Addendum 1 20208.pdf
PDF 124 KB Posted
- Solicitation number
- RFP - 171 - 220000002645
- Issued by
- Mackinac County, Michigan
About this file
This document is an Addendum to a Request for Proposal (RFP) issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division for a Historic Mill Creek - Saw Mill Drop Box Study, Project #751/20208.ABG. The addendum provides updated information, including that the mill will close on September 4, 2022, and field investigations for the study can occur anytime after that date. It also includes the meeting attendance record. The proposal is due on July 28, 2022, and the project director is Alan Goschka, AIA.
The related state and local contract opportunity is for the Historic Mill Creek - Drop Box Repair Study, Project #751/20208.TAP, in Mackinac County, Michigan. The contract will involve providing professional services for this study.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 20208 (Billable Rate).pdf | ||
| SAMPLE Billable Rate Contract (Rev 220207).pdf | ||
| Project Advertisement 20208.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 2/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL
ADDENDUM NO. 1
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.
Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
July 21, 2022
PROJECT NAME
Historic Mill Creek – Saw Mill Drop Box Study
FILE NUMBER
751/20208.ABG
PROJECT DIRECTOR
Alan Goschka, AIA
PROPOSAL DUE DATE:
July 28, 2022
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
See attached Meeting Attendance Record
The mill closes on September 4, 2022. Field investigation for the PSC can occur anytime after that date.
APPROVED BY:
Alan Goschka, AIA
PROJECT DIRECTOR DATE 07-21-2022
http://www.buy4michigan.com/
File details come from the government source that posted it. Updated .