Addendum 1 220057A001 final.pdf
PDF 221 KB Posted
- Solicitation number
- S-24800-00004810
- Issued by
- Marion County, Oregon
About this file
This document is an Addendum to the Request for Proposals (RFP) for the ANDERSON READINESS CENTER PARKING AREA IMPROVEMENTS Project Number 220057A001, issued by the Oregon Military Department (OMD) Joint Force Headquarters, Oregon National Guard Installations Division. The addendum outlines changes, clarifications, and responses to questions received during the RFI period for this project, which involves the design and construction of a new overflow surge parking area north of the existing parking lot at the Anderson Readiness Center. The project is located in Marion County and the City of Salem and must comply with National Guard Bureau (NGB) regulations and City of Salem permitting requirements. The RFP deadline is April 21, 2023, and the estimated project budget is $940,000 for construction, with the design limited to 3%, 6%, and 3% of the estimated construction budget.
The addendum also clarifies that a hazardous materials survey is not required for this project, but the contractor must conform to regulatory procedures if such materials are encountered. Additionally, the addendum states that the project does not require additional pedestrian access standards or a new application for the parking lot expansion. The vertical datum to be used is NGVD 29, and natural resources requirements, if any, will be a joint effort between OMD and the selected design team.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OREGON MILITARY DEPARTMENT
JOINT FORCE HEADQUARTERS, OREGON NATIONAL GUARD
INSTALLATIONS DIVISION
1776 MILITIA WAY
P.O. BOX 14350
SALEM, OREGON 97309-5047
November 18, 2022
Installations Division
SUBJECT: Addendum 1 to ANDERSON READINESS CENTER PARKING AREA IMPROVEMENTS Project Number 220057A001
TO ALL PROSPECTIVE PROPOSERS AND ALL OTHERS CONCERNED
1. The changes, clarifications, omissions, additions, and alterations in, on, and to the proposal information and specifications shall apply to the proposals submitted for and to the project indicated above. Except as modified by this Addendum, all of the terms and provisions of the Request for Proposals (“RFP”) for the above listed project remain in full force and effect. This Addendum Number 1 supersedes all previous instructions pertaining to the items listed:
CHANGES TO RFP
2. Changes to RFP: The following changes are made to the RFP. (Where applicable, additions are indicated with bold and underlined and deletions are indicated by strikethroughs).
ANSWER TO QUESTIONS RECEIVED DURING RFI PERIOD
1. Is Hazardous Materials Survey required as specified on page 46?
RESPONSE: No, not Required for this Project. However, if hazardous or contaminated materials are encountered, contractor will conform to regulatory procedures.
2. The project budget is estimated to be approximately 1.1 million dollars inclusive of design and permitting fees. What of that number, is anticipated to be the construction cost?
RESPONSE: $940,000. Project design is limited to 3%, 6%, 3% of estimated Construction
Budget
3. Has OMD conducted a site calculation to confirm the Site Plan Review application does not include variances for exceeding the maximum off-street parking allowed for the facility?
RESPONSE: Yes, see Pre-Application Report.
4. Has OMD confirmed the pedestrian access standards for connectivity to buildings throughout the site are not triggered with the expansion of the parking lot? It is our experience that a new application for this type of parking lot expansion would trigger other pedestrian connection requirements elsewhere onsite.
RESPONSE: No.
5. The site is a known Archeological site per the city’s overlay map. Has OMD contacted the City’s historic preservation office to discuss requirements for development of the property as it relates to archeological resources?
RESPONSE: No, however, OMD will work with selected Design Team to clarify City’s historic preservation requirements for development of this site per Pre-Application Report.
6. The RFP lists April 1st as the deadline is to get the project out to bid. Please confirm this does not mean the project is to have planning approval or permits in hand by that date. Is there a deadline for site plan review and permits to be approved by?
RESPONSE: Yes, April 21st, 2023.
7. The CAD requirements indicate the vertical datum to be used is NAVD88 but under type A basic services the vertical datum indicated is NGVD 29. What datum should be used?
RESPONSE: NGVD 29.
8. Confirming, Natural resources is not required as part of the scope of work and obtaining DSL concurrence (if required) or an updated report is to be completed by OMD?
RESPONSE: Yes, natural resources if required will be a joint effort between OMD and selected
Design Team
9. .Is fencing and gate design a part of the project? No, not part of this Project.
Does OMD have as-built drawing of the existing irrigation system? Page 33 indicates that the irrigation design is to be based on the existing as-built drawings provided by the owner.
RESPONSE: Yes, OMD has an as-built of existing irrigation system.
3. This addendum must be acknowledged and submitted for this project. By acknowledging this addendum on RFP Attachment A, Representations, Attestations, and Certifications, (4), the proposer agrees they have read and understood the above mentioned changes, and have incorporated those changes into their proposal.
PROTEST OF ANY CHANGES TO THE RFP MADE BY THIS ADDENDUM MUST BE SUBMITTED IN
WRITTEN FORM TO SAM GOFF – CPPB PROCUREMENT & CONTRACT SPECIALIST, OREGON
MILITARY DEPARTMENT - AGI, 3225 STATE STREET, SALEM, OREGON 97301 BY 10:00 am ON
NOVEMBER 22, 2022
Sam Goff - CPPB Procurement & Contract Specialist