Summary

This Addendum 1 document, issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division, pertains to the Jerome T. Hart Office Building Chilled Water Upgrades project located at 411 E. Genesee Ave, Saginaw, MI 48607 (File No. 171/23125.CTS). The project involves upgrades to the chiller plant at the Jerome T. Hart State Office Building. The mandatory pre-bid meeting was held on November 4, 2026, at 11:00 a.m. at the project site. The bid due date has been extended to November 18, 2026, at 2:00 p.m., with questions to be received until November 11, 2026, directed to nfrechen@matrixceinc.com. The contract time is specified as 430 calendar days from notice to proceed to substantial completion, with anticipated early March 2027 completion and final completion 30 calendar days thereafter. The bulk of onsite work is scheduled to begin after the 2027 cooling season in late fall 2027. Liquidated damages are specified at $1,000 per day after substantial and final completion.

Bid Security equal to five percent (5%) of the base bid is required. A provisionary or contingency allowance of $150,000 is included in the bid for scope as directed in writing from the Project Controls Committee and Project Director. All bids must be submitted electronically in Adobe PDF format through SIGMA VSS, with a maximum file size of 25 MB. Bidders and all subcontractors must submit LEO state project registrations (SPR) with their bids. The contractor is responsible for obtaining all permits required by LARA or other agencies and for scheduling all inspections. Working hours are restricted to daylight hours between 7:00 a.m. and 6:00 p.m. during normal business days (Monday through Friday), with no additional weekday hours, weekend work, or work on State Holidays permitted unless specifically authorized in writing. The site has very limited staging space, and scheduled shipping must be carefully coordinated with potential coordination required with the City of Saginaw for street parking closures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 6/25)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design & Construction Division

CONSTRUCTION BID ADDENDUM NO. Enter No.

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

11/6/2026

PROJECT NAME

Jerome T. Hart Office Building Chilled Water Upgrades

FILE NUMBER

171/23125.CTS

PROFESSIONAL

Matrix Consulting Engineers, Inc.

PROJECT DIRECTOR

Chris Schanbeck

BID OPENING DATE:

11/18/2026

ADDENDUM ITEMS:

1. The Bid due date is extended 1-week to 11/18/2026, 2:00pm. Questions will be received until 11/11/2026 sent to nfrechen@matrixceinc.com.

2. A selection of the existing plans for the 2009 Ice Storage installation are included for reference (ADD1 - EXDWGS - 23125 2009 Ice Storage plans for reference.pdf).

3. Attached are the pre-bid meeting notes, pre-bid sign-in sheet and additional Matrix addendum items.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Matrix Consulting Engineers, Inc. DATE: 11/6/2026

PROJECT DIRECTOR: Chris Schanbeck DATE: 11/6/2026

MANDATORY PRE-BID MEETING

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

Project: Jerome T. Hart Office Building Chilled Water Upgrades

File Number: 171/23125.CTS

Date & Time: Wednesday, November 4, 2026, at 11:00am

Location: 411 E. Genesee Ave, Saginaw, MI 48607

A. Introductions and Sign-in Sheet

All attendees are to sign-in. Individuals can represent only one firm that may submit a bid.

B. Addendum will be issued to document any questions, issues or changes to the contract documents that arise during bidding. All questions or issues shall be submitted via email including any items discussed in this meeting that are not documented in addendum 1. The sign-in sheet will be issued in addendum 1.

C. During the bid submit alternatives for named or specified materials or equipment for possible approval and inclusion by addendum.

D. Bid Submissions

1. Execute and include all required forms and documents. Refer to Bidder’s Checklist.

a. Note the allowance, $150,000, to be included in the bid for provisionary or contingency scope as directed in writing from the PSC and Project Director.

b. Bid Security equal to five percent (5%) of the base bid is required.

c. LEO state project registrations (SPR) is required to be submitted with bid for bidders and all subcontractors.

d. Must include the asbestos attestation page (unsigned) even though marked as

‘Project Does Not Contain Asbestos Abatement’.

2. Bids shall be submitted electronically in Adobe PDF format to SIGMA VSS.

a. Maximum file size for uploading attachments is 25 MB which may require breaking into multiple files.

b. Do not wait until the last minute. Submit early. Pay attention to various inputs (early payment discounts are not considered in bid, etc.)

c. If you experience issues or have questions regarding your electronic submission, you must work through the SIGMA Help Center for assistance and if necessary, receive a ticket number prior to contacting the DCD.

E. Items to be provided by Contractor after notification of award including but not limited to:

Performance and Payment Bonds, Proof of Insurances: Liability (CGL, ULAL/VL, WC, EL) & Builder’s Risk

F. Use Michigan products and recycled and/or environmentally friendly products whenever possible where price, quality and performance are equal to, or superior to non-Michigan products.

G. No exceptions, qualifications, conditions, etc. are permitted.

H. Permits - The contractor is responsible for obtaining and paying for all permits required by LARA, or any other agency as required. The Contractor is responsible for scheduling all inspections.

171/23123.CTS PRE-BID MEETING 11/4/2026

I. Schedule

1. November 10, 2026, 2:00pm, any questions must be submitted. Email to nfrechen@matrixceinc.com. (EXTENDED FROM ORIGINAL)

2. November 18, 2026, 2:00pm, Bids are due on SIGMA VSS. (EXTENDED A WEEK)

3. December 15, 2026, Anticipated State Ad Board approval.

4. Early January 2027, Anticipated Pre-construction Kickoff Meeting and Notice to Proceed to be confirmed after contract is executed.

5. Contract Time is specified as 430 calendar days from notice to proceed to substantial completion, early March 2027. Final completion anticipated 30 calendar days after substantial completion. Bulk of onsite work to begin after 2027 cooling season which will be coordinated in the late fall of 2027.

6. Liquidated damages specified at $1,000 per day after substantial and final completion.

7. Contractor to provide the initial (Rev. 0) critical path milestone schedule for review and update as key milestones are adjusted or at least monthly. Include normally anticipated 20% float time for unforeseen delays (weather, deliveries, special working conditions, etc.).

J. The Contractor is responsible for managing and supervising the work and must be on site 100% of time.

K. Special Working Conditions – Refer to Appendix II for additional information.

1. Working hours shall be daylight hours between 7:00 AM and 6:00 PM during normal business days (Monday through Friday). Additional weekday hours or work on weekends or State Holidays is NOT allowed unless specific written permission is granted.

2. Very limited site staging space. Scheduled shipping will need to be carefully coordinated.

Will need to coordinate with the City of Saginaw to close street parking or the street.

L. PSC to review technical and any additional scope information.

M. Comments – Questions – Walk Through

544 CHERBOURG DRIVE, LANSING, MI 48917

PHONE: (517) 487-2511

FAX: (517) 487-2544

ADDENDUM NO. 1

JEROME T. HART STATE OFFICE BUILDING

CHILLER REPLACEMENT

File No.: 171/23125.CTS Date:11/6/2026

Matrix Job Number: 23085

ENGINEER:

Matrix Consulting Engineers 544 Cherbourg Drive.

Lansing, MI 48917

This Addendum is issued for the purpose of modifying and/or clarifying the original Contract Documents and shall take precedence over them.

All work included herein shall be in accordance with the original drawings and specifications except as specifically noted herein. All incidental items required to provide the following modifications shall be included even though not specifically described.

This addendum is being sent to all bidders receiving plans and specifications. Receipt of this Addendum shall be noted on the Proposal Form in the appropriate location.

General

1. Sign-in sheet (Issued) A. Sign-in sheet from the pre-bid walkthrough is attached.

Specifications

1. Section 00030 Advertisement (Reissued) B. Bid deadline update to 11/18/2026 @ 2:00 pm C. Pre-bid Conference date updated to 11/4/2026 @ 11:00 am

2. Section 00100 Bidder’s Check List (Reissued)

D. Request for changes to drawings deadline revised to 11/10/2026 E. Pre-Bid RFI deadline revised to 11/10/2026

3. Section 00300 Bid Summary (Reissued)

A. Bid deadline update to 11/18/2026 @ 2:00 pm

Electrical

1. E500

a. Added keynotes to sheet.

STATE OF MICHIGAN (OWNER & CONTRACTOR) TABLE OF CONTENTS

MICHSPEC DTMB 00010 − 1

SECTION 00010 TABLE OF CONTENTS

SECTION/PAGE NO.

SUBJECT INDEX

SECTION 00020 GLOSSARY ............................................................................................................................................. 00020 - 1

SECTION 00030 ADVERTISEMENT .................................................................................................................................. 00030 - 1

SECTION 00100 INSTRUCTIONS TO BIDDERS ............................................................................................................... 00100 - 1

ARTICLE 1 BIDDING DOCUMENT INTERPRETATIONS .................................................................................................. 00100 - 2

ARTICLE 2 QUALIFICATIONS OF BIDDERS ..................................................................................................................... 00100 - 2

ARTICLE 3 BIDDING DOCUMENTS; SITE CONDITIONS; SAFETY REQUIREMENTS; LAWS ....................................... 00100 - 2

ARTICLE 4 INTERPRETATIONS; ADDENDA .................................................................................................................... 00100 - 4

ARTICLE 5 BID SECURITY ................................................................................................................................................ 00100 - 4

ARTICLE 6 CONTRACT TIME; LIQUIDATED DAMAGES .................................................................................................. 00100 - 5

ARTICLE 7 MATERIALS AND EQUIPMENT ...................................................................................................................... 00100 - 5

ARTICLE 8 SUBCONTRACTORS ...................................................................................................................................... 00100 - 6

ARTICLE 9 BID FORM AND BID FORM ATTACHMENTS ................................................................................................. 00100 - 7

ARTICLE 10 PREPARATION AND SUBMISSION OF BIDS.................................................................................................. 00100 - 7

ARTICLE 11 BID WITHDRAWAL; BID MODIFICATION ........................................................................................................ 00100 - 8

ARTICLE 12 BID OPENING; OBJECTION TO THE AWARD ................................................................................................ 00100 - 9

ARTICLE 13 BIDS TO REMAIN OPEN .................................................................................................................................. 00100 - 9

ARTICLE 14 AWARD OF THE CONTRACT .......................................................................................................................... 00100 - 9

ARTICLE 15 EXECUTION OF THE AGREEMENT .............................................................................................................. 00100 - 12

ARTICLE 16 MOBILIZATION PAY ITEM ............................................................................................................................. 00100 -12 ARTICLE 17 SOIL EROSION AND SEDIMENTATION CONTROL–FINE FOR NON-COMPLIANCE .................................. 00100 -13 ATTACHMENT A TO SECTION 00100: BIDDER'S CHECK LIST........................................................................................ 00110 - 1

SECTION 00120 SUPPLEMENTARY INSTRUCTIONS ..................................................................................................... 00120 - 1

SECTION 00210 INFORMATION FOR BIDDERS .............................................................................................................. 00210 - 1

SECTION 00300 BID SUMMARY ....................................................................................................................................... 00300 - 1

SECTION 00300 BID FORM ............................................................................................................................................... 00300 - 2

ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF MICHIGAN ("THE OWNER"). ................................................. 00300 - 2

ARTICLE 2 THE BIDDER'S REPRESENTATIONS ............................................................................................................... 00300 - 2

ARTICLE 3 TIME OF COMPLETION ..................................................................................................................................... 00300 - 3

ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID .................................................................................................... 00300 - 3

ARTICLE 5 DEFINED TERMS ............................................................................................................................................... 00300 - 3

ARTICLE 6 BID SCHEDULE .................................................................................................................................................. 00300 - 4

ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES ...................................................................................................... 00300 - 6

ARTICLE 8 BID SUBMITTED ON ......................................................................................................................................... 00300 - 7

SECTION 00310 BID BOND ............................................................................................................................................... 00310 - 1

SECTION 00320 NONCOLLUSION AFFIDAVIT ............................................................................................................... 00320 – 1

SECTION 00330 ASBESTOS ABATEMENT ATTESTATION........................................................................................... 00330 – 1

SECTION 00410 BID BREAKDOWN ................................................................................................................................. 00410 - 1

SECTION 00420 QUESTIONNAIRE ................................................................................................................................... 00420 - 1

ARTICLE 1 ORGANIZATION ............................................................................................................................................... 00420 - 1

ARTICLE 2 SPECIALTY CONTRACTOR LICENSES .......................................................................................................... 00420 - 1

ARTICLE 3 EXPERIENCE ................................................................................................................................................... 00420 - 1

ARTICLE 4 ADDITIONAL QUALIFICATIONS ...................................................................................................................... 00420 - 2

ARTICLE 5 REFERENCES .................................................................................................................................................. 00420 - 2 REFERENCES ATTACHMENT ......................................................................................................................... 00420 - 3

SECTION 00430 LIST OF SUBCONTRACTORS ............................................................................................................... 00430 - 1

SECTION 00440 SCHEDULE OF MATERIALS AND EQUIPMENT .................................................................................. 00440 - 1

ARTICLE 1 BID MATERIALS AND EQUIPMENT −LISTED (NAMED OR SPECIFIED) ITEMS ........................................... 00440 - 1

ARTICLE 2 BID MATERIALS AND EQUIPMENT − OPEN SPECIFICATIONS .................................................................... 00440 - 2

SECTION 00500 AGREEMENT .......................................................................................................................................... 00500 - 1

ARTICLE 1 THE CONTRACT; THE PROJECT; THE WORK .............................................................................................. 00500 - 1

ARTICLE 2 CONTRACT DOCUMENTS .............................................................................................................................. 00500 - 1

ARTICLE 3 CONTRACT PRICE ........................................................................................................................................... 00500 - 2

MICHSPECTM DTMB

This is a Cover Sheet to the State’s Owner and Contractor Standard Construction Contract, known as the MICHSPEC Division 0

Specifications. The MICHSPEC Division 0 Specifications have been developed from the FORMSPEC Michigan Model, 1997 Edition. Although the State’s 2008 Version of the Division 0 Specifications are written as simply as practical, it is nonetheless advisable to consult with companion Guide to Specifiers when preparing specifications for a specific project. These Division 0 Specifications were developed by incorporating provisions and requirements furnished by the State into the FORMSPEC Michigan Model. These Division 0 Specifications have undergone detailed technical reviews by Department of Technology, Management and Budget, State Facilities Administration representatives and detailed legal reviews by the Department of the Attorney General for the State of Michigan. Specifiers are encouraged to consult with a Division 0 specifications specialist or an attorney knowledgeable in public contracts when preparing specifications for a specific project.

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR

STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT

MICHSPEC No. 97.0820 − 00020 THROUGH 97.0820 − 00440

RELEASED ON NOVEMBER 1, 1997.

Developed from

Contract Forms and Conditions of the Contract

FORMSPEC Michigan Model and suggested for use with

Bidding Requirements

File No. 171.23125. CTS Department of Technology, Management, and Budget Jerome T Hart Office Building Chilled Water Upgrades

411 E Genesee Ave, Saginaw MI 48607

October 16, 2026

1997 Edition/R 4/26v3

MICHSPEC DTMB 00010 − 2

ARTICLE 4 CONTRACT TIME; LIQUIDATED DAMAGES ................................................................................................... 00500 - 2

ARTICLE 5 PAYMENTS TO CONTRACTOR ...................................................................................................................... 00500 - 3

ARTICLE 6 THE PROFESSIONAL SERVICES CONTRACTOR ......................................................................................... 00500 - 4

ARTICLE 7 CONTRACTOR'S REPRESENTATIONS .......................................................................................................... 00500 - 4

ARTICLE 8 MISCELLANEOUS ............................................................................................................................................ 00500 - 4

ARTICLE 9 NOTICE AND SERVICE .................................................................................................................................... 00500 - 5

SECTION 00520 ATTACHMENT “A” TO AGREEMENT ................................................................................................... 00520 - 1

SECTION 00610 PERFORMANCE BOND ........................................................................................................................ 00610 - 1

SECTION 00620 PAYMENT BOND ................................................................................................................................... 00620 - 1

SECTION 00700 GENERAL CONDITIONS ........................................................................................................................ 00700 - 1

ARTICLE 1 INTERPRETATIONS ........................................................................................................................................... 00700 - 1

1.1 Section 00020 Glossary:............................................................................................................................................... 00700 - 1

1.2 Intent of the Contract Documents: ................................................................................................................................ 00700 - 1

1.3 Priority of the Contract Documents: ....... 00700 - 2

1.4 Interpretation of Indemnification Provisions: ................................................................................................................. 00700 - 3

1.5 Additional Interpretations: ............................................................................................................................................. 00700 - 3

1.6 Ownership and Use of the Contract Documents: .......................................................................................................... 00700 - 3

1.7 Copies of the Contract Documents: ............................................................................................................................... 00700 - 4

ARTICLE 2 THE OWNER−GENERAL PROVISIONS .......................................................................................................... 00700 - 4

2.1 Availability of Lands, Areas, Properties and Facilities: ................................................................................................. 00700 - 4

2.2 Reference Points; Base Lines and Benchmarks: .......................................................................................................... 00700 - 4

2.3 Stop Work Order: .......................................................................................................................................................... 00700 - 4

2.4 Limitations on the Owner’s Responsibilities: ................................................................................................................ 00700 - 4

2.5 Additional General Provisions: ...................................................................................................................................... 00700 - 5

2.6 Partnering Charter: ....................................................................................................................................................... 00700 - 5

ARTICLE 3 THE PROFESSIONAL − GENERAL PROVISIONS .......................................................................................... 00700 - 5

3.1 Owner’s Representative: ............................................................................................................................................. 00700 - 5

3.2 Clarifications and Interpretations: ................................................................................................................................. 00700 - 5

3.3 Minor Variations and No-Cost Changes; Minor Delays:................................................................................................ 00700 - 6

3.4 Determinations by the Professional: ........................................................................................................................... 00700 - 6

3.5 Limitations on the Professional’s Responsibilities: ....................................................................................................... 00700 - 6

ARTICLE 4 CONTROL OF WORK − GENERAL PROVISIONS ........................................................................................... 00700 - 6

4.1 Review of the Contract Documents: ............................................................................................................................. 00700 - 6

4.2 Management, Supervision, and Personnel: .................................................................................................................. 00700 - 6

4.3 Materials and Equipment: ............................................................................................................................................. 00700 - 7

4.4 Concerning Control of Work: ........................................................................................................................................ 00700 - 7

4.5 Patent Fees and Royalties: ........................................................................................................................................... 00700 - 8

4.6 Use of Premises: .......................................................................................................................................................... 00700 - 8

4.7 Record Documents: ...................................................................................................................................................... 00700 - 9

4.8 Emergencies: ................................................................................................................................................................ 00700 - 9

4.9 Indemnification: ............................................................................................................................................................ 00700 - 9

ARTICLE 5 SUBCONTRACTORS AND SUPPLIERS ........................................................................................................ 00700 - 10

5.1 Employment of Subcontractors: .................................................................................................................................. 00700 - 10

5.2 "Or Equal" and Substitute Materials and Equipment:.................................................................................................. 00700 - 10

5.3 The Contractor’s Continuing Responsibilities: .......................................................................................................... 00700 - 11

ARTICLE 6 SUBMITTALS .................................................................................................................................................. 00700 - 11

6.1 Shop Drawing, Sample and Other Technical Submittals: ........................................................................................... 00700 - 11

6.2 Review and Return of Technical Submittals: .............................................................................................................. 00700 - 12

6.3 Progress Schedule Submittals: ................................................................................................................................... 00700 - 12

6.4 Review and Return of Progress Schedule Submittals: ............................................................................................... 00700 - 13

6.5 Additional Provisions Concerning Submittals: ............................................................................................................ 00700 - 13

ARTICLE 7 LEGAL REQUIREMENTS; INSURANCE ........................................................................................................ 00700 - 13

7.1 Laws; Permits (Which Include Approvals and Licenses): ........................................................................................... 00700 - 13

7.2 Sales and Use Tax and Other Similar Taxes, including Tariffs: .................................................................................. 00700 - 14

7.3 Safety and Protection: ................................................................................................................................................ 00700 - 14

7.4 Bonds and Insurance - General Requirements: .......................................................................................................... 00700 - 15

7.5 The Contractor’s Liability Insurance:......................................................................................................................... 00700 - 15

7.6 Pollution Liability Insurance: ....................................................................................................................................... 00700 - 16

7.7 Property Insurance (Builder's All Risk Insurance): ...................................................................................................... 00700 - 16

MICHSPEC DTMB 00010 − 3

7.8 Waiver of Rights: ........................................................................................................................................................ 00700 - 16

7.9 Receipt and Application of Proceeds: ......................................................................................................................... 00700 - 16

7.10 Unfair Labor Practice: ................................................................................................................................................. 00700 - 17

7.11 Michigan Right-To-Know Law: .................................................................................................................................... 00700 - 17

7.12 Nondiscrimination: ...................................................................................................................................................... 00700 - 17

7.13 Michigan Residency for Employees: ........................................................................................................................... 00700 - 18

7.14 Prevailing Wages: ....................................................................................................................................................... 00700 - 18

7.15 Asbestos Abatement:.................................................................................................................................................. 00700 - 19

ARTICLE 8 PROSECUTION; SUBSTANTIAL COMPLETION ........................................................................................... 00700 - 20

8.1 Starting the Work: ....................................................................................................................................................... 00700 - 20

8.2 Revision 0 (Rev. 0) Schedule and Cost Submittals: ................................................................................................... 00700 - 20

8.3 Compliance with Contract Time Requirements: .......................................................................................................... 00700 - 20

8.4 Substantial Completion: .............................................................................................................................................. 00700 - 20

8.5 Partial Use: ................................................................................................................................................................. 00700 - 21

8.6 Division of Responsibilities: ........................................................................................................................................ 00700 - 21

8.7 Suspension of Work: .................................................................................................................................................. 00700 - 21

8.8 Sharing of Total Float on Non-Critical Paths: .............................................................................................................. 00700 - 22

ARTICLE 9 WARRANTY; TESTS, INSPECTIONS, AND

APPROVALS; CORRECTION OF WORK ....................................................................................................... 00700 - 22

9.1 Warranty: ................................................................................................................................................................... 00700 - 22

9.2 Tests, Inspections and Approvals: ............................................................................................................................. 00700 - 22

9.3 Uncovering Work: ...................................................................................................................................................... 00700 - 23

9.4 Correction of Work: .................................................................................................................................................... 00700 - 23

9.5 Special Correction Period Requirements: .................................................................................................................. 00700 - 24

9.6 Special Maintenance Requirements: ......................................................................................................................... 00700 - 24

ARTICLE 10 CHANGES ..................................................................................................................................................... 00700 - 24

10.1 Changes in the Work: ................................................................................................................................................ 00700 - 24

10.2 Differing Subsurface or Physical Site Conditions: ...................................................................................................... 00700 - 25

10.3 Responsibilities for Underground Utilities: ................................................................................................................. 00700 - 26

10.4 Hazardous Material Conditions: ................................................................................................................................. 00700 - 26

10.5 Incidents with Archaeological Features: .................................................................................................................... 00700 - 26

10.6 Unit Price Work: ......................................................................................................................................................... 00700 - 27

10.7 Cash Allowances; Provisionary Allowances: ............................................................................................................. 00700 - 27

10.8 Change Orders; Change Authorizations: ................................................................................................................... 00700 - 27

ARTICLE 11 CHANGES IN CONTRACT PRICE; CHANGES IN

CONTRACT TIME ......................................................................................................................................... 00700 - 28

11.1 General Provisions: ................................................................................................................................................... 00700 - 28

11.2 Changes in Contract Time: ........................................................................................................................................ 00700 - 28

11.3 Methods for Making Adjustments in Contract Price: .................................................................................................. 00700 - 29

11.4 Labor, Subcontract and Material/Equipment Costs: .................................................................................................. 00700 - 29

11.5 Construction Equipment Costs: ................................................................................................................................. 00700 - 30

11.6 Rented or Leased Construction Equipment: .............................................................................................................. 00700 - 30

11.7 Owned Construction Equipment: ............................................................................................................................... 00700 - 30

11.8 General Conditions Costs: ......................................................................................................................................... 00700 - 30

11.9 Limitations on Allowable Costs: ................................................................................................................................. 00700 - 31

11.10 Costs Covered by the Fee for the Work Involved (and not Allowable as Cost of the Work Involved): ........................ 00700 - 31

11.11 Limits on the Fee for the Work Involved: .................................................................................................................... 00700 - 32

11.12 Fee for Unabsorbed Home Office Overhead: ............................................................................................................. 00700 - 32

11.13 Changes in Contract Time for Early Completion: ........................................................................................................ 00700 - 33

11.14 Access to Records: ..................................................................................................................................................... 00700 - 33

11.15 Price Reduction for Defective Cost and Pricing Data: ................................................................................................ 00700 - 33

ARTICLE 12 PROGRESS PAYMENTS; FINAL PAYMENT ............................................................................................... 00700 - 34

12.1. Schedule of Values: ................................................................................................................................................... 00700 - 34

12.2 Requests for Payment: .............................................................................................................................................. 00700 - 34

12.3 Review of Request for Payment; Intent of Review: .................................................................................................... 00700 - 35

12.4 Refusal to Make or to Recommend Payment: ........................................................................................................... 00700 - 35

12.5 Final Request for Payment: ....................................................................................................................................... 00700 - 35

12.6 Final Payment and Acceptance: ................................................................................................................................ 00700 - 36

12.7 Contractor’s Continuing Obligation: ......................................................................................................................... 00700 - 36

12.8 Waiver of Claims: ...................................................................................................................................................... 00700 - 36

ARTICLE 13 OTHER WORK .............................................................................................................................................. 00700 - 36

MICHSPEC DTMB 00010 − 4

13.1 Related Work at Site: ................................................................................................................................................. 00700 - 36

13.2 Coordination Requirements: ...................................................................................................................................... 00700 - 37

13.3 Claims Between the Contractor and Other Parties: ................................................................................................. 00700 - 37

ARTICLE 14 TERMINATION .............................................................................................................................................. 00700 - 38

14.1 Notice Requiring Assurance of Due Performance: .................................................................................................... 00700 - 38

14.2 Contractor Default and Termination for Cause: ........................................................................................................ 00700 - 38

14.3 Surety Default: ........................................................................................................................................................... 00700 - 39

14.4 Termination for Convenience of the Owner: .............................................................................................................. 00700 - 39

14.5 The Contractor May Suspend Work: ........................................................................................................................ 00700 - 40

ARTICLE 15 DISPUTES .................................................................................................................................................... 00700 - 40

15.1 Claims Under This Article: ......................................................................................................................................... 00700 - 40

15.2 Requirement for Certification of Contractor Claims: ................................................................................................. 00700 - 41

15.3 Recommendations or Decisions from the Professional:........................................................................................... 00700 - 41

15.4 Determinations by the Director-DCD: ....................................................................................................................... 00700 - 41

15.5 Supplements to AAA Arbitration: ............................................................................................................................... 00700 - 42

15.6 Interest on a Judgment; Payment of Judgment: ........................................................................................................ 00700 - 42

15.7 Venue; Flow-Through Provision: ............................................................................................................................... 00700 - 42

SECTION 00800 SUPPLEMENTARY CONDITIONS ......................................................................................................... 00800 - 1

SECTION 01310 PROGRESS SCHEDULE ........................................................................................................................ 01310 - 1

APPENDIX I SPECIAL WORKING CONDITIONS

APPENDIX II SPECIAL PROJECT PROCEDURES

APPENDIX III STATE OF MICHIGAN PREVAILING WAGE SCHEDULES

APPENDIX IV PROJECT SIGNAGE

TECHNICAL SPECIFICATIONS

DIVISION 1 – GENERAL REQUIREMENTS

013000 Submittals

017823 Operations and Maintenance Manual

DIVISION 23 – HEATING, VENTILATION AND AIR CONDITIONING

230500 Common Work Results for HVAC

230516 Expansion Fittings & Loops

230519 Meters & Gages for HVAC Piping

230523 General-Duty Valves for HVAC Piping

230529 Hangers & Supports for HVAC Piping & Equipment

230553 Identification for HVAC Piping & Equipment

230593 Testing, Adjusting & Balancing for HVAC

230700 HVAC Insulation

230800 Commissioning of HVAC

230913 Instrumentation and Control for HVAC

230923 Direct Digital Controls for HVAC

232113 Hydronic Piping

232114 Hydronic Specialties

232123 Hydronic Pumps

232500 HVAC Water Treatment

236426 Rotary-Screw Water Chillers

DIVISION 26 – ELECTRICAL

260010 Basic Electrical Requirements

230050 Basic Electrical Materials and Methods

260500 Common Work Results for Electrical

260519 Low-voltage Electrical Power Conductors and Cables

MICHSPEC DTMB 00010 − 5

260526 Grounding and Bonding for Electrical Systems

260529 Hangers and Supports for Electrical Systems

260533 Raceways and Boxes for Electrical Systems

260544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling

260553 Identification for Electrical Systems

262416 Panelboards

262726 Wiring Devices

262813 Fuses

262816 Enclosed Switches & Circuit Breakers

262923 Variable-Frequency Motor Controllers

DRAWINGS - BOUND SEPARATELY

M-000 TITLE SHEET

M-100 MECHANICAL SYMBOLS, NOTES, AND ABBREVIATIONS

M-300 BASEMENT FLOOR PLAN - PIPING DEMOLITION

M-301 ENLARGED PLANS – BASEMENT MECHANICAL ROOMS - PIPING DEMOLITION

M-302 PENTHOUSE PLANS - PIPING DEMOLITION

M-600 BASEMENT FLOOR PLAN - PIPING NEW

M-601 ENLARGED PLANS – BASEMENT MECHANICAL ROOMS - PIPING NEW

M-602 PENTHOUSE PLANS - PIPING NEW

M-800 MECHANICAL DETAILS

M-801 CHILLER PIPING DIAGRAM – DEMOLITION

M-802 CHILLER PIPING DIAGRAM – NEW

M-803 COOLING PLANT CONTROLS

M-900 MECHANICAL SCHEDULES

E-100 ELECTRICAL SYMBOLS, NOTES, AND ABBREVIATIONS

E-300 ELECTRICAL – BASEMENT FLOOR PLANS – DEMOLITION

E-500 ELECTRICAL – BASEMENT FLOOR PLANS – POWER

E-600 ELECTRICAL RISER DIAGRAMN

STATE OF MICHIGAN (OWNER AND CONTRACTOR) GLOSSARY

MICHSPEC DTMB 00020 - 1

SECTION 00020 GLOSSARY

1.1 Defined Terms:

1.1.1. The following terms or relative pronouns used in Division 0 of the Specifications have these intent and meanings:

Activity− An element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.

Addenda− Written instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications, and other information into the Bidding Documents. An Addendum issued after Bid opening to those Bidders who submitted a Bid, for the purpose of rebidding the Work without readvertising, is referred to as a post-Bid Addendum.

Agreement− The written agreement between the Owner and Contractor covering the Work to be furnished and performed.

Alternate− Refers to Work specified in the Bidding Documents for which the Bidder shall bid a Bid Price in the space provided in the Schedule of Alternates in Section 00300 Bid Form.

Apparent Low Bidder:- Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Base Bid and Alternates. Additional Bidders may be considered Apparent Low Bidders if their Base Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation and with the veteran’s pre ference is the lowest Bidder is considered the Apparent Low Bidder.

Archaeological Feature− Any prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts, or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan.

As-Planned Schedule− The Contractor’s Revision 0 Progress Schedule returned to the Contractor as "Resubmittal Not Required," with or without comments or objections noted.

Authorized Technical Data− Information and data contained in a report of exploration and tests of subsurface conditions that are expressly designated in paragraph 2.0 of Section 00210 Information for Bidders. Also, any physical data (dimension, location, conditions, etc.) contained in those drawings of physical conditions of existing surface and subsurface facilities identified in paragraph

3.0 of Section 00210 Information for Bidders.

Bar Chart Schedule− Activity schedule, in a bar chart format, that accounts for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.

STATE OF MICHIGAN MODEL

Developed from FORMSPEC Michigan Model.

Bid− Written offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates.

The term Bid includes a Rebid.

Bidder− The Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.

Bidding Documents− The proposed Contract Documents as advertised, and all Addenda issued before Bid opening, and after Bid opening, if the Work is rebid without readvertising.

Bid Price− The Bidder's price for a lump sum item of Work, or the product of the Bidder's unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.

Bid Security− A security serving as a guarantee that the Bidder will conform to all conditions requisite for its return or as liquidated damages in the event of failure or refusal to conform.

MICHSPEC DTMB 00020 - 2

Bidding Requirements− The Advertisement, Instructions to Bidders (including Attachment A), Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and Qualification Submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.

*AD Board− The Administrative Board of the State of Michigan.

Bonds− Section 00310 Bid Bond, Section 00610 Performance Bond and Section 00620 Payment Bond are security furnished by the Contractor, as required by the Contract Documents.

Business Day− Any Day except Saturdays, Sundays and holidays observed by the Owner.

Bulletin− A standard DTMB or other PSC form used by the PSC & Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.

Calendar Day− Every day shown on the calendar, Saturdays, Sundays, and holidays included.

Cash Allowance− An Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or other designated items, as specifically provided in the Contract Documents.

Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently detailed in the Contract Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.

Change Authorization− A written order issued and signed by the Professional, which directs changes in the Work that require no adjustment in Contract Price or Contract Time, or which allows for variations in the quantities of Unit Price Work.

Change Order− A written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.

Construction Mechanic− A skilled or unskilled mechanic, laborer, worker, helper, assistant, or apprentice working on a state project but shall not include executive, administrative, professional, office, or custodial employees

Contact Person− Individual in the employ of the Professional or the Owner who is designated as the sole point of contact for prospective Bidders for requests or inquiries concerning the Work and/or the Bidding Documents.

Contract− Refer to the definition in paragraph 1.1 of Section 00500 Agreement. The term “Contract” encompasses the legal obligations of the Owner and Contractor, as defined by…