This Statement of Work (SOW) document outlines the requirements for the California Department of Transportation (Caltrans) Ad Hoc Reporting Solution procurement (Solicitation No. 20A0408). Caltrans seeks a turnkey ad hoc reporting solution to support approximately 2,000 users with the ability to create custom financial reports without programming expertise. The solution will be installed and maintained within a Caltrans-managed, tenant-managed service environment hosted at the State Data Center, utilizing an Oracle Autonomous Data Warehouse in the Oracle Public Cloud. The contractor must deliver forty-four standard reports, complete implementation services, training, and maintenance and operations support. The contract term is two years, consisting of fifteen months for planning, design, development, testing, and implementation phases, followed by nine months of maintenance and operations. An optional one-year amendment may extend the contract, with estimated project start date of August 6, 2027. The contract includes mandatory key staff positions (Project Manager, Technical Lead, Test Lead, and Training Lead) with specified minimum qualifications and experience requirements.

The contractor must provide all services including solution implementation, system integration, quality assurance, user acceptance testing, deployment, and comprehensive training. Mandatory firm qualifications include a minimum of two years implementing and supporting the proposed solution and prior project experience with the State of California. All contractor work must be performed within the continental United States, with key staff available during Caltrans business hours (8:00 a.m. to 5:00 p.m. Pacific Time, Monday through Friday) and capable of onsite participation during critical project phases in Sacramento, California. The Service Level Agreement establishes a 99 percent system availability target, with response and resolution times ranging from four hours to five business days depending on severity level. Contractor responsibilities include providing a System Design Specification, security planning, disaster recovery with 72-hour Recovery Time Objective and 24-hour Recovery Point Objective, monthly support reporting, and incident notification within two to three hours of discovery. The contractor bears responsibility for software defects, configuration errors, data security, system recovery, and must indemnify Caltrans for any breach of security, with all intellectual property and work products becoming the exclusive property of Caltrans.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. The term of this Agreement is:

DRAFT

DRAFT

AD HOC REPORTING SOLUTION

STATEMENT OF WORK

Solicitation No. 20A0408 Ad Hoc Reporting Solution

Exhibit A Statement of Work

Table of Contents

1. INTRODUCTION

2. BACKGROUND

3. PURPOSE

4. CONTRACT TERM

5. AGREEMENT AMENDMENT

6. CONTRACT CONTACTS

7. CALTRANS RESPONSIBILITIES

8. CONTRACTOR’S RESPONSIBILITIES

9. DESCRIPTION OF SERVICES

10. TASKS/DELIVERABLES

PLANNING PHASE

10.1 PROJECT PLANNING AND START-UP

REQUIREMENTS PHASE

10.2 REQUIREMENTS VALIDATION AND ANALYSIS

DESIGN

10.3 DESIGN

CONFIGURATION/DEVELOPMENT

10.4 CONFIGURATION

10.5 CUSTOMIZATION

10.6 SYSTEM INTEGRATIONS

10.7 REPORTS AND TEMPLATES

TESTING

10.8 QUALITY ASSURANCE

DEPLOYMENT

10.9 DEPLOYMENT

10.10 TRAINING

MAINTENANCE AND OPERATIONS

10.11 TRANSITION TO SUPPORT

11. SERVICE LEVEL AGREEMENT

12. FIRM QUALIFICATIONS

13. CONTRACTOR KEY STAFF

13.1 QUALIFICATION ATTRIBUTES AND DEFINITIONS

13.2 KEY STAFF RESPONSIBILITIES AND QUALIFICATIONS

13.3 SUBMISSION OF STATEMENT OF ECONOMIC INTERESTS

13.4 LOCATION OF CONTRACTED FUNCTIONS AND PERSONNEL

13.5 NON-KEY STAFF

13.6 KEY STAFF PERSONNEL CHANGES

13.7 KEY STAFF FACILITY AND USER ACCESS

14. ASSIGNMENT OF WORK AND REQUEST FOR SERVICE

15. ACCEPTANCE PROCESS

16. ESCALATION PROCESS

17. CHANGE CONTROL PROCESS

18. DELIVERABLE AND PAYMENT MILESTONE MANAGEMENT

18.1 CORRECTIVE ACTION PLAN

18.2 PAYMENT TERMS

18.3 WITHHOLDS

18.4 BUDGET CONTINGENCY

19. UNANTICIPATED TASKS

20. DATA HANDLING AND OWNERSHIP

20.1 INFORMATION AND DATA OWNERSHIP

20.2 TRANSITION PERIOD

21. SECURITY

22. USER ACCESS

23. MAINTENANCE AND OPERATIONS (M&O)

24. SYSTEM RECOVERY

25. HELP DESK

26. INSURANCE REQUIREMENTS

26.1 GENERAL PROVISIONS

26.2 COMMERCIAL GENERAL LIABILITY INSURANCE

26.3 COMMERCIAL AUTOMOBILE LIABILITY INSURANCE

26.4 PROFESSIONAL LIABILITY (ERRORS AND OMISSIONS) INSURANCE

26.5 WORKERS’ COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE

27. WARRANTY CLARIFICATION

28. INFORMATION TECHNOLOGY - GENERAL PROVISIONS CLOUD - COMPUTING

SERVICES, DGS PD 402-ITGP (CLOUD)

29. INFORMATION TECHNOLOGY - GENERAL PROVISIONS - NON-CLOUD GOODS &

SERVICES, DGS PD 403-ITGP (NON-CLOUD)

30. MISCELLANEOUS

30.1 SUPPLEMENTAL CONTRACTS

30.2 STATE PROPERTY

30.3 SUBCONTRACTORS

EXHIBIT B: STANDARD REPORTS

EXHIBIT C: SOLUTION REQUIREMENTS

EXHIBIT D: COST WORKSHEET

ALL YEARS

YEAR 1 (15 MONTHS)

YEAR 2 (9 MONTHS)

YEAR 3 (OPTIONAL – 12 MONTHS)

IMPLEMENTATION COSTS BY TASK

1. Introduction The Statement of Work (SOW) defines and is inclusive of all services the State of California (State) requires of (TBD), hereinafter referred to as the “Contractor,” to provide the California Department of Transportation, hereinafter referred to as the “State” or “Caltrans”.

The Contractor will provide an Ad Hoc Reporting Solution that is completely installed, debugged, integrated, accepted and maintained within the Caltrans managed environment – Tenant Managed Service hosted at the State Data Center. For the purposes of this RFP, Ad Hoc Reporting refers to the ability for Caltrans non-technical staff to create custom financial reports as needed without programming.

The following terms are used interchangeably throughout the solicitation documents: 1) “Contract” and “Agreement”.

2. Background Caltrans has over 22,000 positions, a budget of over $17 billion and is one of the largest departments in the State. Currently, financial reporting data is maintained in an on-premises database. This will change when Caltrans migrates its financial system to the Financial Information System for California (FI$Cal). Once Caltrans moves to FI$Cal, current financial data will be coming from FI$Cal, while legacy data will be maintained by Caltrans. Caltrans will address this situation by creating a Financial Data Model (FDM) for the current and legacy financial data to be stored in the Enterprise Data Warehouse (an Oracle Autonomous Data Warehouse) in the Oracle Public Cloud. The FDM will be used for ad hoc reporting purposes. Today, Caltrans has 1,740 users accessing its current ad hoc reporting solution. Caltrans is seeking a new ad hoc reporting solution that can support 2,000 users with efficient processes and quick response times. The daily average concurrent users are fifty-seven (57), with the highest number of concurrent users in a day at 229. This is considered a critical system for Caltrans.

3. Purpose The purpose of this Agreement is for the Contractor to provide a turnkey Ad Hoc Reporting Solution installed and maintained within the Caltrans managed environment – Tenant Managed Service hosted at the State Data Center.

Exhibit A Statement of Work

Contractor will provide the solution, implementation services, training, maintenance and operations and forty-four (44) standard reports.

4. Contract Term Effective upon execution of the contract by Caltrans the term of the Contract is for two (2) years, with an estimated project start date of August 6, 2027. The contract term covers the planning/design/development/testing and integration/implementation/acceptance process/training (15 months) and Maintenance and Operation (9 months) of the Ad Hoc Reporting Solution.

The total cost of this Contract is the amount contained on the Std 213 cover page.

Cost details are located on Exhibit D, Cost Worksheets.

In no event shall the total amount of the Contract exceed the amount contained on the Std 213 cover page, and there is no obligation on the part of the State to utilize the entire amount.

5. Agreement Amendment Subject to the terms and conditions of this Agreement and contingent upon mutual agreement between the State and the Contractor, the State and Contractor may amend the Agreement prior to its expiration date, as expressly permitted by the State Contracting Manual.

The Agreement amendment may be for up to one (1) year and at the cost as presented in the Cost Worksheet for the optional amendment.

If the Agreement is amended, the Contractor’s rates offered in the “Optional Amendments” table of Exhibit D: Cost Worksheet, for the additional work, would apply. The additional costs will also be included in the final offer as part of the evaluated costs; however, there is no commitment to issue a contract amendment.

Any resulting Contract amendment will not take effect until it is signed by the State, and the Contractor has received a signed copy of the executed Contract amendment.

6. Contract Contacts The State and Contractor will appoint a Contract Manager to interface with each other related to contractual matters. The following are the identified points of contact for this Contract.

Caltrans Contract Manager Contractor Representative

Name: TBD Name:

Title: Title:

Address: Address:

Phone: Phone:

Email: Email:

7. Caltrans Responsibilities

a. The State will designate a Caltrans Contract Manager to whom all contract related communications may be addressed and who has the authority to act on all aspects of this Contract. This person will review the Contract and associated documents with the Contractor to ensure understanding of the responsibilities of both parties.

b. The State will provide Contractor access to applicable files, reports, documents, and other relevant information necessary for the Contractor to complete the tasks and deliverables identified in the Contract.

c. The State will provide timely review, decisions, and approval of deliverables and other work products provided by the Contractor as required by this Contract.

d. The State will ensure State personnel within the scope of this project are available to perform assigned tasks and attend interviews, working sessions, consultation meetings, review meetings, training and knowledge transfer (KT) sessions as requested by the Contractor’s staff.

e. The State may provide workspace and meeting rooms at Department Headquarters in Sacramento, California, or at another designated location in the greater Sacramento area for performance of the work while onsite.

f. The State will not provide Contractor with smart phones, cell phones, laptops, or mobile devices (e.g., iPads).

g. The State will monitor, review, and approve services as invoiced.

h. The State will help resolve and escalate issues within the organization, as necessary.

i. The State shall be responsible for its internal local area network, Department applications or interfaces to the Contractor’s solution, wide area network, and Internet connectivity.

8. Contractor’s Responsibilities

a. The Contractor will designate a person to whom all project communications may be addressed and who has the authority to act on all aspects of the services. This person will review the Contract and associated documents with the project to ensure understanding of the responsibilities of both parties. This person shall be identified as the Contract or Account Manager.

b. The Contractor shall provide contract management functions, reconciliation of timesheets, management of resource(s), and meeting attendance as necessary. The Contractor shall be responsible for identifying and managing all Contractor key resources to ensure compliance with the resulting contract.

c. The Contractor will designate key resources and other Contractor resources necessary to successfully fulfill the terms of the Contract. The Contractor shall budget $2,500.00 per laptop per staff member that will require Caltrans database access. Contractor shall purchase the laptop conforming to Caltrans IT Standards, and Caltrans IT will image and provide configuration updates while the laptop is being used for this contract. Upon completion/removal from this contract, the laptop shall be wiped by Caltrans IT.

d. The Contractor shall participate in information gathering meetings, fact-finding meetings, working sessions, status reporting (both written and verbal), presentations, and general communication(s) to ensure success of consultant activity performance.

e. The Contractor shall comply with applicable Caltrans policies and procedures.

f. The Contractor shall provide draft results and to incorporate, as appropriate, comments provided by Caltrans Contract Manager. The Contractor should expect to conduct walkthroughs to discuss preliminary and draft results of their work.

g. The Contractor shall provide clear and concise technical documentation, assessments, status reports and other written artifacts as required.

h. All Contractor Key Staff and Non-Key Staff work on the Ad Hoc Reporting Solution must be performed from within the continental United States.

i. The Contractor shall provide, at their own expense, all desktop equipment and workspace necessary to perform the services required in this agreement, except as provided by the State. Any workspace other than that provided by the State shall be provided by the Contractor at their own expense.

j. Contractor shall return all State property including security badges, work products, etc., prior to termination of Agreement.

k. Contractor shall timely complete and submit all required on-boarding documentation for all Key Staff to obtain security access badge, network access, email accounts, etc.

l. The Contractor shall use Caltrans SharePoint as a repository for all project documents.

9. Description of Services The Contractor will be responsible for providing the solution and support services required to implement a new turnkey Ad Hoc Reporting Solution according to the requirements specified in Exhibit C: Solution Requirements and create forty-four

(44) standard reports as defined in Exhibit B: Standard Reports.

The Contractor must provide all necessary services to include planning, executing, monitoring, controlling, reporting on all Contractor-related activities throughout the term of the Contract. The Contractor is responsible for delivering the services to ensure the successful implementation of the Ad Hoc Reporting Solution. The Contractor is responsible for the successful completion of all deliverables and associated tasks as outlined in this Contract.

These services will be completed by the Contractor in accordance with an agreed-upon scope, timelines, and project requirements. These include all technical expertise and project management services needed to produce and deliver the listed deliverables.

Contractor will work closely with Caltrans to ensure each phase of this project is completed. The successful completion of any one phase does not constitute final acceptance of the project requirements. Full acceptance will only occur upon completion of all phases, the validation of all contractual obligations, and acceptance of all of the deliverables by Caltrans.

All deliverables produced by the Contractor must follow the Deliverable Expectation Document (DED) and Deliverable Acceptance Document (DAD) process utilizing industry best practices and analysis techniques, as well as State standards and polices to ensure that each deliverable is well-defined, approved, and validated by Caltrans before payment is issued. For additional details refer to SECTION 10. Tasks and Deliverables.

All deliverable documents are to be prepared and delivered in Microsoft Office and/or PDF formats, or as otherwise specified and agreed to in the DED.

10. Tasks/Deliverables The Contractor is responsible for completing all tasks and deliverables necessary to fulfill the requirements identified in Exhibit C: Solution Requirements.

PLANNING PHASE

10.1 Project Planning and Start-up

a. Contractor shall consider and use the items set forth in Exhibit B: Standard

Reports for report requirements and Exhibit C: Solution requirements in this Phase. Project planning and start-up consists of the following key activities:

1. Produce the detailed project plan: The Contractor will produce a detailed project plan for implementing the solution, Caltrans training, and solution support. The plan shall include a Work Breakdown Structure (WBS) and schedule that describes the activities, tasks, milestones, and due dates for each. The project plan shall follow best practices as established by the Project Management Institute (PMI) Project Management Body of Knowledge®..

2. Project communication plan: The Contractor project manager will produce the project communication plan. The plan will identify all project participants and contact information, meeting types and schedules and the communication tools that the project team will use including such things as document management repositories, email lists and Teams chat.

3. Marshal resources and make initial assignments: Contractor will confirm the availability of Contractor resources to fulfill the roles indicated in the SOW Resources section. Initial tasks assignments will be communicated.

4. Conduct the project kickoff meeting: The Contractor project manager will schedule and conduct a project kick-off meeting at a mutually agreeable date and time, as close to the start of the project as is reasonable. The purpose of the project kick-off meeting is to introduce and engage all project participants in the implementation process and to make sure all assignments and tasks are communicated properly.

b. The Contractor will provide electronic project management documents using Microsoft Office applications and Microsoft Project. The software versions must be no more than one version behind the latest release available on the market.

c. Deliverables of this Phase:

1. Project Plan

2. WBS

3. Communication Plan

4. Vendor Project Resource List

5. Kickoff Meeting Documentation

6. Documentation of the Ad Hoc Reporting Solution organization and administrative accounts

REQUIREMENTS PHASE

10.2 Requirements Validation and Analysis

a. Contractor shall consider and use the items set forth in Exhibit B: Standard

Reports for report requirements and Exhibit C: Solution requirements in this Phase. Requirements Validation and Analysis consists of the following key activities by Contractor:

1. Produce session master schedule: The master session schedule is produced by Contractor at the outset of the requirements phase and contains a list of all sessions that are planned along with proposed timing. The master schedule helps project participants plan their time and ensures that they can allocate sufficient effort to the project. The master session schedule shall be updated, posted in the project repository, and regularly circulated.

2. Compile session pre-read materials: To ensure a consistent baseline for requirements sessions, Contractor will distribute and redistribute all relevant materials such as prior requirements, the current Requirements Traceability Matrix (RTM), process flows, and organizational charts that will be discussed during the session. Contractor will direct that participants review all materials in advance of the session.

3. Conduct requirements validation sessions: The Contractor session facilitator leads the participants through the agenda and captures requirements in notes and directly in the RTM. Notes and action items should be distributed following each session.

4. Requirements validation and Update Requirements Traceability Matrix (RTM): Contractor shall use existing RTM, perform requirements validation and elicitation with Stakeholders. Following each session, Contractor will update the RTM with all relevant requirements and post to the project SharePoint repository.

5. Expand/enhance Ad Hoc Reporting Solution prototype: Contractor shall ensure that the Ad Hoc Reporting Solution prototype is regularly used during requirements sessions so that participants can better envision how requirements may be implemented. As key requirements are gathered the Ad Hoc Reporting team will update the prototype to demonstrate new requirements or to show design alternatives.

6. Develop requirements for the forty-four (44) standard reports:

Contractor shall meet with business owners to establish requirements to reproduce the identified forty-four standard reports.

7. Confirm and accept RTM as accurate and complete: As requirements gathering nears completion, Contractor shall have participants review the RTM and confirm that requirements are accurate and complete. To ensure that the task is easier, Contractor shall ensure that the RTM is regularly updated and circulated and used as a tool during the requirements sessions. Review and acceptance of the RTM concludes the requirements gathering phase.

b. Deliverables of this Phase:

1. Session Master Schedule and updates

2. Pre-read Materials

3. Requirements sessions notes and action items

4. System Requirements Specification (SRS) for the solution which includes:

Wireframe for standard reports.

a) Updated Ad Hoc Reporting prototype

b) Updated RTM

5. SRS Sign Off

DESIGN

10.3 Design

a. Contractor shall develop a System Design Specification (SDS). The SDS is subject to the review and written approval of both Caltrans IT and Business leadership. Contractor shall ensure that the SDS represents and fully describes a full-functioning solution that is designed to meet all requirements contained within the approved System Requirements Specification (SRS) and it will contain no less than the following items:

1. Solution Architecture:

a) Architecture Overview

1) Describe the logical and physical architecture of the reporting platform.

2) Identify the reporting engine, dashboard services, ad hoc query services, metadata repository, administration tools, APIs, and supporting infrastructure.

3) Define deployment environments, scalability, availability, and major component dependencies.

2. Data Architecture:

a) Data Sources and Connectivity

1) Identify databases, data warehouses, data marts, APIs, files, and external systems used by the reporting platform.

2) Document connection methods, access requirements, refresh dependencies, and data ownership.

b) Reporting Models

1) Define reporting entities, facts, dimensions, relationships, measures, calculations, hierarchies, KPIs, and business definitions.

2) Document reporting databases, schemas, views, cubes, materialized structures, metadata, and data dictionaries.

c) Data Refresh and Synchronization

1) Define refresh schedules, incremental and full processing, caching, validation, reconciliation, failure recovery, and data-availability expectations.

3. Reporting and Analytics Design:

a) Reports and Dashboards

1) Define report types, templates, layouts, dashboards, visualizations, filtering, drill-down, navigation, parameters, exports, scheduling, subscriptions, and distribution.

b) Ad Hoc and Self-Service Reporting

1) Define field selection, search, filtering, grouping, aggregation, calculated fields, saved reports, personalization, sharing, and export capabilities.

2) Establish query limits, timeouts, row limits, and safeguards against inefficient or disruptive queries.

c) Business Calculations

1) Document formulas, measures, KPIs, thresholds, aggregation rules, ownership, validation, and approval requirements.

4. Integration Architecture:

a) Interfaces and Data Integration

1) Define interfaces with source systems, data platforms, APIs, authentication providers, file repositories, and external reporting services.

2) Document mappings, protocols, schedules, authentication, encryption, and synchronization.

b) Change and Exception Management

1) Define schema evolution, versioning, backward compatibility, impact analysis, exception handling, reconciliation, retries, alerts, and rollback procedures.

5. Security and Governance:

a) Access and Data Security

1) Define authentication, authorization, role-based access, administrative permissions, and segregation of duties.

2) Document row-level, column-level, report-level, dashboard-level, and subject-area security.

3) Define encryption, API security, service-account controls, and access-review procedures.

b) Reporting Governance

1) Define ownership, certification, publication, versioning, change approval, duplication control, retention, and retirement of reports, dashboards, models, and calculations.

c) Auditing and Compliance

1) Define logging and auditing for access, report execution, queries, exports, subscriptions, security changes, and administrative activity.

6. Non-Functional Requirements:

a) Performance and Response Time

1) Define target response times for dashboards, standard reports, ad hoc queries, filters, drill-down, exports, and scheduled processing.

b) Concurrency and Scalability

1) Define normal, peak, and maximum concurrent users, report executions, queries, exports, refreshes, and scheduled jobs.

2) Define expected growth in users, reports, data volume, and workload.

c) Availability and Recovery

1) Define uptime, maintenance windows, high availability, fault tolerance, backup, failover, Recovery Time Objectives, and Recovery Point Objectives.

d) Usability and Supportability

1) Define browser, device, accessibility, usability, maintainability, diagnostics, documentation, and support expectations.

7. Development and Quality Standards:

a) Deployment and Change Management

1) Define environment promotion, release packaging, deployment sequencing, configuration migration, validation, rollback, and production-readiness criteria.

b) Documentation and Training

1) Define administrator, developer, report-author, user, operational, and support documentation.

2) Include training, knowledge transfer, inventories, diagrams, mappings, and security matrices.

c) Support Model

1) Define operational ownership, support levels, escalation paths, response targets, issue management, vendor support, and maintenance responsibilities.

8. Deployment and Support:

a) Deployment and Change Management

1) Define environment promotion, release packaging, deployment sequencing, configuration migration, validation, rollback, and production-readiness criteria.

b) Documentation and Training

1) Define administrator, developer, report-author, user, operational, and support documentation.

2) Include training, knowledge transfer, inventories, diagrams, mappings, and security matrices.

c) Support Model

1) Define operational ownership, support levels, escalation paths, response targets, issue management, vendor support, and maintenance responsibilities.

9. Post-Production Monitoring and Optimization:

a) Platform and Usage Monitoring

1) Monitor platform availability, system resources, report execution, query activity, refreshes, schedules, APIs, exports, and failures.

2) Analyze report consumption, user adoption, peak periods, unused reports, duplicate reports, and capacity trends.

b) Query and Report Optimization

1) Identify slow reports, inefficient queries, expensive joins, excessive data retrieval, large exports, and resource-intensive calculations.

2) Optimize queries, views, indexes, partitions, aggregations, caching, and report design.

c) Non-Disruptive Optimization

1) Test changes outside production where practical.

2) Use controlled releases, impact analysis, rollback procedures, phased deployment, and post-change monitoring.

3) Avoid interrupting active users, scheduled reports, refresh processes, and integrations.

d) Continuous Improvement

1) Conduct periodic performance and capacity reviews.

2) Track corrective actions, optimization opportunities, obsolete assets, user feedback, and platform improvements.

b. Deliverables of this Phase:

1. System Design Specification

2. SDS Sign Off

CONFIGURATION/DEVELOPMENT

10.4 Configuration

a. For the purposes of this SOW, a configuration is defined as changes that can be made without custom code or changes to the core software. In this regard, configuration refers to the process of adjusting system-provided settings, options, and built-in features so the software behaves in a way that meets organizational or user needs without writing custom code or altering the core application. Configuration involves using the software’s existing tools to tailor workflows, permissions, templates, and preferences.

Configuration relies on vendor-supported capabilities to ensure that future upgrades and updates can be made.

b. Configuration contains the following activities:

1. Configure Ad Hoc Reporting objects, fields, record types, validation rules and page layouts: Ad Hoc Reporting declarative (code-free) configuration tools are used to configure all objects, fields, record types and page layouts.

2. Set up workflows: Ad Hoc Reporting declarative (code-free) configuration tools are used to configure all workflows.

3. Conduct Configuration Review sessions: As the configuration progresses, conduct periodic review sessions with the project team to ensure that implemented solutions continue to meet requirements and design specifications.

4. Update RTM with as-built specifications: The RTM is updated with all as-built specifications. Review and acceptance of the RTM as built specification concludes the configuration phase.

c. Deliverables of this Phase:

1. Workflow documentation

2. Configuration review

3. RTM update

4. Build and Configuration Document (BCD)

5. BCD Sign Off

10.5 Customization

a. For the purposes of this SOW, customization is defined as changes made with custom code or changes to the core software at no cost to the State and are limited in use as configuration should be considered first.

b. If the project has any requirements that can only be met with customizations, they must be identified in writing with the details of the customization and level-of-effort. Customizations shall not be made (and no payment for customizations shall be payable to Contractor) unless the written details of the customization and level-of-effort are approved in writing by Caltrans before work begins. Caltrans has a strong preference for a solution with no to minimal customizations.

c. Customization contains the following activities:

1. Customize Ad Hoc Reporting objects, fields, record types, validation rules and page layouts: Ad Hoc Reporting customization tools are used to customize specific objects, fields, record types and page layouts.

2. Set up workflows Ad Hoc Reporting customization tools are used to customize specific tools are used to customize specific workflows.

3. Conduct Customization Review sessions: As the limited customization progresses, conduct periodic review sessions with the project team to ensure that implemented solution continues to meet requirement and design specifications.

4. Update RTM with as-built specifications: The RTM is updated with all as-built specifications. Review and acceptance of the RTM as built specification concludes the customization phase.

5. All intellectual property, data, and work products generated and developed in the course of delivering this project shall be the sole and exclusive property of Caltrans. All code and logic utilized shall be delivered back to Caltrans formatted as CSV, SQL, or PL/SQL.

d. Deliverables of this Phase:

1. Workflow documentation

2. Customization review

3. Intellectually property, data, and work products

4. RTM update

10.6 System Integrations

a. System integration is the connection of multiple software components, so they work together as a unified, efficient and error-free system, and it involves aligning applications, databases, operating environments, and interfaces to enable unified, efficient and error-free communication, data flow, and processing.

b. In this Agreement, Contractor shall ensure complete System Integration, and the main activities for System Integration are:

1. Create inventory of current and proposed system integrations: The inventory of system integrations can typically be found in the SOW. The inventory will include descriptions of the system, identification of existing integrations and the SME’s that have knowledge of the system and integration technology. Integrations often require specific or deep technical expertise and the appropriate resources should be assigned to each interface.

2. Collect and review documentation for current and proposed integrations: If available, all prior documentation including requirements and specifications for an existing integration should be gathered and added to the project repository.

3. Conduct design sessions with integration SME’s: The project team will meet with the integration SME to review requirements and explore design alternatives. To the extent possible, designs utilizing the robust Ad Hoc Reporting API capabilities will be preferred over other solutions such as loading flat files.

4. Draft integration specifications: Contractor will draft the specification, upload to the project repository and circulate for review and approval.

5. Configure & Unit Test Integrations: Contractor will work with the Caltrans SME to configure the interface. The Contractor Test Lead will prepare unit test plans to confirm operation of the interface conforms to the specifications.

c. Deliverables of this Phase:

1. Inventory of current and proposed system integrations

2. System Build Document (similar to as-builts)

3. Unit Tests for integration

10.7 Reports and Templates

a. The main activities for Reports and templates are:

1. Inventory all required reports: Client will create inventory listings for all reports required to be developed. The inventory is used to track the status of each item, assigned resources and estimated completion dates.

2. Establish report development protocols: Contractor will work with client to define a protocol to follow for the creation of reports including naming conventions, libraries, permissions and best practices.

3. Conduct report development workshops: Contractor will conduct a series of workshops to validate report requirements.

4. Create reports: Contractor will develop forty-four (44) standard reports.

See Exhibit B: Standard Reports for report requirements.

b. Deliverables of this Phase:

1. Reports and document inventory

2. Report development protocols

3. Forty-four (44) Standard Reports

TESTING

10.8 Quality Assurance

Contractor is responsible for the development and successful implementation of quality assurance. Contractor shall develop and deploy Quality Assurance (QA) processes that ensure that the software meets pre-defined quality standards through systematic planning, monitoring, and evaluation. It focuses on preventing defects by establishing clear requirements, consistent development practices, and thorough testing. QA includes activities such as code reviews, test planning, automated and manual testing, and validation of functionality, security, and performance.

a. Some QA key activities are:

1. Develop master test plan: The Contractor will develop and maintain a master written test plan that lays out the overall testing approach for the project, including how testing will be managed and coordinated with Caltrans staff. Testing covers all functional and technical deliverables including the Ad Hoc Reporting configuration system interfaces and security.

2. Develop test plans: The Contractor QA team will develop test plans for all Contractor provided functionality in the system as defined in the master test plan. Test plans are Excel based documents that reference the requirements/specification the test is derived from, the steps to execute the test and the expected results. Test plans also include a field to capture the results of the testing (pass/fall) as well as any comments the tester may have regarding their execution of the test.

a) The Contractor will develop and maintain a written draft Test Plan.

The test plan will include the procedures for documenting the test phases, test scripts, test conditions, test cases, and test reports.

Detailed test plans will be created for the following: integration testing, security testing, performance testing, and user acceptance testing. The test plan is subject to written approval by Caltrans.

b) The Contractor will be responsible for building test plans, executing test plans, and creating test reports. The State will review and approve the Contractor's test plans and test results and may validate the testing done by augmenting it with State testing.

c) The Contractor will ensure that testing and development will have their own environments, separate from production environment.

d) The Contractor will repeat the test cycle when a failure occurs at any stage of testing.

e) The Contractor will update and maintain the test documents, procedures, and scripts throughout the development/deployment and through full system acceptance to reflect the current requirements.

f) The Contractor will produce a UAT results report. The Contractor will support the State user acceptance testing activities, including: script development and requirements traceability; technical consultant during UAT; system support for UAT environment; and document UAT results for State management approval.

g) The Contractor will correct any functionality that does not pass UAT within a timeframe agreed to by the State and perform system regression testing.

3. Conduct testing: The Contractor QA team conducts iterative testing of the system as specific functionality is determined completed. Testing will include: unit, system, security, performance, and regression. Testing may require multiple iterations and interaction with the configuration/development team to remediate any issues that are found. Contractor will facilitate a team of Caltrans testers to perform user acceptance testing to verify all requirements and functionality have been validated. Caltrans has the final decision to accept.

a) Acceptance Testing

1) Project work and deliverables that involve software programs, as well as any implementation or installation activities, are subject to acceptance testing under the terms of this Agreement.

Acceptance testing is intended to ensure that the services acquired under this Contract result in successful implementation and continued satisfactory levels of performance. The projects and services acquired shall conform to the State’s requirements in this Agreement, while meeting performance standards and warranties.

2) Acceptance testing shall be in accordance with the State-approved Test Management Plan, including completion certification by the Caltrans Contract Manager and the Contractor that each deliverable meets the contract requirements.

3) If the Contractor fails to satisfactorily complete a deliverable according to the schedule set forth under this Agreement, no payment will be made until the deliverable has been satisfactorily completed.

4) The Caltrans Contract Manager or designee may periodically review the content and quality of the Contractor’s work to assess the progress and quality of the work.

5) The Contractor and State shall develop descriptions for each specific and measurable deliverable, and they shall also establish specific and measurable requirements and acceptance criteria/tests for each deliverable. It is the responsibility of the Contractor to notify the Caltrans Contract Manager that the work is complete and ready for acceptance testing or review. Work is subject to inspection and approval by the Caltrans Contract Manager or designee.

6) The Caltrans Contract Manager shall have the ultimate responsibility and authority to determine whether the Contractor’s satisfied the Contractor’s duties and obligations under the Agreement, including specifically whether the Contractor delivered all work product and deliverables and whether the Contractor’s work product and deliverables satisfied all of the applicable contract requirements (including acceptance criteria or tests) and whether the Contractor’s work product and deliverables operate efficiently, error-free and in compliance with applicable contract requirements.

7) Approval of work constitutes approval for payment and not transference or termination of Contractor’s responsibility to perform work in accordance with the terms of the Agreement, and any work that needs correction shall be made at the Contractor's sole cost and expense and in a timely manner.

Regardless of any prior inspections and acceptances of work during the term of this Agreement, all work is subject to final inspection and approval by the Caltrans Contract Manager or designee.

8) Failure to begin work and to complete work as required by this Agreement shall be considered grounds for termination of this Agreement for default in accordance with Section 23, Information Technology – General Provisions Cloud – Computing Services, DGS PD 402-ITGP (Cloud) and/or Information Technology – General Provisions – Non-Cloud Goods & Services, DGS PD 403- ITGP, Number 23, Termination for Default.

9) At the Caltrans Contract Manager’s direction, the Contractor will assist the Caltrans Contract Manager in monitoring and verification of Contractor’s performance and Deliverables. The Caltrans Contract Manager shall have the ultimate responsibility and authority to verify Contractor’s performance cost, schedule and deliverable.

4. Deliver test plans and test results: Contractor will deliver the executed test plans and test results to demonstrate that the system has been fully tested and is operating according to approved specifications. If test results contain any defects, a corresponding entry will be made in the Issue tracking system. This deliverable is based on the final testing results, and interim testing results are not provided.

a) System Acceptance

1) Project The Contractor will meet specific system acceptance and approval criteria, including:

a. The Contractor has completed and verified, and the State has approved, all deliverables required for the project.

b. The Contractor has completed and verified via a certification process, and the State has approved, all State staff training in the use of the solution

c. The Contractor has resolved and documented all critical system errors, as defined by State, and mitigation strategies have been documented for remaining system errors.

d. All test results/issues classified as critical or High Priority, as defined by the State, have been completed and successfully tested by the State, and implemented into production. Any medium or low issues are identified and agreement is reached with the State on those that must be fixed prior to acceptance, as well as Contractor plan for remediating outstanding issues.

2) Acceptance of the Ad Hoc Reporting Solution is defined as achieving a period of stability for thirty (30) consecutive calendar days after “go-live.” Stability is defined as having the production system operating without any Severity 1 or 2 incidents during the acceptance period. For the purposes of system acceptance, Severity 1 or 2 incidents (as defined in Section 27, Service Level Agreements), Service Levels must be attributed to Contractor scope or under direct control of the Contractor. Should this type of defect occur, the 30-day clock will restart upon the defect being resolved by the Contractor and accepted by the State. Full system acceptance will be provided in writing to the Contractor.

b. Deliverables of this Phase:

1. Master test plan

2. Test plans for all Ad Hoc Reporting functionality

3. Updated test plans with results

DEPLOYMENT

10.9 Deployment

a. The key activities in Deployment are:

1. Deployment communication plan: The deployment communication plan describes the approach for the communication of deployment status and issues to team members throughout the deployment process.

Special attention is paid to off-hours communications as deployments often involve weekend and late-night work streams that require team members to be on-call and available when needed.

2. Deployment readiness checklist: The Contractor project manager will prepare the deployment readiness checklist which contains all the items that must be completed as part of the deployment process. The first section lists the pre-requisites that must be completed before the deployment can proceed followed by the go/no-go decision point (see item 3 below). The second section contains all the items that must be completed during the deployment process and it serves as an auditable safeguard that all required steps are performed.

3. Go/No-Go Decisions: Go/no-go decisions are made jointly by all the project stakeholders at two checkpoints during deployment. The first go/no-go certifies that all prerequisites are completed and authorizes the deployment to proceed. The second go/no-go occurs after the system has been deployed and tested and certifies that production use of Ad Hoc Reporting Solution can proceed as planned.

4. Execute final migration: The final migration will be performed along a carefully timed and orchestrated schedule including the following steps:

a) Contractor confirms data receipt and validates that data is readable

b) Contractor uploads data to Ad Hoc Reporting and confirms system ready for QA testing

c) Contractor QA conducts testing and notifies Caltrans when complete

d) Caltrans QA conducts testing and notifies Caltrans stakeholder when complete

e) Caltrans stakeholders meets for final go/no-go decision

f) Ad Hoc Reporting placed into production and user accounts are activated

5. Training delivery: User training is delivered as soon as feasible and upon agreement with Caltrans. Training should begin after Testing (Section

10.9. Quality Assurance).

6. Hyper-support: The Contractor team goes into hyper-support following deployment with onsite and/or virtual resources providing floor support and technical staff to address any issues as they arise.

b. Deliverables of this Phase:

1. Deployment communication plan

2. Deployment readiness checklist

3. Two go/no-go decision meeting materials

4. Final QA testing results

5. Hyper-support description

10.10 Training

a. The Ad Hoc Reporting Solution training and KT shall be provided through a combination of self-paced online instruction, instructor-led in-person training, and virtual training. The key components of the training program are:

1. Quick start Team training: Quick design team training and KT is either an in-person (or virtual) instructor led course provided very early in the Ad Hoc Reporting Solution implementation process. The two-fold purpose of this class is to acclimate the State’s implementation team with the general capabilities and lexicon of the Ad Hoc Reporting Solution and to convey the guiding principles for designing and configuring their unique Ad Hoc Reporting Solution. The State’s implementation team is expected to regularly access the Ad Hoc Reporting Solution to prepare for and participate in the Ad Hoc Reporting Solution workshops.

2. Prepare master training plan: The master training plan (MTP) describes the overall approach to Ad Hoc Reporting Solution functional training and KT, including the type and structure of classes, total users to train, available training facilities, required instructors, and training materials. It includes breakdowns of students by practice and roles and prescribes the class offerings and throughput required to train the user population.

a) Training goals/standards and the specific plan for training including

KT;

b) Size of population and types of user roles that need training;

c) Strategy for providing training early in the project to allow the training goals to be implemented throughout the project;

d) Tasks, deliverables and resources necessary to complete the training effort and identify tools and documentation that will be necessary to support proposed effort;

e) Types of training, the specific courses and course materials, the training approach for end users, and how training effectiveness will be measured and addressed;

f) Contractor will work with the State to devise a scheduling and registration process for all Ad Hoc Reporting Solution training classes.

The State will follow the process to schedule and register all participants;

g) Deliverables to support initial and ongoing training including user manuals and on-line help and training materials for personnel;

h) Metrics for tracking progress in training objectives

3. Curriculums and training materials: Each training class will be described by a curriculum specific to the topics being discussed and will include a training manual with exercises for the class. Training materials cover system specific know-how as well as the relevant State business procedures and protocols. The provided materials for KT must be tailored for each specific KT session(s).

4. Conduct training: Ad Hoc Reporting Solution training classes are conducted in an instructor-led, hands-on format that requires students to work directly in the Ad Hoc Reporting Solution during the classes and complete exercises to demonstrate their competence. Classes are conducted in a State-provided training facility and/or virtually that should include instructor audio/visual equipment and individual workstations, where applicable.

a) The Contractor will provide train-the-trainer and end user training documentation in hardcopy and digital format, which must include updated user manuals, online content, and reference cards;

b) The Contractor will provide training manuals in advance for all classroom training, based on the approved Training Plan;

c) The Contractor will provide an unlimited use license for all training materials developed for the solution to State. The State has rights to modify and duplicate training materials, as appropriate;

d) The Contractor will schedule all training and KT sessions during regular work hours as approved by the State, unless the Contractor receives advance approval from the State for specific training at other times;

e) The Contractor will provide both end-user classroom training/Train-the-trainer sessions and on-line, interactive training as agreed with the State for State end-users.

5. Training feedback and improvement: The Ad Hoc Reporting training team will prepare and distribute training feedback forms at the conclusion of every class. Forms will be compiled and analyzed to determine the effectiveness of training. Any trending feedback on potential improvements or impairments to the training are addressed in real time so that subsequent training sessions can be modified accordingly.

6. See Exhibit E Training and Knowledge Transfer for more information.

b. Deliverables of this Phase:

1. Quick start guides/training materials

2. Master training plan to be approved by the State

3. Training curriculum and materials

4. Job Aids

MAINTENANCE AND OPERATIONS

10.11 Transition to Support

a. Transition to support includes the following activities:

1. Review support ticket and escalation process: Contractor provides training on issue reporting and escalation procedures.

2. Prioritize outstanding issues: All outstanding issues are reviewed and prioritized for inclusion in periodic software updates.

3. Set roll-off dates for project implementation team: The Contractor project team is decommissioned, and the project formally enters the support phase.

4. Transition phase: During the actual transition, Contractor will provide daily logs/metrics/report, including but not limited to the number of tickets, resolution of each, repeat issue, etc. Once transitioned, Contractor will provide this information on a weekly basis.

b. Deliverables of this Phase:

1. Support and ticket escalation process

2. Prioritized list of outstanding maintenance and operations issues

3. Implementation team roll-off plan

11. Service Level Agreement

a. Service Level Agreement (SLA) are critical for ensuring that the provided solution meets the needs of the stakeholders and applies appropriate penalties should the service fall below contractually established thresholds.

SLA are defined to objectively measure and report adherence to the threshold values and to invoke the mutually agreed upon contractual penalties for failing to provide the required levels of service. The Contractor will be responsible and accountable for all components for the Ad Hoc Reporting Solution.

1. Software Maintenance and Upgrades – Contractor shall provide and install software maintenance updates, upgrades, and enhancements to ensure the application operates accurately and efficiently. Software updates, upgrades, and enhancements must be coordinated with Caltrans to ensure that software can be tested by Caltrans prior to being released to Ad Hoc Reporting Solution users.

2. Data Security – Contractor is responsible for maintaining a secure computing environment supporting the on-premise application. The Contractor shall manage the applications, Ad Hoc Reporting Solution data, and infrastructure according to the security requirements described in the Information Technology…