Addendum 1 20145.pdf
PDF 693 KB Posted
- Solicitation number
- RFQ-171-210000000298-3
- Issued by
- Saginaw County, Forest Hills CDP, Michigan
About this file
This is a Construction Bid Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration for the Saginaw Correctional Facility Parking Lot and Walkway Restoration project (File No. 472/20145.SDW). The project involves asphalt pavement cleaning and sweeping, weed control, crack sealing, crack filling, two-coat surface sealcoating, and pavement markings. Bids are due May 19, 2021 at 2:00 pm through the SIGMA website. The contract duration is 90 days from the pre-construction meeting or Notice to Proceed, with construction starting at the end of April. Questions were due by May 13, 2021, with an Ad Board/Director agenda date of May 28, 2021 for contract approval.
The bid schedule includes a base bid with line items for mobilization, sweeping/cleaning, surface sealcoating, pavement marking, and other costs. There are allowances for 2,500 linear feet each of standard crack seal and crack fill, plus a $5,000 provisional allowance amount. Liquidated damages are set at $500 per day after substantial and final completion. The project requires a 5% bid bond and includes COVID-19 safety protocols for contractors working on site. Working hours are restricted to dawn till dusk Monday through Friday, with additional hours requiring written permission. Prevailing wage rates are not required for this project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawings 20145.pdf | ||
| MDOC LEIN Request 20145.pdf | ||
| Specifications 20145.pdf | ||
| Advertisement 20145 revised.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
5/14/2021
PROJECT NAME
Saginaw Correctional Facility – Parking Lot and Walkway Restoration
FILE NUMBER
472/20145.SDW
PROFESSIONAL
Beckett & Raeder, Inc.
PROJECT DIRECTOR
Susan Wheaton
BID OPENING DATE:
5/19/2021
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
Bidder Question:
1. Regarding the crack sealing and filling line item on the bid form I am checking to see if you can just put 1,000/LF or whatever the state feels comfortable with and anything above 1,000/LF will be charged at the unit price provided that way everyone is bidding apples to apples.
Answer:
See the revised Bid Schedule.
Plan and Specifications Clarification:
1. During all operations, the Contractor shall ensure that adjacent vehicles and concrete pavement remain clean. Cleaning overspray shall be the responsibility of the Contractor.
2. Discussions occurred on project phasing. A sample phasing plan is included for reference. The Contractor shall provide a phasing plan along with the anticipated schedule.
3. The Bid Schedule has been revised to include a “Provisional Allowance Amount” as it pertains to Section 01020 of the specifications.
4. Sheet C3, Detail 2, Note 1 has been revised to read “This detail applies to all cracks over ¼” wide.”
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Beckett & Raeder, Inc. DATE: 5/14/2021
APPROVED BY:
PROJECT DIRECTOR: DATE: Click to enter date
Mandatory Pre‐Bid Meeting Agenda
Project: Saginaw Correctional Facility – Parking Lot and Walkway Restoration File No.: 472/20145.SDW Date: Tuesday, May 11, 2021, 1:00 pm at Saginaw Correctional Facility, 9625 Pierce Road, Freeland, MI
A. Introductions
1. Owner’s Representatives – Susan Wheaton RA – DTMB‐DCD – Project Director Maria Alvaro RA – DTMB‐DCD – Project Director Jason Poag – DTMB‐DCD – Field Representative Gene Page – MDOC – Physical Plant Ed Laplant – SRF ‐ Physical Plant
2. PSC’s Representatives – Kris Enlow – Beckett & Raeder
B. Sign‐in Sheet – Susan to complete roll‐call.
Notice: An individual is only permitted to represent one bidder at a mandatory Pre‐Bid Conference.
C. Addendum ‐ If a point or concern raised during this meeting is determined by the
PSC/Owner to require a change to the bidding documents, an addendum will be issued.
D. Project description – Saginaw Correctional Facility – Parking Lot and Walkway Restoration:
The work includes but is not necessarily limited to: asphalt pavement cleaning and sweeping, weed control, crack sealing, crack filling, two (2) coat surface sealcoating and pavement markings.
E. Project Schedule
1. Bid due date – Wednesday, May 19, 2021 at 2:00 pm (must be received on or before
2:00 pm in the office and on SIGMA to be Accepted).
Bids must be submitted electronically through the SIGMA website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService .
2. Questions must be received by 5:00 pm Thursday, May 13, 2021 at 5:00 pm.
3. Ad Board/Director Agenda Friday, May 28, 2021 for contract approval.
4. After the contract is executed
i. Pre‐Construction Meeting – Scheduled after contract is executed – tentatively the last week of April.
ii. Progress Meetings – To be determined at Pre‐Construction Meeting.
5. Contract Time
1. A detailed schedule is required from the Contractor at the start of the work.
2. Time of substantial completion. 90 days from pre‐construction meeting or Notice to Proceed with construction taking place starting the end of April.
3. Liquidated Damages. $500.00/day after substantial and final completion.
F. Bid Contents: (DC, Mich SPEC)
1. Forms required for all bids:
a. Bid Summary Form (DMB‐401)
i. Submit two copies of Bid Summary Form with bidder information filled in and signed – both copies signed by an Officer of the Company with original signatures.
ii. Fill base proposal amount.
iii. Check box for Qualified Disabled Veteran if applicable.
iv. Check box for any allowances (allowances should be included in base bid per specification section 01020) $5,000.00
v. Fill in alternates to base bid – 1 (The Contract will be awarded on the basis of the Base Proposal Sum…and deductive alternate in the order the Owner accepts them. Specification section 01030)
vi. Acknowledge addenda received.
b. Bid Schedule ‐ Fill out form in Appendix I of specifications. (If unit prices are used)
c. Professional/Contractor Demographics, Statistics and Demographics form
Fill out form in Appendix I of specifications. (Note: is sent with Notice of Award)
d. Certification Regarding Debarment, Suspension, and Other Responsibility Matters form ‐ Fill out form in Appendix I of specifications. (Note: is sent with Notice of Award)
e. Bid Bond – A certified check payable to the State of Michigan or a satisfactory bid bond executed by the bidder and surety company in the amount equal to five percent (5%) of the base proposal. Fill out form in Appendix I of specifications. Bid bond is to be furnished on the Surety’s standard form.
G. Michigan Preferences
1. All contractors and suppliers are encouraged to use Michigan products and recycled and/or environmentally friendly products whenever possible where price, quality and performance are equal to, or superior to non‐Michigan products.
2. Certification of Michigan based business – Fill out form in Appendix I of specifications.
H. Permits –
1. The contractor is responsible for obtaining and paying for all permits required by LARA, or any other agency as required.
2. The Contractor is responsible for scheduling all inspections.
I. Contractor Supervision – The Contractor is responsible for managing and supervising the work and must be on site 100% of time.
J. Insurance Requirements – Must be submitted by contractor after notification of award of contract.
1. Workers’ Compensation and Employer’s Liability
2. Commercial General Liability
3. Commercial Automobile Liability
4. Excess Liability and any other designated in Supplementary conditions.
5. Builder’s Risk – Must be provided by the contractor per specification section 00700 part 3.4. State no longer provides.
K. Testing – The Owner will retain a professional/agency to perform inspections, tests, or approvals for those material required to meet quality control standards specified in the contract documents. However, the Contractor must assume full responsibility for testing, per Section 00700 part 5.2. Testing Allowances, if applicable are indicated in Section 01020.
L. Special Working Conditions – Working on State owned property. Working hours will be dawn till dusk, Monday through Friday. Additional weekday hours or work on Saturdays or Sundays is not allowed unless written permission is granted from Ed Laplant (SRF ‐ Facilities).
1. Security Clearance Request – Follow Agency Requirements ‐ LEIN Clearance and site‐ specific training.
2. All contractors will be subjected to a health screening performed by a Facility employee at the specified entrance and/or by the contractor’s COVID site coordinator.
3. The contractor will be required to have a designated person on site at all times construction is taking place for conducting your COVID-19 screening and / or monitoring.
M. Special Working Conditions / Special Project Procedures – See Appendix II, III.
1. Department of Corrections
2. Hazardous Materials Project Procedures
N. Wage Rates – Prevailing wage rates ARE NOT required.
O. COVID‐19 Requirements for the awarded Contractor:
1. Provide a site specific COVID preparedness plan prior to having any employees or sub‐ contractors on site. The plan must meet the most recent guidelines by MDHHS, OSHA, MIOSHA, CDC or any other governing body regarding health, safety and welfare.
2. Masks that cover the nose and mouth must be worn at all times within the building.
Neck gaiters are not allowed per DHHS.
3. The contractor must have a COVID representative on site during construction who is knowledgeable of screening and reporting procedures. This individual may be the site superintendent.
4. All contractors will be subjected to a health screening performed upon entry of the building along in addition to the contractor’s health screening. The location of this screening will be determined at the beginning of the project.
P. Questions.
DTMB‐0441 (R 6/16)
MEETING ATTENDANCE RECORD
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration
Design and Construction Division
PROJECT DESCRIPTION/LOCATION
Saginaw Correctional Facility
DATE
May 11, 2021
INDEX NUMBER / PROGRAM
472SRFMaintProj / 20SRF13
FILE NUMBER
472/20145.SDW
CONTRACT NUMBER TIME
1:00 pm
MEETING PLACE
Saginaw Correctional Facility – Main Lobby
PLEASE PRINT YOUR NAME
FIRM YOU REPRESENT
TELEPHONE NUMBER
Susan Wheaton RA
DTMB ‐ DCD
517‐242‐9945 Wheatons1@michigan.gov
Gene Page
MDOC
517‐749‐7518 Pageg@michigan.gov
Ed Laplant
MDOC ‐ Saginaw Correctional Facility
989‐695‐9880 x 273‐1501 LaplantE@michigan.gov
Warden Gary Miniard
MDOC – Saginaw Correctional Facility
989‐695‐9880 miniardg@michigan.gov
Carolle Walker ‐ A/Deputy Warden
Walkerc11@michigan.gov
Sam Morgan ‐ A/Assit Deputy Warden
Morgans8@michigan.gov
Glenn Kusey
KuseyG@michigan.gov
Kris Enlow
Beckett & Raeder
734‐239‐6610 kenlow@bria2.com
Jason Poag – Field Rep
DTMB‐DCD
517‐499‐5150 poagj@michigan.gov
Maria Alvaro AIA – Project Director
DTMB‐DCD
248‐520‐6702 Alvaroa1@michigan.gov
Jourdan Lindsey
Tamarack Builders / Griffith
989‐620‐4737 jlindsey@tamarackbuilder.com
Kevin Griffith
Tamarack Builders / Griffith
616‐856‐0411 kgriffith@tamarackbuilder.com
Matt Spisak
Spartan Construction Group
734‐331‐5061 matt@spartan‐constructiongroup.com
Courtney Gary
MKC Group Inc
989‐439‐1767 cgary@mkcmi.com
Yasmeen Ali
Angels General Construction, Inc.
313‐768‐8907 yasmeen@angelsgc.com
Bidding and Contract Document (R 11/19) Project: Saginaw Correctional Facility, Parking Lot and Walkway Restoration File No. 472/20145.SDW
The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.
Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated: ________ FIRM NAME TELEPHONE NUMBER and E-MAIL ADDRESS
BID SCHEDULE
Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:
Base Bid Item No.
Bid Quantity
Description (Bidder to write price in Words)
Unit Price
Item Bid Price
1 Lump Sum Mobilization, Bonds and Insurance N/A $
2 Lump Sum Sweeping and Cleaning Pavement N/A $
3 Lump Sum Surface Sealcoating N/A $
4 Lump Sum Pavement Marking N/A $
5 Lump Sum All other costs not included in items
1 through 4 above
N/A $
2,500 linear feet Allowance for Standard Crack Seal
(Detail 1)
2,500 linear feet Allowance for Standard Crack Fill
(Detail 2)
PROVISIONAL ALLOWANCE
AMOUNT
N/A $5,000.00
TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $
Base Bid (Sum of Item Bid Prices for all Base Bid Items):
__________________________________________________________________ Dollars $__________________________ (use words) (in figures)
Bidding and Contract Document (R 11/19) Project: Saginaw Correctional Facility, Parking Lot and Walkway Restoration File No. 472/20145.SDW
Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:
Alternate Item No.
Bid Quantity
Description (Bidder to write price in Words)
Unit Price
Item Bid Price
The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.
Schedule of Unit Prices or Contingent Change Order Prices - The Bidder shall use this “Schedule” to quote unit prices identified in the bid documents or propose other contingent Change Order prices. The proposed Unit Prices or contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate Unit Prices or contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.
Item No.
Units or Quantity
Description (Bidder to write price in Words)
Bidder’s Bid Price
Price Proposed By The Owner
1 Lin. Ft. Standard Crack Seal (Detail 1)
2 Lin. Ft. Standard Crack Fill (Detail 2)
Kristofer Enlow, P.E. - BRI Polygon
Kristofer Enlow, P.E. - BRI Polygon
Kristofer Enlow, P.E. - BRI Polygon
Kristofer Enlow, P.E. - BRI Polygon
Kristofer Enlow, P.E. - BRI Engineer
SAMPLE PAVEMENT MAINTENANCE PHASING FOR 2021
Kristofer Enlow, P.E. - BRI Engineer Only sealcoat half of the ADA spots at a time.
Kristofer Enlow, P.E. - BRI Polygon
Kristofer Enlow, P.E. - BRI Polygon
Kristofer Enlow, P.E. - BRI Engineer
PHASING:
Contractor to provide a similar phasing plan with their project schedule.
| Addendum No. 1 |
| DCSpec_Rev_02-19_645871_7 (5) 3 |
| DCSpec_Rev_02-19_645871_7 (5) 4 |
| DTMB-0441 (Meeting Attendance Record) 472-20145.SDW |
| Pre-BidMtgAgenda-DCSpec 472-20145.SDW - final |
| Saginaw CF DRAFT Pavement Maintenance Phasing |
File details come from the government source that posted it. Updated .