This is Addendum No. 1, issued March 12, 2026, by the State of Michigan Department of Technology, Management and Budget (DTMB) Design and Construction Division in conjunction with engineer Fishbeck for the Secondary Complex Steam Tunnel and Water Infiltration repair project located at 7432 Parsons Drive, Dimondale, Michigan. The project involves concrete steam tunnel restoration, including repair of concrete delaminations and spalls, replacement of corroded structural steel and Unistrut stanchion members, concrete crack injection, and temporary relocation of utilities obstructing repair work. The addendum adds unit price items for temporary relocation of conduit (64 each) and cable trays (32 each) as separate line items rather than including them within the concrete repair pricing. Base bid items total nine line items including general conditions (lump sum), overhead and vertical concrete spall/delamination repairs (910 sq/ft and 164 sq/ft respectively), Unistrut stanchion vertical member replacement (115 each), structural steel stanchion base replacement (10 each), structural steel stanchion base clean and coat (148 lineal feet), and concrete crack injection (57 lineal feet). The mandatory pre-bid meeting was held on March 11, 2026, with attendance from DTMB staff, multiple construction firms, and the engineer. Bids are due electronically through the SIGMA VSS website on Wednesday, March 25, 2026, at 2:00 PM Eastern Time, with bid opening on the same date. Bidder questions must be submitted by March 17, 2026, and award notification is expected in early May 2026. Contract time is to be determined with bidders during the award process.
Bidders must submit a five percent bid guarantee and provide a performance bond and payment bond for all bids exceeding $50,000. The contract requires builders risk insurance unless otherwise indicated. Bidders must acknowledge receipt of Addendum No. 1 on the bid form or face automatic disqualification. The project scope is estimated based on field inspections with final quantities determined once repair areas are prepared and verified by the engineer. Three engineered inspections are required during the repair process: upon repair identification, repair preparation, and repair completion. Post-bid submittals required include current EMR rating, identification of the project superintendent with resume, and references for at least three similar projects completed within the last three years. Bidders must certify compliance with Michigan-Based Business and Qualified Disabled Veteran requirements and acknowledge understanding of asbestos abatement project procedures per PA 59 of 2024. The addendum also removed the stated date of substantial completion from the project drawings and provided attendees with tunnel cross-section documentation and a shorter tunnel section location diagram referenced during the pre-bid meeting.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Secondary Complex Repair Steam Tunnel and Water Infiltration Project No. 240740
ADDENDUM
Z:\2024\240740\WORK\CONTRACTS\ECD\ADD01\ADD01.DOCX
Addendum No. 1
Date: March 12, 2026
OWNER: State of Michigan Department of Technology, Management and Budget Design and Construction Division 3111 West St. Joseph Street Lansing, MI 48917
ENGINEER: Fishbeck 1515 Arboretum Drive, SE Grand Rapids, MI 49546
DRAWING REVISION NO.: A1
ISSUED HEREWITH:
SPECIFICATION SECTIONS: 00300, 01 22 00
SHEETS: None
OTHER DOCUMENTATION Pre-Bid Meeting Minutes Pre-Bid Meeting Attendance Sheet Tunnel Cross-section and Location of Shorter Tunnel
BIDS DUE: Wednesday, March 25, 2026
This Addendum is issued to all Bid Set Holders, is a part of the Contract Documents, and modifies the previously issued Bidding Documents. Acknowledge receipt of this Addendum in the space provided on the Bid form; failure to do so may result in rejection of the Bid.
ITEM NO. 1: Added Unit Price Items for Temporary Relocation of Conduit and Cable Trays Sections: 00300 – Bid Summary (reissued)
01 22 00 – Unit Prices – Measurement and Payment (reissued)
A. Added Unit Price Items for Temporary Relocation of utilities that were found to be obstructing concrete delamination/spall repairs.
B. Ignore all language in Drawings and Specifications related to including temporary relocation of utilities in the unit price of concrete delamination/spall repairs, including but not necessarily limited to:
1. Concrete Repair Notes #3: (…include any required work associated with temporarily moving and re-attaching utilities…)
ITEM NO. 2: Removed Date of Substantial Completion from the Drawings.
Sheet: G001 – Project Overview (reissued)
A. Ignore stated Date of Substantial Completion on sheet G001.
ITEM NO. 3: Included Pre-Bid Meeting Minutes
A. Pre-Bid Meeting Minutes are attached.
ITEM NO. 4: Included Tunnel Cross-section and location of shorter tunnel mentioned in Pre-Bid Meeting.
A. Tunnel Cross-section and location of shorter tunnel mentioned in Pre-Bid Meeting are attached.
ITEM NO. 5: Included Attendance sheet of Pre-Bid Meeting.
A. Pre-Bid Meeting Attendance sheet is Attached.
END OF ADDENDUM
MICHSPECÔ DTMB 00300 - 1
SECTION 00300 − BID SUMMARY
BID SUMMARY
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
3111 W. St. Joseph Street Lansing, Michigan 48917
Bids must be submitted electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
FILE NUMBER
171/23055.JGH
DEPARTMENT/AGENCY
CONTRACT TIME(S)
TBD with bidders (duration or deadline)
PROJECT NAME
Secondary Complex – Repair Steam Tunnel & Water Infiltration
LOCATION
7432 Parsons Drive, Dimondale
BID OPENING DATE
March 25, 2026 at 2:00 pm ET
FOR AN EXAMINATION OF THE SITE CONTACT:
Ryan Goerge
SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.
BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN
CONSIDERATION OF THE BID PRICE (S) STATED BELOW.
FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS
□ Qualified Disabled Veteran
SIGMA VENDOR NUMBER
(protected information required for processing payments)
BIDDER'S SIGNATURE AND TITLE DATE
WITNESS' SIGNATURE DATE
By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.
BASE BID FROM BID SCHEDULE (Include specified Allowances):
____________________________________________________________________________Dollars $____________________ (use words) (in figures)
Alternate1: (Add/Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)
Alternate 2: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)
Alternate 3: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)
A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE. BUILDERS RISK INSURANCE IS REQUIRED TO BE PROVIDED BY THE CONTRACTOR UNLESS
OTHERWISE INDICATED IN THE BID DOCUMENTS.
BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.
Project Scope of Work:
Concrete steam tunnel restoration
The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.
Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated: ________
ADDENDUM NO. 1
MICHSPEC DTMB 00300 − 2
SECTION 00300 BID FORM
PROFESSIONAL − Fishbeck
WORK − Secondary Complex – Repair Steam Tunnel & Water Infiltration
FILE No. - 171/23055.JGH
TABLE OF CONTENTS
PAGE
BID SUMMARY………………………………………………………………………………………………………………………………………..1
1 THIS BID IS SUBMITTED TO………………………………………………………………………………………………………………………...2
2 THE BIDDER'S REPRESENTATIONS……………………………………………………………………………………….2
3 TIME OF COMPLETION……………………………………...…………………………………………………………….3
4 ATTACHMENTS INCLUDED WITH THIS BID…………………………………..…………………………………………….3
5 DEFINED TERMS……………………………………...………………………………………………………………….3
6 BID SCHEDULE…………………………………………………………………………………..……………………….4
7 SCHEDULE OF CHANGE ORDER PRICES……………………………………………………………………………………………………… 6
8 BID SUBMITTED……………………………………………………………………………………………………………………………………. 7
ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF MICHIGAN ("the Owner").
1.1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an agreement with the Owner on the form in Section 00500 Agreement and to furnish and perform the Work as specified or indicated in the Bidding Documents for the Bid prices in the "Bid Schedule" on this Section 00300 Bid Form, within the Contract Times specified in Section 00500 Agreement, and in accordance with all other provisions and terms and conditions of the Bidding Documents, including, without limitation, those dealing with the disposition of the Bid Security.
1.2. The undersigned Bidder agrees to hold this Bid open for acceptance by the Owner for the period specified in Article 9 of Section 00030 Advertisement.
STATE OF MICHIGAN MODEL
Developed from FORMSPEC Michigan Model
1.3. The Bidder will provide a signed original of Section 00500 Agreement, the executed Section 00610 Performance Bond, the executed Section 00620 Payment Bond, and appropriate evidence of insurance within the times and in the manner specified in the Bidding Documents.
ARTICLE 2 THE BIDDER'S REPRESENTATIONS
2.1. The Bidder has examined the Bidding Documents, including the Addenda acknowledged in the table below. The Bidder has verified that the Addenda acknowledged below include all issued Addenda. Except for Addenda, which solely revise the date of Bid, opening, failure by the Bidder to acknowledge receipt of all Addenda correctly, by either failing to complete or incorrectly completing the table below, shall justify the Owner's refusal to read the Bid and automatically disqualify the Bidder from any consideration for award of the Contract.
MICHSPEC DTMB 00300 − 3
No. ___ Dated _____________ No. ___ Dated __________ No. ___ Dated __________
No. ___ Dated _____________ No. ___ Dated __________ No. ___ Dated __________
No. ___ Dated _____________ No. ___ Dated __________ No. ___ Dated __________
2.2. The Bidder has taken those steps that are reasonably necessary to (a) ascertain and become familiar with the Work, site, and locality; (b) account for all applicable federal, state, and other local Laws and all general, local, and prevailing conditions that may in any manner affect cost, schedule, progress, performance or furnishing of the Work; and (c) study and account for the terms and conditions of the Bidding Documents. The Bidder has carefully correlated the Bidder's observations with the Bidding Documents.
2.3. The Bidder has studied carefully all reports concerning subsurface conditions and drawings of physical conditions of existing surface and subsurface facilities that have been used by the Professional and all documents of physical conditions of existing Underground Utilities facilities that have been used by the Professional − in both cases as identified in Section 00210 Information for bidders. The Bidder assumes responsibility for carefully and accurately locating existing Underground Utilities in a manner consistent with paragraph 10.3 of Section 00700 General Conditions and as required by 2013 PA 174, as amended, MCL 460.721 et seq. The Bidder accepts the determinations set forth in the Bidding Documents as to the extent of such Authorized Technical Data and Underground Utilities information and data contained in those reports, drawings, documents, or the Bidding Documents, as applicable, upon which the Bidder may rely.
2.4. To the extent Additional Technical Data has been considered by the Bidder as necessary for determining the Bid in Article 6 Bid Schedule, and the Owner, upon request, did not have the necessary Additional Technical Data, the Bidder assumes responsibility for having undertaken or undertaking reasonable examinations of the site and any other pertinent available information and data. The Bidder agrees to perform and furnish the Work affected by the conditions involved, at no increase in Contract Price and Contract Time, to the extent the information and data necessary for determining the Bid could have been discovered through reasonable examinations of the site and any other pertinent information and data available (including, but not limited to the information and data designated in Section 00210 Information for Bidders).
2.5. The Bidder has carefully correlated the results of its observations, examinations, and studies of those reports of explorations and all that information and data in studies, drawings, and specifications, referred to in paragraphs 2.3 and 2.4, with the terms and conditions of the Bidding Documents.
2.6. The Bidder has examined all information and data shown or indicated in the Bidding Documents concerning other work, including, but not limited to provisions in Section 00700 General Conditions. The Bidder assumes responsibility for all reasonably foreseeable terms, conditions and consequences resulting from other work that may in any manner affect cost, schedule, progress, performance or furnishing of the Work.
2.7. The Bidder has carefully examined the terms and conditions of the Bidding Documents concerning Delay, Activity Float times and early completion. The Bidder agrees that increases in Contract Price and/or Contract Time for Delay shall be as provided in Section 00700 General Conditions. The Bidder has correlated those terms and conditions with the Bidder's schedule for the Work and its Base Bid and Alternates.
2.8. The Bidder represents that each unit price covering Specified or Contingent Unit Price Work, whether bid on Article 6 − Bid Schedule or on Article 7 − Schedule of Change Order Prices, includes sufficient amounts to cover (a) all labor costs, Subcontractor costs, material and equipment costs, construction equipment costs and general conditions costs, and (b) all administrative costs and home office overhead), and
(c) profit. The Owner reserves the right to reject any unit prices bid on paragraph 6.2 Schedule of Alternates or in Article 7 Schedule of Change Order Prices, which, in the Owner’s sole discretion, are not in the Owner’s best interest.
2.9. The Bidder has given the Professional written notice of all conflicts, ambiguities, errors, or omissions the Bidder has discovered in the Bidding Documents, and the written resolution given by the Professional is acceptable to the Bidder.
2.10. This Bid is genuine, is not made in the interest of or on behalf of any undisclosed person and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation. To induce the Owner into consideration of this Bid, the Bidder reiterates and makes each of the representations made by the Bidder in Section 00320 Non-collusion Affidavit attached to this Section 00300 Bid Form.
2.11. The Bidder is aware of the Owner's requirements for business owned by minorities, women, and persons with physical or mental disabilities, and assumes responsibility for all conditions and consequences that may result from meeting those requirements and that may in any manner affect cost, schedule, progress, performance and furnishing of the Work.
2.12. The Bidder has read and studied each provision of the Bidding Documents. The Bidder has no expectations different from the terms and conditions of the Bidding Documents.
MICHSPEC DTMB 00300 − 4
2.13. The Bidder is aware of the Owner's requirements for asbestos abatement projects pursuant to PA 59 of 2024, MCL 338.3371 et seq. and the APPENDIX II – ASBESTOS ABATEMENT PROJECT PROCEDURES as part of and in conjunction with all other contract requirements and assumes responsibility for all conditions and consequences that may result from meeting those requirements and that may in any manner affect cost, schedule, progress, performance and furnishing of the Work.
ARTICLE 3 TIME OF COMPLETION
3.1. The Contract Times are specified in paragraph 4.1 of Section 00500 Agreement. The Bidder has carefully correlated the provisions in paragraph 4.1 of Section 00500 Agreement with the other terms and conditions of the Bidding Documents and unequivocally accepts the Contract Times for the Work, and any other designated parts of the Work, as specified.
3.2. The Bidder unequivocally accepts the liquidated damage provisions specified in paragraph 4.2 of Section 00500 Agreement in the event of any failure, neglect, or refusal to complete the Work, or designated part of the Work, within the corresponding Contract Times specified in paragraph 4.1 of Section 00500 Agreement.
ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID
4.1. Attachments to this Section 00300 Bid Form and made a condition of this Bid are:
4.1.1. Evidence of Authority to Sign the Bid.
4.1.2. Section 00310 Bid Bond, with the attached certified copy of Power of Attorney, or
Alternate Bid Security.
4.1.3. Section 00320 Non-collusion Affidavit, and if applicable, Section 00330 Asbestos Abatement Attestation.
TO BE PROVIDED POST BID WITH SECTION 00400 SUBMITTALS:
4.1.5 Current EMR Rating
4.1.6 Identification of the proposed project superintendent with a resume or list of similar projects handled by that individual.
4.1.7 A list of at least three (3) projects completed within the last three (3) years of similar size and complexity, with contact information for references for each.
4.2. Bidder-provided documents, made a condition of this Bid, are as required in the following Section(s) of the Bidding Documents:
ARTICLE 5 DEFINED TERMS
5.1. Section 00020 Glossary assigns specific intent and meanings to capitalized terms and to other defined terms used in (a) this Section 00300 Bid Form, (b) Section 00310 Bid Bond and Section 00320 Non-collusion Affidavit), and (c) Section 00410 Bid Breakdown, Section 00420 Questionnaire, Section 00430 List of Subcontractors and Section 00440 Schedule of Materials and Equipment.
MICHSPEC DTMB 00300 − 5
ARTICLE 6 BID SCHEDULE
6.1 Base Bid Schedule - The Bidder will complete the Work and accept in full payment, for the Work items listed, the following unit prices and/or Bid Prices, as applicable:
Base Bid Item No.
Bid Quantity
Description
Unit Price
Item Bid Price
1 Lump
Sum
General Conditions N/A
2 910 sq/ft Overhead Concrete Spall or Delamination Repair Sq/ft
3 164 sq/ft Vertical Concrete Spall or Delamination Repair Sq/ft
4 115 each Unistrut Stanchion Vertical Member Replacement Each
5 10 each Structural Steel Stanchion Base Replacement Each
6 148 each Structural Steel Stanchion Base Clean and Coat Lineal Foot
7 57 lineal foot
Concrete Crack Injection
8 64 each Temporarily Relocate Conduit Each
9 32 each Temporarily Relocate Cable Tray Each
TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $
Base Bid (Sum of Bid Prices for all Base Bid Items):
________________________________________________________________ Dollars and No/Cents $__________________________ (use words) (in figures)
Name of the Bidder _________________________________________ File No. _______________
Date _________________________
SIGMA VENDOR NUMBER _________________________________
Telephone No. _______________________
MICHSPEC DTMB 00300 − 6
6.2 Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Bid Prices:
Alternate Item No.
Bid
Item Bid
The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.
Name of the Bidder _________________________________________ File No. _____________
Date _________________________
SIGMA VENDOR NUMBER _________________________________
MICHSPEC DTMB 00300 − 7
ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES
7.1 The Bidder shall use this “Schedule of Change Order Prices” to propose contingent prices. The proposed contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.
Proposed Change Order prices will not affect determination of the lowest Bid.
7.2 Subject to their incorporation into the Contract Documents, as provided in the Agreement, the Bidder will add to, or deduct from, the Contract Work covered by the contingent prices that follow and accept in full payment, or allow in full credit, for that Work (a) those prices bid by the Bidder, or (b) if a particular price is not bid, the price proposed by the Owner (and shown in the appropriate column):
Item No. Bid
Item Bid
Name of the Bidder _________________________________________
File No. _________
Date _________________________
SIGMA VENDOR NUMBER _________________________________
MICHSPEC DTMB 00300 − 8
ARTICLE 8 BID SUBMITTED ON the _______ day of ________________, 20____.
8.1. Bid Security is in the form of a Bid Bond _______ Bid Bond form provided in Section 00310 has been duly executed _______; or
A Certified or Cashier's check ___ or Money Order ___ if a check or money order is provided as Bid Security, the original check/money order must be delivered before Bid Due Time to the issuing office as per Section 00100 paragraph 5.2 and Section 00110 item 3.
8.2. If the Bidder is an Individual:
Name of Individual: _________________________________________________________
Name & Title of Person Authorized to sign: _________________________________________________________
Signature: _________________________________________________________ (If not the Individual, Attach Power of Attorney) Date
Doing Business as: _________________________________________________________
Business Address: _________________________________________________________
SIGMA VENDOR NUMBER ____________________________________________
County of registration _________________________
Telephone: _________________________ FAX: ______________________
8.3. If the Bidder is a Partnership:
By: _________________________________________________________ (True Name of the Partnership)
Partner Authorized to Sign Date
Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date
Business Address: _________________________________________________________
SIGMA VENDOR NUMBER ____________________________________________
County of registration _________________________
Telephone: _________________________ FAX _______________________
8.4. If the Bidder is a Corporation:
By: _________________________________________________________ (Legal Corporation Name)
Name & Title of Authorized Officer: _________________________________________________________
Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date
Name & Title of Officer Attesting: _________________________________________________________
Signature: _________________________________________________________ Date
Business Address: _________________________________________________________
SIGMA VENDOR NUMBER ____________________________________________
Telephone: _________________________ FAX _______________________
(State of Incorporation): _________________________________________________________
MICHSPEC DTMB 00300 − 9
8.5. If The Bidder is A Joint Venture: JOINT VENTURE SIGNATURES SHALL BE AS PROVIDED IN PARAGRAPH 9.5 OF SECTION 00100 INSTRUCTIONS TO BIDDERS. EACH JOINT VENTURER SIGNING THE BID SHALL SIGN IN THE MANNER INDICATED FOR AN INDIVIDUAL, A PARTNERSHIP OR A CORPORATION. IF MORE THAN TWO JOINT VENTURERS OF THE SAME TYPE ARE INCLUDED, USE ADDITIONAL PAGES. JOINT VENTURE STATE OF INCORPORATION ___________________ OR COUNTY OF
REGISTRATION _____________________
CERTIFICATE OF PRINCIPAL
(BIDDER)
I, ________________________________, certify that I am the Secretary of the Corporation ____, or a General Partner ____ or Managing Partner ____ or Partner ____ of the partnership, named as the Bidder in the attached Section 00300 Bid Form; that __________________ _____________ who signed Section 00300 Bid Form on behalf of the Bidder, was then _____________________ of that corporation ____ or partnership ____; that I know the undersigned's signature, and the signature is genuine; and that Section 00300 Bid Form was duly signed, sealed and attested for and on behalf of that corporation ___ partnership ___ by authority of its governing body ___ or partners ___
Signed by the Secretary or Other Authorized Officer of the Corporation Date or By General Partner or Managing Partner or Authorized Partner Certifying
Name of the Corporation or True Name of the Partnership
Federal Identification (I.D.) No. or Social Security No. (LAST 4 ONLY)__________________________________
Telephone No. ____________________________
(Corporate Seal)
VERIFICATION
(BIDDER)
STATE OF MICHIGAN )
COUNTY OF __________________ )
Before me, a Notary duly commissioned, qualified and acting, personally appeared (enter name of person who signed the Bid Form on behalf of the Bidder), _______________________________________________ to me well known to be the person described in and who signed Section 00300 Bid Form, who being by me first duly sworn upon oath, says that he/she is the Attorney-in-Fact for (enter the Bidder's name) ___________________________________________________________________ and that he/she has been authorized by (enter name of individual, partnership name, or that governing body of the Bidder named in the attached corporate resolution) _______________ _____________________________________________________________________ to execute the attached Section 00300 Bid Form on behalf of the named Bidder in favor of the STATE OF MICHIGAN.
Subscribed and sworn before me this __________ day of ______________________________, 20_____.
Notary Public, State of: _________________
My Commission Expires: _____________________________________
END OF SECTION 00300
MDTMB
Secondary Complex Repair Steam Tunnel & Water Infiltration Fishbeck Project Number 240740 – ADDENDUM NO. 1
2018 EJCDC 01 22 00 – 1
Unit Prices - Measurement and Payment
Section 01 22 00
SECTION 01 22 00 - UNIT PRICES - MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes descriptions of the method of measurement and the basis of payment for Unit Price Work under this Contract.
B. Basis of Contract Payments:
1. Final Contract Price shall be determined by actual quantities installed at unit prices stated in Contractor's
Bid.
2. Engineer shall determine actual as-built quantities.
3. All work identified on the Drawings, but not included as a Bid item shall be considered incidental to construction and not paid for directly, except Work that would be considered additional Work due to unforeseen conditions.
4. Unit price payments for individual items shall include everything necessary for such item to function as intended in the system.
5. Owner reserves the right to increase, decrease or eliminate any quantities for items listed in Contractor's Bid or which become a part of the Contract Documents.
C. Items included as incidental to Unit Prices for systems and appurtenances. Unless there is a specific pay item identified, the unit price payment shall include, but not be limited to:
1. Support, relocation, replacement, connection or reconnection of existing pipelines and utilities.
2. Cleanup and surface restoration.
3. Coordination of mail delivery and refuse removal with residents, post office, and refuse collectors.
4. Temporary removal and reinstallation of utilities to allow concrete restoration.
5. Concrete steel reinforcement.
6. Temporary enclosures and sources of heat and humidity control to allow construction activity to proceed during cold weather and adverse conditions.
7. Testing of concrete repair materials.
1.3 GENERAL CONDITIONS
A. Item No. 1 - Mobilization:
1. Includes:
a. Preparatory work and expenses incurred prior to beginning work onsite.
b. Transport materials, personnel, and equipment to the Site.
c. Establish temporary onsite construction facilities.
d. Provide insurance, bonds, and other costs associated with the project in general and not included in other pay items.
e. All required submittals.
2. Unit of Measure:
a. Lump sum.
b. 50% payment will be made after 5% of the original contract amount is earned.
c. Final 50% payment will be made after 25% of the contract amount is earned.
1.4 CONCRETE RESTORATION
A. Item No. 2 – Overhead Concrete Spall or Delamination Repair:
1. Location: Steam Tunnel.
2. Detail: Spall / Delamination Repair
2018 EJCDC 01 22 00 – 2
3. Description:
a. Prepare spalled areas and areas identified by Engineer by saw cutting perimeter.
b. Remove delaminated and unsound concrete and clean reinforcing.
c. Prepare cavity.
d. Apply corrosion protection material.
e. Install patching material.
f. Fill to match adjacent surface.
4. Products: Refer to 03 Section “Rehabilitation of Cast-In-Place Concrete.”
5. Extent: Contractor shall locate delaminated and unsound concrete. Engineer shall verify.
6. Unit of Measure: Square foot.
B. Item No. 3 – Vertical Concrete Spall or Delamination Repair:
1. Location: Steam Tunnel.
2. Detail: Spall / Delamination Repair
3. Description:
a. Prepare spalled areas and areas identified by Engineer by saw cutting perimeter.
b. Remove delaminated and unsound concrete and clean reinforcing.
c. Prepare cavity.
d. Apply corrosion protection material.
e. Install patching material.
f. Fill to match adjacent surface.
4. Products: Refer to 03 Section “Rehabilitation of Cast-In-Place Concrete.”
5. Extent: Contractor shall locate delaminated and unsound concrete. Engineer shall verify.
6. Unit of Measure: Square foot.
C. Item No. 4 – Unistrut Stanchion Vertical Member Replacement:
2. Detail: Typical Unistrut Stanchion Replacement Repair
3. Description:
a. Determine required support for utilities during member replacement and provide necessary support.
b. Remove existing corroded vertical stanchion member.
c. Install replacement vertical stanchion member matching that of removed. Refer to Drawings for attachment details.
4. Products: Refer to drawings.
5. Extent: As indicated on Drawings.
6. Unit of Measure: Each
D. Item No. 5 – Structural Steel Stanchion Base Replacement:
1. Location: Steam Tunnel.
2. Detail No.: Typical Structural Steel Stanchion Base Replacement
3. Description:
a. Determine required support for utilities during member replacement and provide necessary support.
b. Cut bottom portion of stanchion vertical, removing the length with heavy corrosion.
c. Clean bottom of vertical member of corrosion still present.
d. Install baseplate, concrete anchors, and grout in accordance with drawings.
e. Touch-up assembly with paint with color matching existing.
4. Products: Refer to Drawings.
5. Extent: As indicated on Drawings.
6. Unit of Measure: Each.
E. Item No. 6 – Structural Steel Stanchion Base Clean and Coat:
1. Location: Steam Tunnel.
2. Detail No.: N/A.
3. Description: Prepare surface and apply coating.
4. Products: Refer to Steel Stanchion Repair notes in Drawings.
5. Extent: As indicated on Drawings.
6. Unit of Measure: Each.
2018 EJCDC 01 22 00 – 3
F. Item No. 7 – Concrete Crack Injection:
1. Location: Steam Tunnel.
2. Detail No.: N/A
3. Description: This item includes injecting cracks in walls that show signs of corrosion staining or active leaking with polymer injectable material.
4. Products: Refer to Division 03 Section “Rehabilitation of Cast-In-Place Concrete.”
5. Extent: As indicated on Drawings or located by Contractor and verified by Engineer.
6. Unit of Measure: Linear foot.
G. Item No. 8 – Temporarily Relocate Conduit:
2. Description: This item refers to relocating conduit to properly perform a delamination / spall repair.
3. Products: N/A.
4. Extent: As indicated on the Drawings or located by Contractor and verified by Engineer.
5. Unit of Measure: Each.
H. Item No. 9 - Temporarily Relocate Cable Tray:
2. Description: This item refers to relocating a cable tray to properly perform a delamination / spall repair.
3. Products: N/A.
4. Extent: As indicated on the Drawings or located by Contractor and verified by Engineer.
7.5. Unit of Measure: Each.
PART 2 - PRODUCTS
Not used.
PART 3 - EXECUTION
Not used.
END OF SECTION 01 22 00
Meeting Minutes PROJECT: Repair Steam Tunnel and Water Infiltration PROJECT NO.: 171.23055.JGH
(240740)
MEETING DATE: March 11, 2026SUBJECT: Mandatory Pre-Bid Meeting
START: 11:00 am ADJOURN: 12:00 pm
MEETING SITE: MDTMB – Conference Room/Tunnels DISTRIBUTION DATE: March 12, 2026
PREPARED BY: Nathan Fleming, PE ATTACHMENTS: ☒ Yes ☐ No
ATTENDING: DTMB - Ryan George, Heath Miller, Brady Ruhl, Jeff Wright Fessler & Bowman - Laurin Keyes Glen Construction - Bryce Mckerchie Helfrich - Jared Gavin Pullman - Brandon Keezer RAM Construction - Tom Szabe RAS Contracting Inc. - Mason Krippen Smith’s Waterproofing - David Brannon Fishbeck - Nathan Fleming, Carl Otte
DISTRIBUTION: Attendees State of Michigan - Bethanie Jensen (JensenB3@michigan.gov), Kurt King
(KingK3@michigan.gov)
If information contained herein is thought to be inaccurate or incorrect, please contact writer at once for resolution.
The following pertains to items discussed at the pre-bid meeting, related to the Repair Steam Tunnel and Water Infiltration project.
• Bids are due Wednesday, March 25.
• An addendum is forthcoming to aid bidders and provide clarifications.
• Questions from bidders are to be received by March 17.
• Bidders can expect to hear back about their bid-status sometime in early May.
• Tunnel is split into sections, with the intent that sections may be removed for budgetary reasons if necessary.
• All noted degradations on the drawings are paired with like photos, for the bidders’ reference.
• Majority of work involves repairing concrete delaminations/spalls present throughout the tunnel and repairing/replacing rusting stanchions.
• There were notable obstructions present at some degradations which need to be accounted for in the bids.
Cable trays may need to be moved if they are in the way of a repair item.
Conduit may need to be moved if it is in the way of a repair item.
Degradation areas may extend into an area behind a major steam pipe, making them partially inaccessible.
Meeting Minutes – Mandatory Pre-Bid Meeting Meeting Date – March 11, 2026 Fishbeck | Page 2
Z:\2024\240740\WORK\CONTRACTS\ECD\ADD01\PRE-BID MEETING MINUTES.DOCX
• Repair of delaminations and spalls has a required engineering inspection, as stated on the drawings. The intent of the inspections is to get an engineer onsite to inspect the repair work at three different times.
Limits of repair marked Repair areas prepped Repair completed
• Due to the size and likely duration of the project, there will likely be some logistical issues with the timing of these different inspections. Fishbeck plans on coordinating these inspections further with the contractor as the time nears.
• DTMB staff mentioned a planned shutdown (typically in early October) which lasts for about a weekend. This could be used to aid in the project.
• Bidders voiced that the current handling of the work related to dealing with obstructions in the spall/delamination unit price could be better. It was discussed and a general consensus was reached that breaking out the obstructions as separate items was a preferrable option.
• Fishbeck is following up to provide the following information in Addendum 1 Extents of shorter tunnel section, along with a description/cross-section of the tunnel section.
Rework the unit price items. Concrete spall/delamination work is to be a separate item from their related obstructions.
29B1
B2
B3
B4
B5
B6
B7
B8
B9
LOC. 16.5
LOC. 1.5
LOC. 233
LOC. 404
REFER TO SHEET S103
FOR CONTINUATION
R E
F E
R T
O S
H E
E T
S
F
O R
C O
N T
IN
U
A T
IO
N
LOC. 45.55
LOC. NORTH OF VAULT 4 6
7LOC. NORTH OF VAULT 4
RESTORATION SCHEDULE - S104
KEY
NOTE
DETAIL
NUMBER
DESCRIPTION UTILITY INTERFERENCES
DEFECT
PHOTO*
REPAIR EXTENDS
BEHIND PIPE
QUANTITY
1 1/S002 SPALL/DELAM REPAIR 8 SF VERT. - X L/S111
2 1/S002 SPALL/DELAM REPAIR - X F/S111
3 1/S002 SPALL/DELAM REPAIR 1 CONDUIT + 1 CABLE TRAY - I/S110
4 - I/S110
5 D/S110-
SPALL/DELAM REPAIR
SPALL/DELAM REPAIR
3 SF OH
2 SF VERT.
5 SF OH + 5 SF VERT.
15 SF OH
1/S002
1/S002
1 CONDUIT + 1 CABLE TRAY
1 CONDUIT + 1 CABLE TRAY
6 K/S110-UNISTRUT STA. REPL. 191/S001 -
7 G/S111-STA. CLEAN AND COAT 29- -
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
P L
U R
I B
U E
S U
N U
M
C I
R C
U M
S P
I C
E
S I
Q U
E R
E I
S P
E N
I N
S U
L A
M A
M
OE
N A
M
NORTH
Hard copy is intended to be 30"x42" when plotted. Scale(s) indicated and graphic quality may not be accurate for any other size.
PROJECT NO.
Drawn By
Designer
Reviewer
Manager
P L O
T I N
F O
© C o p y r i g h t 2 0 2 5 A l l R i g h t s R e s e r v e d
R E V I S I O N S
S ta te o f M ic h ig a n L a n s in g
M ic h ig a n
S e c o n d a ry
C o m p le x
L a n s in g
S te a m
T u n n e l R e p a ir a n d W a te r In fi lt ra ti o n S tu d y
2/26/2026 BIDS AND CONSTRUCTION
SHEET NO.
KEY PLAN
CJOTTE
240740
C BC BC BC BC BC BC BC BC BC B
C W o rk
\R e v it \2
S n fl e m in g
Q K
J V
.r v t
/2
/2
:1
:2
P
M
S104
NFLEMING
CJOTTE
RMEISSNER
NORTH
SCALE: 1/32" = 1'-0"
TUNNEL CONCRETE REPAIR PLAN
REP. = REPAIR
REPL. = REPLACEMENT
STA. = STANCHION
STR. ST. = STRUCTURAL STEEL
1. INFORMATION ON THIS SHEET SUPPLEMENTS THE PROJECT SPECIFICATIONS. REFER
TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
2. THESE DOCUMENTS HAVE BEEN PREPARED BASED ON VISUAL INSPECTIONS AND
SOUNDING OF EXPOSED AREAS OF THE EXISTING STRUCTURE. REPAIR QUANTITIES
HAVE BEEN ESTIMATED AND ARE REFLECTED IN THE BID PRICE SHEET. THE
CONTRACTOR IS RESPONSIBLE FOR INSPECTING REPAIR AREAS. DELAMINATIONS
SHOULD BE VERIFIED USING A SOUNDING TOOL. LIMITS OF ALL DELAMINATIONS AND
SPALLS SHALL BE MARKED FOR ENGINEER'S INSPECTIONS.
3. OBTAIN ENGINEER'S REVIEW PRIOR TO MAKING ALTERATIONS TO A STRUCTURAL ITEM
OR MEMBER NOT INDICATED ON THE DRAWINGS.
4. DO NOT SCALE DRAWINGS TO OBTAIN DIMENSIONS NOT INDICATED.
5. WHERE SHOP DRAWINGS ARE REQUIRED BY THE SPECIFICATIONS, DO NOT USE THE
DESIGN DRAWINGS AS SHOP OR ERECTION DRAWINGS, OR BOTH.
6. FIELD VERIFY EXISTING CONDITIONS.
REPAIR ITEM #, LOCATED NEAR STANCHION MARKED YY BY FISHBECK.
REPAIR ITEM INFORMATION CONTAINED IN RESTORATION SCHEDULE THIS
SHEET.
KEY NOTES#
NOTES
1. ALLOW FOR AN INSPECTION BY THE ENGINEER AFTER EACH OF THE FOLLOWING
PHASES OF THE WORK. NOTIFY THE ENGINEER ONE WEEK PRIOR TO THE COMPLETION
OF WORK FOR EACH PHASE.
1. REPAIR IDENTIFICATION: SOUND CONCRETE AND MARK THE BOUNDARY OF ALL
SPALLS AND DELAMINATIONS TO RECEIVE REPAIR FOR VERIFICATION.
2. REPAIR PREPARATION: PREPARE EACH REPAIR AREA DEFINED BASED ON
REPAIR DETAILS AND MANUFACTURER'S RECOMMENDATIONS FOR
VERIFICATION.
3. REPAIR COMPLETION: VERIFICATION OF COMPLETE REPAIR WORK.
REQUIRED ENGINEERED INSPECTIONS
LOC. YY#
CONCRETE REPAIR NOTES
1. FOR UNIT PRICE BID PURPOSES, ASSUME ALL SPALLS AND DELAMINATIONS HAVE A
DEPTH OF 3".
2. QUANTITIY OF REPAIRS IS ESTIMATED BASED ON OBSERVATIONS MADE DURING FIELD
INSPECTIONS. FINAL QUANTITY TO BE DETERMINED ONCE AREAS ARE PREPPED FOR
REPAIR AND VERIFIED BY ENGINEER.
3. UNIT PRICING FOR CONCRETE SPALL AND DELAMINATION REPAIRS IS TO INCLUDE ANY
REQUIRED WORK ASSOCIATED WITH TEMPORARILY MOVING AND RE-ATTACHING
UTILITIES THAT ARE OBSTRUCTING WORK. REFER TO RESTORATION SCHEDULE AND
SHEET S002 FOR A DESCRIPTION OF OBSTRUCTIONS.
1. STRUCTURAL STEEL STANCHIONS MARKED FOR A "CLEAN AND COAT" REPAIR HAVE
BEEN PHYSICALLY MARKED "CC" IN THE FIELD BY FISHBECK. THESE STANCHIONS AND
THEIR BASEPLATES AND FASTENERS ARE TO BE TREATED WITH A STEEL COATING
SYSTEM. STEPS FOR SURACE PREPARATION AND APPLICATION OF THE COATING OF
THE SYSTEM SHALL BE DONE IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS AND SPECIFICATIONS. APPLY COATING AROUND THE ENTIRE
STANCHION VERTICAL MEMBER AND TERMINATE AT A LOCATION SUCH THAT THE
EXTENTS OF THE DEGRADATION ARE COATED. COAT A MINIMUM OF 1'-0" ABOVE TOP OF
FLOOR.
2. STRUCTURAL STEEL STANCHIONS MARKED FOR A "BASE REPLACEMENT" REPAIR HAVE
BEEN PHYSICALLY MARKED "BR" BY FISHBECK. REFER TO TYPICAL STRUCTURAL STEEL
STANCHION BASE REPLACEMENT DETAIL.
3. UNISTRUT STANCHION VERTICALS MARKED FOR REPLACEMENT HAVE BEEN
PHYSICALLY MARKED "R" BY FISHBECK. REFER TO TYPICAL UNISTRUT STANCHION
REPLACEMENT DETAIL.
STEEL STANCHION REPAIR NOTES:
DEFECT PHOTO INDICATED IN SCHEDULE IS INTENDED
TO BE REPRESENTATIVE OF CONDITIONS AT A GIVEN
REPAIR ITEM. PHOTO MAY NOT DEPICT ACTUAL
INSTANCE OF ITEM.
Nathan Fleming Line
Nathan Fleming Line
Nathan Fleming Line
Nathan Fleming Line
Nathan Fleming Line
Nathan Fleming Callout
6 FT DIAMETER TUNNEL THIS LOCATION
Nathan Fleming Image
Nathan Fleming Cloud
Nathan Fleming Cloud
Nathan Fleming Text Box THIS SHEET SHOWS A REPRESENTATIVE CROSS SECTION OF THE SHORTER TUNNEL, LOCATED IN THE AREA INDICATED WITH THE RED OUTLINE.
| ADD01 |
| ITEM NO. 1: Added Unit Price Items for Temporary Relocation of Conduit and Cable Trays |
| ITEM NO. 2: Removed Date of Substantial Completion from the Drawings. |
| Sheet: G001 – Project Overview (reissued) |
| ITEM NO. 3: Included Pre-Bid Meeting Minutes |
| ITEM NO. 4: Included Tunnel Cross-section and location of shorter tunnel mentioned in Pre-Bid Meeting. |
| ITEM NO. 5: Included Attendance sheet of Pre-Bid Meeting. |
| 00300_ADD1 |
| 01 22 00 Unit Prices - Measurement And Payment_ADD1 |
| Pre-Bid Meeting Attendance Sheet |
| Pre-Bid Meeting Minutes_2026_0312 |
| Shorter Tunnel Extents and CrossSection |
File details come from the government source that posted it. Updated .