximum unit weight in accordance with MDOT procedures at no additional cost to the Owner.
3. Maintain, reroute or extend as required, existing utility lines to remain which pass through excavation area.
4. Protect utility services uncovered by excavation.
5. Cap off, plug or seal, discontinued utility services and remove from site within excavated areas.
3.03 STABILITY OF EXCAVATIONS:
A. Comply with local codes, ordinances, and requirements of agencies having jurisdiction.
B. Slope sides of excavations to comply with local codes, ordinances, and requirements of agencies having jurisdiction.
1. Shore and brace where sloping is not possible because of space restrictions or stability of material excavated.
2. Maintain sides and slopes of excavations in safe condition until completion of backfilling.
C. Shoring and Bracing:
1. Provide materials for shoring and bracing, such as sheet piling, uprights, stringers, and cross braces, in good serviceable condition as required to carry out the Work.
2. Maintain shoring and bracing in excavations regardless of time period excavations will be open.
3. Extend shoring and bracing as excavation progresses.
3.04 FILL AND COMPACTION REQUIREMENTS:
A. Under Floor Slabs and Exterior Slabs and Sidwalks: Select granular material placed in layers maximum 9 inches deep compacted to 95% maximum density.
B. Under Roadways: Select Granular material placed in layers maximum 9 inches deep compacted to
95% maximum density.
C. Under Foundations: Select Granular material placed in layers maximum 9 inches deep compacted to 95% maximum density.
D. Landscaped Areas: Suitable excavated material or granular material placed in layers maximum 12 inches deep compacted to 85% maximum density.
3.05 ROUGH GRADING:
A. Rough grade to levels, profiles, contours and elevations required for finished grades and surface treatment.
-s:\2023\2230227 state of michigan dtmb\cds\312200 earthwork.doc-10/18/23 Page 5
B. Maintain the following, rough grades unless otherwise directed by ENGINEER:
1. Sidewalk: 4 inches below finished grade.
2. Floor Slabs and Exterior Slabs: 6 inches below bottom slab elevation.
3. Pavement Surfaces: As shown.
4. Landscape Areas: 4 inches below finished grades to receive topsoil.
3.06 DEWATERING:
A. No installation of any underground work will be acceptable unless the ground at the grade of the installation is free of any visible water and is firm such that embedment material may be placed and successfully compacted, as required.
B. As necessary, install dewatering system utilizing wells, well points, or similar methods complete with pump equipment, standby power and pumps, filter material gradation, valves, appurtenances, water disposal and surface-water controls.
C. The on-site water supply well provides drinking water for the State Park. Utmost care shall be taken to prevent the intrusion of any foreign substances into the groundwater on the site and contaminating the well. Therefore, only potable water may be used during well installation.
1. The total depth of any temporary dewatering wells used on site shall not extend deeper than 20 feet below the ground surface.
2. Any temporary ground water wells shall be abandoned properly with neat cement grout.
D. Dispose of water removed from excavations in a manner to avoid endangering public health, property and portions of work under construction or completed. Dispose of water in a manner to avoid inconvenience to others. Provide sumps, sedimentation tanks, and other flow-control devices as required by authorities having jurisdiction.
E. Provide dry excavations until structures or pipe have been placed and fill is complete. The Contractor is responsible to review available information and perform any other investigative work he deems necessary before bidding to determine the necessary dewatering equipment, etc.
required to accomplish this. No claims will be considered for groundwater dewatering issues which may arise on the site due to the Contractor’s failure to do this.
F. Provide and maintain slopes, crowns, ditches and ponds to insure satisfactory surface drainage at all times.
1. Construct ditches and other drainage facilities necessary to remove ponded water as soon as practical to provide dry work area for progression of the work.
2. Interruption of Surface Drainage or Underdrainage: Provide temporary drainage facilities until permanent drainage work complete.
3.07 PLACEMENT AND COMPACTION:
A. Properly place and compact all required materials and exert proper control over the moisture content of the material and other details necessary to obtain satisfactory results.
1. Remove materials that cannot be compacted with manipulation and/or moisture control.
2. Replace with suitable excavated materials or granular materials at no cost to the
OWNER.
B. Place backfill and fill materials in layers not more than 9 inches in loose depth for material compacted by heavy compaction equipment, and not more than 4 inches in loose depth for material compacted by hand operated tampers.
C. Correct any deficiencies resulting from insufficient or improper compaction. Retest if required.
-s:\2023\2230227 state of michigan dtmb\cds\312200 earthwork.doc-10/18/23 Page 6
3.08 GRADING:
A. Uniformly grade areas within limits of grading under this section, including adjacent transition areas.
B. Smooth finished surface within specified tolerances, compact with uniform levels or slopes between points where elevations are indicated or between such points and existing grades.
C. Grading Outside Building Lines:
1. Grade areas adjacent to building lines to drain away from structures and to prevent ponding.
2. Finish surfaces free from irregular surface changes and as follows:
a. Lawn or Unpaved Areas: Finish areas to receive topsoil to within not more than
1-1/4 inches above or below required subgrade elevations.
b. Walks: Shape surface of areas under walks to line, grade, and cross-section, with finish surface not more than 1/2 inch above or below required subgrade elevations.
c. Pavements: Shape surface of areas under pavement to line, grade, and cross-section, with finish surface not more than 1/2 inch above or below required subgrade elevation.
D. Compaction: After grading, compact subgrade surfaces to the depth and indicated percentage of maximum of relative density for each area classification.
3.09 PAVEMENT SUBBASE COURSE:
A. Subbase course for pavements consists of placing subbase materials, in layers of specified thickness, over prepared subgrade surface to support pavement structure.
1. Refer to MDOT Standard Specifications 2020 for bituminous paving Specifications.
B. Grade Control: During construction, maintain lines and grades including crown and cross-slope subbase course.
C. Shoulders: Place shoulders along edges of subbase course to prevent lateral movement. Construct shoulders of acceptable soil materials, placed in such quantity to compact to thickness of each subbase course layer. Compact and roll at 24 inch width of shoulder simultaneous with the compaction and rolling of each layer of subbase course.
D. Placing:
1. Place subbase course material on prepared subgrade in layers of uniform thickness, conforming to indicated cross-section and thickness.
2. Maintain optimum moisture content for compacting subbase material during placement operations.
3. Thickness:
a. When compacted subbase course is indicated to be 6 inches thick or less, place material in single layer.
b. When indicated to be more than 6 inches thick, place material in equal layers, except no single layer more than 6 inches or less than 3 inches in thickness when compacted.
3.10 SURPLUS MATERIALS:
A. Surplus excavated or unsuitable excavated material becomes the property of the CONTRACTOR.
-s:\2023\2230227 state of michigan dtmb\cds\312200 earthwork.doc-10/18/23 Page 7
B. Dispose of surplus or unsuitable excavated materials off site.
3.11 DUST CONTROL:
A. Dust Control Measures:
1. Maintain dust control so as not to cause detriment to the safety, health, welfare, or comfort of any person or cause damage to property or business.
2. Perform at no additional cost to the OWNER.
B. Sweep paved surfaces as often as necessary as directed by the OWNER or ENGINEER.
C. Use self-propelled or towed street sweeper with pick-up attachments and curb brushes.
3.15 UTILITIES
A. PIPE EMBEDMENT:
Pipe embedment shall include the furnishing and placing of approved materials as specified or as directed from 4 inches under the outside bottom of the pipe to 12 inches over the outside top of the pipe.
Flexible pipe is any pipe having a pipe stiffness of less than 60 psi. as defined under the requirements of ASTM Designation D-2412 (this includes all plastic pipe except Composite (Truss) pipe, and may include corrugated metal pipe, ductile iron pipe, and steel pipe, depending on pipe diameter and wall thickness). Pipe embedment for flexible pipe shall be Class B. For pipes less than fifteen (15) inches in diameter, bedding material meeting the requirements of Section 902.07 of the MDOT 2012 Standard Specifications for Construction for granular materials Class II, modified to 100% passing a 1" sieve shall be used. If stone is used for bedding it shall meet the requirements of ASTM D2321 (Table 1) for Class 1A crushed stone. An Engineer approved geotextile filter fabric shall be placed around all areas where Class 1A crushed stone pipe embedment is used such that the fabric completely encapsulates the stone.
B. Placing Pipe Embedment Material
Pipe embedment material shall be placed in the bottom of the trench and shaped by hand to provide a firm and uniform bearing for the barrel of the pipe with additional shaping to accommodate the bells on bell and spigot pipe. After each pipe has been graded, aligned, and placed in final position on the bedding material and jointing is complete, additional embedment material shall be carefully placed and compacted under and around each side of the pipe and over the pipe until it is completely covered by 12 inches of embedment material. Said material shall be distributed along both sides of the pipe uniformly and simultaneously to prevent lateral displacement of the pipe. All granular embedment material shall be compacted to 95% of maximum unit weight in accordance with MDOT procedures. All the work of placing pipe embedment shall be considered an integral part of installing the pipe and shall be completed immediately after the pipe is laid to the correct alignment and grade.
C. Trench Backfill Area:
1. Under Permanent Pavement, Shoulder Areas, and Areas Within a 1:1 Slope from the Shoulder Edge:
a. Compact suitable excavated material or granular material in 9 inch layers to
95% of maximum density.
b. Compact granular material in 9 inch layers to 95% of maximum density.
2. Under Nonpermanent Pavement: Same as permanent pavement.
3. Under Unimproved Right-of-Way Areas: Compact suitable excavated material to 85% of maximum density.
-s:\2023\2230227 state of michigan dtmb\cds\312200 earthwork.doc-10/18/23 Page 8
4. Under Landscaped Areas: Compact suitable excavated material to 80% of maximum density.
5. Under Unimproved Areas:
a. Suitable Excavated Material: Compact to 80% of maximum density and round neatly over trench.
b. Unsuitable Excavated Material: Replace and round neatly over trench with permission of ENGINEER.
END OF SECTION
SECTION 32 92 00
SURFACE PROTECTION AND RESTORATION
jlm/RLS-s:\2023\2230227 state of michigan dtmb\cds\329200 restoration.doc-10/18/23 Page 1
PART 1 - GENERAL
1.01 DESCRIPTION:
A. This Section includes the work required for protection and restoration of surface features such as site improvements, concrete sidewalks, asphalt pavement, and all trees, shrubs, lawns, and other landscape features as well as installation of new site improvements.
B. All areas disturbed by construction operations shall be restored to the original condition thereof or better as determined by the Engineer using information from drawings, surveys, and photographs or video tapes when available.
C. The work shall be performed in accordance with the specifications and drawings, the MDOT 2020 Standard Specifications for Construction and the following specifications.
1.02 SUBMITTALS:
A. Submit under provisions of SECTION 01300.
B. Topsoil Analysis: Certification of suitability by local agricultural agent.
C. Seed Analysis: Certification of purity and germination by manufacturer.
D. Trees and Shrubs: Certification by suppliers of source and species.
1.03 JOB REQUIREMENTS:
A. Areas Disturbed by Construction Operation:
1. Restoration along all utility (water, sewer, forcemain, storm sewer, electrical, etc.)
installation including all connection points near buildings and all other areas disturbed during construction.
2. Restoration on wellhouse site including all areas disturbed during construction.
B. Scheduling:
1. Restoration of Lawns and Other Surface Features: Promptly following curb and gutter, site improvements, and paving.
2. Restoration of paved roads and trails, concrete, and Site Improvements: Promptly following utility installation.
3. Clean Up: Promptly following restoration.
C. Seasonal Limitations:
1. Sodding: None
2. Seeding: Spring, summer, and fall with mulching from June 1 to September 1.
PART 2 - PRODUCTS
2.01 MATERIALS:
A. Topsoil: MDOT 917.07
1. Stockpile existing surface material and replace to match existing.
2. Supplement with new topsoil in accordance with MDOT 917.07 such that 4 inches of topsoil are provided.
B. Chemical Fertilizer: Grade 12:12:12.
C. Seed: MDOT 917.12: Areas in campground: Annual Ryegrass jlm/RLS-s:\2023\2230227 state of michigan dtmb\cds\329200 restoration.doc-10/18/23 Page 2
D. Mulch: Straw, marsh hay or wood excelsior.
E. Hydraulic Seeding: Uniformly blended and mixed homogeneous slurry of seed mix, fertilizer, and pulverized mulch suspended in water and suitable for hydraulic application.
F. Other Site Improvements: Provide materials equal to or better than those that existed prior to start of construction whether shown or not shown on the drawings.
PART 3 - EXECUTION
3.01 PREPARATION:
A. All streets, drives, bike paths, sidewalks, and other improved surfaces disturbed by construction operations shall be replaced to uniform lines and grades established by the Engineer. The finish grade line will be established within three (3) inches of the existing ground profile shown on the drawings unless a proposed grade is shown which indicates otherwise.
B. The Contractor shall perform all grading, compacting, shaping, and related work required to prepare the subgrade to the satisfaction of the Engineer. The cost for preparing the subgrade as specified herein shall be incidental to the cost of the project, and no specific payment will be made therefor. Inspection: Approval required.
3.02 AGGREGATE
A. The Contractor shall furnish and place additional aggregate conforming to MDOT Specifications in disturbed locations for the replacement of aggregate shoulders, drives, and streets.
B. Aggregate shoulders disturbed by the Contractor's operations shall be restored or replaced to their original width and thickness with aggregate conforming to the requirements of Section 902 of the MDOT 2020 Standard Specifications for Construction for 22A, 21AA or 23A aggregate as specified.
3.03 REPLACEMENT OF AGGREGATE SURFACE OR HOT MIX ASPHALT (HMA) PAVED AREAS
(PATCHING)
All aggregate surface or paved areas damaged or disturbed during construction by the Contracor shall be cut square and replaced to match existing thickness of adjacent materials. Where not shown on the drawings, this replacement will be incidental to the main items of work and no separate payment will be made.
A. Materials
Surfacing aggregate and aggregate base for HMA pavement shall conform to the requirements for 22A/21AA aggregate in Section 902 of the MDOT 2020 Standard Specifications for Construction.
Unless otherwise specified on the plans or in the specifications, HMA 13A, conforming to the requirements in Section 501 and applicable, commonly used Special Provisions for Section 501 of the MDOT 2020 Standard Specifications for Construction, shall be used for HMA patches. When existing seal coat pavement is disturbed, a HMA patch shall be placed. The edges of the patched area shall be cut square prior to placing the patch.
When a HMA surface is disturbed by the Contractor's operations, that surface shall be replaced at a thickness equal to the thickness of the existing pavement adjacent to the trench but not less than three (3) inches thick. Aggregate base shall be replaced at a thickness equal to the adjacent aggregate base (minimum six inches) as specified for aggregate patches above. After placement of jlm/RLS-s:\2023\2230227 state of michigan dtmb\cds\329200 restoration.doc-10/18/23 Page 3 the aggregate base but prior to its final shaping and compaction, the edges of the existing pavement shall be trimmed to straight lines. Trimming of the existing pavement shall be by sawcutting, or other suitable means approved by the Engineer.
When an aggregate surface is disturbed by the Contractor's operations, the edges of the existing aggregate surface shall be trimmed and shall be free of all foreign material before the new aggregate is placed. The subgrade shall be graded and compacted to the proper lines and grades to match the adjacent surface. The aggregate shall be placed in layers not to exceed six (6) inches and shall be compacted to 98% of its maximum unit weight in accordance with MDOT procedures.
The Contractor shall replace all valley gutter in patching areas and shall be considered part of the HMA replacement.
3.04 FENCES:
A. Fences, which are removed for construction, shall be replaced with equal or better type and size.
The cost of removing and replacing the fences shall be considered part of the major items of work and separate payment will not be made.
3.05 TREES AND SHRUBS:
A. Protection: All items not indicated for removal.
B. Damaged Branches: Trim and seal within 15 days.
3.06 TOPSOIL:
A. Place existing stockpiled topsoil in areas in campgrounds and between campgrounds in preparation for seeding, Supplement with new topsoil.
3.07 SEEDING:
A. Construction Methods: MDOT (816.03.A, B, and C), except with the following rates:
1. Topsoil: 4 inches of topsoil.
2. Fertilizer: 25 pounds per 1,000 square feet.
3. Sowing:
a. Lawns: 4 pounds per 1,000 square feet.
b. Other Areas: 3 pounds per 1,000 square feet.
4. Mulch: 150 pounds per 1,000 square feet.
END OF SECTION
Ludington State Park – Cedar Campground Mandatory Pre-Bid Meeting
Meeting Minutes
Date: October 4, 2023, 10:00 A.M.
Meeting Location: Ludington State Park, Park Headquarters
Departments: Departments of Technology, Management and Budget (DTMB) and Natural Resources (DNR) Project Name: Ludington State Park Cedar Campground Septic Tank Replacement File No. 751/23148.GAG
Introductions
1. Sign-in Sheet – Sign in sheet attached.
2. Project Scope - The existing septic tanks and dosing chamber in the Cedar Campground are leaking and require replacement. New septic tanks, dosing station, controls, and pumps are to be installed.
3. Bid Procedure: Electronic bids due Wednesday, October 25, 2023 at 2:00 pm. Jerry Gregorski strongly urged all bidders to double check bids to make sure all items are included and forms are signed prior to submittal, or they will be rejected.
4. Prevailing Wages are required for this project, included in the contract documents.
5. Contract Time – Construction can start November 2023. Completion May 1, 2024
6. No Alternates.
7. Addenda will be posted on Sigma along with sign-in sheet.
8. Tentative Schedule
Questions due to Prein&Newhof no later than October 18, 2023 Addenda issued no later than October 20, 2023 Electronic bids due @ 2:00 p.m. October 25, 2023 Award November, 2023 Project Complete (21 Days to complete) May 1, 2024
9. Clarification:
The Contractor must secure the site during the work. Holes must be fenced off or filled.
Equipment must be locked. The campground will not be closed.
Existing fencing on the site will likely require removal to complete the work. The fence must be reinstalled, if the existing material is in good condition it may be reused.
10. Questions:
Q: Will Cedar campground be open to campers during the work.
A: The campground will be open but sites around the work will be blocked off. Access to the hose bib on the side of the toilet/shower building and the vault toilet adjacent to the s:\2023\2230227 state of michigan dtmb\cor\minutes prebid 2023-10-03.docx construction site must be maintained throughout the work. The toilet shower building will be closed so no flow from the building is anticipated during the work.
Q: What is the anticipated water table at the site.
A: Water table is historically high, usually between 2 and 4 ft below the surface.
Q: Is repair of the asphalt road to be included in the work?
A: Any asphalt road or parking area removed or damaged due to the work on the site must be replaced for its full depth and road width. The road must be cut and the full width of roadway must be replaced in the damaged area.
Q: What is the extent of work on the force main?
A: Force main must be connected to after the valve vault, no other work on the existing force main is planned.
Q: Does concrete need to be poured around the dosing station similar to how it is now?
A: No, the entire area is to be restored with topsoil and seed.
11. Site Tour: A tour of the site followed. The dosing station was opened up for review.