171.23125.CTW - JTH SOB Chiller Replacement- Addendum #2 Write Up.pdf
PDF 163 KB Posted
- Solicitation number
- RFQ 171 270000000036 3
- Issued by
- Saginaw County, Michigan
About this file
This is an Addendum No. 2 to the original contract documents for the Jerome T. Hart State Office Building Chiller Replacement project located at 544 Cherbourg Drive, Lansing, Michigan. The addendum modifies and clarifies the original contract documents and takes precedence over them. The project, managed by Matrix Consulting Engineers, involves the replacement of chillers at the Jerome T. Hart State Office Building. The addendum includes revisions to multiple mechanical and electrical drawings and specifications. Mechanical modifications outlined in the addendum address the disconnection, removal, and salvage of four tanks in the areaway, with corresponding reinstallation details reflected across drawings M-300, M-301, M-600, and M-601. Additional chiller dimensions and weight information have been added to drawing M-900. The addendum must be acknowledged by all bidders receiving plans and specifications, with receipt noted on the Proposal Form.
Electrical modifications specified in Addendum No. 2 include revisions to feeder configurations for pumps P-1 through P-5 to align with the one-line diagram on sheet E-600, and a correction referencing panel designation from 'BMP' to 'BRP' on drawing E-500. Specifications section 262923 regarding variable-frequency motor controllers (VFD) has been referenced, with a list of acceptable VFD manufacturers provided in the bidding documents. The addendum does not indicate pricing terms, set-asides, incumbent contractors, or specific funding sources beyond the project identification number and engineer contact information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
544 CHERBOURG DRIVE, LANSING, MI 48917
PHONE: (517) 487-2511
FAX: (517) 487-2544
ADDENDUM NO. 2
JEROME T. HART STATE OFFICE BUILDING
CHILLER REPLACEMENT
File No.: 171/23125.CTS Date:11/13/2026
Matrix Job Number: 23085
ENGINEER:
Matrix Consulting Engineers 544 Cherbourg Drive.
Lansing, MI 48917
This Addendum is issued for the purpose of modifying and/or clarifying the original Contract Documents and shall take precedence over them.
All work included herein shall be in accordance with the original drawings and specifications except as specifically noted herein. All incidental items required to provide the following modifications shall be included even though not specifically described.
This addendum is being sent to all bidders receiving plans and specifications. Receipt of this Addendum shall be noted on the Proposal Form in the appropriate location.
Mechanical
1. M-300 (Re-Issued)
a. Removed keynote 5.
b. Showing all 4 tanks in areaway as disconnected, removed, and salvaged.
c. Added general demolition note 4.
2. M-301 (Re-Issued)
a. Showing all 4 tanks in areaway as disconnected, removed, and salvaged.
b. Added general demolition notes.
3. M-600 (Re-Issued)
a. Showing all 4 tanks in areaway being reinstalled.
4. M-601 (Re-Issued)
a. Showing all 4 tanks in areaway being reinstalled.
5. M-900 (Re-Issued)
a. Added chiller dimensions and weight.
Electrical
1. E-500 (Re-Issued)
a. Revise feeders for pumps P-1, P-2, P-3, P-4, P-5 to match the one line on sheet E-600.
b. Revise reference for panel ‘BMP’ to ‘BRP’.
2. Specifications section 262923 - variable-frequency motor controllers (Not Re issued)
a. List of VFD manufacturers can be found in this section issued with the bidding document.