Addendum 1 17400.pdf

PDF 979 KB Posted

Attached to
SAIF - Perimeter Fence Enhancements 472/17400. SMD
Solicitation number
RFQ 171 180000000415 2
Issued by
Washtenaw County, Cheboygan City, Michigan

About this file

This is Addendum No. 1 to the bid documents for the SAI Correctional Facilities Razor Ribbon Enhancements project issued by the State of Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division, on February 28, 2018. The project, with File No. 472/17400.SMD and Index No. 71060, involves modifications to fencing and razor ribbon systems at a correctional facility, including the removal and replacement of existing fence systems around the C-unit, relocation of twelve fiberglass support rods from inside to outside fence locations, installation of new flex zone cable around the C-unit, and the addition of detainer hook razor ribbon with specified spacing. A mandatory pre-bid meeting and walk-through is required for all bidders, with each person representing only one bidder entity. Bids must be submitted to the SIGMA VSS site and emailed to Linda Feldpausch at FeldpauschL1@Michigan.Gov with the project name and file number in the subject line.

The addendum clarifies critical work conditions and scheduling parameters for contractor execution. Contractors are permitted to work up to eight-hour days, six days per week, or alternatively four days per week at ten hours per day, with work hours restricted to 7:00 a.m. to 6:00 p.m. One escort per crew will be provided for work within the secure perimeter, though escorts are not required for outside perimeter work. The alternate listed in the bid documents is designated as a deduct alternate with removal of fence, poles, and foundations deleted from the deduct scope; the base bid shall include full demolition including foundations. The base bid must also include two days of re-supporting existing razor ribbon. Shop drawings for all fencing components are required, and new flex zone cable must be tested before removal of existing cable around the C-unit.

View the file

Other files

File Type Posted
Specifications 17400.pdf PDF
Plans 17400.pdf PDF
Advertisement 17400.pdf PDF
LEIN Request 17400.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSU LTING EN G INEERS, INC.

1601 E. GRAND RIVER, LANSING, MI 48906

PHONE: (517) 487-2511

FAX: (517) 487-2544

ADDENDUM NO. 1

Date: 02/28/18 Project Name: SAI Correctional Facilities Razor Ribbon Enhancements File No.: 472/17400.SMD Index No.: 71060 Matrix Project Number: 17303.00

This Addendum is issued for the purpose of modifying and/or clarifying the original Contract Documents and shall take precedence over them.

All work included herein shall be in accordance with the original drawings and specifications except as specifically noted herein. All incidental items required to provide the following modifications shall be included even though not specifically described.

This addendum is being sent to all bidders receiving plans and specifications. Receipt of this Addendum shall be noted on the Bid Summary in the appropriate location.

Clarification and Questions:

A1.1 Clarification: All bidders must attend the pre-bid meeting and walk through to bid the project. Each person may only represent one bidder.

A1.2 Clarification: The alternate listed shall be a deduct alternate.

A1.3 Clarification: Delete removal of fence, poles and foundation for the deduct alternate. Base bid shall include full demo including foundations.

A1.4 Clarification: Relocate (12) fiberglass support rods from the inside of the fence to the outside of the fence locations to be determined.

A1.5 Clarification: Install new flex zone cable instead of relocating the existing. Test new flex zone cable before removing the existing flex zone cable around C-unit.

A1.6 Clarification: Send bids to the SIGMA VSS site as well as email them to Linda Feldpausch FeldpauschL1@Michigan.Gov . In the Subject line include name of the project and file number 472/17400.SMD.

mailto:FeldpauschL1@Michigan.Gov

ADDENDUM NO. 1

A1.7 Clarification: Section 008000 Supplementary Conditions: Contractors will be allowed to work up to 8 hour days, 5 days a week, a request for 10 hour days may be considered.

Changed to: Contractors will be allowed to work up to 8 hour days, 6 days a week, or 4 days a week at 10 hours per day. Time shall be between 7 am and 6 pm.

A1.8 Clarification: One escort for each crew working inside secure perimeter will be provide.

Escorts not required on the outside perimeter.

A1.9 Clarification: Include two days of re-supporting the existing razor ribbon.

Attachments:

A1.10 Sign in sheet.

A1.11 Drawing sheet C-100.

A1.12 Drawing sheet C-200

End of Addendum No. 1

C-100

JKB

JFS

N file no.

checked by drawn by consultant issue date index no.

contract order no.

71060 consultant job no.

17303.00 sheet title

472/17400.SMD

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

BID SET 02/14/2018

ADDENDUM #1 02/28/2018

FENCING AND GATES NOTES

GRADE

EXISTING "A"

FENCE

EXISTING SPOOLS,

TYP

x x x x x x x x x x x x x x x x x x x x x x x x x x

NEW DETAINER HOOK

RAZOR RIBBON w/ 12"

LOOP SPACING 36

APPROACH

1. ALL FABRIC, RAILS, POSTS, GATES AND FITTINGS SHALL BE HOT-DIPPED GALVANIZED

STEEL WITH ZINC COATING, UNLESS NOTED OTHERWISE. ALL FABRIC SHALL BE 2"

DIAMOND MESH.

2. ALL CHAIN LINK FENCE, GATE AND COMPONENTS SHALL HAVE GALVANIZED FINISH.

3. ALL FENCING TO BE KNUCKLED TOP AND BOTTOM.

4. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR ALL FENCING.

5. ALL FRAMES SHALL BE CONSTRUCTED IN SHOP. CONTRACTOR SHALL FIELD-MEASURE

POSTS PRIOR TO CONSTRUCTION.

6. ALL GATE FRAMES SHALL BE CONSTRUCTED WITH WELD CUPPED JOINTS (FISH MOUTH).

7. ALL WELDS SHALL BE CLEAN, UNIFORM, CONTINUOUS AND FREE OF RUST. GRIND

WELDS SMOOTH AND CLEAN PRIOR TO APPLICATION OF GALVANIZED FINISH.

11'-5"

4" DIA. GATE POST

1.660" TOP RAIL

1.660" MID RAIL

1.660" BOTTOM

RAIL

FINISHED GRADE

SCALE: N.T.S.

4" DIA. GATE

POSTNEW FENCE

SECTIONS

PER PLAN

HEIGHT TO MATCH ADJACENT FENCE

1'-0"

4'-0"

SCALE: N.T.S.

6" OF SOIL

WIRE TIES TO CONNECT

5/6" STEEL ROD TO PIER,

TYP.

CONCRETE FOOTING

TYP., 18" DIA.

6" DEEP MDOT 23A

CRUSHED LIMESTONE

5'-0"

FINISHED GRADE

13'-6"

EXISTING FENCE

NEW GATE

EXISTING RAZOR

RIBBON

ADD (1) ROW 31"

DETAINER HOOK

RAZOR RIBBON TO

NEW TRANSOM

ADD 30" DETAINER

HOOK RAZOR RIBBON

WITH 12" LOOP SPACING

ADD 30" DETAINER

HOOK RAZOR RIBBON

WITH 12" LOOP SPACING

30"30"

11' -5"

7'7'

SCALE: N.T.S.

EXISTING FENCE

SYSTEM, TYP

REMOVE ENTIRE

FENCE SYSTEM

AROUND C-UNIT

REMOVE EXISTING

FENCE SYSTEM TO

NEXT ROUND POST

EXISTING FENCE

SYSTEM, TYP

EXISTING ROUND

POST

NEW FENCE, SEE

DETAIL #2 ON C200

NEW ROUND COLUMN,

SEE DETAILS #2 AND #3

ON C200

TIE EXISTING FENCE

INTO NEW ROUND

COLUMN

10'-0"

REMOVE ENTIRE

FENCE SYSTEM

AROUND C-UNIT

REMOVE EXISTING

FENCE SYSTEM TO

NEXT ROUND POST

EXISTING ROUND

POST

EXISTING FENCE

SYSTEM

NEW FENCE, SEE

DETAIL #2 ON C200

EXISTING FENCE

SYSTEM, TYP

SCALE: N.T.S.

19'-3" x x x x x x x x x x x x x

ADD TRANSOM

ABOVE GATE

CANE BOLT LOCK FOR 12' WIDE GATES

12"

6"

18"

CANE BOLT IN

OPEN POSITION

CANE BOLT IN

CLOSED

POSITION

CANE BOLT

RES, WELDED

CONTINUOUSLY

1" DIA. STEEL

CANE BOLT

CANE BOLT

GUIDES, WELDED

CONTINOUSLY

STOP, WELDED

CONTINOUSLY

FINISHED F=GRADE

18" DIA. X24" DEEP

CONCRETE PIER

1 1/2" DIA. STEEL

PIPE EMBEDDED IN

CONCRETE

PROVIDE LOCKS - SEE

DETAIL #7 ON C200

C-200

JKB, CCR

JFS

file no.

checked by drawn by consultant issue date index no.

contract order no.

71060 consultant job no.

17303.00 sheet title

472/17400.SMD

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

BID SET 02/14/2018

ADDENDUM #1 02/28/2018

A-100

JKB

JFS

file no.

checked by drawn by consultant issue date index no.

contract order no.

71060 consultant job no.

17303.00 sheet title

472/17400.SMD

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

BID SET 02/14/2018

ADDENDUM #1 02/28/20181

Addendum No 1
SC368_1773618022816150
20180228_SAI_Addendum1