Addedum One- Questions and Answers.pdf
PDF 253 KB Posted
- Solicitation number
- 6958
- Issued by
- King William County, Virginia
About this file
This document is an addendum to a Request for Proposal (RFP) issued by King William County Public Schools in Virginia for a roof replacement project at Cool Spring Primary School. The addendum provides clarification on several questions raised by potential bidders, including the acceptability of alternate manufacturers, the extent of work required for the curb and wall sheet metal flashings, the treatment of the copper counterflashing, the inclusion of walk pads, and the removal and reinstallation of the coping. The addendum confirms that alternative manufacturers are acceptable, that the lower counterflashing will be removed and replaced, and that the copper counterflashing will be removed and the membrane installed up and over the wall. The addendum also states that walk pads are not part of the original bid but should be added as an option, and that the coping will not be removed and reinstalled.
The related state and local contract opportunity is for the design and management of a roof system replacement at Cool Spring Primary School in King William County, Virginia. The project is being managed by King William County Public Schools, and the jurisdiction involved is King and Queen County.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum Two- 1.6.2023.pdf | ||
| Award of Contract | — | |
| CSPS - RFP - 2023-01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
King William County Public Schools P.O. Box 185
18548 King William Road King William, Virginia 23086
Phone Fax
(804) 769-3434 (804) 769-3312
Addendum One: Clarification Questions and answers
1. Are alternate manufacturers acceptable? Yes - alternative manufacturers are acceptable.
2. Are all curb and wall sheet metal flashings to be removed and replaced? Yes. The 2 pc stainless is in good shape. At a minimum we can leave the upper receiver reglet in place and replace the lower counter flashing.
Otherwise we will remove the lower counter, install term bar and reinstall the counter. Yes, leave the reglet, install a termination bar and counter flashing.
3. Will the copper counter flashing be removed from the inside the parapet walls and new membrane be installed up and over the wall? Yes, remove...and install membrane up and over the wall.
4. Are any walk pads required for the new system? This was not part of the bid -but we would definitely like to see this option added to the cost of the project.
5. Is coping to be removed and reinstalled? NO.
6. Is it acceptable to encapsulate the wall with membrane and fabricate and install a new drip edge? YES