Addendum 1 20208.pdf

PDF 124 KB Posted

Attached to
751/20208. TAP; Historic Mill Creek - Drop Box Repair Study
Solicitation number
RFP - 171 - 220000002645
Issued by
Mackinac County, Michigan

About this file

This document is an Addendum to a Request for Proposal (RFP) issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division for a Historic Mill Creek - Saw Mill Drop Box Study, Project #751/20208.ABG. The addendum provides updated information, including that the mill will close on September 4, 2022, and field investigations for the study can occur anytime after that date. It also includes the meeting attendance record. The proposal is due on July 28, 2022, and the project director is Alan Goschka, AIA.

The related state and local contract opportunity is for the Historic Mill Creek - Drop Box Repair Study, Project #751/20208.TAP, in Mackinac County, Michigan. The contract will involve providing professional services for this study.

View the file

Other files

File Type Posted
RFP 20208 (Billable Rate).pdf PDF
SAMPLE Billable Rate Contract (Rev 220207).pdf PDF
Project Advertisement 20208.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 2/22)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL

ADDENDUM NO. 1

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.

Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

July 21, 2022

PROJECT NAME

Historic Mill Creek – Saw Mill Drop Box Study

FILE NUMBER

751/20208.ABG

PROJECT DIRECTOR

Alan Goschka, AIA

PROPOSAL DUE DATE:

July 28, 2022

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

See attached Meeting Attendance Record

The mill closes on September 4, 2022. Field investigation for the PSC can occur anytime after that date.

APPROVED BY:

Alan Goschka, AIA

PROJECT DIRECTOR DATE 07-21-2022

http://www.buy4michigan.com/

File details come from the government source that posted it. Updated .