Ad for Bids Food Service Equipment.pdf
PDF 71 KB Posted
- Attached to
- Request for Food Service Equipment
- Solicitation number
- RFP - CLPS - 240000001640
- Issued by
- Macomb County, Michigan
About this file
This document is an Advertisement for Bids for the Center Line Public Schools 2023 Bond Issue, Bid Package #2, for the Center Line High School Kitchen Remodeling project. The bid solicitation is for the Food Service Equipment bid division (Bid Division 137). Sealed bids will be accepted electronically through Building Connected until 1:00 PM on March 28, 2024, and will be publicly opened and read aloud via Zoom. A pre-bid meeting is scheduled for March 20, 2024 at 2:00 PM, which is strongly encouraged but not mandatory. The awarded contractor may be required to provide performance and labor/material payment bonds. Center Line Public Schools reserves the right to reject any or all bids.
The bid documents are available beginning March 14, 2024 through Building Connected. Bidders must include the required Familial Disclosure Affidavit, Iran Linked Business Affidavit, and Criminal Background Check Affidavit, as well as a 5% bid security. Center Line Public Schools, located in Macomb County, Michigan, is the contracting agency for this project.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00 11 13-1
Center Line Public Schools Center Line, MI
SECTION 00 11 13
ADVERTISEMENT FOR BIDS
Sealed bids for the Center Line Public Schools, 2023 Bond Issue, Bid Package #2, consisting of:
Center Line High School Kitchen Remodeling will be received through Building Connected until 1:00 P.M (local time), on Thursday, March 28, 2024.
1. All proposals shall be submitted electronically through Building Connected:
https://app.buildingconnected.com/public/5ae227ade0d395000fd24541 (McCarthy and Smith Plan Room)
2. For instructions on how to submit a bid please go to the following link:
https://buildingconnected.zendesk.com/hc/en-us/articles/360010222793-How-to-submit-your-bid-through- BuildingConnected-
Bids submitted after this time and date will not be considered or accepted.
Faxed proposals will not be accepted.
Sealed Bids will be publicly opened, read aloud and tabulated, beginning at approx. 1:00 p.m. (local time) on March 28, 2024. Bid Opening will be publicly conducted via a Zoom meeting at the following link:
Join Zoom Meeting https://us04web.zoom.us/j/76025900357?pwd=R6TD7d10PnFQ8vj86BaqRhgCzLapSA.1
Meeting ID: 760 2590 0357 Passcode: 8avNEM
This Bid Package will consist of separate sealed bids for the following Bid Division:
137: Food Service Equipment
Bidding documents prepared by Partners in Architecture, PLC. will be available for public inspection at the main office of the Construction Manager, McCarthy & Smith, Inc., 24317 Indoplex Circle, Farmington Hills, MI 48335;
the Construction Association of Michigan Plan Room, Bloomfield Hills; and the Builder’s Exchange, Lansing.
Bidding Documents will be available beginning at 12:00 p.m. on Thursday, March 14, 2024 via Building Connected.
There will be a Pre-Bid Meeting on Wednesday, March 20, 2024 at 2:00 p.m. at the Center Line Administration Building located at 26400 Arsenal, Center Line, MI 48015. The Pre-Bid Meeting is not mandatory, however, all bidders are strongly encouraged to attend.
All bids must include the Familial Disclosure Affidavit (Section 004205), the Iran Linked Business Affidavit (Section 004210), and the Criminal Background Check Affidavit (Section 004220).
All Bids must be accompanied by a Bid Security, in either the form of a bid bond or certified bank check, in the amount of five (5) percent of the amount of the Bid, payable to Center Line Public Schools, as a guarantee that if the Bid is accepted, the School District is secured from loss or damage by reason of the withdrawal of the Bid or failure of the Bidder to enter a Contract for performance. Further, the Bidder will execute the Contract, provide the required insurance certificate(s) and file the required bonds within ten (10) days after notice of award of Contract but prior to Work commencing.
If awarded a contract, the successful bidder may be required to furnish a Performance Bond and Labor and Material Payment Bond in the amount of 100% of the contract price.
Center Line Public School District reserves the right to reject any or all bids received, to waive any informalities and irregularities in the bidding, and to accept a bid other than the lowest bid.
End of Section https://app.buildingconnected.com/public/5ae227ade0d395000fd24541 https://buildingconnected.zendesk.com/hc/en-us/articles/360010222793-How-to-submit-your-bid-through-BuildingConnected-https://buildingconnected.zendesk.com/hc/en-us/articles/360010222793-How-to-submit-your-bid-through-BuildingConnected-https://us04web.zoom.us/j/76025900357?pwd=R6TD7d10PnFQ8vj86BaqRhgCzLapSA.1
File details come from the government source that posted it. Updated .