This document is an Addendum to an Invitation to Bid (ITB) for the Basin 2 Clamshell Dredging and Slope Repair project at the Port of Brookings Harbor in Brookings, Oregon. The project involves the maintenance, rehabilitation, replacement, and upgrade of the existing western embankment at the south basin of the Port of Brookings Harbor. The work includes excavation, clearing, placement of geogrid and rock, with a final embankment slope not to exceed 1.5:1. The addendum provides clarification on the approximate bill of materials quantities for the west and east embankments. No bid closing date is provided, but the original ITB was dated July 24, 2024.
The project specifications outline the requirements for the rock materials, including AASHTO and ODOT standards, placement methods, and slope stabilization. Erosion, sedimentation, and pollution control measures are also detailed, including requirements for heavy equipment use, site preparation, and in-water work. Estimated project quantities and the local funding source are provided, but no pricing terms or incumbent information is included.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Port of Brookings Harbor This Institution is an Equal Opportunity Provider
16330 Lower Harbor Road ● P.O. Box 848 ● Brookings Oregon 97415
(541)469-2218 ● (541)359-3999 ● www.portofbrookingsharbor.com ● info@portofbrookingsharbor.com
Project Name: Basin 2 Clamshell Dredging and Slope Repair
ADDENDUM NO. 1
The original ITB dated July 24, 2024, is hereby supplemented by this Addendum No. 1 dated August 15, 2024.
CLARIFICATIONS
1. Basin 2 Embankment Rock Reconstruction Drawing C5.0. Approximate bill of materials quantities for west embankment, based on existing topo and approximations of final grades.
Contractor to verify.
2. Basin 2 Embankment Rock Reconstruction Drawing C6.0. Approximate bill of materials quantities for east embankment, based on existing topo and approximations of final grades.
Contractor to verify.
END OF ADDENDUM NO. 1
http://www.portofbrookingsharbor.com/
GRAVEL OR
CONCRETE PAVING
LAN
D
SC
APE
O U
TD
O
O R
STO
R
AG
E
O U
TD
O
O R
STO
R
AG
E
PROJECT DESCRIPTION
TITLE: EMBANKMENT ROCK RECONSTRUCTION
REFERENCE: 113
LOCATION: BOAT BASIN ROAD
TAX LOT(S): 1400, 1300, 401
NATURAL FEATURES
EXISTING NATURAL RESOURCES OR NATURAL HAZARDS ON THE SUBJECT
PROPERTY, INCLUDING WETLANDS, STREAMS, RIPARIAN AREAS, FLOOD PLAINS, OR
FLOODWAYS TO BE DETERMINED BY ENGINEER
EXISTING TREE CANOPY
THERE IS LOW STORY SHRUBBERY/VEGETATION ON THE SUBJECT PROPERTY
CULTURAL RESOURCES
LOCALLY, OR FEDERALLY DESIGNATED HISTORIC AND/OR CULTURAL RESOURCES
ON THE SITE OR ON ADJACENT PARCELS TO BE DETERMINED BY ENGINEER.
PUBLIC SERVICES
PUBLIC UTILITY SERVICES, INCLUDING WATER, SEWER, STORM DRAINAGE, POWER,
TELEPHONE, CABLE INTERNET, AND GAS ARE AVAILABLE TO THE SUBJECT
PROPERTY.
UTILITY STATEMENT
EXISTING UNDERGROUND UTILITIES ILLUSTRATED IN THESE PLANS ARE
APPROXIMATED BASED ON MAPS OBTAINED FROM CURRY COUNTY GIS ELEVATIONS
ESTIMATES, OR HAVE BEEN LOCATED BY A UTILITY LOCATE COMPANY. LAYOUT
INDICATED IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. ALL LINES
WITHIN PROJECTED WORK ZONE SHALL BE FIELD VERIFIED AS REQUIRED PRIOR TO
CONSTRUCTION.
1. DEQ 1200-C PERMIT IS NOT REQUIRED.
2. UNLESS DIRECTED OTHERWISE, REMOVE CLEARED AND GRUBBED MATERIAL FROM
THE SITE AND DISPOSE AT AN APPROVED LOCATION.
3. PRIOR TO THE START OF CONSTRUCTION, VERIFY GRADES AT SAWCUT LOCATIONS
AND MATCHING OF EXISTING GRADE LOCATIONS.
4. MINIMIZE TRAFFIC ON SOIL AREAS DURING WET WEATHER. IF THE SITE SOILS ARE
EXPOSED DURING WET WEATHER, THE USE OF CRUSHED ROCK PLACED AS
ENGINEERED FILL IN THE BOTTOM OF THE EXCAVATIONS MAY BE NECESSARY TO
PROTECT THE SUBGRADE. TAKE ALL PRECAUTIONS TO LIMIT SURFACE
DISTURBANCE AND PROTECT THE SITE GRADING AREA FROM EROSION AND
RUNOFF. AVOID DISTURBANCE OF EXISTING SOIL STRUCTURE.
5. UNLESS OTHERWISE NOTED, THE SAMPLING AND TESTING OF MATERIALS FOR USE
ON THE JOBSITE SHALL BE AT THE EXPENSE OF THE CONTRACTOR. ALL TESTING OF
MATERIALS AND WORKMANSHIP SHALL BE PERFORMED BY A CERTIFIED
INDEPENDENT TESTER. RESULTS OF THE TESTS SHALL BE SENT DIRECTLY TO THE
PROJECT ENGINEER AS WELL AS THE CONTRACTOR, BY THE LABORATORY.
LOCATION AND FREQUENCY OF TESTS SHALL BE DESIGNATED BY THE GENERAL
CONTRACTOR.
6. ALL CUT AND FILL SLOPES SHALL BE MAXIMUM OF 1.5:1.
PROJECT OVERVIEW
GEOTEXTILE
COVER
SHEET
C1.0
BANK RECONSTRUCTION
SHEET INDEX
C1.0 COVER SHEET - NOTES
C1.1 GENERAL NOTES
C2.1 EXISTING EMBANKMENT PHOTOS
C5.0 WEST EMBANKMENT DETAILS
C6.0 EAST EMBANKMENT DETAILS
DATE SET DESCRIPTION
PRELIMINARY - REVIEW 50% SUBMITTAL
PRELIMINARY - REVIEW 90% SUBMITTAL
RECORD DRAWINGS
PORT OF BROOKINGS - HARBOR
BASIN 2 EMBANKMENT ROCK RECONSTRUCTION
PROJECT ENGINEER
EMC ENGINEERS / SCIENTISTS
450 CONESTOGA DRIVE
JACKSONVILLE, OR 97530
(541) 261-9929
CONTACT: JACK AKIN, P.E.
STORMWATER PLAN & 25% CD
CALL BEFORE YOU DIG!
08/14/2024
CONSTRUCTION DOCUMENTS SUBMITTAL SET
REVIEW & APPROVED
BY ENGINEER
X X X
BY
R
EV
IS
IO
N S
P R E
LI
M
IN
A R Y
DRAWN BY:
BA
SI
N
EM
BA
NK
M
EN
T
RO
CK
R
EC
ON
ST
RU
CT
IO
N
0 L
OW
ER
H
AR
BO
R
RO
AD
, B
RO
OK
IN
GS
, O R
PO
RT
O
F B
RO
OK
IN
GS
H
AR
BO
R
DATE:
JOB No:
SHEET No:
CD/JW
14 AUG 2024
022-2203
NOT FOR C
ONSTRUCTIO
N
PROJECT NOTES
GENERAL GRADING NOTES
Low er H arbor R oad
Boat Basin Road
BASIN #2
X
AGENCY APPROVED BY DATE
POWER
DOMESTIC WATER
SANITARY SEWER
STORM DRAINAGE
STREETS
ENGINEERING
COOS-CURRY ELECTRIC
HARBOR SANITARY
CURRY COUNTY
PORT OF BROOKINGS HARBOR
CONSTRUCTION AUTHORIZED TO PROCEED IN ACCORDANCE WITH
APPROVED PLANS WHEN ALL PERMITS HAVE BEEN ISSUED AND
PRE-CONSTRUCTION MEETING HAS CONCLUDED.
BY TITLE DATE
HARBOR WATER DISTRICT
CURRY COUNTY
1. CONTRACTOR IS RESPONSIBLE FOR SCHEDULING ALL TESTING,
INSPECTIONS, AND SPECIAL INSPECTIONS, AND SPECIAL INSPECTIONS AS
REQUIRED BY PROJECT ENGINEER, CURRENT BUILDING CODES, OR
JURISDICTIONS HAVING AUTHORITY. ALL TESTING MUST BE COMPLETED AND
APPROVED PRIOR TO SUBSEQUENT WORK. ADDITIONAL OR FREQUENT
TESTS MAY BE REQUIRED BY AGENCY, BUILDING OFFICIAL OR ENGINEER.
2. TESTING MUST BE PERFORMED BY AN APPROVED INDEPENDENT TESTING
LABORATORY RETAINED BY THE CONTRACTOR.
3. THE APPROVED INDEPENDENT LABORATORY SHALL PROVIDE
CLARIFICATION STAMPED BY AN ENGINEER LICENSED IN THE STATE OF
OREGON THAT ALL ENGINEERED FILLS ARE PLACED IN ACCORDANCE WITH
THE CONTRACT DRAWINGS AND DOCUMENTS.
INSPECTION AND TESTING NOTES
BANK RECONSTRUCTION
AutoCAD SHX Text
SITE
AutoCAD SHX Text
CARPENTERVILLE RD.
AutoCAD SHX Text
PACIFIC OCEAN
AutoCAD SHX Text
COVE
AutoCAD SHX Text
CHETCO
AutoCAD SHX Text
POINT
AutoCAD SHX Text
TANBARK
AutoCAD SHX Text
COVE
AutoCAD SHX Text
MACKLYN
AutoCAD SHX Text
POINT
AutoCAD SHX Text
CHETCO
AutoCAD SHX Text
EASY STREET
AutoCAD SHX Text
PARK
AutoCAD SHX Text
AZALEA
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
CHETCO
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
OLD
AutoCAD SHX Text
STATE PARK
AutoCAD SHX Text
HARRIS BEACH
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
BIRD
AutoCAD SHX Text
AIRPORT
AutoCAD SHX Text
BROOKINGS
AutoCAD SHX Text
CITY OF BROOKINGS
AutoCAD SHX Text
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
DAWSON RD
AutoCAD SHX Text
BASIN #1
AutoCAD SHX Text
BASIN #2
AutoCAD SHX Text
AutoCAD SHX Text
42,650 PE
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
RENEWAL DATE: 12/31/25
1. EMBANKMENT CONSTRUCTION SHALL INCLUDE PREPARATION OF THE AREAS UPON WHICH EMBANKMENTS ARE PLACED, THE PLACEMENT AND COMPACTION OF APPROVED EMBANKMENT MATERIALS AND FILLING OF HOLES, PITS AND OTHER DEPRESSIONS WITHIN THE SUBJECT AREA.
2. THE CONTRACTOR SHALL PLACE EMBANKMENTS AND FILLS IN THE HORIZONTAL LAYERS AS SPECIFIED AND COMPACT EACH LAYER TO THE DENSITY SPECIFIED.
3. EMBANKMENT SHALL NOT BE CONSTRUCTED WHEN THE EMBANKMENT MATERIAL OR THE FOUNDATION ON WHICH THE EMBANKMENT WOULD BE PLACED IS FROZEN.
4. IMMEDIATELY PRIOR TO COMPLETION OF THE EARTHWORK, THE CONTRACTOR SHALL CLEAN THE ENTIRE WORK AREA OF DEBRIS AND FOREIGN MATTER.
5. THE MAXIMUM DENSITY OF COMPACTED MATERIAL WILL BE DETERMINED BY AASHTO T-99
6. THE CONTRACTOR SHALL COMPACT ALL EMBANKMENTS, FILLS AND BACKFILLS TO A MINIMUM IN PLACE DENSITY OF 95 PRESENT.
7. THE CONTRACTOR SHALL WATER THE MATERIALS TO PROVIDE OPTIMUM MOISTURE FOR COMPACTION OF EMBANKMENT AND BACKFILLS. EMBANKMENTS OF
BACKFILL MATERIALS SHALL NOT BE PLACED IN FINAL POSITION UNTIL MOISTURE IN EXCESS OF OPTIMUM MOISTURE HAS BEEN REMOVED.
8. IF THE SPECIFIED COMPACTION IS NOT OBTAINED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER. THE CONTRACTOR MAY BE REQUIRED TO USE A MODIFIED
COMPACTION PROCEDURE OR APPLY ADDITIONAL COMPACTIVE EFFORT. IF APPROVED MATERIALS MEETING THE SPECIFICATIONS CANNOT BE COMPACTED TO THE REQUIRED DENSITY REGARDLESS OF COMPACTIVE EFFORT OR METHOD, THE ENGINEER MAY REDUCE THE REQUIRED DENSITY OR DIRECT THE USE OF ALTERNATE MATERIALS. IN NO CASE SHALL EARTHWORK OPERATIONS PROCEED UNTIL THE CONTRACTOR IS ABLE TO COMPACT THE MATERIAL TO THE SATISFACTION OF THE
ENGINEER.
9. DEQ 1200-C PERMIT IS NOT REQUIRED.
10. UNLESS DIRECTED OTHERWISE, REMOVE CLEARED AND GRUBBED MATERIAL FROM THE SITE AND DISPOSE AT AN APPROVED LOCATION.
11. UNLESS OTHERWISE NOTED, THE SAMPLING AND TESTING OF MATERIALS FOR USE ON THE JOBSITE SHALL BE AT THE EXPENSE OF THE CONTRACTOR. ALL TESTING
OF MATERIALS AND WORKMANSHIP SHALL BE PERFORMED BY A CERTIFIED INDEPENDENT TESTER. RESULTS OF THE TESTS SHALL BE SENT DIRECTLY TO THE PROJECT ENGINEER AS WELL AS THE CONTRACTOR, BY THE LABORATORY. LOCATION AND FREQUENCY OF TESTS SHALL BE DESIGNATED BY THE GENERAL
CONTRACTOR.
12. ALL CUT AND FILL SLOPES SHALL BE MAXIMUM OF 1.5:1.
13. PRIOR TO THE CONSTRUCTION OF EMBANKMENTS, THE CONTRACTOR SHALL EXCAVATE UNSUITABLE FOUNDATION MATERIAL. VOIDS, TRENCHES AND HOLES ENCOUNTERED WITHIN EMBANKMENT LIMITS SHALL BE FILLED WITH APPROVED MATERIAL. PRIOR TO BACKFILLING THE CONTRACTOR SHALL BREAK CONCRETE (IF APPLICABLE) AS DIRECTED. THE CONTRACTOR SHALL BREAK UP AND ROUGHEN THE GROUND SURFACE BEFORE EMBANKMENTS MATERIAL IS PLACED. THE NATURAL GROUND UNDERLYING EMBANKMENTS SHALL BE COMPACTED TO THE DENSITY SPECIFIED FOR THE EMBANKMENT MATERIALS TO BE PLACED.
GEOTECHNICAL NOTE
THE CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES WITH THE PROJECT ENGINEER FOR REQUIRED REMEDIATION. THE CONTRACTOR SHALL COORDINATE WITH THE PROJECT ENGINEER FOR REQUIRED SITE OBSERVATIONS AND TESTING OF ALL FILLS.
THESE NOTES ARE INTENDED FOR USE IN INTERPRETING AND IMPLEMENTING THE TASKS SHOWN ON THE FOLLOWING CONSTRUCTION PLANS AND SPECIFICATIONS SHEETS.
THESE ARE IN ADDITION TO THE OVERALL PROJECT SPECIFICATION AND BID DOCUMENTS AND CONTRACTUAL ITEMS.
1. THESE ARE INTENDED FOR THE USE OF THE GENERAL CONTRACTOR AND HIS/HER SUBCONTRACTORS IN THE DEMOLITION AND RECONSTRUCTION OF THE SUBJECT AREA OF THE PORT OF BROOKINGS HARBOR. USE FOR OTHER PURPOSES OR AT OTHER SITES IS NOT RECOMMENDED AND IS
ACCOMPLISHED AT THE SOLE RISK OF THE USER.
2. THESE ITEMS ARE TO BE USED AS A SUPPLEMENT TO THE DETAILS PROVIDED ON THE PLAN SHEETS AND SPECIFICATION PAGES. ANY DISCREPANCIES FOUND AMONG THE DRAWINGS, THE SPECIFICATIONS, REFERENCED REPORTS, THESE GENERAL NOTES AND OTHER ITEMS LISTED ON THIS SHEET AND THE SITE CONDITIONS SHALL BE REPORTED TO THE ENGINEER, WHO SHALL CORRECT SUCH DISCREPANCY IN WRITING. ANY WORK DONE BY THE GENERAL CONTRACTOR AFTER DISCOVERY OF SUCH DISCREPANCY SHALL BE DONE AT THE GENERAL CONTRACTOR’S RISK. THE GENERAL CONTRACTOR SHALL VERIFY AND COORDINATE DIMENSIONS AMONG ALL
DRAWINGS PRIOR TO PROCEEDING WITH ANY WORK.
3. THE EMBANKMENT REPAIR HAS BEEN DESIGNED TO RESIST ANTICIPATED VERTICAL AND LATERAL FORCES AFTER THE CONSTRUCTION OF ALL STRUCTURAL ELEMENTS HAS BEEN COMPLETED. STABILITY OF THE STRUCTURE AND SLOPE AREAS PRIOR TO COMPLETION IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THIS RESPONSIBILITY INCLUDES, BUT IS NOT LIMITED TO JOBSITE SAFETY, CONSTRUCTION MEANS, METHODS, AND SEQUENCES, TEMPORARY SHORING, SLOPE STABILITY, FORMWORK AND BRACING, USE OF EQUIPMENT AND CONSTRUCTION PROCEDURES.
4. CONSTRUCTION OBSERVATION BY THE ENGINEER IS FOR CHECKING FOR CONFORMANCE WITH DESIGN ASPECTS ONLY AND IS NOT INTENDED IN ANY WAY TO REVIEW AND/OR APPROVE THE GENERAL CONTRACTOR’S CONSTRUCTION PROCEDURES OR RELIEVE THE CONTRACTOR FROM PROVIDING A COMPLETED PROJECT, CONSISTENT WITH THE PLANS AND SPECIFICATIONS AND GOOD CONSTRUCTION PRACTICES. SPECIAL INSPECTION BY THE ENGINEER DOES NOT PROVIDE A CERTIFICATION OF THE PROJECT OR RELIEVE THE CONTRACTOR OF ALL RESPONSIBILITY FOR A PROPERLY CONSTRUCTED PROJECT.
STANDARDS USED FOR DESIGN
1. ALL METHODS, MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE PLANS AND SPECIFICATIONS AND ODOT STANDARD SPECIFICATIONS, UNLESS ELSEWHERE
HEREIN SPECIFIED OTHERWISE. INTERNATIONAL BUILDING CODE (IBC) 2021; 2019 OREGON STRUCTURE SPECIALTY CODE (OSSC); AMERICAN SOCIETY OF CIVIL
ENGINEERS (ASCE)
OTHER NOTES
1. JOBSITE SAFETY IS THE RESPONSIBILITY OF THE CONTRACTOR.
2. ALL PRODUCTS AND WORKMANSHIP SHALL BE NEW MATERIALS OF GOOD QUALITY, ACCEPTABLE FOR THIS TYPE OF CONSTRUCTION. WORK TO BE ACCOMPLISHED IN A
GOOD AND WORKMANLIKE MANNER.
3. ALL MATERIALS TO BE SHIPPED, HANDLED AND STOCKPILED IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS AND GOOD CONSTRUCTION PRACTICES.
4. LOCATIONS MUST BE VERIFIED AT THE SITE WITH THE ENGINEER AND THE PORT OF BROOKINGS HARBOR REPRESENTATIVE PRIOR TO PLACEMENT.
5. ABIDE BY LOCAL, STATE AND FEDERAL BUILDING ORDINANCES, INCLUDING ALL SAFETY REQUIREMENTS, IN ALL PHASES OF THE PROJECT.
6. ALL PHASES OF THE PROJECT ARE TO CONFORM TO THE PLANS AND SPECIFICATIONS ATTACHED HERETO AND SPECIFICATIONS PROVIDED BY THE OWNER AND THE
ENGINEER-OF-RECORD.
7. PROPOSED CHANGES TO PROJECT PLANS AND SPECIFICATIONS MUST BE APPROVED BY THE DESIGNER PRIOR TO ACCEPTANCE AND IMPLEMENTATION AT THE SITE.
8. PROPOSED CHANGES MUST BE SUBMITTED IN WRITING FOR REVIEW AND APPROVAL/DISAPPROVAL BY THE DESIGNER AND THE OWNER.
9. IN NO CASE SHALL CHANGES, SUBSTITUTIONS OR OMISSIONS BE MADE TO THE DESIGN OR MATERIALS WITHOUT THE WRITTEN AUTHORIZATION OF THE DESIGNER AND
THE OWNER.
10. AUTHORIZATION OF A DESIGN CHANGE BY THE ENGINEER DOES NOT CONSTITUTE ACCEPTANCE BY THE PORT OF BROOKINGS HARBOR, NOR DOES IT AUTHORIZE
ADDITIONAL FUNDS FOR THE CHANGES. THE PORT’S REPRESENTATIVE MUST AUTHORIZE IN WRITING THE DESIGN CHANGE AND APPLICABLE CHANGES IN THE CONTRACT AMOUNT AND/OR CONSTRUCTION TIME PERIOD PRIOR TO IMPLEMENTATION OF SUCH CHANGES.
11. PROJECT SCHEDULE AND GENERAL SEQUENCING OF ALL WORK MUST BE REVIEWED AND APPROVED BY THE DESIGN ENGINEER AND THE OWNER. SUCH APPROVAL DOES NOT RELIEVE THE CONTRACTOR OR HIS/HER SUBCONTRACTORS OF ALL RESPONSIBILITIES FOR PROPER EXECUTION OF THE SUBJECT PROJECT CONSTRUCTION.
12. SEQUENCING OF TASKS THAT REQUIRES VARYING THE INSTALLED SIZES OF PROJECT MATERIALS MUST BE REVIEWED AND APPROVED BY THE DESIGN ENGINEER AND
OWNER.
13. TRAFFIC CONTROL AND SIGNAGE MUST BE PROVIDED BY THE CONTRACTOR UNLESS OTHERWISE SO STATED IN THE CONTRACT. ACCESS TO THE US COAST GUARD
FACILITIES MUST BE MAINTAINED DURING CONSTRUCTION.
14. CONTRACTOR MUST UNDERSTAND THAT THE PROJECT SITE IS IN A HARBOR AREA SUBJECT TO TIDAL FLUCTUATIONS. THEREFORE, SEQUENCING AND PROJECT WORK
MUST TAKE INTO ACCOUNT EFFECTS OF HIGH AND LOW TIDES.
15. REPLACEMENT OF SPECIFIED PRODUCTS BY AN “EQUIVALENT” PRODUCT MUST BE APPROVED BY THE DESIGN ENGINEER AND THE OWNER. REDESIGN REQUIRED FOR
USE OF ALTERNATE “EQUIVALENT” MATERIALS IS TO BE BORNE BY THE CONTRACTOR.
1. PROJECT/PURPOSE - WITH THE PURPOSE OF MAINTAINING, REHABILITATING, REPLACING, AND UPGRADING THE EXISTING WESTERN EMBANKMENT AT THE SOUTH BASIN OF PORT OF BROOKINGS HARBOR. FINAL DESIRABLE SLOPE IS NOT TO EXCEED 1.5:1. BASE ROCK WILL BE PRESSED INTO MUDLINE APPROXIMATELY 2' INTO THE EMBANKMENT (TO ABOUT 0.0' MLLW), THENCE PLACED UPSLOPE, WITH BEGINNING THICKNESS OF ABOUT 4 - 5', TAPERING TO UP TO 2' THICKNESS AT
ABOUT 12' MLLW. AGGREGATE WILL BE PLACED ON REST OF THE SLOPE.
2. CONTRACTOR ACTIVITIES - CONTRACTOR ACTIVITIES ARE DESCRIBED AS EXCAVATION AND CLEARING USING EXCAVATOR/CRANE & BUCKET. EXCAVATION AND SPREADING AT THE BASE OF THE SLOPE USING A LONG REACH EXCAVATOR OR CRANE/BUCKET. PLACEMENT OF GEOGRID TO +12' MLLW, & THENCE UPSLOPE WITH 2'-3" MINUS TO TOP OF SLOPE. ODOT 2000 ROCK TO BE DONE PER DRAWING DETAIL FROM BASE ROCK UP TO +12' MLLW.
3. SOIL DISTURBING ACTIVITIES - EXCAVATION WILL BE LIMITED TO EXISTING MARINA EDGES
4. NON-STORMWATER DISCHARGES - NO DEWATERING, WATER-LINE FLUSHING, PAVEMENT WASH WATERS OR IRRIGATION WATER DISCHARGES ARE PLANNED FOR
THIS PROJECT.
5. ESTIMATED START DATE FOR CONSTRUCTION - TO BE DETERMINED
6. NEAREST SURFACE WATER BODIES - PORT OF BROOKINGS ICE HOUSE INLET IN BASIN 2 (SOUTH BASIN) AND BASIN 1, NEAR DOCK A (NORTH BASIN).
7. RECEIVING WATERS - PACIFIC OCEAN
8. SPECIAL ENVIRONMENTAL CONSIDERATIONS - SEE NOTE 10
9. DESIGNATED EPCM - THE DESIGNATED EROSION AND POLLUTION CONTROL MANAGER (EPCM) WHO WILL ASSURE COMPLIANCE WITH ALL ITEMS IN THIS PLAN IS
TBD.
10. EROSION, SEDIMENTATION AND POLLUTION CONTROL BMPS - BEST MANAGEMENT PRACTICES (BMP) TO BE USED, WHEN APPLICABLE, TO PREVENT POLLUTION
RELATED TO CONTRACTOR ACTIVITIES LISTED IN THIS SECTION ARE AS FOLLOWS: A) OFFSITE VEHICLE TRACKING AND DUST PREVENTION - MEASURES WILL BE TAKEN TO PREVENT OFFSITE TRACKING OF MATERIALS, INCLUDING SWEEPING PAVEMENTS, COVERING LOADS AND WETTING SOIL TO PREVENT DUST. B) MATERIAL MANAGEMENT AND SPILL PREVENTION - ALL ON SITE FUELS WILL BE DELIVERED, HANDLED, STORED, USED, AND APPLIED SO AS NOT TO BE RELEASED INTO THE WATERS OF THE STATE/US. FUELING WILL BE ACCOMPLISHED AWAY FROM THE WORK AREA A SPILL CLEANUP KIT WILL BE AVAILABLE IF DEEMED BY THE EPCM TO BE REQUIRED. C) WASTE MANAGEMENT - HANDLING, STORAGE AND DISPOSAL OF SOLID WASTE AND/OR HAZARDOUS WASTE WILL BE DISPOSED INTO SUITABLE LANDFILL OFFSITE, UNLESS WASTE CAN BE BENEFICIALLY USED, AS DETERMINED BY PORT MANAGEMENT AND/OR THE ENGINEER. D) INSPECTION AND MAINTENANCE - DAILY INSPECTION AND MAINTENANCE FOR ALL CONTROLS INCLUDED IN THE POLLUTION CONTROL PLAN AND THE ESCP WILL BE PERFORMED BY THE EPCM OR HIS DESIGNEE. E) EMPLOYEE AND SUBCONTRACTOR TRAINING - EMPLOYEE AND SUBCONTRACTOR EDUCATION AT A MINIMUM WILL INCLUDES INFORMING PERSONNEL OF THE POSTED LOCATIONS OF THE POLLUTION CONTROL PLAN/EROSION AND SEDIMENT CONTROL PLAN/MSDS'S AND IMPORTANT EMERGENCY PHONE NUMBERS. EDUCATION WILL ALSO INCLUDE INFORMING PERSONNEL OF REVISED MATERIAL MANAGEMENT PROCEDURES FOLLOWING A SPILL F) (CRITERIA 15) PRECONSTRUCTION ACTIVITY - BEFORE ALTERATION OF THE ACTION AREA, FLAG THE BOUNDARIES OF CLEARING LIMITS ASSOCIATED WITH SITE ACCESS AND CONSTRUCTION TO MINIMIZE SOIL AND VEGETATION DISTURBANCE, AND ENSURE THAT ALL TEMPORARY EROSION CONTROLS ARE IN PLACE AND FUNCTIONAL. G) (CRITERIA 16) SITE PREPARATION - DURING SITE PREPARATION, CONSERVE NATIVE MATERIALS FOR RESTORATION, INCLUDING LARGE WOOD, VEGETATION, TOPSOIL AND CHANNEL MATERIALS (GRAVEL, COBBLE AND BOULDERS) DISPLACED BY CONSTRUCTION. WHENEVER PRACTICAL, LEAVE NATIVE MATERIALS WHERE THEY ARE FOUND AND IN AREAS TO BE CLEARED, CLIP VEGETATION AT GROUND LEVEL TO RETAIN ROOT MASS AND ENCOURAGE REESTABLISHMENT OF NATIVE VEGETATION. BUILDING AND RELATED STRUCTURES MAY NOT BE CONSTRUCTED INSIDE THE RIPARIAN MANAGEMENT AREA H) (CRITERIA 17) HEAVY EQUIPMENT - HEAVY EQUIPMENT WILL BE SELECTED AND OPERATED AS NECESSARY TO MINIMIZE ADVERSE EFFECTS ON THE ENVIRONMENT; AND ALL VEHICLES AND OTHER HEAVY EQUIPMENT WILL BE USED AS
FOLLOWS:
(A.) STORED, FUELED AND MAINTAINED IN A VEHICLE STAGING AREA PLACED 150 FEET OR MORE FROM ANY WATER BODY, OR IN AN ISOLATED HARD
ZONE SUCH AS A PAVED PARKING LOT.
(B.) INSPECTED DAILY FOR FLUID LEAKS BEFORE LEAVING THE VEHICLE STAGING AREA FOR OPERATION WITHIN 50 FEET OF ANY WATER BODY.
(C.) STEAM-CLEANED BEFORE OPERATION BELOW ORDINARY HIGH WATER, AND AS OFTEN AS NECESSARY DURING OPERATION TO REMAIN FREE OF ALL
EXTERNAL OIL, GREASE, MUD, SEEDS, ORGANISMS AND OTHER VISIBLE CONTAMINANTS.
(D.) GENERATORS, CRANES AND ANY OTHER STATIONARY EQUIPMENT OPERATED WITHIN 150 FEET OF ANY WATER BODY WILL BE MAINTAINED AND PROTECTED AS NECESSARY TO PREVENT LEAKS AND SPILLS FROM ENTERING THE WATER I) (CRITERIA 18)
IN-WATER WORK PERIOD -
ALL WORK WITHIN THE ACTIVE CHANNEL WILL BE COMPLETED IN ACCORDANCE WITH THE OREGON GUIDELINES FOR TIMING OF IN-WATER WORK TO PROTECT FISH
AND WILDLIFE RESOURCES (ODFW 2000, OR THE MOST RECENT VERSION).
J) (CRITERIA 21) EMBANKMENT INSTALLATION -
<TBC>
K) (CRITERIA 24) SUBGRADE PREPARATION -
<TBC>
GENERAL
NOTES
C1.1
BY
R
EV
IS
IO
N S
P R E
LI
M
IN
A R Y
DRAWN BY:
BA
SI
N
EM
BA
NK
M
EN
T
RO
CK
R
EC
ON
ST
RU
CT
IO
N
0 L
OW
ER
H
AR
BO
R
RO
AD
, B
RO
OK
IN
GS
, O R
PO
RT
O
F B
RO
OK
IN
GS
H
AR
BO
R
DATE:
JOB No:
SHEET No:
CD/JW
14 AUG 2024
022-2203
NOT FOR C
ONSTRUCTIO
N
GENERAL NOTES
GRADING NOTES
EROSION, SEDIMENTATION & POLLUTION CONTROL PLAN NOTES
AutoCAD SHX Text
42,650 PE
AutoCAD SHX Text
OREGON
EXISTING EMBANKMENT PHOTOS
NO SCALE
EXISTING
PHOTOS
C2.1
BY
R
EV
IS
IO
N S
P R E
LI
M
IN
A R Y
DRAWN BY:
BA
SI
N
EM
BA
NK
M
EN
T
RO
CK
R
EC
ON
ST
RU
CT
IO
N
0 L
OW
ER
H
AR
BO
R
RO
AD
, B
RO
OK
IN
GS
, O R
PO
RT
O
F B
RO
OK
IN
GS
H
AR
BO
R
DATE:
JOB No:
SHEET No:
CD/JW
14 AUG 2024
022-2203
NOT FOR C
ONSTRUCTIO
N
EMBANKMENT
AutoCAD SHX Text
42,650 PE
AutoCAD SHX Text
OREGON
1+00
1+50
2+00
2+50
3+00
3+50
-1.5:1
-1.5:1
TYP.
-1.5:1
TYP.
-1.5:1
TYP.
-20
-10
-20
-10
1.5
+12' MLLW
MUDLINE
TYPICAL
(VARIES)
+7.5' HTL
(2) 2500#-3000#
ANGULAR ROCK
(PLACEMENT A SHOWN)
EXISTING SLOPE -
VARIES
FILTER FABRIC WRAPS ROCK AT
BOTTOM AND ROCK AT TOP TO +12' MLLW
EXISTING TOE OF SLOPE
IN SOME LOCATIONS REQUIRES
2000-3000# ROCK TO BE LOCATED
FURTHER FROM TOE TO ACHIEVE
1.5:1 SLOPE (PLACEMENT B)
Note:
Engineer & Contractor to determine if placement A, placement B or both are required.
ENGINEERED FILL
WHERE REQURED
CUT BACK
EMBANKMENT WHERE
THERE IS ROOM
TOWARD SIDEWALK
(24X36)
(24X36)
EXISTING ELEV. +12.0' MLLW
TOP OF ODOT 750#-2000#
ROCK @ +12.0' MLLW
0' 20' 40' 60'
DESIGN SPECIFICS OF ROCK & CONSTRUCTION
THE ROCK USED FOR THIS PROJECT WILL BE SPECIFIED TO FOLLOW TEST REQUIREMENTS FOUND
WITHIN AASHTO 85 (APPARENT SPECIFIC GRAVITY, PERCENT ABSORPTION); ODOT TM 208A
(DEGRADATION); AND AASHTO T 104 (SOUNDNESS). ALL ROCK SPECIFIED IN THIS PROJECT MUST BE ANGULAR IN SHAPE, AND THE THICKNESS OF ANY SINGLE ROCK SHALL NOT BE LESS THAN ONE THIRD OF ITS LENGTH. ROUND ROCK WILL NOT BE ACCEPTED UNLESS AUTHORIZED BY EMC. THE
ROCK MUST MEET THE GRADATION REQUIREMENTS FOR THE CLASS SPECIFIED, BE FREE FROM
OVERBURDEN, SPOILED, SHALE AND ORGANIC MATERIAL. NON-DURABLE ROCK, SHALE OR ROCK
WITH SHALE SEAMS IS NOT ACCEPTABLE. CLASS 2000 RIP RAP IS BY DEFINITION COMPRISED OF ROCKS THAT ARE 20% BY WEIGHT OF 1400 POUNDS TO 2000 POUNDS, 30% BY WEIGHT OF 700 TO 1400 POUNDS, 40% BY WEIGHT 40 TO 700 POUNDS AND 0 TO 10% 0 TO 40 POUNDS. EITHER A FILTER BLANKET OF 16 INCH LAYER OF CLASS 50, OR SPECIFIED FILTER FABRIC WILL BE LAID BENEATH THE
ROCK.
A CLAMSHELL, ORANGE PEEL BUCKET, SKIP OR SIMILAR APPROVED DEVICE WILL BE USED WHICH WILL TRANSPORT THE RIPRAP MATERIAL TO ITS FINAL DESTINATION. THIS REVETMENT REPAIR IS FOR FLOW ASSUMED TO GENERALLY BE UNIFORM, STEADY AND SUBCRITICAL. HOWEVER, RAPIDLY
VARYING, UNSTEADY FLOW CONDITIONS OCCUR OCCASIONALLY, AND EXCESSIVE WAVE ACTION,
HYDRAULIC JUMPS AND EXTREME FLOW TURBULENCE CAN OCCUR AT THIS LOCATION. THESE
CONDITIONS ARE AMONG THE REASONS FOR THE EXTENT OF PROTECTION PROPOSED. THE
LONGITUDINAL EXTENT OF THIS REPAIR SHOULD BE CONTINUOUS FOR A DISTANCE GREATER THAN
THE LENGTH THAT IS IMPACTED. THE VERTICAL EXTENT OF PROTECTION REQUIRED FOR THIS
REVETMENT INCLUDES DESIGN HEIGHT AND FOUNDATION OR TOE DEPTH. THE DESIGN HEIGHT OF THE RIP RAP INSTALLATION IS TO BE EQUAL TO THE DESIGN HIGH WATER ELEVATION (KING TIDE
PLUS STORM SURGE) WITH ADEQUATE FREEBOARD TO ACCOMMODATE WAVE ACTION, SUPER
ELEVATION FROM THE CHANNEL BEND, HYDRAULIC JUMP, AND FLOW IRREGULARITIES, PLUS
ERRATIC PHENOMENA SUCH AS UNFORESEEN EMBANKMENT SETTLEMENT, ACCUMULATION OF
TRASH AND DEBRIS FROM THE RIVER.
SCOUR DEPTH IS ESTIMATED AT ABOUT 4 FEET FROM THE LOWEST ELEVATION IN THE
CROSS-SECTION OF THE BASIN AT THIS POINT, UTILIZING THE CONSERVATIVE ASSUMPTION OF A MEDIAN DIAMETER OF BED MATERIAL TO BE ABOUT 0.15 M. RIPRAP THICKNESS FOR CLASS 2000 IS
SPECIFIED TO BE AT LEAST A 4 FOOT LAYER.
THE FILTER BENEATH THE RIPRAP AND OVERLYING THE STRUCTURAL FILL IS TO PREVENT THE
MIGRATION OF FINE SOIL PARTICLES THROUGH STRUCTURAL VOIDS AND TO DISTRIBUTE THE
WEIGHT OF THE ARMORING UNITS (RIPRAP) TO PROVIDE MORE UNIFORM SETTLEMENT, AND ALSO
PERMITS RELIEF OF HYDROSTATIC PRESSURES WITHIN THE SOILS.
FOR THE AREAS ABOVE THE WATERLINE AT ANY GIVEN TIME THE FABRIC OR GEOTEXTILE ALSO PREVENTS SURFACE WATER FROM CAUSING EROSION BENEATH THE RIP RAP. IN ADDITION TO TOE CONSIDERATIONS WITH RESPECT TO SCOUR THE FLANKS OF THIS REVETMENT ARE DESIGNED FOR
UPSTREAM AND DOWNSTREAM CONDITIONS
GENERAL CONSTRUCTION, EROSION & CONTROL NOTES
FINAL BANK SLOPE WILL BE NOT GREATER THAN 1V:1.5H. BANK PREPARATION WILL CONSIST OF CLEARING DEBRIS AND MINOR GRADING. RIPRAP PLACEMENT WILL BE BY MACHINE PLACING AND
HAND PLACING. HAND PLACING WILL BE PERFORMED AS SPECIFIED BY EMC ON STEEPER SIDE
SLOPES.
RE-HANDLING OR DRAGGING TO SMOOTH REVETMENT SERVICES TEND TO RESULT IN SEGREGATION
AND BREAKAGE OF STONE AND ARE TO BE AVOIDED. STONE WILL NOT BE DROPPED FROM AN
EXCESSIVE HEIGHT.
ACTIONS THAT WILL REQUIRE THE USE OF MATERIALS THAT ARE HAZARDOUS OR TOXIC TO AQUATIC LIFE (SUCH AS MOTOR FUEL, OIL, OR DRILLING FLUID), ARE INCLUDED WITHIN THE POLLUTION AND EROSION CONTROL PLAN SECTIONS OF THIS NARRATIVE, TO BE MANAGED BY EMC AND ENFORCED BY THE PORT OF BROOKINGS-HARBOR. THE PLAN INCLUDES PRACTICES TO MINIMIZE EROSION AND
SEDIMENTATION ASSOCIATED WITH ALL ASPECTS OF THE PROJECT (E.G., STAGING AREAS,
STOCKPILES, GRADING); TO PREVENT DEBRIS FROM DROPPING OR OTHERWISE ENTERING ANY
STREAM OR WATERBODY; AND TO PREVENT AND CONTROL HAZARDOUS MATERIAL SPILLS.
EROSION CONTROLS WILL BE MONITORED AND MAINTAINED DAILY DURING THE RAINY SEASON AND
WEEKLY DURING THE DRY SEASON AS NECESSARY TO ENSURE CONTROLS ARE PROPERLY
FUNCTIONING. IF MONITORING SHOWS THAT THE EROSION CONTROLS ARE INEFFECTIVE AT
PREVENTING VISIBLE SEDIMENT DISCHARGE, THE PROJECT WILL STOP TO EVALUATE EROSION
CONTROL MEASURES. REPAIRS, REPLACEMENTS OR THE INSTALLATION OF ADDITIONAL EROSION
CONTROL MEASURES WILL BE COMPLETED BEFORE THE PROJECT RESUMES.
IF APPLICABLE, MAINTENANCE WILL INCLUDE REMOVAL OF SEDIMENT AND DEBRIS FROM EROSION CONTROLS LIKE SILT FENCES OR HAY BALES AND TURBIDITY CURTAINS ONCE IT HAS REACHED ONE-THIRD OF THE EXPOSED HEIGHT OF THE CONTROL. WHENEVER PRACTICAL, NATIVE MATERIALS ARE TO BE LEFT WHERE THEY ARE FOUND AND IN AREAS TO BE CLEARED, VEGETATION IS TO BE
CLIPPED AT GROUND LEVEL TO RETAIN ROOT MASS AND ENCOURAGE REESTABLISHMENT OF
NATIVE VEGETATION.
HEAVY EQUIPMENT WILL BE SELECTED AND OPERATED AS NECESSARY TO MINIMIZE ADVERSE
EFFECTS ON THE ENVIRONMENT (E.G., MINIMALLY-SIZED, LOW PRESSURE TIRES, MINIMAL HARD
TURN PATHS FOR TRACKED VEHICLES, TEMPORARY MATS OR PLATES WITHIN WET AREAS OR
SENSITIVE SOILS); AND ALL VEHICLES AND OTHER HEAVY EQUIPMENT WILL BE USED AS FOLLOWS:
1) STORED, FUELED AND MAINTAINED IN A VEHICLE STAGING AREA PLACED 150 FEET OR MORE
FROM ANY WATERBODY, OR IN AN ISOLATED HARD ZONE SUCH AS A PAVED PARKING LOT, OR
LINED SURFACE;
2) INSPECTED DAILY FOR FLUID LEAKS BEFORE LEAVING THE VEHICLE STAGING AREA FOR
OPERATION WITHIN 50 FEET OF ANY WATERBODY;
3) STEAM-CLEANED BEFORE OPERATION BELOW ORDINARY HIGH WATER, AND AS OFTEN AS
NECESSARY DURING OPERATION TO REMAIN FREE OF ALL EXTERNAL OIL, GREASE, MUD, SEEDS, ORGANISMS AND OTHER VISIBLE CONTAMINANTS AND
4) GENERATORS, CRANES AND ANY OTHER STATIONARY EQUIPMENT OPERATED WITHIN 150 FEET
OF ANY WATERBODY WILL BE MAINTAINED AND PROTECTED AS NECESSARY TO PREVENT LEAKS
AND SPILLS FROM ENTERING THE WATER.
APPROXIMATE
TOP OF PROPOSED
EMBANKMENT
EXISTING
ELEVATIONS
FABRIC TUCKED UNDER TOP
OF ROCK ABOUT 1', +12' MLLW
BASIN 2, WEST EMBANKMENT PLAN
SCALE 1" = 20'
DETAILS
C5.0
BY
R
EV
IS
IO
N S
P R E
LI
M
IN
A R Y
DRAWN BY:
BA
SI
N
EM
BA
NK
M
EN
T
RO
CK
R
EC
ON
ST
RU
CT
IO
N
0 L
OW
ER
H
AR
BO
R
RO
AD
, B
RO
OK
IN
GS
, O R
PO
RT
O
F B
RO
OK
IN
GS
H
AR
BO
R
DATE:
JOB No:
SHEET No:
CD/JW
14 AUG 2024
022-2203
NOT FOR C
ONSTRUCTIO
N
EMBANKMENT
TYPICAL WEST EMBANKMENT DETAIL2
SCALE - 1"=5'
APPROX. TOE OF
BASE ROCK
VARIES - SEE DETAIL 2
APPROX. TOP OF
EX. BANK-TYP.
CUT/FILL AS
REQUIRED -TYP.
ODOT 750#-2000#
ROCK @ +12.0' MLLW
DREDGING AREA
SEE DREDGING PLANS
TOE ROCK DETAIL3
SLOPE CREATED
BY DREDGING
PROJECT AND/OR
DOCK AREA
EXCAVATION
USE 2000# TO 3000#
ROCK FOR BASE
TOP OF ODOT 750#-2000#
ROCK @ +12.0' MLLW
FABRIC WRAPPED AROUND BASE
ROCK AND BENEATH ROCK ABOVE
AS SHOWN
NO SCALE
SEE DETAIL 3 BELOW
EMBANKMENT RECONSTRUCTION PROCEDURE:
1. OBTAIN DESIRED SLOPE
2. LAY FABRIC TO +12' MLLW
3. PRESS 2500-3000# BASE ROCK AT TOE
4. PLACE ODOT 750-2000# ROCK
FABRIC TUCKED
UNDER TOP OF ROCK
ABOUT 1', +12' MLLW
PRESS ROCK AT LEAST 50% INTO
EXISTING GRADE - TYP,
EXISTING FLOATING DOCKS
235.0'± EM
BANKM
ENT RECONSTRUCTION
WEST
ODOT 750#-2000# ROCK
FINISHES +12 MLLW
FILL EXISTING SLOPE AS REQUIRED
APPROXIMATE
HTL
2000# - 3000# BOULDERS
SEE DETAIL 3 BELOW
ODOT 750# - 2000# ROCK 308 CU. YDS. ±
± 180 - 190 EACH
FILTER FABRIC 7,700 SQ. FT. ±
APPROXIMATE QUANTITIES
MATERIAL CUT 150 CU. YDS ±
MATERIAL FILL 100 CU. YDS ±
* *BASED UPON EXISTING TOPO AS SHOWN
AND APPROXIMATIONS OF FINAL GRADES.
CONTRACTOR TO VERIFY.
AutoCAD SHX Text
VARIES - 30.0' ±
AutoCAD SHX Text
42,650 PE
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
RENEWAL DATE: 12/31/25
SEE DETAIL 2, TYPICAL EMBANKMENT
-20
-10
-20
-10
1.5
+12' MLLW
TYP
+4' MLLW
+7.5' HTL
C6.0
BY
R
EV
IS
IO
N S
P R E
LI
M
IN
A R Y
DRAWN BY:
BA
SI
N
EM
BA
NK
M
EN
T
RO
CK
R
EC
ON
ST
RU
CT
IO
N
0 L
OW
ER
H
AR
BO
R
RO
AD
, B
RO
OK
IN
GS
, O R
PO
RT
O
F B
RO
OK
IN
GS
H
AR
BO
R
DATE:
JOB No:
SHEET No:
CD/JW
14 AUG 2024
022-2203
NOT FOR C
ONSTRUCTIO
N
EXISTING SLOPE -
VARIES
FILTER FABRIC WRAPS ROCK AT
BOTTOM AND ROCK AT TOP TO +12' MLLW
ENGINEERED FILL
WHERE REQURED
CUT BACK
EMBANKMENT WHERE
THERE IS ROOM
TOWARD SIDEWALK
EXISTING ELEV. +12.0' MLLW
ODOT 750#-2000# ROCK
FINISHES +12 MLLW
FILL EXISTING SLOPE AS REQUIRED
APPROXIMATE
TOP OF PROPOSED
EMBANKMENT
EXISTING
ELEVATIONS
FABRIC TUCKED UNDER TOP
OF ROCK ABOUT 1', +12' MLLW
APPROX. TOE OF
BASE ROCK
VARIES - SEE DETAIL 2
APPROX. TOP OF
EX. BANK-TYP.
CUT/FILL AS
REQUIRED -TYP.
ODOT 750#-2000#
ROCK @ +12.0' MLLW
SLOPE CREATED
BY DREDGING
PROJECT AND/OR
DOCK AREA
EXCAVATION
EAST EMBANKMENT RECONSTRUCTION PROCEDURE:
1. OBTAIN DESIRED SLOPE
2. LAY FABRIC TO +12' MLLW
3. PLACE ODOT 750-2000# ROCK
FABRIC TUCKED
UNDER TOP OF ROCK
ABOUT 1', +12' MLLW
EXISTING FLOATING DOCKS
65.0'± EM
BANKM
ENT RECONSTRUCTION
(24X36)
BASIN 2, EAST EMBANKMENT PLAN
SCALE 1" = 20'
TYPICAL EAST EMBANKMENT DETAIL2
SCALE - 1"=5'
NOTE:
SEE SHEET C5.0 FOR EMBANKMENT RECONSTRUCTION NOTES
0' 20' 40' 60'
VARIES - VERIFY
ON SITE PER ENGINEER
DETAILS
EMBANKMENT
EAST
DREDGING AREA
SEE DREDGING PLANS
APPROXIMATE HTL
ODOT 750# - 2000# ROCK 95 CU. YDS. ±
FILTER FABRIC 1,400 SQ. FT. ±
APPROXIMATE QUANTITIES
MATERIAL CUT 50 CU. YDS ±
MATERIAL FILL 40 CU. YDS ±
*BASED UPON EXISTING TOPO AS SHOWN
AND APPROXIMATIONS OF FINAL GRADES.
CONTRACTOR TO VERIFY.
AutoCAD SHX Text
42,650 PE
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
RENEWAL DATE: 12/31/25
AutoCAD SHX Text
VARIES
SEE DETAIL 2, TYPICAL EMBANKMENT