Ad for Bid.pdf
PDF 124 KB Posted
- Attached to
- Ft Morgan WB/Scale & Pit Auth to Bid
- Solicitation number
- IFB1 RBAA 2026000145 3
- Issued by
- Otero County, Colorado
About this file
This is an Advertisement for Bids issued by the State of Colorado, Department of Public Safety for the Ft. Morgan WB Scale & Scale Pit Replacement project. The project involves replacement of the point-of-entry scale and scale pit for the Westbound POE building at the Ft. Morgan Weigh Station on I-76. The scope of work includes full construction contracting services to construct a new concrete scale pit to house a new scale that will be provided and installed by other parties, with all work performed per engineer's designs and specifications. The mandatory pre-bid conference and site tour is scheduled for March 4, 2026 at 9:00 AM at 13395 I-76 North Frontage Road, Fort Morgan, Colorado 80701. Bid submittals are due electronically on March 23, 2026 at 9:00 AM (Mountain Time), with a virtual public bid opening scheduled for the same date at 2:00 PM. The anticipated contract award date is March 23, 2026, with contract approval anticipated by April 1, 2026 and construction start on April 6, 2026, with completion anticipated by June 5, 2026.
The estimated project cost is $260,000.00. Qualified contractors must have a minimum of five years of relevant experience, not have been previously terminated by the State for non-performance, have operated under the same business name for at least two years, demonstrate specific contracting experience on at least two projects exceeding $750,000 in hard costs, and provide evidence of bonding capability up to $1,500,000. Bidders must attend the mandatory pre-bid conference to be considered. Per Colorado law, a bid bond and power of attorney or proposal guaranty equal to at least 5% of the bid is required. Payment and performance bonds of not less than 50% of the contract value are required. Colorado labor must perform at least 80% of the work. No prevailing wage requirements apply to this project as it is below the $500,000 threshold. All submittals become the property of the State and will not be returned, and late submittals will be rejected without consideration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OSA-AFB-1 pg. 2
REV 7/2025
ADVERTISEMENT FOR BIDS
Design / Bid / Build State of Colorado
[Department of Public Safety]
Notice Number: 1 Project Number: 25/10-02 Project Title: Ft. Morgan WB Scale & Scale Pit Replacement Estimated Project Cost: $260,000.00
NOTICES
1. For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.
2. For State Public Works C.R.S. §8-17-101 - Colorado labor shall be employed to perform at least 80% of the work. Colorado labor means any person who is a resident of the state of Colorado at the time of the Public Works project.
3. All respondents accept the conditions of this AFB, including but not limited to, the following:
a. All submittals shall become the property of the State of Colorado and will not be returned.
b. Late submittals shall not be evaluated.
c. The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information.
d. The State shall not be liable for any costs incurred by respondents in the preparation of submittals and proposals nor in costs related to any element of the selection and contract negotiation process.
4. The respondent has reviewed Appendix F and by responding has agreed that the terms and conditions of the sample Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.21) and General Terms and Conditions of the Contractor’s Design/Bid/Build Agreement (SC- 6.23) are expressly workable without reservation. Any exceptions to the contract must be communicated formally in writing before the bid closes.
5. Per C.R.S. §24-92-115 unless prohibited by applicable federal law, contract for any public project in the amount of one million dollars or more, that does not receive federal money, in the amount of one million dollars or more shall require the general contractor to which the contract is awarded to submit, at
OSA-AFB-1 pg. 3 the time the mechanical, electrical, or plumbing subcontractor is put under contract, documentation that Identifies the contractors or subcontractors that will be used for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical, and plumbing work required on the project and certifies that all firms identified participate in apprenticeship programs registered with the United States department of labor’s employment and training administration or state apprenticeship councils recognized by the United States department of labor and have a proven record of graduating a minimum of 15% of its apprentices for at least three of the past five years.
6. Per C.R.S. §24-92-117, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act program requirements. The BCCO Act requires the Office of the State Architect to establish a maximum acceptable global warming potential (GWP) limit for each category of eligible materials, which include asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements. For any solicitation for a contract for the design of an eligible project, a State Agency or institution shall require the designer who is awarded the contract to include, in project specifications when final construction documents are released, a current Environmental Product Declaration (EPD) that meets the maximum acceptable GWP limits for each eligible material specified for the project. A contractor that is awarded a contract for an eligible project shall not install any eligible materials on the project until the contractor submits an EPD for each eligible material procured for the project.
7. Per C.R.S. §24-92-Part 2, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the State prevailing wage rate, of the regular, holiday, and overtime wages paid and the general prevailing payments on behalf of employees to lawful welfare, pension, vacation, apprentice training, and educational funds in the State, for each employee needed to execute the contract. Payments to the funds must constitute an ordinary business expense deduction for federal income tax purposes by contractors and subcontractors. Contractors are required to pay their employees at weekly intervals and shall comply with the enforcement provisions of C.R.S. §24-92-209. Contractors awarded a project of this size will be required to utilize the LCPTracker cloud-based labor compliance and certified payroll application.
8. Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.
9. Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.
OSA-AFB-1 pg. 4
PROJECT OVERVIEW
Introduction This project is for the replacement of the POE scale and scale pit for the Westbound POE building in Ft. Morgan.
The State of Colorado, Colorado Department of Public Safety (CDPS) is soliciting bids from qualified contractors for the Ft. Morgan POE WB Scale & Scale Pit Replacement project.
The Ft. Morgan POE WB Scale & Scale Pit Replacement project is located at the WB Weigh Station in Ft. Morgan on I-76. The goal of this project is to provide the weigh station with a new scale pit primarily made of concrete which will contain a new scale that will be provided by and installed by other parties. All work is to be done per the engineer’s specifications, and all of the specifications are to be verified by the bidding contractors. The bidding contractors are required to have a minimum of 5 years of relevant experience.
Scope of Services
Per Engineer’s Designs and Specifications
The scope of services will include full Construction Contracting Services for the project specified during the process of construction and warranty period to the State as per the Advertisement for Bid. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the State. Bidders shall reference the drawings, specifications, and supporting documents in the Appendices for an understanding of the entire scope of the project.
Per C.R.S. §38-26-106, if a contract amounts to $150,000 or more, the awarded contractor shall provide payment and performance bonds not less than 50% of the value of the contract. The costs associated with this bond are to be included in the contractor’s bid.
MINIMUM REQUIREMENTS
Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested bidders should be prepared to show evidence of the following to be considered as qualified, as a minimum:
1. Not previously terminated by the State for non-performance on a State Buildings contract or procurement.
2. The bidding contractor must have been in the same business, under the same name for the last two (2) years.
OSA-AFB-1 pg. 5
3. Demonstrated specific contracting experience in projects of similar scope and complexity for at least two (2) projects each in excess of $ 750,000.00 (hard costs), utilizing the expertise present in their Colorado Office; and
4. Demonstrated bonding capability up to $ 1,500,000.00 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity.
5. Attended and signed in at the Mandatory Pre-Bid Conference
Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.
https://prd.co.cgiadvantage.com/PRDVSS1X1/Advantage4
MANDATORY PRE-BID CONFERENCE AND SITE TOUR
A mandatory Pre-Bid Meeting will be held at:
Building Address: 13395 I 76 North Frontage Rd, Fort Morgan, CO 80701 Room:
Date/Time March 4, 2026 at 9:00 AM
SCHEDULE
The following is a tentative schedule of events for the Bid Submittal process and an outline of the schedule for the balance of the project. All dates are subject to change and changes in the schedule will be issued via addendum.
Advertisement for Bids Issued February 25, 2026 Mandatory Pre-Bid Conference and Site Tour March 4, 2026 at 9:00 AM Request for Clarifications Due March 10, 2026 by Noon Final Addendum Issued (anticipated) March 12, 2026 COB Bid Submittals Due (date and Time) March 23, 2026 at 9:00 AM Public Bid Opening March 23, 2026 at 2:00 PM Award Intent Notification (anticipated) March 23, 2026 Contracting March 24, 2026 Contract Approval (anticipated) April 1, 2026 Anticipated Construction Start April 6, 2026 Anticipated Construction Finish June 5, 2026
The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on https://prd.co.cgiadvantage.com/PRDVSS1X1/Advantage4 website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.
https://prd.co.cgiadvantage.com/PRDVSS1X1/Advantage4
OSA-AFB-1 pg. 6
QUESTIONS, CLARIFICATIONS AND ADDENDA
Owner initiated changes to this AFB will be issued under numerically sequenced addenda.
Owner initiated changes to this AFB will be posted in the form of addenda on https://prd.co.cgiadvantage.com/PRDVSS1X1/Advantage4.
Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule.
Communication regarding the project during the procurement, outside of the this submission process or scheduled procurement milestones is not permitted.
POINT OF CONTACT/CLARIFICATION
Name: Attn: Procurement Agency: Department of Public Safety Email Address: cdps_edo_bids@state.co.us Phone: N/A
BIDDING
Bids shall be submitted on the required bid form as indicated on the Information For Bidders document (SBP-6.12) in Appendix A.
An electronic copy of the sealed bid submittal is due March 23, 2026 and shall be received no later than 9:00 AM (MD/ST), and shall be submitted/accepted via [Insert submission method], as described in the Information for Bidders (SBP-6.12)
_____ (__) hard copies of the sealed bid submittal are due [Insert date] and shall be received no later than _______ AM/PM (MD/ST), and shall be submitted/accepted via [Insert submission method], as described in the Information for Bidders (SBP-6.12)
Bid Forms and Appendices to be included with bid submittal:
Bid Form (SBP-6.13) Bid Bond (SBP-6.14) Bid Alternates (SBP-6.131) Unit Pricing (SBP-6.133)
Late bid submittals will be rejected without consideration. The State of Colorado assume no responsibility for costs related to the preparation of bid submittals.
BID OPENING
Opening of the bid submittals will be a virtual public bid opening via [name of software platform] Meeting platform.
OSA-AFB-1 pg. 7
Virtual public bid opening will take place at the date and time identified in Schedule
APPENDICES:
Appendix A: Information for Bidders (SBP-6.12) Appendix B: Bid Form (SBP-6.13) Appendix B1: Bid Alternates (SBP-6.131) (if Applicable) Appendix B2: Unit Pricing (SBP-6.133) (if Applicable) Appendix B3: Bid Bond (SBP-6.14) (if Applicable) Appendix C: Sample: Direct Labor Burden Calculation (SBP-6.18) Appendix D: Applicable Prevailing Wage and Apprenticeship and Fringe
Rates (if Applicable) Appendix E: Sample: Apprenticeship Utilization Certifications (SBP-2.1)
(if Applicable) (Appendix F: Sample: SC6.21 and SC6.23 Design/Bid/Build Contractor’s
Agreement and General Conditions of the Contract)
File details come from the government source that posted it. Updated .