Summary of Addendum II - QA Round 2
This addendum, issued October 28, 2026, by the Florida Department of Agriculture and Consumer Services provides clarifications and revisions to RFP FNW 26 27 10 for Child Nutrition Program Administrative Reviews. The solicitation seeks a contractor to conduct Administrative Reviews (ARs), Targeted Technical Assistance Reviews (TTARs), and Pre-Operational Visits for School Food Authorities participating in the National School Lunch Program and related child nutrition programs across Florida. The anticipated scope for the initial term includes up to 100 ARs (100 small, 30 medium, and 20 large School Food Authorities), up to 10 TTARs, and up to 5 pre-operational visits. The deadline for sealed proposals was revised from November 5, 2026 to November 2, 2026 at 5:00 PM ET, with public opening scheduled for November 3, 2026 at 9:30 AM ET. The evaluation phase is anticipated for November 3-6, 2026, followed by Notice of Agency Decision on a date to be determined. The Off-Site Assessment Tool and Preliminary Findings Report are due prior to the on-site review or no later than 10 calendar days after the SMAR Exit Conference, with the final SMAR report due 15 calendar days after the exit conference.
The evaluation structure was revised to a total of 375 points, with price proposals worth up to 150 points (75 for initial term and 75 for renewal term), references worth up to 25 points, contractor experience and program knowledge worth up to 75 points, technical approach and methodology worth up to 75 points, and management plan worth up to 50 points. The addendum clarifies that respondents should price one service type per category and that renewal term scoring will apply quantities across three renewal years. The revised Reference Check Form and Evaluator Score Sheet clarify that references are worth 25 total points (5 points per reference for three references maximum) and that organizational charts and staffing plans should be included in Tab F (Management Plan). No set-asides are identified in this addendum. CN Resource is the incumbent contractor, having performed administrative reviews for four years. The contract term includes an initial term and renewal options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addedum I - Q&A.pdf | ||
| RFP FNW 26 27 10_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum Date: October 28, 2026
Addendum Number: II
Solicitation Number: RFP FNW 26 27 10
Solicitation Title: Child Nutrition Program Administrative Reviews
Please be advised that the information contained below is applicable to the original specifications of the above-referenced solicitation.
This Addendum includes the Department’s written answers to the written questions received by the deadline.
This Addendum also includes the following changes to the above-referenced solicitation. Terms struck through are deletions; new terms are indicated in red font.
Change No. 1: Revises Section 1.2 Timeline.
Change No. 2: Revises Section 2.4 Minimum Deliverables, Table A – SCHEDULE OF DELIVERABLES, A. Off-site Assessment Tool.
Change No. 3: Revises Section 5.4 Evaluation Procedure, Points Available table.
Change No. 4: Revises Section 5.4 Evaluation Procedure, A) Price Response Score.
Change No. 5: Replaces Attachment H – Reference Check Form, with REVISED Attachment H – Reference Check Form and is attached hereto.
Change No. 6: Replaces Attachment J – Evaluator Score Sheet, with REVISED Attachment I – Evaluator Score Sheet and is attached hereto.
Please see changes on the next page of this Addendum.
Addendum II
RFP FNW 26 27 10
Change No. 1: Section 1.2 Timeline, timeline table is hereby revised as follows:
EVENT DATE/TIME (ET) LOCATION
Release of RFP October 13, 2026 Vendor Information Portal https://vendor.myfloridamarketplace.com/search/bids
Last day for Vendors to Submit Questions. No questions will be accepted after this date.
October 16. 2026
5:00PM
Florida Department of Agriculture and Consumer Services
Email: Bids@FDACS.gov
Anticipated Posting of Written Responses to
Vendor Questions October 19, 2026
Vendor Information Portal https://vendor.myfloridamarketplace.com/search/bids
Sealed Proposals Due November 5, 2026 November 2, 2026
5:00PM
Florida Department of Agriculture and Consumer Services
Mayo Building - Purchasing Office 407 S. Calhoun Street, SB-8
Tallahassee, Florida 32399-0800
Public Opening November 6, 2026 November 3, 2026
9:30AM
Teleconference Number: (877) 273-4202 Conference Room Number: 585 608 901
OR
Mayo Building
407 S. Calhoun Street, SB-8 Tallahassee, Florida 32399-0800
Evaluation Phase (Anticipated)
November 6 – 11, 2026 November 3 – 6, 2026
Notice of Agency Decision / Intent to Award
(Anticipated)
TBD
Vendor Information Portal https://vendor.myfloridamarketplace.com/search/bids mailto:Bids@FDACS.gov
Change No. 2: Section 2.4 Minimum Deliverables, Table A – SCHEDULE OF DELIVERABLES, A. Off-site Assessment Tool, is hereby revised as follows:
TABLE A – SCHEDULE OF DELIVERABLES
DELIVERABLE TASK DUE DATE SUBMIT TO
A. Off-site Assessment Tool
Engage the Sponsor to initiate the review process; prior to conducting the On-Site Review, ensure Sponsor has completed the Off-Site Assessment Tool and submitted the completed Off-Site Assessment Tool to FDACS. Review Off-Site Assessment Tool for compliance, and if findings are discovered, complete the Preliminary Findings Report and submit it to FDACS prior to conducting the On-Site Review, where practical. The Preliminary Findings Report shall identify all areas of technical assistance (TA) and/or the Corrective Action Plan (CAP) determined up to this point in the review. The Preliminary Findings Report shall include the following areas: week of menu review, resource management, procurement, and general areas of review that do not include the On-Site Review.
Communicate any potential findings to the Sponsor.
Engage the Sponsor to initiate the review process, complete the Off-Site Assessment Tool prior to conducting the On-Site Review, and submit the completed Off-Site Assessment Tool to FDACS. Complete the Preliminary Findings Report and submit it to FDACS prior to conducting the On-Site Review. The report shall identify all areas of technical assistance (TA) and/or the Corrective Action Plan (CAP) determined up to this point in the review. The Preliminary Findings Report shall include the following areas: week of menu review, resource management, procurement, and general areas of review that do not include the On- Site Review.
Communicate any potential findings to the Sponsor.
Prior to conducting the On-Site Review or no later than 10 calendar days after the SMAR Exit Conference is conducted
The final SMAR report is due once the on-site portion of the review is completed and 15 calendar days after the SMAR Exit Conference
10 calendar days after the SMAR Exit Conference is conducted
Contractor submission in SharePoint
Change No. 3: Section 5.4 Evaluation Procedure, Points Available table is revised as follows:
300 Points Available 375 Points Available
Price Proposal and References (Scored by Procurement Officer)
Budget and Price Proposal (Tab B) Up to 75 Points Up to 150 Points
References (Tab D) Up to 25 Points
Technical Response (Scored by Evaluators)
Contractor Experience / Program Knowledge / Conducting ARs (Tab C) Up to 75 Points
Technical Approach and Methodology (Tab E) Up to 75 Points
Management Plan (Tab F) Up to 50 Points
Change No. 4: Section 5.4 Evaluation Procedure, A) Price Response Score (150 Points Possible), is hereby revised as follows:
A) Price Response Score (75 150 Points Possible): The Respondent shall complete Exhibit
A – Price Sheet for all service types (Administrative Review, Targeted Technical Assistance Review, and Pre-Operational Visit). The Procurement Officer will calculate each Respondent’s Price Proposal Score as described below using the Respondent’s completed Exhibit A – Price Sheet.
1) Initial Term Points (75 Points Possible): The Respondent with the lowest sum of the Grand Total Price for all service types for the Initial Term will receive 75 Initial Term Points. Other Respondents’ Initial Term Scores will be calculated as follows.
(Lowest Respondent’s Initial Term Price) / (Respondent’s Initial Term Price) = Y Y x 75 = Total Points
2) Renewal Term Points (75 Points Possible): The Respondent with the lowest sum of Grand Total Price for all service types for the Renewal Term will receive 75 Renewal Term Points. Other Respondents’ Renewal Term Scores will be calculated as follows:
(Lowest Respondent’s Renewal Term) / (Respondent’s Renewal Term) = Z
Z x 75 = Renewal Term Points
Change No. 5: Attachment H – Reference Check Form, is hereby replaced in its entirety with REVISED Attachment H – Reference Check Form and is attached hereto.
Change No. 6: Attachment J – Evaluator Score Sheet, is hereby replaced in its entirety with REVISED Attachment I – Evaluator Score Sheet and is attached hereto. The original attachment included the incorrect title.
Question Number
RFP Section Question Answer
Exhibit A, Price Sheets (AR, TTAR, Pre-Op)
The Initial Term price sheets show quantities of 100 small, 30 medium and 20 large SFAs (150 total) on all three sheets. Sections 2.1-
2.3 anticipate up to 100 ARs, up to 10 TTARs and up to 5 pre-operational visits. Please confirm the quantities Respondents should use for each service type and size category when calculating the Initial Term Grand Total Price.
Vendors should refer to the totals as listed in Exhibit A, Price Sheet, of the original RFP document.
Section 5.4(A)(2);
Exhibit A
The Renewal Term price tables list unit prices only, with no quantities or Grand Total, but 75 points are scored on the "lowest sum of Grand Total Price" for the Renewal Term.
Please explain how the Renewal Term score will be calculated, including which quantities will be applied and whether the three renewal years are summed, averaged, or scored separately.
Please refer to Change No. 3 and No. 4, of this Addendum. Respondents are expected to list their price to conduct one (1) type of service per category. For example, the respondent should indicate the amount charged to conduct one SMAR for a large SFA, and so on.
Section 2.3(C); Section 2.5(1)(c)
Please provide the 2026-27 SMAR and TTAR schedules, or the anticipated distribution of the up to 100 ARs by SFA size.
For the anticipated distribution of SMARs by SFA size, please refer to Addendum I, Question #10, and Attachment A, which is referenced in and attached to that addendum
FDACS does not yet have a 2026–27 TTAR schedule available; however, the Department anticipates issuing at least 10 TTARs.
RFP Section Question Answer
Table A, Deliverables A and B
Table A lists the Off-Site Assessment Tool and Preliminary Findings Report due "10 calendar days after the SMAR Exit Conference," but the task description says these are completed prior to the On-Site Review. Please clarify the due date for the Off-Site deliverable and how it interacts with the Exit Conference and the 15-day On- Site/SMAR report deadline.
Please refer to Change No. 2, of this Addendum.
Attachment H; Section 4.1, Tab D; Section 5.4
Attachment H states the maximum reference score is 15 points (5 points per reference), while Section 4.1 and Section 5.4 state up to 25 points for references. Please confirm the maximum points available for Tab D.
Please refer to Change No. 5, of this Addendum.
RFP Section Question Answer
Attachment J (Evaluator Score Sheet); Section 5.4
Section 5.4 refers to the evaluator score sheet as Attachment I, and the document labels it Attachment J. The score sheet also (a) lists Tab E and Tab F criteria with different point values than the text (e.g., "75 Points Possible" for Tab F), (b) states the total as the "Sum of Tab C, Tab D, and Tab E", and (c) scores Tab C on criteria that overlap with Tab F content.
Please confirm the criteria, point values and tabs to be used in scoring, and where the org chart and staffing plan should be placed (Tab C or Tab F).
Please refer to Change No. 6, of this Addendum.
(a) The Tab totals match the totals outlined in Section 5.4, of the RFP.
• Tab C = 75 Points Possible. There are three (3) subsections on the score sheet, which are 25 points possible each, for a total of up to 75 points awarded for Tab C.
• Tab E = 75 Points Possible.
• Tab F = 50 Points Possible.
(b) Tab C will have a subtotal for the three
(3) subsections that will be scored. Points will be calculated to reflect the sum of Tab C + Tab E + Tab F = Total Points Awarded.
(c) Respondents should include its organizational chart and staffing plan under Tab F. Please refer to Section 4.1, Tab F – Management Plan.
Section 4.1 (Tabs F/G); Section 4.5
The redacted proposal is labeled Tab G in Section 4.1 and Tab F in Section 4.5. Please confirm the correct tab designation and whether a separate USB should contain the redacted copy.
Respondents’ redacted proposal should be labeled Tab G.
ADVERTISEMENT NUMBER: RFP FNW 26 27 10
REVISED ATTACHMENT H
Florida Department of Agriculture and Consumer Services
Bureau of General Services
REFERENCE CHECK FORM
Respondent Name:
Reference Contact Name:
Reference Contact Phone Number:
Reference Contact Email:
The following questions will be asked by the Procurement Officer for each reference. Each question is worth a maximum of 5 points. The total raw score for each reference (maximum of 25 points) will be divided by 5 to produce a final score of up to 5 points per reference. With three completed references, the maximum total score available to the Respondent is 25 points.
Questions are rated as follows: Excellent = 5 points, Fair = 3 Points, and Poor = 0 Points.
1) Would you use the services of the Respondent again?
Yes (5 Point) No (0 Points)
2) How would you rate the Respondent’s overall performance?
Excellent - 5 points Fair - 3 Points Poor - 0 Point
3) How would you rate the Respondent’s customer service?
4) How well did the Respondent stay within proposed timelines for service delivery?
5) Were issues and problems addressed and resolved in a timely and satisfactory manner?
Total Rated Points: ________________ ÷ 5 = Total Maximum Points: ________________
WILTON SIMPSON
COMMISSIONER
ADVERTISEMENT NUMBER: RFP FNW 26 27 10
REVISED ATTACHMENT I
Bureau of General Services
EVALUATOR SCORE SHEET
INSTRUCTIONS: Evaluators must score each Respondent being evaluated on a separate score sheet. Criteria have been developed to score the Proposal and are presented on this Evaluator Score Sheet. Scoring should reflect the evaluator’s independent evaluation of the Respondent’s Proposal based on each criterion and should consider the Respondent’s ability to meet each function, characteristic, performance level, or specification described in the solicitation. A Respondent who exceeds the function, characteristic, performance level, or specification described in the solicitation should receive a higher score than a Respondent who merely meets the function, characteristic, performance level, or specification.
Once the evaluator has completed a score sheet for each Proposal, the evaluator should submit the completed score sheets to the Procurement Officer.
RESPONDING COMPANY NAME:
EVALUATOR NAME:
EVALUATOR SCORE SHEET
Tab C: Contractor Experience / Program Knowledge / Conducting ARs (75 Points Possible)
How do you rate the Respondent’s qualifications and operational readiness to perform all required services? (25 Points Possible)
RANKING RANGE
EXCELLENT
(25 – 20)
GOOD
(19 – 13)
FAIR
(12 – 6)
POOR
(5 – 0)
SCORE
How well does the Respondent’s proposed personnel, organizational chart, and proposed roles and responsibilities (including subcontractors) address the Department’s needs for the required services? (25 Points Possible)
RANKING RANGE
EXCELLENT
(25 – 20)
GOOD
(19 – 13)
FAIR
(12 – 6)
POOR
How do you rate the Respondent’s capacity to perform the required services? (25 Points Possible)
RANKING RANGE
EXCELLENT
(25 – 20)
GOOD
(19 – 13)
FAIR
(12 – 6)
POOR
TAB C SUBTOTAL
Tab E: Technical Approach and Methodology (75 Points Possible)
How well does the Respondent’s prior relevant experience address the services sought in this RFP?
RANKING RANGE
EXCELLENT
(75 – 61)
GOOD
(60 – 46)
FAIR
(45 – 31)
POOR
(30 – 0)
Tab F: Management Plan (50 Points Possible)
How do you rate the Respondent’s implementation and management plan to carrying out the required services sought in this RFP? (75 Points Possible)
RANKING RANGE
EXCELLENT
(50 – 41)
GOOD
(40 – 27)
FAIR
(26 – 13)
POOR
(12 – 0)
Total Points Awarded (Sum of Tab C, Tab E, and Tab F)
WILTON SIMPSON
COMMISSIONER
This Addendum is hereby incorporated into and made a part of the above noted Request for Proposals. All other terms, conditions, and specifications of this Request for Proposals will remain the same. All questions regarding this Addendum should be submitted in writing to the Procurement Officer at Bids@FDACS.gov or contact the Procurement Office at (850) 617-7180.
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Protests must be filed with the Department’s Agency Clerk. Filings may be made physically at: