ADDEND~1.PDF

PDF 5 MB Posted

Attached to
Basin 2 Clamshell Dredging & Slope Repair
Solicitation number
S-R08018-00011082
Issued by
Crook County, Oregon

About this file

This document is an Addendum to an Invitation to Bid (ITB) for the Basin 2 Clamshell Dredging and Slope Repair project at the Port of Brookings Harbor in Brookings, Oregon. The project involves the maintenance, rehabilitation, replacement, and upgrade of the existing western embankment at the south basin of the Port of Brookings Harbor. The work includes excavation, clearing, placement of geogrid and rock, with a final embankment slope not to exceed 1.5:1. The addendum provides clarification on the approximate bill of materials quantities for the west and east embankments. No bid closing date is provided, but the original ITB was dated July 24, 2024.

The project specifications outline the requirements for the rock materials, including AASHTO and ODOT standards, placement methods, and slope stabilization. Erosion, sedimentation, and pollution control measures are also detailed, including requirements for heavy equipment use, site preparation, and in-water work. Estimated project quantities and the local funding source are provided, but no pricing terms or incumbent information is included.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Port of Brookings Harbor This Institution is an Equal Opportunity Provider

16330 Lower Harbor Road ● P.O. Box 848 ● Brookings Oregon 97415

(541)469-2218 ● (541)359-3999 ● www.portofbrookingsharbor.com ● info@portofbrookingsharbor.com

Project Name: Basin 2 Clamshell Dredging and Slope Repair

ADDENDUM NO. 1

The original ITB dated July 24, 2024, is hereby supplemented by this Addendum No. 1 dated August 15, 2024.

CLARIFICATIONS

1. Basin 2 Embankment Rock Reconstruction Drawing C5.0. Approximate bill of materials quantities for west embankment, based on existing topo and approximations of final grades.

Contractor to verify.

2. Basin 2 Embankment Rock Reconstruction Drawing C6.0. Approximate bill of materials quantities for east embankment, based on existing topo and approximations of final grades.

Contractor to verify.

END OF ADDENDUM NO. 1

http://www.portofbrookingsharbor.com/

GRAVEL OR

CONCRETE PAVING

LAN

D

SC

APE

O U

TD

O

O R

STO

R

AG

E

O U

TD

O

O R

STO

R

AG

E

PROJECT DESCRIPTION

TITLE: EMBANKMENT ROCK RECONSTRUCTION

REFERENCE: 113

LOCATION: BOAT BASIN ROAD

TAX LOT(S): 1400, 1300, 401

NATURAL FEATURES

EXISTING NATURAL RESOURCES OR NATURAL HAZARDS ON THE SUBJECT

PROPERTY, INCLUDING WETLANDS, STREAMS, RIPARIAN AREAS, FLOOD PLAINS, OR

FLOODWAYS TO BE DETERMINED BY ENGINEER

EXISTING TREE CANOPY

THERE IS LOW STORY SHRUBBERY/VEGETATION ON THE SUBJECT PROPERTY

CULTURAL RESOURCES

LOCALLY, OR FEDERALLY DESIGNATED HISTORIC AND/OR CULTURAL RESOURCES

ON THE SITE OR ON ADJACENT PARCELS TO BE DETERMINED BY ENGINEER.

PUBLIC SERVICES

PUBLIC UTILITY SERVICES, INCLUDING WATER, SEWER, STORM DRAINAGE, POWER,

TELEPHONE, CABLE INTERNET, AND GAS ARE AVAILABLE TO THE SUBJECT

PROPERTY.

UTILITY STATEMENT

EXISTING UNDERGROUND UTILITIES ILLUSTRATED IN THESE PLANS ARE

APPROXIMATED BASED ON MAPS OBTAINED FROM CURRY COUNTY GIS ELEVATIONS

ESTIMATES, OR HAVE BEEN LOCATED BY A UTILITY LOCATE COMPANY. LAYOUT

INDICATED IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. ALL LINES

WITHIN PROJECTED WORK ZONE SHALL BE FIELD VERIFIED AS REQUIRED PRIOR TO

CONSTRUCTION.

1. DEQ 1200-C PERMIT IS NOT REQUIRED.

2. UNLESS DIRECTED OTHERWISE, REMOVE CLEARED AND GRUBBED MATERIAL FROM

THE SITE AND DISPOSE AT AN APPROVED LOCATION.

3. PRIOR TO THE START OF CONSTRUCTION, VERIFY GRADES AT SAWCUT LOCATIONS

AND MATCHING OF EXISTING GRADE LOCATIONS.

4. MINIMIZE TRAFFIC ON SOIL AREAS DURING WET WEATHER. IF THE SITE SOILS ARE

EXPOSED DURING WET WEATHER, THE USE OF CRUSHED ROCK PLACED AS

ENGINEERED FILL IN THE BOTTOM OF THE EXCAVATIONS MAY BE NECESSARY TO

PROTECT THE SUBGRADE. TAKE ALL PRECAUTIONS TO LIMIT SURFACE

DISTURBANCE AND PROTECT THE SITE GRADING AREA FROM EROSION AND

RUNOFF. AVOID DISTURBANCE OF EXISTING SOIL STRUCTURE.

5. UNLESS OTHERWISE NOTED, THE SAMPLING AND TESTING OF MATERIALS FOR USE

ON THE JOBSITE SHALL BE AT THE EXPENSE OF THE CONTRACTOR. ALL TESTING OF

MATERIALS AND WORKMANSHIP SHALL BE PERFORMED BY A CERTIFIED

INDEPENDENT TESTER. RESULTS OF THE TESTS SHALL BE SENT DIRECTLY TO THE

PROJECT ENGINEER AS WELL AS THE CONTRACTOR, BY THE LABORATORY.

LOCATION AND FREQUENCY OF TESTS SHALL BE DESIGNATED BY THE GENERAL

CONTRACTOR.

6. ALL CUT AND FILL SLOPES SHALL BE MAXIMUM OF 1.5:1.

PROJECT OVERVIEW

GEOTEXTILE

COVER

SHEET

C1.0

BANK RECONSTRUCTION

SHEET INDEX

C1.0 COVER SHEET - NOTES

C1.1 GENERAL NOTES

C2.1 EXISTING EMBANKMENT PHOTOS

C5.0 WEST EMBANKMENT DETAILS

C6.0 EAST EMBANKMENT DETAILS

DATE SET DESCRIPTION

PRELIMINARY - REVIEW 50% SUBMITTAL

PRELIMINARY - REVIEW 90% SUBMITTAL

RECORD DRAWINGS

PORT OF BROOKINGS - HARBOR

BASIN 2 EMBANKMENT ROCK RECONSTRUCTION

PROJECT ENGINEER

EMC ENGINEERS / SCIENTISTS

450 CONESTOGA DRIVE

JACKSONVILLE, OR 97530

(541) 261-9929

CONTACT: JACK AKIN, P.E.

STORMWATER PLAN & 25% CD

CALL BEFORE YOU DIG!

08/14/2024

CONSTRUCTION DOCUMENTS SUBMITTAL SET

REVIEW & APPROVED

BY ENGINEER

X X X

BY

R

EV

IS

IO

N S

P R E

LI

M

IN

A R Y

DRAWN BY:

BA

SI

N

EM

BA

NK

M

EN

T

RO

CK

R

EC

ON

ST

RU

CT

IO

N

0 L

OW

ER

H

AR

BO

R

RO

AD

, B

RO

OK

IN

GS

, O R

PO

RT

O

F B

RO

OK

IN

GS

H

AR

BO

R

DATE:

JOB No:

SHEET No:

CD/JW

14 AUG 2024

022-2203

NOT FOR C

ONSTRUCTIO

N

PROJECT NOTES

GENERAL GRADING NOTES

Low er H arbor R oad

Boat Basin Road

BASIN #2

X

AGENCY APPROVED BY DATE

POWER

DOMESTIC WATER

SANITARY SEWER

STORM DRAINAGE

STREETS

ENGINEERING

COOS-CURRY ELECTRIC

HARBOR SANITARY

CURRY COUNTY

PORT OF BROOKINGS HARBOR

CONSTRUCTION AUTHORIZED TO PROCEED IN ACCORDANCE WITH

APPROVED PLANS WHEN ALL PERMITS HAVE BEEN ISSUED AND

PRE-CONSTRUCTION MEETING HAS CONCLUDED.

BY TITLE DATE

HARBOR WATER DISTRICT

CURRY COUNTY

1. CONTRACTOR IS RESPONSIBLE FOR SCHEDULING ALL TESTING,

INSPECTIONS, AND SPECIAL INSPECTIONS, AND SPECIAL INSPECTIONS AS

REQUIRED BY PROJECT ENGINEER, CURRENT BUILDING CODES, OR

JURISDICTIONS HAVING AUTHORITY. ALL TESTING MUST BE COMPLETED AND

APPROVED PRIOR TO SUBSEQUENT WORK. ADDITIONAL OR FREQUENT

TESTS MAY BE REQUIRED BY AGENCY, BUILDING OFFICIAL OR ENGINEER.

2. TESTING MUST BE PERFORMED BY AN APPROVED INDEPENDENT TESTING

LABORATORY RETAINED BY THE CONTRACTOR.

3. THE APPROVED INDEPENDENT LABORATORY SHALL PROVIDE

CLARIFICATION STAMPED BY AN ENGINEER LICENSED IN THE STATE OF

OREGON THAT ALL ENGINEERED FILLS ARE PLACED IN ACCORDANCE WITH

THE CONTRACT DRAWINGS AND DOCUMENTS.

INSPECTION AND TESTING NOTES

BANK RECONSTRUCTION

AutoCAD SHX Text

SITE

AutoCAD SHX Text

CARPENTERVILLE RD.

AutoCAD SHX Text

PACIFIC OCEAN

AutoCAD SHX Text

COVE

AutoCAD SHX Text

CHETCO

AutoCAD SHX Text

POINT

AutoCAD SHX Text

TANBARK

AutoCAD SHX Text

COVE

AutoCAD SHX Text

MACKLYN

AutoCAD SHX Text

POINT

AutoCAD SHX Text

CHETCO

AutoCAD SHX Text

EASY STREET

AutoCAD SHX Text

PARK

AutoCAD SHX Text

AZALEA

AutoCAD SHX Text

RIVER

AutoCAD SHX Text

CHETCO

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

COUNTY

AutoCAD SHX Text

OLD

AutoCAD SHX Text

STATE PARK

AutoCAD SHX Text

HARRIS BEACH

AutoCAD SHX Text

ISLAND

AutoCAD SHX Text

BIRD

AutoCAD SHX Text

AIRPORT

AutoCAD SHX Text

BROOKINGS

AutoCAD SHX Text

CITY OF BROOKINGS

AutoCAD SHX Text

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

VICINITY MAP

AutoCAD SHX Text

DAWSON RD

AutoCAD SHX Text

BASIN #1

AutoCAD SHX Text

BASIN #2

AutoCAD SHX Text

AutoCAD SHX Text

42,650 PE

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

RENEWAL DATE: 12/31/25

1. EMBANKMENT CONSTRUCTION SHALL INCLUDE PREPARATION OF THE AREAS UPON WHICH EMBANKMENTS ARE PLACED, THE PLACEMENT AND COMPACTION OF APPROVED EMBANKMENT MATERIALS AND FILLING OF HOLES, PITS AND OTHER DEPRESSIONS WITHIN THE SUBJECT AREA.

2. THE CONTRACTOR SHALL PLACE EMBANKMENTS AND FILLS IN THE HORIZONTAL LAYERS AS SPECIFIED AND COMPACT EACH LAYER TO THE DENSITY SPECIFIED.

3. EMBANKMENT SHALL NOT BE CONSTRUCTED WHEN THE EMBANKMENT MATERIAL OR THE FOUNDATION ON WHICH THE EMBANKMENT WOULD BE PLACED IS FROZEN.

4. IMMEDIATELY PRIOR TO COMPLETION OF THE EARTHWORK, THE CONTRACTOR SHALL CLEAN THE ENTIRE WORK AREA OF DEBRIS AND FOREIGN MATTER.

5. THE MAXIMUM DENSITY OF COMPACTED MATERIAL WILL BE DETERMINED BY AASHTO T-99

6. THE CONTRACTOR SHALL COMPACT ALL EMBANKMENTS, FILLS AND BACKFILLS TO A MINIMUM IN PLACE DENSITY OF 95 PRESENT.

7. THE CONTRACTOR SHALL WATER THE MATERIALS TO PROVIDE OPTIMUM MOISTURE FOR COMPACTION OF EMBANKMENT AND BACKFILLS. EMBANKMENTS OF

BACKFILL MATERIALS SHALL NOT BE PLACED IN FINAL POSITION UNTIL MOISTURE IN EXCESS OF OPTIMUM MOISTURE HAS BEEN REMOVED.

8. IF THE SPECIFIED COMPACTION IS NOT OBTAINED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER. THE CONTRACTOR MAY BE REQUIRED TO USE A MODIFIED

COMPACTION PROCEDURE OR APPLY ADDITIONAL COMPACTIVE EFFORT. IF APPROVED MATERIALS MEETING THE SPECIFICATIONS CANNOT BE COMPACTED TO THE REQUIRED DENSITY REGARDLESS OF COMPACTIVE EFFORT OR METHOD, THE ENGINEER MAY REDUCE THE REQUIRED DENSITY OR DIRECT THE USE OF ALTERNATE MATERIALS. IN NO CASE SHALL EARTHWORK OPERATIONS PROCEED UNTIL THE CONTRACTOR IS ABLE TO COMPACT THE MATERIAL TO THE SATISFACTION OF THE

ENGINEER.

9. DEQ 1200-C PERMIT IS NOT REQUIRED.

10. UNLESS DIRECTED OTHERWISE, REMOVE CLEARED AND GRUBBED MATERIAL FROM THE SITE AND DISPOSE AT AN APPROVED LOCATION.

11. UNLESS OTHERWISE NOTED, THE SAMPLING AND TESTING OF MATERIALS FOR USE ON THE JOBSITE SHALL BE AT THE EXPENSE OF THE CONTRACTOR. ALL TESTING

OF MATERIALS AND WORKMANSHIP SHALL BE PERFORMED BY A CERTIFIED INDEPENDENT TESTER. RESULTS OF THE TESTS SHALL BE SENT DIRECTLY TO THE PROJECT ENGINEER AS WELL AS THE CONTRACTOR, BY THE LABORATORY. LOCATION AND FREQUENCY OF TESTS SHALL BE DESIGNATED BY THE GENERAL

CONTRACTOR.

12. ALL CUT AND FILL SLOPES SHALL BE MAXIMUM OF 1.5:1.

13. PRIOR TO THE CONSTRUCTION OF EMBANKMENTS, THE CONTRACTOR SHALL EXCAVATE UNSUITABLE FOUNDATION MATERIAL. VOIDS, TRENCHES AND HOLES ENCOUNTERED WITHIN EMBANKMENT LIMITS SHALL BE FILLED WITH APPROVED MATERIAL. PRIOR TO BACKFILLING THE CONTRACTOR SHALL BREAK CONCRETE (IF APPLICABLE) AS DIRECTED. THE CONTRACTOR SHALL BREAK UP AND ROUGHEN THE GROUND SURFACE BEFORE EMBANKMENTS MATERIAL IS PLACED. THE NATURAL GROUND UNDERLYING EMBANKMENTS SHALL BE COMPACTED TO THE DENSITY SPECIFIED FOR THE EMBANKMENT MATERIALS TO BE PLACED.

GEOTECHNICAL NOTE

THE CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES WITH THE PROJECT ENGINEER FOR REQUIRED REMEDIATION. THE CONTRACTOR SHALL COORDINATE WITH THE PROJECT ENGINEER FOR REQUIRED SITE OBSERVATIONS AND TESTING OF ALL FILLS.

THESE NOTES ARE INTENDED FOR USE IN INTERPRETING AND IMPLEMENTING THE TASKS SHOWN ON THE FOLLOWING CONSTRUCTION PLANS AND SPECIFICATIONS SHEETS.

THESE ARE IN ADDITION TO THE OVERALL PROJECT SPECIFICATION AND BID DOCUMENTS AND CONTRACTUAL ITEMS.

1. THESE ARE INTENDED FOR THE USE OF THE GENERAL CONTRACTOR AND HIS/HER SUBCONTRACTORS IN THE DEMOLITION AND RECONSTRUCTION OF THE SUBJECT AREA OF THE PORT OF BROOKINGS HARBOR. USE FOR OTHER PURPOSES OR AT OTHER SITES IS NOT RECOMMENDED AND IS

ACCOMPLISHED AT THE SOLE RISK OF THE USER.

2. THESE ITEMS ARE TO BE USED AS A SUPPLEMENT TO THE DETAILS PROVIDED ON THE PLAN SHEETS AND SPECIFICATION PAGES. ANY DISCREPANCIES FOUND AMONG THE DRAWINGS, THE SPECIFICATIONS, REFERENCED REPORTS, THESE GENERAL NOTES AND OTHER ITEMS LISTED ON THIS SHEET AND THE SITE CONDITIONS SHALL BE REPORTED TO THE ENGINEER, WHO SHALL CORRECT SUCH DISCREPANCY IN WRITING. ANY WORK DONE BY THE GENERAL CONTRACTOR AFTER DISCOVERY OF SUCH DISCREPANCY SHALL BE DONE AT THE GENERAL CONTRACTOR’S RISK. THE GENERAL CONTRACTOR SHALL VERIFY AND COORDINATE DIMENSIONS AMONG ALL

DRAWINGS PRIOR TO PROCEEDING WITH ANY WORK.

3. THE EMBANKMENT REPAIR HAS BEEN DESIGNED TO RESIST ANTICIPATED VERTICAL AND LATERAL FORCES AFTER THE CONSTRUCTION OF ALL STRUCTURAL ELEMENTS HAS BEEN COMPLETED. STABILITY OF THE STRUCTURE AND SLOPE AREAS PRIOR TO COMPLETION IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THIS RESPONSIBILITY INCLUDES, BUT IS NOT LIMITED TO JOBSITE SAFETY, CONSTRUCTION MEANS, METHODS, AND SEQUENCES, TEMPORARY SHORING, SLOPE STABILITY, FORMWORK AND BRACING, USE OF EQUIPMENT AND CONSTRUCTION PROCEDURES.

4. CONSTRUCTION OBSERVATION BY THE ENGINEER IS FOR CHECKING FOR CONFORMANCE WITH DESIGN ASPECTS ONLY AND IS NOT INTENDED IN ANY WAY TO REVIEW AND/OR APPROVE THE GENERAL CONTRACTOR’S CONSTRUCTION PROCEDURES OR RELIEVE THE CONTRACTOR FROM PROVIDING A COMPLETED PROJECT, CONSISTENT WITH THE PLANS AND SPECIFICATIONS AND GOOD CONSTRUCTION PRACTICES. SPECIAL INSPECTION BY THE ENGINEER DOES NOT PROVIDE A CERTIFICATION OF THE PROJECT OR RELIEVE THE CONTRACTOR OF ALL RESPONSIBILITY FOR A PROPERLY CONSTRUCTED PROJECT.

STANDARDS USED FOR DESIGN

1. ALL METHODS, MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE PLANS AND SPECIFICATIONS AND ODOT STANDARD SPECIFICATIONS, UNLESS ELSEWHERE

HEREIN SPECIFIED OTHERWISE. INTERNATIONAL BUILDING CODE (IBC) 2021; 2019 OREGON STRUCTURE SPECIALTY CODE (OSSC); AMERICAN SOCIETY OF CIVIL

ENGINEERS (ASCE)

OTHER NOTES

1. JOBSITE SAFETY IS THE RESPONSIBILITY OF THE CONTRACTOR.

2. ALL PRODUCTS AND WORKMANSHIP SHALL BE NEW MATERIALS OF GOOD QUALITY, ACCEPTABLE FOR THIS TYPE OF CONSTRUCTION. WORK TO BE ACCOMPLISHED IN A

GOOD AND WORKMANLIKE MANNER.

3. ALL MATERIALS TO BE SHIPPED, HANDLED AND STOCKPILED IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS AND GOOD CONSTRUCTION PRACTICES.

4. LOCATIONS MUST BE VERIFIED AT THE SITE WITH THE ENGINEER AND THE PORT OF BROOKINGS HARBOR REPRESENTATIVE PRIOR TO PLACEMENT.

5. ABIDE BY LOCAL, STATE AND FEDERAL BUILDING ORDINANCES, INCLUDING ALL SAFETY REQUIREMENTS, IN ALL PHASES OF THE PROJECT.

6. ALL PHASES OF THE PROJECT ARE TO CONFORM TO THE PLANS AND SPECIFICATIONS ATTACHED HERETO AND SPECIFICATIONS PROVIDED BY THE OWNER AND THE

ENGINEER-OF-RECORD.

7. PROPOSED CHANGES TO PROJECT PLANS AND SPECIFICATIONS MUST BE APPROVED BY THE DESIGNER PRIOR TO ACCEPTANCE AND IMPLEMENTATION AT THE SITE.

8. PROPOSED CHANGES MUST BE SUBMITTED IN WRITING FOR REVIEW AND APPROVAL/DISAPPROVAL BY THE DESIGNER AND THE OWNER.

9. IN NO CASE SHALL CHANGES, SUBSTITUTIONS OR OMISSIONS BE MADE TO THE DESIGN OR MATERIALS WITHOUT THE WRITTEN AUTHORIZATION OF THE DESIGNER AND

THE OWNER.

10. AUTHORIZATION OF A DESIGN CHANGE BY THE ENGINEER DOES NOT CONSTITUTE ACCEPTANCE BY THE PORT OF BROOKINGS HARBOR, NOR DOES IT AUTHORIZE

ADDITIONAL FUNDS FOR THE CHANGES. THE PORT’S REPRESENTATIVE MUST AUTHORIZE IN WRITING THE DESIGN CHANGE AND APPLICABLE CHANGES IN THE CONTRACT AMOUNT AND/OR CONSTRUCTION TIME PERIOD PRIOR TO IMPLEMENTATION OF SUCH CHANGES.

11. PROJECT SCHEDULE AND GENERAL SEQUENCING OF ALL WORK MUST BE REVIEWED AND APPROVED BY THE DESIGN ENGINEER AND THE OWNER. SUCH APPROVAL DOES NOT RELIEVE THE CONTRACTOR OR HIS/HER SUBCONTRACTORS OF ALL RESPONSIBILITIES FOR PROPER EXECUTION OF THE SUBJECT PROJECT CONSTRUCTION.

12. SEQUENCING OF TASKS THAT REQUIRES VARYING THE INSTALLED SIZES OF PROJECT MATERIALS MUST BE REVIEWED AND APPROVED BY THE DESIGN ENGINEER AND

OWNER.

13. TRAFFIC CONTROL AND SIGNAGE MUST BE PROVIDED BY THE CONTRACTOR UNLESS OTHERWISE SO STATED IN THE CONTRACT. ACCESS TO THE US COAST GUARD

FACILITIES MUST BE MAINTAINED DURING CONSTRUCTION.

14. CONTRACTOR MUST UNDERSTAND THAT THE PROJECT SITE IS IN A HARBOR AREA SUBJECT TO TIDAL FLUCTUATIONS. THEREFORE, SEQUENCING AND PROJECT WORK

MUST TAKE INTO ACCOUNT EFFECTS OF HIGH AND LOW TIDES.

15. REPLACEMENT OF SPECIFIED PRODUCTS BY AN “EQUIVALENT” PRODUCT MUST BE APPROVED BY THE DESIGN ENGINEER AND THE OWNER. REDESIGN REQUIRED FOR

USE OF ALTERNATE “EQUIVALENT” MATERIALS IS TO BE BORNE BY THE CONTRACTOR.

1. PROJECT/PURPOSE - WITH THE PURPOSE OF MAINTAINING, REHABILITATING, REPLACING, AND UPGRADING THE EXISTING WESTERN EMBANKMENT AT THE SOUTH BASIN OF PORT OF BROOKINGS HARBOR. FINAL DESIRABLE SLOPE IS NOT TO EXCEED 1.5:1. BASE ROCK WILL BE PRESSED INTO MUDLINE APPROXIMATELY 2' INTO THE EMBANKMENT (TO ABOUT 0.0' MLLW), THENCE PLACED UPSLOPE, WITH BEGINNING THICKNESS OF ABOUT 4 - 5', TAPERING TO UP TO 2' THICKNESS AT

ABOUT 12' MLLW. AGGREGATE WILL BE PLACED ON REST OF THE SLOPE.

2. CONTRACTOR ACTIVITIES - CONTRACTOR ACTIVITIES ARE DESCRIBED AS EXCAVATION AND CLEARING USING EXCAVATOR/CRANE & BUCKET. EXCAVATION AND SPREADING AT THE BASE OF THE SLOPE USING A LONG REACH EXCAVATOR OR CRANE/BUCKET. PLACEMENT OF GEOGRID TO +12' MLLW, & THENCE UPSLOPE WITH 2'-3" MINUS TO TOP OF SLOPE. ODOT 2000 ROCK TO BE DONE PER DRAWING DETAIL FROM BASE ROCK UP TO +12' MLLW.

3. SOIL DISTURBING ACTIVITIES - EXCAVATION WILL BE LIMITED TO EXISTING MARINA EDGES

4. NON-STORMWATER DISCHARGES - NO DEWATERING, WATER-LINE FLUSHING, PAVEMENT WASH WATERS OR IRRIGATION WATER DISCHARGES ARE PLANNED FOR

THIS PROJECT.

5. ESTIMATED START DATE FOR CONSTRUCTION - TO BE DETERMINED

6. NEAREST SURFACE WATER BODIES - PORT OF BROOKINGS ICE HOUSE INLET IN BASIN 2 (SOUTH BASIN) AND BASIN 1, NEAR DOCK A (NORTH BASIN).

7. RECEIVING WATERS - PACIFIC OCEAN

8. SPECIAL ENVIRONMENTAL CONSIDERATIONS - SEE NOTE 10

9. DESIGNATED EPCM - THE DESIGNATED EROSION AND POLLUTION CONTROL MANAGER (EPCM) WHO WILL ASSURE COMPLIANCE WITH ALL ITEMS IN THIS PLAN IS

TBD.

10. EROSION, SEDIMENTATION AND POLLUTION CONTROL BMPS - BEST MANAGEMENT PRACTICES (BMP) TO BE USED, WHEN APPLICABLE, TO PREVENT POLLUTION

RELATED TO CONTRACTOR ACTIVITIES LISTED IN THIS SECTION ARE AS FOLLOWS: A) OFFSITE VEHICLE TRACKING AND DUST PREVENTION - MEASURES WILL BE TAKEN TO PREVENT OFFSITE TRACKING OF MATERIALS, INCLUDING SWEEPING PAVEMENTS, COVERING LOADS AND WETTING SOIL TO PREVENT DUST. B) MATERIAL MANAGEMENT AND SPILL PREVENTION - ALL ON SITE FUELS WILL BE DELIVERED, HANDLED, STORED, USED, AND APPLIED SO AS NOT TO BE RELEASED INTO THE WATERS OF THE STATE/US. FUELING WILL BE ACCOMPLISHED AWAY FROM THE WORK AREA A SPILL CLEANUP KIT WILL BE AVAILABLE IF DEEMED BY THE EPCM TO BE REQUIRED. C) WASTE MANAGEMENT - HANDLING, STORAGE AND DISPOSAL OF SOLID WASTE AND/OR HAZARDOUS WASTE WILL BE DISPOSED INTO SUITABLE LANDFILL OFFSITE, UNLESS WASTE CAN BE BENEFICIALLY USED, AS DETERMINED BY PORT MANAGEMENT AND/OR THE ENGINEER. D) INSPECTION AND MAINTENANCE - DAILY INSPECTION AND MAINTENANCE FOR ALL CONTROLS INCLUDED IN THE POLLUTION CONTROL PLAN AND THE ESCP WILL BE PERFORMED BY THE EPCM OR HIS DESIGNEE. E) EMPLOYEE AND SUBCONTRACTOR TRAINING - EMPLOYEE AND SUBCONTRACTOR EDUCATION AT A MINIMUM WILL INCLUDES INFORMING PERSONNEL OF THE POSTED LOCATIONS OF THE POLLUTION CONTROL PLAN/EROSION AND SEDIMENT CONTROL PLAN/MSDS'S AND IMPORTANT EMERGENCY PHONE NUMBERS. EDUCATION WILL ALSO INCLUDE INFORMING PERSONNEL OF REVISED MATERIAL MANAGEMENT PROCEDURES FOLLOWING A SPILL F) (CRITERIA 15) PRECONSTRUCTION ACTIVITY - BEFORE ALTERATION OF THE ACTION AREA, FLAG THE BOUNDARIES OF CLEARING LIMITS ASSOCIATED WITH SITE ACCESS AND CONSTRUCTION TO MINIMIZE SOIL AND VEGETATION DISTURBANCE, AND ENSURE THAT ALL TEMPORARY EROSION CONTROLS ARE IN PLACE AND FUNCTIONAL. G) (CRITERIA 16) SITE PREPARATION - DURING SITE PREPARATION, CONSERVE NATIVE MATERIALS FOR RESTORATION, INCLUDING LARGE WOOD, VEGETATION, TOPSOIL AND CHANNEL MATERIALS (GRAVEL, COBBLE AND BOULDERS) DISPLACED BY CONSTRUCTION. WHENEVER PRACTICAL, LEAVE NATIVE MATERIALS WHERE THEY ARE FOUND AND IN AREAS TO BE CLEARED, CLIP VEGETATION AT GROUND LEVEL TO RETAIN ROOT MASS AND ENCOURAGE REESTABLISHMENT OF NATIVE VEGETATION. BUILDING AND RELATED STRUCTURES MAY NOT BE CONSTRUCTED INSIDE THE RIPARIAN MANAGEMENT AREA H) (CRITERIA 17) HEAVY EQUIPMENT - HEAVY EQUIPMENT WILL BE SELECTED AND OPERATED AS NECESSARY TO MINIMIZE ADVERSE EFFECTS ON THE ENVIRONMENT; AND ALL VEHICLES AND OTHER HEAVY EQUIPMENT WILL BE USED AS

FOLLOWS:

(A.) STORED, FUELED AND MAINTAINED IN A VEHICLE STAGING AREA PLACED 150 FEET OR MORE FROM ANY WATER BODY, OR IN AN ISOLATED HARD

ZONE SUCH AS A PAVED PARKING LOT.

(B.) INSPECTED DAILY FOR FLUID LEAKS BEFORE LEAVING THE VEHICLE STAGING AREA FOR OPERATION WITHIN 50 FEET OF ANY WATER BODY.

(C.) STEAM-CLEANED BEFORE OPERATION BELOW ORDINARY HIGH WATER, AND AS OFTEN AS NECESSARY DURING OPERATION TO REMAIN FREE OF ALL

EXTERNAL OIL, GREASE, MUD, SEEDS, ORGANISMS AND OTHER VISIBLE CONTAMINANTS.

(D.) GENERATORS, CRANES AND ANY OTHER STATIONARY EQUIPMENT OPERATED WITHIN 150 FEET OF ANY WATER BODY WILL BE MAINTAINED AND PROTECTED AS NECESSARY TO PREVENT LEAKS AND SPILLS FROM ENTERING THE WATER I) (CRITERIA 18)

IN-WATER WORK PERIOD -

ALL WORK WITHIN THE ACTIVE CHANNEL WILL BE COMPLETED IN ACCORDANCE WITH THE OREGON GUIDELINES FOR TIMING OF IN-WATER WORK TO PROTECT FISH

AND WILDLIFE RESOURCES (ODFW 2000, OR THE MOST RECENT VERSION).

J) (CRITERIA 21) EMBANKMENT INSTALLATION -

<TBC>

K) (CRITERIA 24) SUBGRADE PREPARATION -

<TBC>

GENERAL

NOTES

C1.1

BY

R

EV

IS

IO

N S

P R E

LI

M

IN

A R Y

DRAWN BY:

BA

SI

N

EM

BA

NK

M

EN

T

RO

CK

R

EC

ON

ST

RU

CT

IO

N

0 L

OW

ER

H

AR

BO

R

RO

AD

, B

RO

OK

IN

GS

, O R

PO

RT

O

F B

RO

OK

IN

GS

H

AR

BO

R

DATE:

JOB No:

SHEET No:

CD/JW

14 AUG 2024

022-2203

NOT FOR C

ONSTRUCTIO

N

GENERAL NOTES

GRADING NOTES

EROSION, SEDIMENTATION & POLLUTION CONTROL PLAN NOTES

AutoCAD SHX Text

42,650 PE

AutoCAD SHX Text

OREGON

EXISTING EMBANKMENT PHOTOS

NO SCALE

EXISTING

PHOTOS

C2.1

BY

R

EV

IS

IO

N S

P R E

LI

M

IN

A R Y

DRAWN BY:

BA

SI

N

EM

BA

NK

M

EN

T

RO

CK

R

EC

ON

ST

RU

CT

IO

N

0 L

OW

ER

H

AR

BO

R

RO

AD

, B

RO

OK

IN

GS

, O R

PO

RT

O

F B

RO

OK

IN

GS

H

AR

BO

R

DATE:

JOB No:

SHEET No:

CD/JW

14 AUG 2024

022-2203

NOT FOR C

ONSTRUCTIO

N

EMBANKMENT

AutoCAD SHX Text

42,650 PE

AutoCAD SHX Text

OREGON

1+00

1+50

2+00

2+50

3+00

3+50

-1.5:1

-1.5:1

TYP.

-1.5:1

TYP.

-1.5:1

TYP.

-20

-10

-20

-10

1.5

+12' MLLW

MUDLINE

TYPICAL

(VARIES)

+7.5' HTL

(2) 2500#-3000#

ANGULAR ROCK

(PLACEMENT A SHOWN)

EXISTING SLOPE -

VARIES

FILTER FABRIC WRAPS ROCK AT

BOTTOM AND ROCK AT TOP TO +12' MLLW

EXISTING TOE OF SLOPE

IN SOME LOCATIONS REQUIRES

2000-3000# ROCK TO BE LOCATED

FURTHER FROM TOE TO ACHIEVE

1.5:1 SLOPE (PLACEMENT B)

Note:

Engineer & Contractor to determine if placement A, placement B or both are required.

ENGINEERED FILL

WHERE REQURED

CUT BACK

EMBANKMENT WHERE

THERE IS ROOM

TOWARD SIDEWALK

(24X36)

(24X36)

EXISTING ELEV. +12.0' MLLW

TOP OF ODOT 750#-2000#

ROCK @ +12.0' MLLW

0' 20' 40' 60'

DESIGN SPECIFICS OF ROCK & CONSTRUCTION

THE ROCK USED FOR THIS PROJECT WILL BE SPECIFIED TO FOLLOW TEST REQUIREMENTS FOUND

WITHIN AASHTO 85 (APPARENT SPECIFIC GRAVITY, PERCENT ABSORPTION); ODOT TM 208A

(DEGRADATION); AND AASHTO T 104 (SOUNDNESS). ALL ROCK SPECIFIED IN THIS PROJECT MUST BE ANGULAR IN SHAPE, AND THE THICKNESS OF ANY SINGLE ROCK SHALL NOT BE LESS THAN ONE THIRD OF ITS LENGTH. ROUND ROCK WILL NOT BE ACCEPTED UNLESS AUTHORIZED BY EMC. THE

ROCK MUST MEET THE GRADATION REQUIREMENTS FOR THE CLASS SPECIFIED, BE FREE FROM

OVERBURDEN, SPOILED, SHALE AND ORGANIC MATERIAL. NON-DURABLE ROCK, SHALE OR ROCK

WITH SHALE SEAMS IS NOT ACCEPTABLE. CLASS 2000 RIP RAP IS BY DEFINITION COMPRISED OF ROCKS THAT ARE 20% BY WEIGHT OF 1400 POUNDS TO 2000 POUNDS, 30% BY WEIGHT OF 700 TO 1400 POUNDS, 40% BY WEIGHT 40 TO 700 POUNDS AND 0 TO 10% 0 TO 40 POUNDS. EITHER A FILTER BLANKET OF 16 INCH LAYER OF CLASS 50, OR SPECIFIED FILTER FABRIC WILL BE LAID BENEATH THE

ROCK.

A CLAMSHELL, ORANGE PEEL BUCKET, SKIP OR SIMILAR APPROVED DEVICE WILL BE USED WHICH WILL TRANSPORT THE RIPRAP MATERIAL TO ITS FINAL DESTINATION. THIS REVETMENT REPAIR IS FOR FLOW ASSUMED TO GENERALLY BE UNIFORM, STEADY AND SUBCRITICAL. HOWEVER, RAPIDLY

VARYING, UNSTEADY FLOW CONDITIONS OCCUR OCCASIONALLY, AND EXCESSIVE WAVE ACTION,

HYDRAULIC JUMPS AND EXTREME FLOW TURBULENCE CAN OCCUR AT THIS LOCATION. THESE

CONDITIONS ARE AMONG THE REASONS FOR THE EXTENT OF PROTECTION PROPOSED. THE

LONGITUDINAL EXTENT OF THIS REPAIR SHOULD BE CONTINUOUS FOR A DISTANCE GREATER THAN

THE LENGTH THAT IS IMPACTED. THE VERTICAL EXTENT OF PROTECTION REQUIRED FOR THIS

REVETMENT INCLUDES DESIGN HEIGHT AND FOUNDATION OR TOE DEPTH. THE DESIGN HEIGHT OF THE RIP RAP INSTALLATION IS TO BE EQUAL TO THE DESIGN HIGH WATER ELEVATION (KING TIDE

PLUS STORM SURGE) WITH ADEQUATE FREEBOARD TO ACCOMMODATE WAVE ACTION, SUPER

ELEVATION FROM THE CHANNEL BEND, HYDRAULIC JUMP, AND FLOW IRREGULARITIES, PLUS

ERRATIC PHENOMENA SUCH AS UNFORESEEN EMBANKMENT SETTLEMENT, ACCUMULATION OF

TRASH AND DEBRIS FROM THE RIVER.

SCOUR DEPTH IS ESTIMATED AT ABOUT 4 FEET FROM THE LOWEST ELEVATION IN THE

CROSS-SECTION OF THE BASIN AT THIS POINT, UTILIZING THE CONSERVATIVE ASSUMPTION OF A MEDIAN DIAMETER OF BED MATERIAL TO BE ABOUT 0.15 M. RIPRAP THICKNESS FOR CLASS 2000 IS

SPECIFIED TO BE AT LEAST A 4 FOOT LAYER.

THE FILTER BENEATH THE RIPRAP AND OVERLYING THE STRUCTURAL FILL IS TO PREVENT THE

MIGRATION OF FINE SOIL PARTICLES THROUGH STRUCTURAL VOIDS AND TO DISTRIBUTE THE

WEIGHT OF THE ARMORING UNITS (RIPRAP) TO PROVIDE MORE UNIFORM SETTLEMENT, AND ALSO

PERMITS RELIEF OF HYDROSTATIC PRESSURES WITHIN THE SOILS.

FOR THE AREAS ABOVE THE WATERLINE AT ANY GIVEN TIME THE FABRIC OR GEOTEXTILE ALSO PREVENTS SURFACE WATER FROM CAUSING EROSION BENEATH THE RIP RAP. IN ADDITION TO TOE CONSIDERATIONS WITH RESPECT TO SCOUR THE FLANKS OF THIS REVETMENT ARE DESIGNED FOR

UPSTREAM AND DOWNSTREAM CONDITIONS

GENERAL CONSTRUCTION, EROSION & CONTROL NOTES

FINAL BANK SLOPE WILL BE NOT GREATER THAN 1V:1.5H. BANK PREPARATION WILL CONSIST OF CLEARING DEBRIS AND MINOR GRADING. RIPRAP PLACEMENT WILL BE BY MACHINE PLACING AND

HAND PLACING. HAND PLACING WILL BE PERFORMED AS SPECIFIED BY EMC ON STEEPER SIDE

SLOPES.

RE-HANDLING OR DRAGGING TO SMOOTH REVETMENT SERVICES TEND TO RESULT IN SEGREGATION

AND BREAKAGE OF STONE AND ARE TO BE AVOIDED. STONE WILL NOT BE DROPPED FROM AN

EXCESSIVE HEIGHT.

ACTIONS THAT WILL REQUIRE THE USE OF MATERIALS THAT ARE HAZARDOUS OR TOXIC TO AQUATIC LIFE (SUCH AS MOTOR FUEL, OIL, OR DRILLING FLUID), ARE INCLUDED WITHIN THE POLLUTION AND EROSION CONTROL PLAN SECTIONS OF THIS NARRATIVE, TO BE MANAGED BY EMC AND ENFORCED BY THE PORT OF BROOKINGS-HARBOR. THE PLAN INCLUDES PRACTICES TO MINIMIZE EROSION AND

SEDIMENTATION ASSOCIATED WITH ALL ASPECTS OF THE PROJECT (E.G., STAGING AREAS,

STOCKPILES, GRADING); TO PREVENT DEBRIS FROM DROPPING OR OTHERWISE ENTERING ANY

STREAM OR WATERBODY; AND TO PREVENT AND CONTROL HAZARDOUS MATERIAL SPILLS.

EROSION CONTROLS WILL BE MONITORED AND MAINTAINED DAILY DURING THE RAINY SEASON AND

WEEKLY DURING THE DRY SEASON AS NECESSARY TO ENSURE CONTROLS ARE PROPERLY

FUNCTIONING. IF MONITORING SHOWS THAT THE EROSION CONTROLS ARE INEFFECTIVE AT

PREVENTING VISIBLE SEDIMENT DISCHARGE, THE PROJECT WILL STOP TO EVALUATE EROSION

CONTROL MEASURES. REPAIRS, REPLACEMENTS OR THE INSTALLATION OF ADDITIONAL EROSION

CONTROL MEASURES WILL BE COMPLETED BEFORE THE PROJECT RESUMES.

IF APPLICABLE, MAINTENANCE WILL INCLUDE REMOVAL OF SEDIMENT AND DEBRIS FROM EROSION CONTROLS LIKE SILT FENCES OR HAY BALES AND TURBIDITY CURTAINS ONCE IT HAS REACHED ONE-THIRD OF THE EXPOSED HEIGHT OF THE CONTROL. WHENEVER PRACTICAL, NATIVE MATERIALS ARE TO BE LEFT WHERE THEY ARE FOUND AND IN AREAS TO BE CLEARED, VEGETATION IS TO BE

CLIPPED AT GROUND LEVEL TO RETAIN ROOT MASS AND ENCOURAGE REESTABLISHMENT OF

NATIVE VEGETATION.

HEAVY EQUIPMENT WILL BE SELECTED AND OPERATED AS NECESSARY TO MINIMIZE ADVERSE

EFFECTS ON THE ENVIRONMENT (E.G., MINIMALLY-SIZED, LOW PRESSURE TIRES, MINIMAL HARD

TURN PATHS FOR TRACKED VEHICLES, TEMPORARY MATS OR PLATES WITHIN WET AREAS OR

SENSITIVE SOILS); AND ALL VEHICLES AND OTHER HEAVY EQUIPMENT WILL BE USED AS FOLLOWS:

1) STORED, FUELED AND MAINTAINED IN A VEHICLE STAGING AREA PLACED 150 FEET OR MORE

FROM ANY WATERBODY, OR IN AN ISOLATED HARD ZONE SUCH AS A PAVED PARKING LOT, OR

LINED SURFACE;

2) INSPECTED DAILY FOR FLUID LEAKS BEFORE LEAVING THE VEHICLE STAGING AREA FOR

OPERATION WITHIN 50 FEET OF ANY WATERBODY;

3) STEAM-CLEANED BEFORE OPERATION BELOW ORDINARY HIGH WATER, AND AS OFTEN AS

NECESSARY DURING OPERATION TO REMAIN FREE OF ALL EXTERNAL OIL, GREASE, MUD, SEEDS, ORGANISMS AND OTHER VISIBLE CONTAMINANTS AND

4) GENERATORS, CRANES AND ANY OTHER STATIONARY EQUIPMENT OPERATED WITHIN 150 FEET

OF ANY WATERBODY WILL BE MAINTAINED AND PROTECTED AS NECESSARY TO PREVENT LEAKS

AND SPILLS FROM ENTERING THE WATER.

APPROXIMATE

TOP OF PROPOSED

EMBANKMENT

EXISTING

ELEVATIONS

FABRIC TUCKED UNDER TOP

OF ROCK ABOUT 1', +12' MLLW

BASIN 2, WEST EMBANKMENT PLAN

SCALE 1" = 20'

DETAILS

C5.0

BY

R

EV

IS

IO

N S

P R E

LI

M

IN

A R Y

DRAWN BY:

BA

SI

N

EM

BA

NK

M

EN

T

RO

CK

R

EC

ON

ST

RU

CT

IO

N

0 L

OW

ER

H

AR

BO

R

RO

AD

, B

RO

OK

IN

GS

, O R

PO

RT

O

F B

RO

OK

IN

GS

H

AR

BO

R

DATE:

JOB No:

SHEET No:

CD/JW

14 AUG 2024

022-2203

NOT FOR C

ONSTRUCTIO

N

EMBANKMENT

TYPICAL WEST EMBANKMENT DETAIL2

SCALE - 1"=5'

APPROX. TOE OF

BASE ROCK

VARIES - SEE DETAIL 2

APPROX. TOP OF

EX. BANK-TYP.

CUT/FILL AS

REQUIRED -TYP.

ODOT 750#-2000#

ROCK @ +12.0' MLLW

DREDGING AREA

SEE DREDGING PLANS

TOE ROCK DETAIL3

SLOPE CREATED

BY DREDGING

PROJECT AND/OR

DOCK AREA

EXCAVATION

USE 2000# TO 3000#

ROCK FOR BASE

TOP OF ODOT 750#-2000#

ROCK @ +12.0' MLLW

FABRIC WRAPPED AROUND BASE

ROCK AND BENEATH ROCK ABOVE

AS SHOWN

NO SCALE

SEE DETAIL 3 BELOW

EMBANKMENT RECONSTRUCTION PROCEDURE:

1. OBTAIN DESIRED SLOPE

2. LAY FABRIC TO +12' MLLW

3. PRESS 2500-3000# BASE ROCK AT TOE

4. PLACE ODOT 750-2000# ROCK

FABRIC TUCKED

UNDER TOP OF ROCK

ABOUT 1', +12' MLLW

PRESS ROCK AT LEAST 50% INTO

EXISTING GRADE - TYP,

EXISTING FLOATING DOCKS

235.0'± EM

BANKM

ENT RECONSTRUCTION

WEST

ODOT 750#-2000# ROCK

FINISHES +12 MLLW

FILL EXISTING SLOPE AS REQUIRED

APPROXIMATE

HTL

2000# - 3000# BOULDERS

SEE DETAIL 3 BELOW

ODOT 750# - 2000# ROCK 308 CU. YDS. ±

± 180 - 190 EACH

FILTER FABRIC 7,700 SQ. FT. ±

APPROXIMATE QUANTITIES

MATERIAL CUT 150 CU. YDS ±

MATERIAL FILL 100 CU. YDS ±

* *BASED UPON EXISTING TOPO AS SHOWN

AND APPROXIMATIONS OF FINAL GRADES.

CONTRACTOR TO VERIFY.

AutoCAD SHX Text

VARIES - 30.0' ±

AutoCAD SHX Text

42,650 PE

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

RENEWAL DATE: 12/31/25

SEE DETAIL 2, TYPICAL EMBANKMENT

-20

-10

-20

-10

1.5

+12' MLLW

TYP

+4' MLLW

+7.5' HTL

C6.0

BY

R

EV

IS

IO

N S

P R E

LI

M

IN

A R Y

DRAWN BY:

BA

SI

N

EM

BA

NK

M

EN

T

RO

CK

R

EC

ON

ST

RU

CT

IO

N

0 L

OW

ER

H

AR

BO

R

RO

AD

, B

RO

OK

IN

GS

, O R

PO

RT

O

F B

RO

OK

IN

GS

H

AR

BO

R

DATE:

JOB No:

SHEET No:

CD/JW

14 AUG 2024

022-2203

NOT FOR C

ONSTRUCTIO

N

EXISTING SLOPE -

VARIES

FILTER FABRIC WRAPS ROCK AT

BOTTOM AND ROCK AT TOP TO +12' MLLW

ENGINEERED FILL

WHERE REQURED

CUT BACK

EMBANKMENT WHERE

THERE IS ROOM

TOWARD SIDEWALK

EXISTING ELEV. +12.0' MLLW

ODOT 750#-2000# ROCK

FINISHES +12 MLLW

FILL EXISTING SLOPE AS REQUIRED

APPROXIMATE

TOP OF PROPOSED

EMBANKMENT

EXISTING

ELEVATIONS

FABRIC TUCKED UNDER TOP

OF ROCK ABOUT 1', +12' MLLW

APPROX. TOE OF

BASE ROCK

VARIES - SEE DETAIL 2

APPROX. TOP OF

EX. BANK-TYP.

CUT/FILL AS

REQUIRED -TYP.

ODOT 750#-2000#

ROCK @ +12.0' MLLW

SLOPE CREATED

BY DREDGING

PROJECT AND/OR

DOCK AREA

EXCAVATION

EAST EMBANKMENT RECONSTRUCTION PROCEDURE:

1. OBTAIN DESIRED SLOPE

2. LAY FABRIC TO +12' MLLW

3. PLACE ODOT 750-2000# ROCK

FABRIC TUCKED

UNDER TOP OF ROCK

ABOUT 1', +12' MLLW

EXISTING FLOATING DOCKS

65.0'± EM

BANKM

ENT RECONSTRUCTION

(24X36)

BASIN 2, EAST EMBANKMENT PLAN

SCALE 1" = 20'

TYPICAL EAST EMBANKMENT DETAIL2

SCALE - 1"=5'

NOTE:

SEE SHEET C5.0 FOR EMBANKMENT RECONSTRUCTION NOTES

0' 20' 40' 60'

VARIES - VERIFY

ON SITE PER ENGINEER

DETAILS

EMBANKMENT

EAST

DREDGING AREA

SEE DREDGING PLANS

APPROXIMATE HTL

ODOT 750# - 2000# ROCK 95 CU. YDS. ±

FILTER FABRIC 1,400 SQ. FT. ±

APPROXIMATE QUANTITIES

MATERIAL CUT 50 CU. YDS ±

MATERIAL FILL 40 CU. YDS ±

*BASED UPON EXISTING TOPO AS SHOWN

AND APPROXIMATIONS OF FINAL GRADES.

CONTRACTOR TO VERIFY.

AutoCAD SHX Text

42,650 PE

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

RENEWAL DATE: 12/31/25

AutoCAD SHX Text

VARIES

SEE DETAIL 2, TYPICAL EMBANKMENT

File details come from the government source that posted it. Updated .