This document is an Addendum to a Request for Proposal (RFP) issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division for the Caro Center - Various Building Demolitions project. The RFP has been changed from a Lump Sum to a Billable Rate not to exceed contract. The proposal due date has been extended to June 23, 2022. The demolition contractor is required to take all building materials down to 2' below grade, punch holes into the basement/tunnel floors, cut and cap all utilities 50' from the buildings, and remove all buildings, sidewalks, parking lots, and roads for the former prison facilities. Trees may be removed within 20' of the building perimeter for equipment access during demolition. The project is located in Tuscola County, Michigan.

The RFP indicates this will be a Billable Rate not to exceed contract. The solicitation does not mention any set asides, incumbents, funding requirements or sources, or contract renewal options.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 2/22)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL

ADDENDUM NO. 1

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.

Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

June 8, 2022

PROJECT NAME

Caro Center - Various Building Demolitions

FILE NUMBER

491/20209.MAA

PROJECT DIRECTOR

Maria Alvaro

PROPOSAL DUE DATE:

June 23, 2022

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

1. The Request for Proposal has been changed from Lump Sum to Billable Rate not to exceed.

(See attached Billable Rate RFP and Sample Billable Rate Contract)

2. The proposal due date has been extended to June 23, 2022.

3. Question - On other MDTMB demolition projects, the demolition contractor takes all building materials down to 2’ below grade and punches holes into the basement/tunnel floors. Will that be the case for this project?

Answer : Yes, this will be the case for these buildings

4. Question - Other than the sanitary sewer, how far away from the building that are being demolished does the demolition contractor need to cut/cap the utilities?

Answer: All Utilities shall be cut and capped at a distance of 50’

5. Question - Concerning the two former prison facilities, Corrections requires everything (Buildings, sidewalks, roads, etc.) to be removed. Is that the case for this project?

Answer: Yes, this is the case for all buildings, sidewalks, parking lots and roads are to be demolished as highlighted on the attached site plan: 220608_Caro_Park.SW_Demo

6. Question – May we cut down trees in the way for demolition:

Answer: Trees may be removed within 20’ of the building perimeter for equipment access during demolition.