Addendum 1 18072.pdf

PDF 251 KB Posted

Attached to
472/18072. TYC Lakeland CF - Various Roof Restorations
Solicitation number
RFP-171-180000002051-2
Issued by
Barry County, Michigan

About this file

This is an Addendum No. 1 to a Request for Proposal issued by the Michigan Department of Technology, Management and Budget's State Facilities Administration, Design and Construction Division for the Lakeland Correctional Facility Various Roof Restorations project in Coldwater, Michigan (File Number 472/18072.TYC). The addendum revises several key dates: the proposal due date is extended to May 3, 2018 at 2:00 pm local time (from April 26), and RFP questions will now be accepted until April 27, 2018 at 12:00 pm local time (from April 20). The project scope has been modified to remove buildings A, B, and C from the scope of work, and the desired schedule of work has been revised from Summer 2018 to Summer/Fall 2018.

The addendum makes no mention of changes to pricing terms, funding requirements, or other financial aspects of the project. The document is primarily focused on timeline revisions and scope reduction, with all changes distributed through www.michigan.gov/SIGMAVSS as an attachment. The Project Director is listed as Todd Y. Cordill, NCARB, who approved the addendum on April 20, 2018.

View the file

Other files

File Type Posted
LEIN Request 18072.pdf PDF
RFP 18072.pdf PDF
18072_ProjectStatement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 6/16)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL ADDENDUM NO. 1

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals. Addenda will be numbered by the Project Director and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

4/20/2018

PROJECT NAME

Lakeland Correctional Facility, Various Roof Restorations, Coldwater, Michigan

FILE NUMBER

472/18072.TYC

PROJECT DIRECTOR

Todd Y. Cordill, NCARB

PROPOSAL DUE DATE:

5/3/2018 (REVISED)

ADDENDUM ITEMS:

The project statement shall be revised as follows: (Refer to enclosed revised Project statement)

-The proposal due date has been revised. It is now May 3, 2018 rather than April 26, 2018.

-The project description has been revised to remove buildings A, B, and C from the scope of work.

-The desired schedule of work has been revised to read Summer/Fall 2018 instead of Summer 2018.

-RFP questions will be accepted until April 27, 2018 instead of April 20, 2018.

The Request for Proposals shall be revised as follows:

-The proposal due date shall be revised to read “May 3, 2018, 2:00 pm local time” instead of “April 26.

-Section I, General Information, I-7 shall be revised to read: “Questions that arise as a result of this RFP MUST BE SUBMITTED IN WRITING to the issuing office no later than Friday, April 27, 2018 at 12:00 pm, local time.”

-Section I, General Information, I-10 shall be revised to read: “To be considered, proposals must arrive at the issuing office on or before 2:00 pm, local time, on Thursday, May 3, 2018.

APPROVED BY:

DATE: 4/20/2018