Addendum 01 ARFQ DEP24-70 Gray #1 Well Plugging Project.pdf
PDF 1 MB Posted
- Attached to
- Gray #1 Well Plugging Project API# 47-085-02485
- Solicitation number
- ARFQ 0313 DEP2400000070 2
- Issued by
- Randolph County, West Virginia
About this file
This document is Addendum 01 to ARFQ DEP24-70 for the Gray #1 Well Plugging Project issued by a state agency. The addendum serves to publish and distribute documentation to the vendor community and includes pre-bid conference sign-in sheets from two separate meetings held on 5/8/2024 and 6/8/2024. The project involves the plugging of a single well (API# 47-103-03628) and requires comprehensive scope of work including site preparation, well plugging operations, and site reclamation. Technical specifications enumerate 38 line items covering equipment, materials, and services necessary for project completion, including drilling rigs, casing, tubing, cement, waste disposal, and specialized tools such as power tongs, wireline services, and logging equipment. Vendors attending the pre-bid conferences were required to provide firm contact information, representative names, phone numbers, fax numbers, and email addresses to facilitate communication regarding bid updates and project details.
Vendors are required to acknowledge receipt of all addenda issued for this solicitation by completing and submitting an Addendum Acknowledgement Form with their bid submission, with failure to do so potentially resulting in bid disqualification. The addendum acknowledgement form provides checkboxes for addenda numbered 1 through 10, though only Addendum No. 1 was issued at the time of this document. The file does not specify pricing terms, contract award dates, contract duration, or funding sources. Vendors should note that only written addenda modifications are binding; verbal representations made during pre-bid conferences are not binding on the state agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AGENCY SOLICITATION NUMBER – ARFQ ______________
Addendum Number: ____
The Purpose of this addendum is to modify the solicitation identified as (“Agency Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid opening date and time
[ ] Modify specification of product or service being sought
[ ] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation:
This Addendum issued to publish and distribute the attached documentation to the vendor community.
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provision of the Agency Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Agency Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
PRE-BID CONFERENCE
SIGN IN SHEET
Request for Quotation Number:
Project Description:
ARFQ DEP24*70 Date:
Gray #1 Well Plugging Project
6/8/2024
PLEASE PRINT LEGIBLY. THIS INFORMATION IS ESSENTIAL TO CONTACT THE ATTENDEES IN A TIMELY MANNER. FAILURE TO DO SO
MAY RESULT IN DELAYS IN YOUR COMPANY GETTING IMPORTANT BID INFORMATION.
Firm Name:
Firm Address:
Represenative Attending:
Phone Number: s*C/lf'~ f Fax Number:
Email Address:
Signature:
Firm Name:
Firm Address:
^7 /w? M
3^
Represenative Attending:
Phone Number: 3 ̂ ̂ ^ ̂ S Y Fax Number: . , Email Address:
Signature
Firm Name:
Firm Address:
Represenative Attending:
Phone Number:
Fax Number:
Email Address:
3<.r>>
(T/N.
Signature:
Firm Name:
Firm Address:
Represenative Attending:
Phone Number:
Fax Number:
mail Address:
V;^\\
.2c2 SaiaaL— o" v\-p ̂ \rf U-1
/■roCrf'
WNCA^\- tj} ^
Signature:
IF POSSIBLE, PLEASE LEAVE A BUSINESS CARD
PRE-BID CONFERENCE
SIGN IN SHEET
Request for Quotation Number;
Project Description:
ARFQ DEP24*70 Date:
Gray #1 Well Plugging Project
5/8/2024
PLEASE PRINT LEGIBLY. THIS INFORMATION IS ESSENTIAL TO CONTACT THE ATTENDEES IN A TIMELY MANNER. FAILURE TO DO SO
MA Y RESULT IN DELA YS IN YOUR COMPANY GETTING IMPORTANT BID INFORMATION.
Firm Name:
Firm Address:
Cat (=ro C6>riP
^.Se>o3
Represenative Attending: ^ qJ) Kli £a ' ^9 c!^*Phone Number:
Fax Number:
Email Address: AoLCo^rt
Signature:
Firm Name:
Firm Address:
Represenative Attending:
Phone Number:
Fax Number:
Email Address:
^AV*.. \\a\\eJocwI
\«s\Vig .V>cm\A-
C3 .C/
Signature
Firm Name:
Firm Address:
Represenative Attending:
Phone Number:
Fax Number:
Email Address:
Signature:
Firm Name:
Firm Address:
Represenative Attending:
Phone Number:
Fax Number:
Email Address:
Signature:
IF POSSIBLE, PLEASE LEAVE A BUSINESS CARD
Revised 04/21/2021
ADDENDUM ACKNOWLEDGEMENT FORM
SOLICITATION NO.:
Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below. Failure to acknowledge addenda may result in bid disqualification.
Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.
Addendum Numbers Received:
(Check the box next to each addendum received)
[ ] Addendum No. 1 [ ] Addendum No. 6
[ ] Addendum No. 2 [ ] Addendum No. 7
[ ] Addendum No. 3 [ ] Addendum No. 8
[ ] Addendum No. 4 [ ] Addendum No. 9
[ ] Addendum No. 5 [ ] Addendum No. 10
I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid.
I further understand that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.
Company
Authorized Signature
Date
NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.
| ADDENDUM 01 ARFQ DEP24-45 JCR II Multi-Well Plugging Package.pdf |
| SKM_C450i24011815170.pdf |
| ADDENDUM 01 ARFQ DEP24-44 WILFONG MULTI-WELL PLUGGING PACKAGE.pdf |
| ADDENDUM 01 ARFQ DEP24-44 WILFONG MULTI-WELL PLUGGING PACKAGE.pdf |
| ADDENDUM 01 ARFQ DEP24-43 MESSER WELL PLUGGING PROJECT.pdf |
| Addendum # 1.pdf |
| Addendum Acknowledgement Form.pdf |
| Insert from: "AED1.pdf" |
| Table of Contents |
| I. PROJECT DESCRIPTION |
| 1.0 Location/Site Description |
| 1.1 API# 47-103-03628 |
2.0 Directions to pre-bid site:
| II. SCOPE OF WORK |
| III. GENERAL CONDITIONS |
| 1.0 Administrative |
| 2.0 Permitting |
| 3.0 Work |
| IV. PROJECT DESCRIPTION |
| 1.0 Site-based considerations: |
| 2.0 Well-specific considerations: |
| V. PROJECT WORK PLAN |
| Site Preparation Plan |
| Proposed Plugging Work Plan: |
| Site Reclamation Plan |
| VI. TECHNICAL SPECIFICATIONS |
| 1.0 Rig and Crew -Three (3) Man Crew (minimum) |
| 2.0 Mobilization & Demobilization |
| 3.0 Site Preparation |
| 3.5 Safety Barrier (Wall) |
| 4.0 Vacuum Water Truck |
| 5.0 Heavy Equipment |
| 6.0 Power Tongs |
| 7.0 Casing Knife/Ripper |
| 8.0 Casing and Tubing Purchase |
| 9.0 Casing, Tubing, and Pipe Rentals |
| 10.0 Tri-Cone Drill Bit |
| 11.0 Trash Pump |
| 12.0 On-Site Water Storage Container(s) |
| 13.0 Disposal of Gel |
| 14.0 Disposal of Liquid Waste |
| 15.0 Disposal of Solid Waste |
| 16.0 Aqua Gel |
| 17.0 Cement |
| 18.0 Gravel |
| 19.0 Steel Mud Pit |
| 20.0 Site Reclamation |
| 21.0 Monument |
| 22.0 Welder/Cutting Torch |
| 23.0 Oil Absorbent Supplies |
| 24.0 Sand Pump |
| 25.0 Cherry Picker |
| 26.0 Casing/Tubing Spear |
| 27.0 Overshot |
| 28.0 Impression Block |
| 29.0 Subs |
| 30.0 Power Swivel |
| 31.0 Concave Mill |
| 32.0 Mud/mixing pump |
| 33.0 Logging, Bond with CCL |
| 33.5 Wireline Shot/Perforation, Collar Buster |
| 34.0 Tie Mats |
| 35.0 Silt Fence |
| 36.0 Topsoil |
| 37.0 Culvert |
| 38.0 Temporary Air Bridge |
| VII. APPENDIX A – WELL RECORDS |
| 1.1 API# 47-103-00152 (Offset for API# 47-103-03628) |
Messer Pre-Bid Sign In.pdf
Wilfong Sign-in.pdf
Pre bid Sign in.pdf
| AGENCY SOLICITATION NUMBER ARFQ: DEP2400000070 |
| Addendum Number: 1 |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Yes |
| Check Box5: Off |
| Check Box6: Off |
| Text7: Addendum No. 1 is issued to publish and distribute the attached information to the Vendor community. |
1 .To Publish the Pre-bid sign in sheet
**No Other Changes**
| Solicitation Number: |
| Company_2: |
| Date_2: |
| Check Box38: Off |
| Check Box40: Off |
| Check Box41: Off |
| Check Box42: Off |
| Check Box43: Off |
| Check Box44: Off |
| Check Box45: Off |
| Check Box46: Off |
| Check Box47: Off |
| Check Box48: Off |
File details come from the government source that posted it. Updated .