This is a Request for Proposal (RFP) issued by the California Department of Transportation (Caltrans) for an Ad Hoc Reporting Solution. Caltrans seeks a contractor to provide a comprehensive ad hoc reporting solution to be installed and maintained within the Caltrans on-premises data center, supporting approximately 2,000 users with current average concurrent usage of 57 users and peak daily concurrent users of 229. The solution must include implementation services, training, and maintenance and operations, along with the creation of a semantic layer and 44 standard reports. The RFP was released on November 20, 2026, with proposals due January 22, 2027, by 12:00 p.m. Pacific Time. The anticipated Notice of Intent to Award is scheduled for July 1, 2027, with an estimated contract start date of August 6, 2027. The contract term is two years and three months, comprising 15 months for design, development, and implementation and 12 months for maintenance and operations. Demonstrations and key staff interviews for the top three scoring bidders or those exceeding 80 percent of available points are scheduled for March 22, 2027, through April 30, 2027. Protests of award must be submitted by July 9, 2027, by 12:00 p.m. Pacific Time.
The proposal submission must follow specific formatting requirements and include mandatory administrative requirements, bidder qualifications with references, key staff qualifications with references, standard reports responses, solution requirements workbooks, narrative responses, and cost worksheets. Socioeconomic program preferences are available, including a five percent small business preference, five percent non-small business subcontractor preference for firms committing at least 25 percent participation with California-certified small businesses, and a Disabled Veteran Business Enterprise (DVBE) incentive for participation exceeding three percent of the net proposal price. The proposed solution must consume financial data from the Caltrans Enterprise Data Warehouse hosted in Oracle Cloud Infrastructure and utilize Oracle Autonomous Databases. All equipment and off-the-shelf software must meet productive use requirements, having been installed in productive use for a minimum of six months prior to proposal submission for critical software exceeding $100,000 in project cost. Insurance coverage is mandatory, including workers' compensation with a waiver of subrogation in favor of the State, and coverage must be provided within ten calendar days of contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
RFP NO. 20A0408
FOR
Ad Hoc Reporting Solution
Release Date: November 20, 2026
Issued by:
CALIFORNIA DEPARTMENT OF TRANSPORTATION
1120 N Street, Sacramento, CA 95814
Ad Hoc Reporting Solution RFP No. 20A0408
Table of Contents
1. INTRODUCTION
1.1 BACKGROUND
1.2 PURPOSE
1.3 CURRENT AND PROPOSED ENVIRONMENTS
1.3.1 CURRENT ENVIRONMENT
1.3.2 PROPOSED ENVIRONMENTS
1.4 CONTRACT TERM
1.5 AMERICANS WITH DISABILITIES ACT (ADA)
2. BIDDING INSTRUCTIONS
2.1 BIDDER ADMONITION
2.2 COMMUNICATIONS AND CONTACTS
2.2.1 PROCUREMENT OFFICER
2.2.2 QUESTIONS REGARDING THE SOLICITATION DOCUMENT
2.3 KEY ACTION DATES
2.4. RULE GOVERNING COMPETITION
2.4.1. IDENTIFICATION AND CLASSIFICATION OF SOLICITATION REQUIREMENTS
2.4.2. SOLICITATION DOCUMENTS
2.4.3. EXAMINATION OF THE WORK
2.4.4. EXCLUSION FOR CONFLICT OF INTEREST
2.4.5. CONFIDENTIALITY
2.4.6. ADDENDA
2.4.7. COST FOR DEVELOPING PROPOSAL
2.4.8. IRREVOCABLE OFFER
2.4.9. FALSE OR MISLEADING STATEMENTS
2.4.10. BONDS
2.4.11. DISCOUNTS
2.5. BIDDING STEPS
2.5.1. WITHDRAWAL AND RESUBMISSION OF PROPOSALS
2.5.2. DISPOSITION OF PROPOSALS
2.6. PROTESTS
3. ADMINSTRATIVE REQUIREMENTS
3.1. ADMINISTRATION REQUIREMENTS CHECKLIST (M)
3.2. COVER LETTER (M)
3.3. ABILITY TO PERFORM (M)
3.4. PRIMARY BIDDER (M)
3.5. SUBCONTRACTORS (M)
3.5.1. BIDDER DECLARATION FORM (M)
3.6. DARFUR CONTRACTING ACT OF 2008
3.7. IRAN CONTRACTING ACT OF 2010
3.8. CALIFORNIA CIVIL RIGHTS LAWS
3.9. CONTRACTOR CERTIFICATION CLAUSES
3.10. AMENDMENT
3.11. FINANCIAL RESPONSIBILITY INFORMATION (M)
3.12. INFORMATION TECHNOLOGY - GENERAL PROVISIONS - NON-CLOUD GOODS &
SERVICES, DGS PD 403-ITGP (NON-CLOUD)
3.13. INSURANCE COVERAGE (M)
3.14. STD 213 AGREEMENT EXAMPLE
3.15. STATEMENT OF WORK (M)
3.16. CONFIDENTIALITY STATEMENT (M)
3.17. GENERATIVE ARTIFICIAL INTELLIGENCE (GENAI) REPORTING (M)
3.18. SOCIOECONOMIC PROGRAMS
3.18.1. BIDDER'S PREFERENCE AND INCENTIVE DECLARATION (M)
3.18.2. SMALL BUSINESS PREFERENCE (O)
3.18.3. NON-SMALL BUSINESS SUBCONTRACTOR PREFERENCE (O)
3.18.4. DISABLED VETERAN BUSINESS ENTERPRISE PROGRAM
3.18.5. COMMERCIALLY USEFUL FUNCTION (M)
3.18.6. TARGET AREA CONTRACT PREFERENCE ACT (O)
3.19. PRODUCTIVE USE REQUIREMENTS
3.19.1. CUSTOMER IN-USE
3.19.2. HARDWARE/EQUIPMENT
4. PROPOSAL REQUIREMENTS
4.1. QUALIFICATION REQUIREMENTS
4.1.1. BIDDER QUALIFICATIONS (M)/(DS)
4.1.2. BIDDER REFERENCES (M/MS)
4.1.3. KEY STAFF QUALIFICATIONS (M)/(DS)
4.1.4. KEY STAFF REFERENCES (MS)
4.2. STANDARD REPORTS (M)
4.3. SOLUTION REQUIREMENTS (MS)
4.4. NARRATIVE RESPONSE REQUIREMENTS (MS)
4.5. DEMONSTRATIONS AND KEY STAFF INTERVIEWS (MS)
4.5.1. CONDUCT OF DEMONSTRATION
4.5.2. DEMONSTRATION CONTENT - REQUIRED SCENARIOS
4.5.3. INTERVIEW CONTENT
5. COST
5.1. COST CONSIDERATIONS
5.2. PRICE ESCALATION
5.3. COST WORKSHEET (M)
5.3.1. SALES TAX
5.4. PROJECT PAYMENT TERMS
6. PROPOSAL FORMAT AND SUBMISSION REQUIREMENTS
6.1. PREPARATION
6.2. COMPLETE PROPOSALS
6.3. DELIVERY OF RESPONSES
6.4. PROPOSAL FORMAT
6.5. PROPOSAL CONTENT AND STRUCTURE
6.6. DOCUMENTS REQUIRED IN THE PROPOSAL
7. EVALUATION
7.1. EVALUATION TEAM
7.2. PROPOSAL EVALUATION
7.2.1. VALIDATION AGAINST REQUIREMENTS
7.2.2. ERRORS IN THE PROPOSAL
7.3. ADMINISTRATIVE AND BIDDER RESPONSE REVIEW
7.3.1. ADMINISTRATIVE REQUIREMENTS EVALUATION
7.3.2. BIDDER QUALIFICATIONS EVALUATION
7.3.3. BIDDER REFERENCES EVALUATION
7.3.4. KEY STAFF QUALIFICATIONS
7.3.5. KEY STAFF REFERENCES
7.3.6. SOLUTION REQUIREMENTS WORKBOOK
7.3.7. NARRATIVE RESPONSE EVALUATION
7.3.8. DEMONSTRATIONS AND KEY STAFF INTERVIEWS
7.3.9. COST EVALUATION
7.3.10. SOCIOECONOMIC PROGRAMS
7.3.11. SMALL BUSINESS PREFERENCE (O)
7.3.12. DVBE INCENTIVE (O)
7.3.13. TACPA PREFERENCE (O)
7.3.14. BIDDER FINAL SCORE CALCULATION
8. PROPOSAL CLARIFICATIONS
8.1. INVITATION
8.2. UPDATED PROPOSAL CLARIFICATIONS
8.3. EVALUATION OF UPDATED PROPOSAL
8.4. NOTICE OF INTENT TO AWARD
8.5. PROTEST OF AWARD
ATTACHMENTS
ATTACHMENT 1: COVER LETTER
ATTACHMENT 2: CONFIDENTIALITY STATEMENT
ATTACHMENT 3: FOLLOW-ON CONTRACT CERTIFICATION
ATTACHMENT 4: RESPONSE TO ADMINISTRATIVE REQUIREMENTS
ATTACHMENT 5: STD 213 EXAMPLE
ATTACHMENT 6: BIDDER DECLARATION GSPD 05-105
ATTACHMENT 7: DARFUR CONTRACTING
ATTACHMENT 8: IRAN CONTRACING ACT OF 2010
ATTACHMENT 9: CALIFORNIA CIVIL RIGHTS LAWS
ATTACHMENT 9-1: CONTRACTOR CERTIFICATION CLAUSES
ATTACHMENT 10: BIDDING PREFERENCES AND INCENTIVES
ATTACHMENT 11: DVBE DECLARATIONS
ATTACHMENT 12: TACPA PREFERENCE REQUEST FORM
ATTACHMENT 13: COMMERICALLY USEFUL FUNCTION
ATTACHMENT 14: NARRATIVE REQUIREMENTS
ATTACHMENT 15: BIDDER QUALIFICATIONS
ATTACHMENT 16: BIDDER REFERENCES
ATTACHMENT 17: KEY STAFF QUALIFICATIONS
ATTACHMENT 18: KEY STAFF REFERENCES
ATTACHMENT 19: BIDDER QUESTION
EXHIBIT C: SOLUTION REQUIREMENTS
1. INTRODUCTION
This solicitation contains the instructions governing the requirements for fixed price deliverable-based proposals to be submitted by Bidders. Also included in this solicitation is the required format and materials Bidders must follow when responding to this solicitation. This solicitation also addresses the requirements that Bidders must meet to be eligible for consideration, as well as Bidders’ responsibilities before and after award.
The terms “Caltrans” and “State” may be used interchangeably.
The Contractor will provide an Ad Hoc Reporting Solution installed and maintained within the Caltrans on-premises data center.
1.1 BACKGROUND
Caltrans has over 22,000 positions, a budget of over $17 billion and is one of the largest departments in the State. Currently, financial reporting data is maintained in an on-premises database. This will change when Caltrans migrates its financial system to the Financial Information System for California (FI$Cal). Once Caltrans moves to FI$Cal, current financial data will be coming from FI$Cal, while legacy data will be maintained by Caltrans. Caltrans will address this situation by creating a Financial Data Model (FDM) for the current and legacy financial data to be stored in the Enterprise Data Warehouse (an Oracle Autonomous Data Warehouse) in the Oracle Public Cloud. The FDM will be used for ad hoc reporting purposes. Today, Caltrans has 1,740 users accessing its current ad hoc reporting solution. Caltrans is seeking a new ad hoc reporting solution that can support 2,000 users with efficient processes and quick response times. The daily average concurrent users are fifty-seven (57), with the highest number of concurrent users in a day at 229. This is considered a critical system for Caltrans
1.2 PURPOSE
The purpose of this solicitation is to have a Contractor provide an Ad Hoc Reporting Solution installed and maintained within the Caltrans on-premises data center. Contractor will provide the solution, implementation services, training, and maintenance and operations. In addition, the Contractor will be responsible for creating the semantic layer to support the performance of the Ad Hoc Reporting Solution and create a limited number of standard reports
1.3 CURRENT AND PROPOSED ENVIRONMENTS
The purpose of this solicitation is to have a Contractor provide an Ad Hoc Reporting Solution installed and maintained within the Caltrans on-premises data center. Contractor will provide the solution, implementation services, training, and maintenance and operations.
1.3.1 CURRENT ENVIRONMENT
The current Ad Hoc solution is installed, operating, and maintained from within a Caltrans on-premises data center and utilizes Microsoft Windows Servers. The solution is able to consume data on and off premises using a variety of SQL data repositories such as Oracle, MS SQL, Azure, Postgres, MYSQL, ODBC…. OLTP data is ETL’d nightly from Caltrans’ transactional financial database to the current OLAP database supporting the current ad hoc solution.
1.3.2 PROPOSED ENVIRONMENTS
With the requirement that the new Ad Hoc reporting solution shall be installed and maintained within the Caltrans on-premises data center, respondents to this RFP shall be advised that Caltrans IT will provide and maintain:
All financial data to be used by the new ad hoc reporting solution will be located in the Caltrans Enterprise Data Warehouse (EDW). The EDW is hosted in the Oracle Cloud Infrastructure public cloud, in a dedicated environment, utilizing Oracle Autonomous Databases. Caltrans will have a Financial Data Model (FDM) within the EDW from which the vendor will use for the new ad hoc reporting solution. The creation of a presentation layer of the FDM will be the responsibility of the vendor to ensure efficient ad hoc reporting performance.
1.4 CONTRACT TERM
Effective upon approval of Caltrans the term of the Contract that results from this solicitation is two (2) years three (3) months, with an estimated project start date of August 6, 2027. The term covers the design, development and implementation (15 months) on the Ad Hoc Reporting solution and Maintenance and Operation (12 months).
The total cost of this Contract is the amount contained on the Std 213 cover page.
Cost details are located on Exhibit D: Cost Worksheets.
In no event shall the total amount of the Contract exceed the amount contained on the Std 213 cover page, and there is no obligation on the part of the State to utilize the entire amount.
1.5 AMERICANS WITH DISABILITIES ACT (ADA)
To comply with the nondiscrimination requirements of the ADA, it is the policy of the State of California to make every effort to ensure that its programs, activities, and services are available to all persons, including persons with disabilities.
For persons with a disability needing a reasonable accommodation to participate in the procurement process or for persons having questions regarding reasonable accommodations of the procurement process, potential Bidders may contact the Procurement Officer (SECTION 2.2.1.).
2. BIDDING INSTRUCTIONS
The following sections provide details surrounding submitting a proposal response.
2.1 BIDDER ADMONITION
This solicitation is being conducted under the policies developed by the Department of Information Technology and procedures developed by the Department of General Services as provided under Public Contract Code Section 12102 et seq. This solicitation will follow an approach designed to increase the likelihood of a successful proposal. The format that bid information is to be submitted and the material to be included therein follows. This solicitation also addresses the requirements that Bidders must meet to be eligible for consideration, as well as addressing Bidders' responsibilities before and after installation.
It is the Bidder’s responsibility to:
a. Carefully read the entire solicitation;
b. Submit questions in a timely manner;
c. Submit all required responses by the dates and times specified in SECTION
2.3. KEY ACTION DATES;
d. Abide by all procedures and requirements of the solicitation;
e. Do not include conditional statements, assumptions, or exception language with proposals; and
f. Carefully review the solicitation requirements prior to submission of a proposal to ensure nothing has been overlooked.
2.2 COMMUNICATIONS AND CONTACTS
The State uses an online procurement system known as Cal eProcure to communicate with prospective Bidders and suppliers. Information and ongoing communications for this solicitation will be posted by the State on the Cal eProcure website (www.caleprocure.com).
Only questions submitted in writing and answered by the Procurement Officer shall be binding and official. All communications and questions must be submitted by email to the Procurement Officer(s) identified in SECTION 2.2.1.
Oral communications by Agency/State entity officers and employees concerning this solicitation shall not be binding on the State and shall in no way excuse the Bidder of any obligations set forth in this solicitation.
2.2.1 PROCUREMENT OFFICER
The Procurement Officer is the State’s designated authorized representative regarding this procurement and is the sole point of contact.
Bidders shall direct all communications and correspondence regarding this procurement to the Procurement Officers or designee using the contact information below in Table 2-1: Procurement Officer.
Table 2-1: Caltrans Contact
Caltrans Contact
Division Name: Division of Procurement and Contracts (DPAC)
Procurement Analyst: Esmeralda Rojo
Email: Esmeralda.Rojo@dot.ca.gov http://www.caleprocure.com/
Phone: (279) 234-2457
2.2.2 QUESTIONS REGARDING THE SOLICITATION DOCUMENT
Bidders requesting clarification of the intent, terms and conditions, content of this solicitation, or on procedural matters regarding the competitive bid process must use the Questions Template ATTACHMENT 19: BIDDER QUESTIONS and address it to the Procurement Officer.
All communications must include the solicitation number in the subject line. To ensure a response, written questions must be received in writing by the date(s) specified in SECTION 2.3. KEY ACTION DATES. Questions and answer sets will be provided to all Bidders through the Cal eProcure site and will not identify the name of the submitting party. At the sole discretion of the State, questions may be paraphrased by the State for clarity. Questions submitted outside the date(s) specified in SECTION 2.3. KEY ACTION DATES will be answered at the State’s option.
If a Bidder desires clarification or further information on the content of the solicitation, but whose questions relate to a proprietary aspect of its proposal and disclosure exposes its proposal to other Bidders, the question may be submitted using the same criteria above with the notation, “CONFIDENTIAL”. The Bidder must explain why the question is sensitive in nature. If the State concurs that the disclosure of the question or the answer would expose the proprietary nature of the proposal, the question will be answered and both the question and answer will be confidentially maintained. If the State does not concur with the proprietary nature of the question, the Bidder will be notified and may withdraw the question.
If the question is not withdrawn, the question and response will not be confidentially maintained.
To ensure a response, questions and requests for changes must be submitted to the Procurement Officer in writing by the scheduled due date(s) specified in SECTION 2.3. KEY ACTION DATES. Only questions submitted in writing and answered in writing by the Procurement Officer shall be binding and official.
2.3 KEY ACTION DATES
Key actions, including dates and times for this RFP, are presented in the chart below. All communications during this procurement must be made to the
Procurement Officer identified in SECTION 2.2.1. An addendum to this RFP will be released if the dates change.
Table 2-3 Key Action Dates
Action Action Date & Time
RFP Release 11/20/2026
Deadline for Written Questions 1 12/01/2026
Release Caltrans’ Responses to Questions 1, if applicable
12/07/2026
Addendum 1, if applicable 12/14/2026
Deadline for Written Questions 2, if needed 12/21/2026
Release Caltrans’ Responses to Questions 2 and Addendum 2, if appliable
01/04/2027
Deadline to Submit Proposals* 01/22/2027 by 12:00 pm (pacific)
Proposal Evaluations 01/25/2027 – 03/19/2027
Conduct Demonstrations and Interviews, for those that are invited/reach threshold of points
03/22/2027 – 04/30/2027
Conduct Cost Evaluation 04/30/2027
Proposal Clarifications 05/03/2027 – 06/18/2027
Updated Proposal Clarifications 06/25/2027
Notice of Intent to Award* 07/01/2027
Protest of Award 07/09/2027 by 12:00 pm (pacific)
Anticipated Contract Start Date* 08/06/2027
* Dates after Deadline to Submit Proposals are estimates and may be changed Caltrans without the issuance of an addendum.
2.3.1. RFP RELEASE
The RFP will be posted on the Cal eProcure (www.caleprocure.ca.gov).
2.3.2. DEADLINE FOR WRITTEN QUESTIONS 1
All questions must be submitted via email by the deadline listed in Table 2-3 above and must include in the Subject Line: RFP 20A0408. Use ATTACHMENT 19, BIDDER QUESTION, to submit questions. At its discretion, Caltrans reserves the right to contact candidates to seek clarification of any inquiry received.
2.3.3. RELEASE CALTRANS’ RESPONSES TO QUESTIONS 1
All questions submitted in writing will be answered in writing by Caltrans. The questions and responses will be posted on Cal eProcure (www.caleprocure.ca.gov) by the deadline listed in Table 2-3 above.
2.3.4. ADDENDUM 1
Caltrans may change the RFP as a result of the Question/Response process, in the form of an Addendum. An addendum, if released, will be posted on Cal eProcure (www.caleprocure.ca.gov) by the deadline listed in Table 2-3 above. If there are no changes to the RFP, an addendum will not be released.
Please note that oral information to or from Caltrans will not be binding unless it is confirmed in writing.
2.3.5. DEADLINE FOR WRITTEN QUESTIONS 2
All questions must be submitted via email by the deadline listed in Table 2-3 above and must include in the Subject Line: RFP 20A0408. Use ATTACHMENT 19, BIDDER QUESTION, to submit questions. At its discretion, Caltrans reserves the right to contact candidates to seek clarification of any inquiry received.
2.3.6. RELEASE CALTRANS’ RESPONSES TO QUESTIONS 2 AND
ADDENDUM 2
If needed, a second date is provided to submit additional questions. All questions submitted in writing will be answered in writing by Caltrans. In addition, a second date is provided for the release of an additional addendum. Caltrans may change the RFP as a result of the Question/Response process, in the form of an Addendum.
Questions and Responses and/or addendum, if released, will be posted on Cal eProcure (www.caleprocure.ca.gov) by the deadline listed in SECTION 2-3 KEY ACTION DATES. If there are no changes to the RFP, an addendum will not be released.
2.3.7. DEADLINE TO SUBMIT PROPOSALS
Proposals must be submitted electronically by the deadline listed in TABLE 2-3 KEY ACTION DATES and must include in the Subject Line: RFP 20A0408. For the purposes of this RFP, the official time that will be used to determine if a proposal was submitted on time is when Caltrans receives the proposal.
2.3.8. PROPOSAL EVALUATIONS
Proposals will be evaluated based on the scoring process identified in the RFP.
This is a confidential process based on consensus-based scoring.
2.3.9. CONDUCT DEMONSTRATIONS AND INTERVIEWS
Demonstrations and key staff interviews will be held with the top 3 scoring Bidders or those exceeding 80% of the total points available through the proposal evaluations. Invitations will be sent out to these bidders with the data that should be used to demonstrate the required scenarios. Confidentiality statements are required before the data is released.
2.3.10. CONDUCT COST EVALUATIONS
Costs will be opened and evaluated based on the Bidders who have passed the demonstrations and interview phase. Costs will be scored based on the scoring process identified in the RFP.
2.3.11. PROPOSAL CLARIFICATIONS
Proposal clarifications will be conducted with invited Bidders ahead of any potential contract. Since the procurement process is a lengthy process, this step ensures Caltrans fully understands what is being offered in the proposal and that the bid and costs are effective through any potential contract execution process.
2.3.12. UPDATED PROPOSAL CLARIFICATIONS
For those that were included in the Proposal Clarifications, the result of the clarifications needs to be submitted through an updated Proposal with signatures attesting that the information is true and accurate and binding the proposal and cost are effective through any potential contract execution process. Update Proposal must be submitted electronically by the deadline listed in Table 2-3 above and must include in the Subject Line: RFP 20A0408.
2.3.13. NOTICE OF INTENT TO AWARD
The Notice of Intent to Award announcement will be posted on the Cal eProcure (www.caleprocure.ca.gov) by the date listed in SECTION 2-3 KEY
ACTION DATES.
2.3.14. PROTEST OF AWARD
A protest process is provided for any Bidder that has a valid reason to protest the Intent to Award. The protest process is open for 5 business days following the Notice of Intent to Award. See Section 2.6. for the protest process that must be followed. Failure to follow the process is grounds for denying the protest.
2.4. RULE GOVERNING COMPETITION
This solicitation, the evaluation of responses, and the award of any resultant Contract shall be made in conformance with current competitive bidding procedures as they relate to the procurement of IT goods and services or Telecommunications by public bodies in the State of California.
2.4.1. IDENTIFICATION AND CLASSIFICATION OF SOLICITATION
REQUIREMENTS
The State has established certain requirements with respect to proposals to be submitted by prospective Contractors. The use of “shall,” “must,” or “will” (except to indicate simple futurity) in the solicitation indicates a requirement or condition which is mandatory. A deviation, if not material, may be waived by the State. A deviation from a requirement is material if the deficient response is not in substantial accord with the solicitation requirements, provides an advantage to one bidder over other bidders, or has a potentially significant effect on the delivery, quantity or quality of items proposed, amount paid to the supplier, or on the cost to the State. Material deviations cannot be waived.
The words “should” or “may” in the solicitation indicate desirable attributes or conditions, but are non-mandatory in nature. Deviation from, or omission of, such a desirable feature may not in itself cause rejection of the proposal.
2.4.2. SOLICITATION DOCUMENTS
This solicitation document includes, in addition to an explanation of the State’s requirements which must be met, instructions which prescribe the format and content of proposals to be submitted and the model of the Contract to be http://www.caleprocure.ca.gov/ executed between the State and the successful Bidder.
If a Bidder discovers any ambiguity, conflict, discrepancy, omission, or other error in this solicitation document, the Bidder shall immediately notify the Procurement Officer identified in SECTION 2.2.1. PROCUREMENT OFFICER in writing and request clarification or modification of the document.
If the solicitation document contains an error known to the Bidder, or an error that reasonably should have been known, the Bidder shall bid at its own risk. If the Bidder fails to notify the State of the error prior to the date fixed for submission of proposals, and is awarded the contract, the Bidder shall not be entitled to additional compensation or time by reason of the error or its later correction.
Modifications will be made by addenda issued pursuant to SECTION 2.4.6.
ADDENDA.
2.4.3. EXAMINATION OF THE WORK
The Bidder should carefully examine the entire solicitation document and any addenda thereto, and all related materials and data referenced in the solicitation document or otherwise available to the Bidder, and should become fully aware of the nature and location of the work, the quantities of the work, and the conditions to be encountered in performing the work. Specific conditions to be examined may be listed in SECTION 3. ADMINISTRATIVE REQUIREMENTS and/or
SECTION 4. PROPOSAL REQUIREMENTS.
2.4.4. EXCLUSION FOR CONFLICT OF INTEREST
No consultant shall be paid out of State funds for developing recommendations on the acquisition of telecom, information technology (IT) products or services or assisting in the preparation of the project approval lifecycle documents (stages 2, 3, or 4), while in effect, if that consultant is to be a source of such acquisition or could otherwise directly and/or materially benefit from State adoption of such recommendations or the course of action recommended in the project approval lifecycle documents (stages 2, 3, or 4). Further, no consultant shall be paid out of State funds for developing recommendations on the disposal of State surplus IT products if that consultant would directly and/or materially benefit from State adoption of such recommendations.
A consultant shall not be eligible to serve as the Prime Contractor or subcontractor pursuant to this solicitation if the Contractor/subcontractor is currently working on the solicitation in an Independent Verification and Validation (IV&V) role.
The Bidder must complete and submit ATTACHMENT 3: FOLLOW-ON CONTRACT CERTIFICATION with its Proposal.
2.4.5. CONFIDENTIALITY
Bidder material becomes public only after the Notification of Intent to Award is released. If material marked “confidential,” “proprietary,” or “trade secret” is requested pursuant to the Public Records Act, the State will make an independent assessment of whether it is exempt from disclosure. If the State disagrees with the Bidder, the State will notify the Bidder and give them a reasonable opportunity to justify their position or obtain a court order protecting the material from disclosure.
The Bidder should be aware that marking a document “confidential” or “proprietary” in their Proposal may exclude it from consideration for award and will not keep that document from being released after notice of award as part of the public record, unless a court has ordered the State not to release the document.
The content of all working papers and discussions relating to Bidder’s proposal shall be held in confidence indefinitely, unless the public interest is best served by an item’s disclosure because of its direct pertinence to a decision, agreement or the evaluation of the proposal.
Any disclosure of confidential information by the Bidder is a basis for rejecting the Bidder’s proposal and ruling the Bidder ineligible to further participate. Any disclosure of confidential information by a State employee is a basis for disciplinary action, including dismissal from State employment, as provided by Government Code §19570 et seq. Total confidentiality is paramount; it cannot be over emphasized.
2.4.6. ADDENDA
The State may modify the solicitation at any time prior to submission of proposals by issuing an addendum. Addenda will be numbered consecutively and released to all bidders via Cal eProcure. The Addenda issued after the proposal response due date, however, will be released only to Bidders that have submitted a proposal.
If a Bidder determines that an addendum unnecessarily restricts its ability to bid, the Bidder is allowed five (5) business days to submit written questions regarding the addendum according to the instructions contained in SECTION 2.2.2.
QUESTIONS REGARDING THE SOLICITATION DOCUMENT and the dates specified in Section 2.3. Key Action Dates. Addenda issued with only Key Action Dates revisions or corrections to minor ambiguities or other similar errors, may not include a question and answer period.
2.4.7. COST FOR DEVELOPING PROPOSAL
Costs for developing proposals are the responsibility entirely of the Bidder and shall not be chargeable to the State.
2.4.8. IRREVOCABLE OFFER
Bidder’s response to this solicitation shall constitute a firm offer, which shall remain irrevocable for not less than one hundred eighty (180) calendar days following the Contract Award date specified in SECTION 2.3 KEY ACTION DATES. In the event of a delay in contract award, a Bidder may extend the expiration date of its firm offer an additional thirty (30) calendar days by written notice to the State.
This expiration date may be further extended by mutual agreement between the State and the Bidder, in order to accommodate processing time for required approvals and other solicitation-related reviews.
2.4.9. FALSE OR MISLEADING STATEMENTS
Proposals that contain false or misleading statements, or provide references that do not support an attribute or condition claimed by the Bidder, may be rejected.
If, in the opinion of the State, such information was intended to mislead the State in its evaluation of the Proposal, and the attribute, condition, or capability is a requirement of this solicitation document, it will be the basis for rejection of the Bidder’s Proposal.
2.4.10. BONDS
The State reserves the right to require a performance bond or other security document as specified in the solicitation from the Bidder for an amount not to exceed the amount of the Contract. In the event the State requires a surety bond that has not been expressly required by the solicitation, the State will reimburse the Bidder as an addition to the purchase price in an amount not exceeding the standard premium on such bond.
2.4.11. DISCOUNTS
In connection with any discount offered, except when a provision is made for a testing period preceding acceptance by the State, time will be computed from the date of delivery of the supplies or equipment as specified, or from date correct invoices are received in the office specified by the State if the latter date is later than the date of delivery. When a provision is made for a testing period preceding acceptance by the State, the date of delivery shall mean the date the supplies or equipment are accepted by the State during the specified testing period. Payment is deemed made, for the purpose of earning the discount, on the date of mailing the State warrant or check.
Cash discounts offered by bidders for the prompt payment of invoices will not be considered in evaluating offers for award purposes; however, all offered discounts will be taken if the payment is made within the discount period, even though not considered in the evaluation of offers.
2.5. BIDDING STEPS
The following instructions provide the steps to submit a response to this solicitation by interested Bidders. Details surrounding proposals are described further in
SECTION 4. PROPOSAL REQUIREMENTS.
The Bidder is expected to follow the format requirements and utilize all forms included in this solicitation necessary for its response. This solicitation also addresses the Bidder responsibilities and requirements it must meet to be eligible for consideration. If the Bidder fails to follow the provided instructions, the Bidder may be disqualified from the solicitation process.
Refer to SECTION 2.3. KEY ACTION DATES to view the key steps that comprise this solicitation.
2.5.1. WITHDRAWAL AND RESUBMISSION OF PROPOSALS
A Bidder may withdraw its proposal at any time prior to the proposal submission date, by submitting a written notification of withdrawal signed by an authorized representative of the Bidder in accordance with SECTION 3.2. COVER LETTER. The Bidder may thereafter submit a new or modified Proposal prior to the respective Proposal submission date and time. Modification offered in any other manner, oral or written, will not be considered. Other than as allowed by law, Proposals cannot be changed or withdrawn after the due date and time designated for receipt, except as provided in the solicitation.
2.5.2. DISPOSITION OF PROPOSALS
All materials submitted in response to this solicitation will become the property of the State of California. At a minimum, each Bidder’s proposal shall be retained as official files and will become a public record after the Notification of Award is issued. Materials the State considers confidential information (such as confidential information submitted to demonstrate Bidder responsibility) will be destroyed upon request of the Bidder.
2.6. PROTESTS
Before a protest is submitted regarding any issue other than selection of the "successful bidder," the bidder must make full and timely use of the procedures described in this Section to resolve any outstanding issue(s) between the bidder and the State. The procurement procedure is designed to give the bidder and the State adequate opportunity to submit questions and discuss the requirements, proposals and counter proposals before the Final Bid is due. The protest procedure is made available in the event that a bidder cannot reach a fair agreement with the State after exhausting these procedures. There are two types of protests: requirements (initial) protests and award protests. A protest shall be submitted according to the procedure below. Protests regarding any issue other than selection of the "successful bidder" are requirements protests and will be heard and resolved by the Deputy Director of the Department of General Services, Procurement Division, whose decision will be final.
An award protest is where a Bidder has submitted a bid which it believes to be totally responsive to the requirements of the solicitation and to be the bid that should have been selected according to the evaluation procedure in SECTION 7 EVALUATION and the bidder believes the State has incorrectly selected another bidder for award. For this situation, the bidder may submit a protest of the selection as described below. Protests regarding selection of the "successful bidder" will be heard and resolved by the Victims Compensation and Government Claims Board, whose decision will be final.
All protests must be made in writing, signed by an individual authorized to sign on the behalf of the Bidder and contain a statement of the reason(s) for protest;
citing the law, rule, regulation or procedures on which the protest is based. The protester must provide facts and evidence to support the claim. Protests must be mailed or delivered to:
Street Address: Mailing Address: Contact Information
Deputy Director Deputy Director Protest Coordinator/Support Services Unit
Procurement Division Procurement Division Phone: (916) 375-4581
707 Third Street, 2nd Floor P.O. Box 989052 FAX: (916) 376-6226
West Sacramento, CA 95605 Sacramento, CA 95798-9052 Email: PDProtest@dgs.ca.gov
All protests to the solicitation requirements or procedures must be received by the Deputy Director of the Procurement Division as promptly as possible, but not later than the respective date and time in SECTION 2.3. KEY ACTION DATES for such protests. Protests concerning the evaluation, recommendation, or other aspects of the selection process must be received by the Deputy Director of the Procurement Division as promptly as possible, but not later than the respective date and time specified in SECTION 2.3. KEY ACTION DATES for such protests or the respective date of the Notification of Intent to Award, whichever is later. Certified or registered mail should be used unless delivered in person, in which case the protester should obtain a receipt of delivery.
3. ADMINSTRATIVE REQUIREMENTS
ADMINISTRATIVE REQUIREMENTS contains the mandatory administrative requirements that must be met in order to be considered responsive to this solicitation.
Unless designated otherwise, all the requirements in this section are mandatory.
The documents that must be submitted with the bidder’s proposal are noted as “Mandatory” or “(M)” in this section.
The administrative requirements listed in this section are denoted as follows:
a. (M) – All sections labeled as “Mandatory” or “M” are not negotiable. To be considered responsive and responsible to these requirements, all requirements identified as (M) must be responded to. A “fail” in a mandatory section will result in a proposal being deemed non-responsive and, therefore, will be disqualified. Failure to respond to any mandatory requirements shall result in disqualification of the proposal. The responses will be evaluated in accordance with SECTION 7 EVALUATION.
b. (O) – All sections labeled as “Optional” or “O” are not required to be offered by the bidder in order to be responsive to the solicitation requirements. A bidder may choose whether to meet administrative requirements labeled as (O) such as those relating to preference points.
However, if a bidder offers any of these (O) requirements, the bidder must meet the minimum requirements as stated in the section. The State will review responses to optional requirements and apply points, if applicable, per criteria stated in SECTION 7 EVALUATION.
3.1. ADMINISTRATION REQUIREMENTS CHECKLIST (M)
The Bidder must complete and submit ATTACHMENT 4: RESPONSE TO ADMINISTRATIVE REQUIREMENTS with its proposal. The Bidder must indicate its willingness and ability to satisfy these requirements by marking “Yes” in the “Bidder Agrees Yes/No” column. Answering a “No” to any of the mandatory Administrative Requirements or not submitting the required documents with its proposal may result in the proposal being deemed non-responsive and the basis for rejecting the Bidder’s proposal.
3.2. COVER LETTER (M)
The Bidder must complete and submit ATTACHMENT 1: COVER LETTER with its proposal.
The cover letter shall be considered an integral part of the proposal and any proposal form requiring signature must be signed by an individual who is authorized to bind the bidding firm contractually. The signature block must also indicate the title or position that the individual holds in the firm signing the cover letter. An unsigned cover letter may be considered non-responsive and may be the basis for rejecting the Bidder’s proposal.
3.3. ABILITY TO PERFORM (M)
Prior to award of the Contract, the State must be assured that the Bidder selected has all of the resources to successfully perform under the Contract. This includes, but is not limited to, personnel in the quantity and with the skills required;
equipment of appropriate type and in sufficient quantity; financial resources sufficient to complete performance under the Contract; and experience in similar endeavors. If, during the evaluation process, the State is unable to assure itself of the Bidder’s ability to perform under the Contract if awarded, the State has the option of requesting from the Bidder any information that the State deems necessary to determine the Bidder’s responsibility. If such information is required, the Bidder will be so notified and will be permitted five (5) State business days to submit the information requested in writing.
Examples of the type of financial responsibility information requested may include annual reports and current audited balance sheets for the Bidder’s firm.
3.4. PRIMARY BIDDER (M)
An award, if made, will be to a primary Bidder. The awarded primary Bidder will be responsible for successful performance of all subcontractors and support services offered in response to this solicitation. All State policies, guidelines, and requirements that apply to the primary Bidder also apply to subcontractors, as applicable to the products and services they provide and to their role as a subcontractor. Furthermore, the State will consider the primary Bidder to be the sole point of contact regarding contractual matters for the term of the resulting Contract. The Bidder shall not assign financial documents to a third-party without prior written approval by the State, and an amendment to the resulting Contract.
3.5. SUBCONTRACTORS (M)
Nothing contained in the resulting Contract shall create any relationship between the State and any subcontractors, and no subcontract shall relieve the Contractor of its responsibilities and obligations. The Contractor is fully responsible to the State for the acts and omissions of the Contractor's subcontractors and of persons either directly or indirectly employed by the Contractor.
The Contractor shall not change subcontractor(s) and/or DVBE subcontractor(s) if such changes conflict with the work to be performed under this Contract. For DVBE subcontractor changes, the Contractor shall utilize another DVBE subcontractor. The State recognizes that changes to subcontractor(s) may be necessary and in the best interests of the State, however, advance notification of a contemplated change and the reasons for such change must be made to the State no less than seven (7) working days prior to the existing subcontractor’s termination. If this should occur, the Contractor should be aware that the State Contract administrator or designee must approve any changes to the subcontractor(s) prior to the termination of the existing subcontractor(s). This also includes any changes made between submittal of the proposal and the actual start of the Contract.
The Contractor understands and agrees to comply with the requirements set forth in Military and Veterans Code, Section 999 et seq. that should award of this contract be based in part on their commitment to use the Disabled Veteran Business Enterprise (DVBE) subcontractor(s) identified in their bid, per Military and Veterans Code, Section 999.5(f), a DVBE subcontractor may only be replaced by another DVBE subcontractor and must be approved by both the awarding department and the Department of General Services (DGS) prior to the commencement of any work by the proposed subcontractor. Changes to the scope of work that impact the DVBE subcontractor(s) identified in the bid or offer and approved DVBE substitutions will be documented by contract amendment.
Failure of the Contractor to seek substitution and adhere to the DVBE participation level identified in the bid may be cause for contract termination, recovery of damages under rights and remedies due to the State, and penalties as outlined in MVC, Section 999.9; Public Contract Code (PCC), Section 10115.10.
The State will not compensate the Contractor for any of the Contractor’s time or effort to educate or otherwise make the new subcontractor(s) ready to begin work on the contract.
The Contractor’s obligation to pay its subcontractors is an independent obligation from the State’s obligation to pay or to enforce the payment of any money to any subcontractor. The Contractor is solely responsible for any payments to or claims made by subcontractors.
3.5.1. BIDDER DECLARATION FORM (M)
The Bidder must complete and submit ATTACHMENT 6: BIDDER DECLARATION GSPD 05-105, with its Final Proposal. When completing the declaration, the Bidder must identify all subcontractors proposed for participation in the Contract. The Bidder awarded the Contract is contractually obligated to use the subcontractors for the corresponding work identified, unless the Agency/State entity agrees to a substitution, and it is incorporated in writing. If the Bidder is not using subcontractors, the Bidder must still complete and submit ATTACHMENT 6: BIDDER DECLARATION GSPD 05-105 answering the applicable questions on the form and submitting it with its Proposal. The form is available at:
https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf
3.6. DARFUR CONTRACTING ACT OF 2008
The Bidder must complete and submit ATTACHMENT 7: DARFUR CONTRACTING ACT OF 2008, with its Final Proposal.
3.7. IRAN CONTRACTING ACT OF 2010
The Bidder must complete and submit ATTACHMENT 8: IRAN CONTRACTING ACT OF 2010, with its Final Proposal.
3.8. CALIFORNIA CIVIL RIGHTS LAWS
The Bidder must complete and submit ATTACHMENT 9: CALIFORNIA CIVIL RIGHTS LAWS, with its Final Proposal.
3.9. CONTRACTOR CERTIFICATION CLAUSES
The Bidder must complete and submit ATTACHMENT 9-1: CONTRACTOR https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf
CERTIFICATION CLAUSES, with its Final Proposal.
3.10. AMENDMENT
Any Contract executed as a result of this solicitation may be amended consistent with the terms and conditions of the Contract and by mutual consent of both parties, subject to approval by Caltrans. Contract Amendments are detailed in
EXHIBIT A: STATEMENT OF WORK.
3.11. FINANCIAL RESPONSIBILITY INFORMATION (M)
In order to minimize the potential risk of default due to financial issues, the State reserves the right to request, and the Contractor agrees to provide additional documentation throughout the life of the awarded Contract.
The State must be assured that the Contractor continues to have the financial resources to sustain its operations during the term of the contract.
3.12. INFORMATION TECHNOLOGY - GENERAL PROVISIONS - NON-
CLOUD GOODS & SERVICES, DGS PD 403-ITGP (Non-Cloud)
For this solicitation Caltrans requires an Ad Hoc Reporting Solution be installed and maintained within the Caltrans on-premises data center. As part of the solution, the Contract awarded as a result of this solicitation shall automatically incorporate by reference the Information Technology - General Provisions – Non- Cloud Goods & Services, DGS PD 403-ITGP (Non-Cloud), which can be found at the location below:
https://www.dgs.ca.gov/-/media/Divisions/PD/Acquisitions/Solicitation- Document-Attachments/IT-General-Provisions-NonCloud-DGS-PD-403ITGP- Revised-02202025.pdf
The Bidder is advised that deviations from the State-approved Terms and Conditions may be the basis for rejection of the Bidder’s proposal
3.13. INSURANCE COVERAGE (M)
In accordance to EXHIBIT A: STATEMENT OF WORK SECTION 25. INSURANCE
REQUIREMENTS,
the Contractor must furnish an insurance certificate(s) evidencing required insurance coverage acceptable to the State, including endorsements showing the State as an “additional insured” if required under the contract. Any required endorsements requested by the State must be separately provided; merely referring to such coverage on the certificates(s) is insufficient for this purpose.
https://www.dgs.ca.gov/-/media/Divisions/PD/Acquisitions/Solicitation-Document-Attachments/IT-General-Provisions-NonCloud-DGS-PD-403ITGP-Revised-02202025.pdf https://www.dgs.ca.gov/-/media/Divisions/PD/Acquisitions/Solicitation-Document-Attachments/IT-General-Provisions-NonCloud-DGS-PD-403ITGP-Revised-02202025.pdf https://www.dgs.ca.gov/-/media/Divisions/PD/Acquisitions/Solicitation-Document-Attachments/IT-General-Provisions-NonCloud-DGS-PD-403ITGP-Revised-02202025.pdf
When performing work on state-owned or controlled property, Contractor shall provide a waiver of subrogation in favor of the State for its workers’ compensation policy.
The prime Contractor shall agree to furnish the State with satisfactory evidence of insurance within ten (10) calendar days of Contract award.
3.14. STD 213 AGREEMENT EXAMPLE
The sample STD 213 Agreement is attached to this solicitation as ATTACHMENT 5 STD 213 EXAMPLE. The Bidder will be asked to designate the name and title of the party authorized to bind the Bidder contractually. The State will send the final STD.
213 to the Bidder for signature.
3.15. STATEMENT OF WORK (M)
EXHIBIT A: STATEMENT OF WORK identifies and describes the tasks and responsibilities of the Contractor and the responsibilities of the State during the term of the Contract.
The Bidder is advised that deviations from the Statement of Work (SOW) may be the basis for rejection of the Bidder’s proposal.
3.16. CONFIDENTIALITY STATEMENT (M)
The Bidder must agree to the State’s confidentiality requirements by submitting a signed ATTACHMENT 2: CONFIDENTIALITY STATEMENT, for the Bidder’s company.
Bidder engaging in services pertaining to this solicitation, requiring contact with confidential State information or State customer information, will be required to exercise security precautions for all such data that is made available and must accept full legal responsibility for the protection of this confidential information.
This includes all statistical, personal, technical, and/or other confidential personal data and information relating to the State’s operations that are designated confidential by the State.
The Bidder will also be required, upon Contract award, to submit a signed confidentiality statement from all personnel, agents, and subcontractors assigned to the awarded Contract.
3.17. GENERATIVE ARTIFICIAL INTELLIGENCE (GENAI) REPORTING (M)
The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI, while balancing the risks of these technologies.
Bidder/Offeror must notify the State in writing if it: (1) intends to provide GenAI as a deliverable to the State; or (2), intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts: (i) functionality of a State system, (ii) risk to the State, or (iii) Contract performance. For avoidance of doubt, the term "materially impacts" shall have the meaning set forth in State Administrative Manual (SAM) 4986.2.
Failure to report GenAI to the State may result in disqualification. The State reserves its right to seek any and all relief it may be entitled to as a result of such non-disclosure.
Upon notification by a Bidder/Offeror of GenAI as required, the state reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the state.
Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
3.18. SOCIOECONOMIC PROGRAMS
Bidders who claim any of the socioeconomic program points will be evaluated to determine whether they submitted the required forms, documents, exhibits, attachments and/or the responses necessary to validate their qualification and eligibility for the claimed preference(s). If the State determines that the submitted information is insufficient or that the required documents do not otherwise validate the eligibility for points in any of the claimed programs, then the points for that program will not be added to the Bidder’s final overall proposal score. If the State is able to validate the Bidder’s claim, the qualified preference points will be applied to the Bidder’s final overall proposal score provided that the Bidder’s proposal is not otherwise determined to be non-responsive to any mandatory requirements.
3.18.1. BIDDER'S PREFERENCE AND INCENTIVE DECLARATION (M)
The Bidder must complete and submit ATTACHMENT 10: BIDDING PREFERENCES AND INCENTIVES, with its proposal, and indicate whether it is or is not claiming each preference and/or incentive.
Refer to SECTION 7 EVALUATION for details on the amount and application of preference and incentive points during proposal evaluation.
3.18.2. SMALL BUSINESS PREFERENCE (O)
California Government Code §14835 et seq. requires that a five percent (5%) preference be given to Bidders that qualify as a small business (SB). The rules and regulations of this law, including the definition of a small business, or qualifying non-small business, are contained in Title 2, California Code of Regulations, §1896 et seq. The definition of nonprofit veteran service agencies qualifying as a small business is contained in §999.50 et seq. of the Military and Veterans Code.
Co…