Addendum 003 Prebid questions RRMM.pdf

PDF 1 MB Posted

Attached to
IFB 26016; James Wood High School - New Water Pump Station
Solicitation number
IFB-125195
Issued by
Fauquier County, Virginia

About this file

This is Addendum 003 to Invitation for Bid (IFB) 26016 for the James Wood High School New Water Pump Station project, issued by Frederick County Public Schools in Virginia on August 21, 2026. The addendum provides responses to three pre-bid questions submitted by prospective bidders regarding clarifications on the project scope, plans, and specifications. The project involves the complete installation of a below-grade water pump station, controls, emergency backup generator, and piping while maintaining the existing water system operational until the new system is tested and approved. The addendum addresses confusion regarding the CG-9B entrance scope, waterline designations on the plans, and electrical service options for the pump station.

Key clarifications provided in the addendum include confirmation that the CG-9B entrance is part of the scope of work to provide access to the pump station but should only disturb the curb and concrete gutter, not the asphalt roadway or areas outside the Limits of Disturbance. The response to the second question clarifies that only the new 12-inch waterline connected to the tee from the existing waterline and leading to the proposed pump station constitutes new work; all other waterlines shown are existing. For electrical service, the addendum states that Shenandoah Valley Electric Cooperative (SVEC) has not yet been contacted regarding preference between three pole-mounted single-phase transformers or a pad-mounted three-phase transformer, and bidders should base proposals on the higher-cost option (three pole-mounted transformers), with the electrical contractor to coordinate final selection with SVEC during installation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

James Wood New Water Pump Station

IFB 26016

Responses to Pre-bid questions Addendum 003 August 21, 2026

1. Question: Sheet CS3000 – Regarding the CG-9B entrance, the project plans depict the demolition of the new asphalt roadway and curb via the contour line changes. This portion is also well beyond the Limits of Disturbance. Additionally, the plans do not provide for and asphalt detail for the replacement of this roadway. Is this entrance still a part of the scope of work? If so, will you provide an asphalt detail for this project and clarification on if work is to be completed outside of the LOD?

Response: The entrance is a part of the scope of work in order to provide access to the pump station, however, the asphalt should not be disturbed. The contour lines shown in the darker color on sheet CS300 are existing contour lines from when the street was recently constructed. The contour lines are a darker color to show how the new entrance will be incorporated into the existing roadway. Since the entrance should only be disturbing the curb and concrete gutter there is no need to provide an asphalt detail. No work should occur outside of the limits of disturbance on sheet

CS3000.

2. Question: Sheets CS1000 and CS3000 – The plans shows light grey ink for existing waterline and darker black ink for new waterline/components. Sheet CS1000 “Existing Conditions” shows the waterline running parallel to Apple Pie Ridge Rd, the tee branch running to the storage tank, the wye branch running to the parking lot and the 90 bend running parallel to the parking lot, including two fire hydrants, as the “new” dark black ink color. However, all aforementioned waterlines are the light grey “existing” color on sheet CS3000. Please clarify what is existing and what is new.

Response: The only new and proposed waterline on this project is the waterline that is connected the tee from the waterline heading to the water tank and leads to the proposed pump station that then connects to the waterline heading to the school, see attached sheet. All of the waterlines seen on sheet CS1000 are existing. See attached plan

3. Question: Sheet E2 - Has there been any communication with the utility company?

Drawing E-2 shows (3) pole mounted transformers, has Shenandoah Valley Electric confirmed this is the course of action they would prefer? Is there a point of contact at SVEC that is familiar with this project?

Response: No, SVEC has not been contacted. To expedite these design drawings, we showed two options for service to the Pump Station. One option is (3) pole mounted single phase service transformers. The other option is for a pad mounted 3-phase service transformer. Electrical Contractor shall work with SVEC during installation to determine which option SVEC would prefer to install and then provide all materials and labor for that option. For this bidding process provide bid based on higher cost option.

PC 5+36.69

+0

11+00

+0

13+

20' FR

ED

ER

IC

K W

ATER

ESM

T

D

EED

: 220009853

FH

WV

FH

24"

WPP

WPP

DB 508 PG 593

0.23 AC.

ZONE RA

Dense Vegetation

EX

. 1

2" W

AT

ER

LIN

E

WATER TANK

(FREDERICK WATER OWNED)

20' FREDERICK WATER ESMT

DEED: 220009853

10+00

11+00

12+00

13+00

14+0014+07

CONNECTION (EX. WATER MAIN)

1 - CUT-IN TEE CONNECTION

CONTRACTOR SHALL COORDINATE SERVICE

INTERRUPTION AND CUT-IN WITH OWNER AND

FREDERICK WATER'S INSPECTOR

CONNECTION (EX. WATER MAIN)

1 - CUT-IN 45° BEND

CONTRACTOR SHALL COORDINATE SERVICE

INTERRUPTION AND CUT-IN WITH OWNER AND

FREDERICK WATER'S INSPECTOR

20' FREDERICK WATER ESMT

PR. WATERLINE - 12" CL-52 DIP

PR. W

ATERLINE - 12" CL-52 DIP

GATE VALVE (TYP.)

PROPOSED DIRECT BURY

BOOSTER PUMP LIMIT OF DISTURBANCE

DISTURBED AREA: 7665.04 SF

PUMP STATION, SEE MECHANICAL

PLANS, SHEET P-1 FOR DETAILS

GENERATOR PAD

PUMP EQUIPMENT PAD

TRANSFORMER PAD

PROPOSED WATER LINE

HORIZONTAL SCALE: 1" = 25'

VERTICAL SCALE: 1" = 2.5'

10+00 11+00 12+00 13+00 14+00

° B

EN

D

ST

A.

+5

° B

EN

D

ST

A.

+2

8.6

CU

T-I

N

CO

NN

EC

TIO

N

° B

EN

D

ST

A.

+8

1.5

° B

EN

D

ST

A.

+0

8.8

TE

E

- S

TA

. 1 2+

.73

TE

E

- S

TA

. 1 2+

.73

CU

T-I

N

CO

NN

EC

TIO

N

TE

E -

ST

A.

+2

48" MIN.

COVER (TYP.)

EX. GRADE

18" MIN.

CLEARANCE

GA

S

XI

NG

S

TA

. 1 1+

.31

PR. 12" CL-52 DIP WATER MAIN

PR

. 1

2" C

L-5 2 D

IP

W

AT

ER

M

AI

N

GA

S

XI

NG

S

TA

. 1 3+

.80

18" MIN.

CLEARANCE

880 LP

1+00

2+0

3+00

PC

1+

.12

PT 1+75.22

PC 2+01.39

PT 2+91.88

PC 3+08.60

R=200.00

R=100.00

FL

RIP RAP

876 87

2 884 88

2 88

4 88 6 88

LIMIT OF DISTURBANCE

DISTURBED AREA: 814.72 SF

REMOVE ±24 LF CURB

CG-9B

U:

\A cc ou nt s\R

RM

M

X\

RR

M M

X2

FC

PS

JW

HS

B oo ste r\D

ES

IG

N\ _S

HE

ET

S\ M

SP

\C

S3

0.

dw g

PL

OT

TE

D:

7/

/2

3:

P

M, B Y:

Jo hn

R ely ea

PL

OT

ST

YL

E:

Pe nn on i N

CS

.st b

BY

N

O

D

AT

E R

EV

IS

IO

N

S

RRMMX25002

AS NOTED

JPR

07-08-2026

DMBAPPROVED BY

DRAWN BY

DRAWING SCALE

DATE

PROJECT

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES

ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

PROJECT. THEY ARE NOT INTENDED OR REPRESENTED

TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON

THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION

OR ADAPTATION BY PENNONI ASSOCIATES FOR THE

SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS

SOLE RISK AND WITHOUT LIABILITY OR LEGAL

EXPOSURE TO PENNONI ASSOCIATES; AND OWNER

SHALL INDEMNIFY AND HOLD HARMLESS PENNONI

ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND

EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

AL

L

D

IM

EN

SI

O N

S M

U

ST

B E

VE

R

IF

IE

D B

Y C

O N

TR

AC

TO

R

AN

D

O W

N

ER

M U

ST

B

E N

O

TI

FI

ED

O F

AN

Y

D

IS

C R

EP

AN

C

IE

S

BE

FO

R

E

PR

O C

EE

D

IN

G

W

IT

H W

O R

K

PE

NN

O

NI

A

SS

O

CI

AT

ES

IN

C.

Ea st

P ic ca di lly S tre et

W in ch es te r, VA

T

0.

7.

F

0.

5.

00 25' 50'

GRAPHIC SCALE 1"=25'

ISSUED FOR REVIEW 07-08-2026

CS3000

TOTAL SHEETS 5

NORTH

-0 8-

FR

ED

ER

IC

K

CO

UN

TY

P

UB

LIC

S

CH

OO

LS

PO

B

OX

W

IN

CH

ES

TE

R, V

IR

GN

IA

JA

M

E S

W O

O D

H

IG

H S

C H

O O

L

1 A

PP

LE

P

IE

R

ID

GE

R D.

W

IN

CH

ES

TE

R, V

A.

| G

AI

NE

SB

OR

O

DI

ST

RI

CT

W

AT

ER

LI

NE

B

OO

ST

ER

P

UM

P

MI

NO

R

SI

TE

P

LA

N

GE

OM

ET

RI

C, G

RA

DI

NG

U

TI

LI

TY

P

LA

N

1. CONNECTIONS TO EXISTING MAIN SHALL BE CUT-IN BY CONTRACTOR.

2. CONNECTIONS TO EXISTING MAIN SHALL BE AS REQUIRED BY THE FREDERICK WATER

INSPECTOR. WATER SERVICE INTERRUPTION TO SCHOOL, WHILE CONNECTING

PROPOSED MAIN, SHALL BE COORDINATED WITH FCPS, FREDERICK WATER INSPECTOR,

AND THE FIRE MARSHAL.

3. CONNECTION ELEVATIONS TO EXISTING WATER MAINS BASED ON 4' MINIMUM ELEVATION

DEPTH AND BASED ON PREVIOUSLY APPROVED SITE PLAN #06-22, DATED APRIL 12, 2022.

CONTRACTOR TO VERIFY EXISTING ELEVATIONS.

4. NATURAL GAS LINE CROSSINGS ELEVATION BASED ON MINIMUM BURY DEPTH OF 3'.

CONTRACTOR TO VERIFY ELEVATION.

5. NEW 12" WATER MAIN SHALL BE SANITIZED AND TESTED IN ACCORDANCE WITH

FREDERICK WATER'S INSPECTOR PRIOR TO REMOVAL OF EXISTING MAIN.

6. RESTRAINED JOINTS SHALL BE UTILIZED IN ACCORDANCE WITH FREDERICK WATER'S

REQUIREMENTS.

7. EXISTING FREDERICK WATER FACILITIES SHALL BE REMOVED AND FURNISHED TO THE

FREDERICK WATER'S INSPECTOR AS REQUIRED.

Proposed Waterline

Existing Waterline

Existing Waterline