Addendum 1 22278.pdf
PDF 3 MB Posted
- Solicitation number
- RFP - 171 - 230000001440
- Issued by
- Houghton County, Holly Village, Michigan
About this file
This document is Addendum No. 1 to a Request for Proposal (RFP) for Professional Services issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division for the Bill Nicholls Trail Improvements project in Adams Township, Houghton County, Michigan. The addendum includes a correction to the RFP question deadline, which is 5pm on March 16, 2023, as well as attachments with the attendance spreadsheet from the March 9, 2023 pre-proposal meeting and the digital slideshow presentation given at that meeting. The project involves 1.85 miles of trail redevelopment including 21 culvert replacement designs, 1 structure repair, and trail surface design improvements to address surface water flows.
The related state and local contract opportunity is identified as 751/22278.TAP, with jurisdictions including Houghton County and Holly Village. The proposal due date is March 23, 2023. The document does not provide details on pricing terms, set asides, incumbents, funding requirements or sources, or contract term and renewal options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAMPLE Billable Rate Contract (Rev 220207).pdf | ||
| Project Statement 22278.pdf | ||
| RFP Billable Rate 22278.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 2/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL – PSC SERVICES
PREPROPOSAL ADDENDUM NO. 1
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.
Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
March 9, 2023
PROJECT NAME
Bill Nicholls Trail Improvements
FILE NUMBER
751/22278.TAP
PROJECT DIRECTOR
Tom Pawlowski
PROPOSAL DUE DATE
March 23, 2023
ADDENDUM ITEMS:
1. Project Statement correction – Revise the “ACCEPTING RFP QUESTIONS UNTIL:” section reference indicating questions would be accepted until 2 days prior to the proposal due date. The appropriate deadline for questions, concurrent with the RFP, is 5pm on March 16, 2023.
2. The attendance spreadsheet from the March 9, 2023 PreProposal Meeting is attached.
3. The digital slideshow presentation given at the online PreProposal Meeting is attached.
4. The Great Lakes Stream Crossing Inventory weblink is not included here, but is referenced as a publicly available resource pertinent to this project.
This ends Addendum No. 1.
APPROVED BY:
PROJECT DIRECTOR Tom Pawlowski DATE 3-9-23 http://www.buy4michigan.com/
DTMB-0441 (R 19.02)
MEETING ATTENDANCE RECORD
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
PROJECT DESCRIPTION/LOCATION
Bill Nicholls Trail Improvements/Adams Twnshp, Houghton County, MI
DATE
2023-03-09
TIME
11am EST
FILE NUMBER
751/22278.TAP
CONTRACT NUMBER
TBD
MEETING PLACE
MS Teams: Meeting ID: 295 080 577 663 Passcode: 9qCxXT
PLEASE PRINT YOUR NAME
FIRM YOU REPRESENT
EMAIL ADDRESS
TELEPHONE NUMBER
Michelle Crook
MDNR-Exec Div crookm@michigan.gov
517-242-3773
Jeffrey Kakuk
MDNR-PRD
kakukj@michigan.gov
906-250-5818
Tom Pawlowski
DTMB-DCD
pawlowskit@michigan.gov
517-242-0973
Zane Hyrkas
OHM Advisors
Sam Genter
UPEA
Steve Wright
UPEA
Craig Richardson +
Wickwire Solutions
Ron Groth
Wickwire Solutions
Bill Kimble +
C2AE
BILL NICHOLLS TRAIL
Adams Township trail improvements
1.85 miles of trail redevelopment including 21 culvert replacement designs, 1 structure repair, and trail surface design improvements to address surface water flows.
BN125-1 outlet note curved tree growth that is common on all banks.
• BN125-1 inlet view
Photo Below is BN131-1 Inlet
Photo to right is Typical trail vegetative cover
BN132-1 Bank slump stabilization 2022
Site ID - BN138-1
BN136-1
• Assumed to be the one structure that can remain.
• Assess for bank stability and repair of wingwall spalling and cracking.
BN141-1
• (Photo on Right) Single wall HDPE inlet curved upward
• Photo below shows outlet during storm and trail overtopping
| BILL NICHOLLS TRAIL Visual Log.pdf |
| BILL NICHOLLS TRAIL�Adams Township trail improvements |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| BN125-1 outlet�note curved tree growth that is common on all banks. |
| Photo Below is�BN131-1 Inlet |
| BN132-1 Bank slump stabilization 2022 |
| Slide Number 8 |
| Slide Number 9 |
| BN136-1 |
| Slide Number 11 |
| BN141-1 |
File details come from the government source that posted it. Updated .