AD 3.2- S9320-AM-PRO-020_MLDG REV 2.pdf
PDF 1 MB Posted
- Attached to
- Cable Assemblies, Copper, Fiber and Hybrid
- Solicitation number
- N6660423R0306
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6660423R03060010.pdf | ||
| N6660423R03060009.pdf | ||
| N6660423R03060008.pdf | ||
| N6660423R03060007.pdf | ||
| N6660423R03060006 Conform.pdf | ||
| N6660423R03060006 Conform Copy.pdf | ||
| N6660423R03060006.pdf | ||
| N6660423R03060005.pdf | ||
| N6660423R03060004.pdf | ||
| N6660423R03060003.pdf | ||
| N6660423R03060002.pdf | ||
| N6660423R03060001.pdf | ||
| N6660423R03060002.pdf | ||
| N6660423R03060001.pdf | ||
| N6660423R0306.pdf | ||
| AD 3.3- S9320-AM-PRO-030_MLDG REV 03.pdf | ||
| N6660423R0306.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVSEA S9320-AM-PRO-020/MLDG REV 2
TECHNICAL MANUAL
UNDERWATER CABLE ASSEMBLY AND
ENCAPSULATED COMPONENTS, FABRICATION,
REPAIR, AND INSTALLATION MANUAL
VOLUME II
MOLDING AND INSPECTION PROCEDURES
FOR FABRICATING CONNECTOR PLUGS
FOR SUBMARINE OUTBOARD CABLES
SUPERSEDES NAVSEA 0962-LP-022-2011, NAVSEA SO 900-00-PRO-010/MLDG
AND NAVSEA S9320-AM-PRO-010/MLDG (JANUARY 1997)
APPENDIX II-E OF THIS DOCUMENT SHOULD BE USED IN LIEU OF MIL-M-24041.
DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS ONLY. OTHER REQUESTS FOR THIS DOCUMENT MUST BE
REFERRED TO: COMMANDER, NAVAL SEA SYSTEMS COMMAND (CODE 03Z),
2531 JEFFERSON DAVIS HWY, ARLINGTON, VA 22242-5160
PUBLISHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND
AUGUST 1999
THIS PAGE INTENTIONALLY BLANK TO ALLOW THE
DISTRIBUTION STATEMENT FOR THE ISSUANCE LETTER TO
BE INSERTED.
NAVSEA S9320-AM-PRO-020/MLDG REV 2
TECHNICAL MANUAL
UNDERWATER CABLE ASSEMBLY AND
ENCAPSULATED COMPONENTS, FABRICATION,
REPAIR, AND INSTALLATION MANUAL
VOLUME II
MOLDING AND INSPECTION PROCEDURES
FOR FABRICATING CONNECTOR PLUGS
FOR SUBMARINE OUTBOARD CABLES
SUPERSEDES NAVSEA 0962-LP-022-2011, NAVSEA SO 900-00-PRO-010/MLDG
AND NAVSEA S9320-AM-PRO-010/MLDG (JANUARY 1997)
APPENDIX II-E OF THIS DOCUMENT SHOULD BE USED IN LIEU OF MIL-M-24041.
DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS ONLY. OTHER REQUESTS FOR THIS DOCUMENT MUST BE
REFERRED TO: COMMANDER, NAVAL SEA SYSTEMS COMMAND (CODE 03Z),
2531 JEFFERSON DAVIS HWY, ARLINGTON, VA 22242-5160
PUBLISHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND
iv
LIST OF EFFECTIVE PAGES
This manual is a complete revision, which supersedes NAVSEA S9320-AM-PRO-010/MLDG, with an original date of January 1997.
Dates of issue for original and changed pages are:
Original August 1999
Page *Change No. No.
Title Page 0 List of Effective Pages 0 Revision Record Table of Contents 0 Foreword 0
Section I 0
Section II 0
Section III 0
Section IV 0
Section V 0
Appendix II-A Vendor Audit Requirements/List of 0 Approved Vendors
Appendix II-B Generic Assembly Traveler 0
Appendix II-C Preformed Inserts - Production and 0 Inspection
Appendix II-D Data Sheets for In-House Inspections 0
Appendix II-E Polyurethane System Requirements/ 0 Backfill Material Requirements/
List of Approved Products
Appendix II-F Test Inspection Report 0
*Zero in this column indicates an original page v
REVISION RECORD
REVISION
NO.
DATE
TITLE AND/OR BRIEF
DESCRIPTION
SIGNATURE
vi
TABLE OF CONTENTS
Paragraph Page
Issuance Letter.................................................................... i Title Page............................................................................ iii
List of Effective Pages iv Revision Record.................................................................. v
Table of Contents................................................................ vi Foreword viii
1 SECTION I
1-1 INTRODUCTION
1-1.1 Purpose 1-1.2 Scope 1-1.3 Applicability 1-1.4 Vendor Qualification
1-2 REFERENCES
1-3 PERSONNEL QUALIFICATION AND TRAINING
2 SECTION II
2-1 SAFETY AND ENVIRONMENTAL CONTROLS
2-1.1 Ventilation 2-1.2 Personal Protective Equipment 2-1.3 General 2-1.4 Electrical 2-1.5 Waste 2-1.6 Environmental Controls
3 SECTION III
3-1 EQUIPMENT REQUIREMENTS
3-1.1 Capital Equipment Required 3-1.2 General Equipment Required vii
3-2 MATERIAL REQUIREMENTS
3-2.1 Consumable Equipment & Material Requirements
4 SECTION IV
4 GENERAL MOLDING PROCEDURES
4-1 INTRODUCTION
4-2 INSPECTION REQUIREMENTS
4-2.1 Cable Inspection 4-2.2 General Connector Inspection 4-2.3 Mold Inspection
4-3 INDIVIDUAL COMPONENT PREPARATION
4-3.1 Generic Cable Preparation 4-3.2 MIL-C-24231 Style Connectors Cable Preparation 4-3.3 Shielded Cable Preparation 4-3.4 General Connector Preparation 4-3.5 Non-Conductive Coated (Plasma Spray Coated)
Backshells
4-4 CONNECTORIZATION
4-4.1 MIL-C-24231 Connector (MIL-C-24231 Style) 4-4.2 Crimp Style Connectors (MIL-C-24217, Others)
QA-1 VISUAL INSPECTION OF SOLDER JOINTS
QA-1.1 Quality Control Inspection QA-1.2 Continuity QA-1.3 Insulation Resistance viii
4-5 ENCAPSULATING (BACKFILL) INNER DIAMETER (ID)
OF CONNECTOR
4-6 PRIMING SYSTEM APPLICATION
4-7 MOLD PREPARATION
4-8 POLYURETHANE PREPARATION
4-8.1 Type I, Two Component Systems 4-8.2 Type II, Frozen Cartridges 4-8.3 Injection Process
QA-2 QUALIFICATION TESTING
QA-2.1 Visual Inspection QA-2.2 Electrical Continuity QA-2.3 Insulation Resistance QA-2.4 Non-Destructive Bond Tests QA-2.5 Hydrostatic Pressure Test
4-9 PRESHIPMENT INSPECTION
APPENDICES
II-A Vendor Audit Requirements/List of Approved Vendors................ II-A1 II-B Generic Assembly Traveler..................................…..................... II-B1 II-C Preformed Inserts – Production and Inspection............................ II-C1 II-D Data Sheets for In-House Inspections........................................ II-D1 II-E Polyurethane System Requirements/Backfill Material Requirements/
Lists of Approved Products ............................................................. II-E1 II-F Test Inspection Report.................................................................... II-F1 ix
FOREWORD
This document provides minimum generic guidelines, current technical references, and sample generic production support forms for:
Manufacture of all outboard submarine cable assemblies:
Molding Inspection Testing
Manufacture of preformed molded inserts:
Production Inspection
Generic “Shop Travelers” Generic “Data Sheets for In-house Inspection” Generic “Test Inspection Report” form Generic “Preformed Insert Production and Inspection” form Audit requirements for vendors Approved Vendor List
This manual is a complete revision, which supersedes NAVSEA S9320-AM-PRO-010/MLDG, with an original date of January 1997.
Ships, training activities, supply points, depots, Naval Shipyards, and Supervisors of Shipbuilding are requested to arrange for the maximum practical use and evaluation of this NAVSEA technical manual. All errors, omissions, discrepancies, and suggestions for improvements to this NAVSEA technical manual shall be reported to NAVSEA.
SECTION I
1-1. INTRODUCTION.
1-1.1 Purpose. The purpose of this document is to provide minimum generic guidelines, current technical references, and sample generic production support forms for:
Manufacture of all outboard submarine cable assemblies:
Molding Inspection Testing
Manufacture of preformed molded inserts:
Production Inspection
Generic “Shop Travelers” Generic “Data Sheet for In-house Inspection” form Generic “Test Inspection Report” form Generic “Preformed Insert Production and Inspection” form Audit requirements for vendors Approved Vendor List (AVL)
Each manufacturer should use these forms as a basis to develop their own forms tailored to the particular cable assemblies in production. The resultant forms should contain at a minimum the items outlined in the generic forms and add the additional requirements of the technical references specified in this manual for the cable assemblies/components being produced.
1-1.2 Scope. These procedures apply to all outboard submarine cable assemblies.
1-1.3 Applicability. These procedures shall be used on all cable assemblies utilizing polyurethane molded boots.
1-1.4 Vendor Qualification: Only these vendors which are qualified, per the audit requirements of Appendix II-A, of this document and listed on the Approved Vendors List in Appendix II-A, shall be authorized to fabricate submarine outboard cable assemblies.
1-2. REFERENCES. The following documents, of the issue in effect, form a part of this procedure to the extent specified herein. Whenever the referenced documents conflict with this cable assembly molding procedure the molding portion of this document shall govern. Copies of these documents shall be maintained in the cable fabrication facility.
MILITARY SPECIFICATIONS:
MIL-C-22520 - Crimping Tools, Terminal, Hand or Power Actuated MIL-C-24217 - Connectors, Electrical, Deep Submergence, Submarine MIL-C-24231 - Connectors, Plugs, Receptacles, Adapters, Hull
Inserts & Hull Insert Plugs, Pressure-Proof, General Specification
MIL-I-16923 - Insulating Compound, Electrical, Embedding
MILITARY STANDARDS:
MIL-STD-129 - Standard Practice for Military Marking MIL-STD-202 - Test Methods for Electronic and Electrical Component Parts MIL-STD-1504 - Abrasive Blasting MIL-STD-2073 - Standard Practice for Military Packaging
DRAWINGS:
Applicable Mold Assembly Drawings Applicable Cable Assembly Drawings
OTHER:
Naval Ships Technical Manual S9086-KC-STM-000/Ch 300 Joint Industry Standard J-STD-001 Requirements for Soldered Electrical and Electronic
Assemblies Joint Industry Standard J-STD-006 Requirements for Electronic Grade Solder Alloys and
Fluxed and Non-Fluxed Solid Solders for Electronic Soldering Applications Occupational Safety and Health (OSHA) Safety Standards, Code of Federal Regulations
10CFR20
1-3. PERSONNEL QUALIFICATION AND TRAINING. Cable assembly fabricators shall establish and maintain a thorough, detailed training program based upon the techniques and procedures outlined within this manual for personnel charged with making up cable assemblies and for personnel charged with in-process and final inspection of cable assemblies. The training program shall be documented, and certification and qualification cited at the facility. All cable assemblies must be fabricated by qualified, certified personnel and inspected by qualified, certified personnel. This training/certification program shall be reviewed and conformance to this manual demonstrated during facility audits.
SECTION II
2-1. SAFETY AND ENVIRONMENTAL CONTROLS
2-1.1 Ventilation. Good ventilation is mandatory for all chemical processes. Adherence to all ventilation requirements specified in Material Safety Data Sheets (MSDS) is mandatory. Local, state, and federal guidelines/requirements, including 10CFR20 OSHA Safety Standards, should be strictly followed.
2-1.2 Personal Protective Equipment. Personnel shall wear required protective equipment as specified in the MSDS of the material being used. At a minimum, all chemical processes require personnel to wear rubber gloves, protective eyewear, and a lab coat/apron. Splashes or spills shall be washed from the skin immediately with soap and water.
2-1.3 General. No smoking, welding, or other source of open flame or sparks shall be allowed in close proximity of the molding operation. Although the polyurethane compounds and primers are flame resistant, the solvents are highly flammable or contain chlorinated hydrocarbons that decompose in fire to give off highly toxic gases.
Use safety cans for the transfer and storage of solvents. Do not leave solvent saturated rags in open areas; place them into safety waste cans immediately after use.
2-1.4 Electrical. Check all electrical equipment in accordance with the Electrical Safety Precautions of Section II of NAVSEA Technical Manual S9086-KC-STM-000/Ch 300.
2-1.5 Waste. Adherence to all local, state, and federal regulations, concerning wastes generated due to these procedures, shall be mandatory.
2-1.6 Environmental Controls. This section defines the minimum standards for working environments applicable to the molding of Navy outboard submarine cable assemblies.
The term working environment refers to those environmental factors that may affect the quality characteristics of the work in process. Those factors include:
a. Cleanliness: Requirements have been assigned to various work areas based on engineering judgment and the potential for contamination of work in process. The cable assembly molding area shall have floors, walls, and workspaces with easily cleaned surfaces. Residue and unused materials shall not be allowed to accumulate and require prompt clean up/stowage. Clean-up of equipment and work areas shall be accomplished on a daily basis.
b. Lighting: The lighting intensity of work areas has been found to affect productivity, error rate, and operator fatigue. Supplemental lighting shall be used when necessary to improve precision and minimize operator fatigue. The cable assembly molding area shall have a minimum of 100 foot-candles illumination; supplemental illumination may be utilized to realize this requirement at specific work stations.
c. Air temperature: These limits have been defined where the worker exerts a direct influence on product quality and have been defined based upon consideration of worker comfort, static electricity, and potential for corrosion. The dry bulb temperature taken during normal working hours at or near the workstations shall be 75ºF ±5ºF.
d. Relative humidity: Designated relative humidity shall be measured at room temperature in proximity to the workstations during regular work hours.
NOTE: The relative humidity shall be less than or equal to 50%.
e. Dust control: Outside air shall be filtered to remove dust particles. Filter shall have a minimum arrestance of 65%.
f. Ventilation or exhaust: Mechanical ventilation hoods with external exhaust shall be utilized to mix chemicals or vapor degrease, or when local environmental/safety and common sense dictate.
g. Noise: Hearing protection shall be provided in areas designated by the local Safety Office as High Noise Areas. The only area in a cable assembly molding facility that may pose a serious noise hazard would be a grit-blasting system.
h. Habitat: No food, drink, personal grooming material, or smoking material is allowed in cable assembly molding areas. No eating, drinking, personal grooming, or smoking is allowed in cable assembly molding areas.
SECTION III
3-1. EQUIPMENT REQUIREMENTS
3-1.1 Capital Equipment Required. The following is a list of capital equipment required to properly mold a cable assembly:
a. Proper mold assemblies, as required, by applicable specifications of cable assembly
b. Standard vacuum equipment capable of drawing a vacuum of less than 5mm (30 in) of mercury
c. Grit blaster
d. An accurate gram balance
e. Non-destructive bond test system
f. Hydrostatic pressure tank
g. If Type II urethanes (two-part, premixed, degassed, and frozen cartridges) are used, a freezer capable of maintaining the manufacturer’s recommended storage temperature and large enough to hold an adequate supply.
h. If urethanes requiring an oven cure are utilized, an oven capable of maintaining required cure temperatures and are large enough to accommodate the molding operation will be required.
3-1.2 General Equipment Required. The following is a list of general equipment required to properly mold a cable assembly:
a. A thermometer 0-220 °F
b. Soldering iron; soldering system
c. Rubber gloves
d. Safety eyewear
e. Lab coat/apron
f. Wire strippers
g. Diagonal cutting pliers
h. Metal/plastic spatula
i. Cable cutters
j. Ohmmeter
k. Megger
l. Box/Exacto knife
m. Round edge probe
n. Laboratory ring stands or equivalent
o. Heat gun
p. Calibrated crimping tools and dies
q. Pressure tank
3-2. MATERIAL REQUIREMENTS
3-2.1 Consumable Equipment and Materials Required. The following is a list of consumable equipment and materials required to properly mold a cable assembly:
a. Connector components as per applicable specification for Cable assembly (MIL-C-24231 or MIL-C-24217)
b. Polyurethane molding compound, as per Approved Products
List (APL)
c. Connector shell primer, as per APL and polyurethane manufacturer’s
TDS
d. Cable jacket primer, as per APL and polyurethane manufacturer’s TDS
e. Cleaning solvents: Acetone, Methyl Ethyl Ketone (MEK), or Isopropyl Alcohol (or equivalent)
f. Plug connector backfill material, as per APL
g. Thomas & Betts Shield crimp rings, or equivalent, (for shielded cables) with properly sized (to receptacle) jumper wire
h. Cable: as per cable assembly specification or drawing
i. Injection tube
j. Shrink sleeving - Per drawing/specification for cable
k. Non-acid resin flux
l. Tape or protective ring
m. Tags - Per cable drawing
n. Solder J-STD-006 (60/40, or SN63)
o. A clean, dry polyethylene or metal container, having at least three times the volume of material to be degassed
p. 1/2" wide bristle (acid) brushes
q. Pressure sensitive tape
r. Lint free cloths
s. Abrasive paper, 60-80 grit or equivalent
t. Non-silicone mold release
u. List of documents used during manufacture:
1. Cable assembly dwgs
2. Manufacturer’s instructions for primer preparation and use
3. Manufacturer’s instructions for mixing, degassing and curing of backfill material
4. Manufacturer’s instructions for mixing, degassing and curing of polyurethane
PROCEDURE NUMBER
TITLE
NAVSEA S9320-AM-PRO-020/MLDG
REV
MOLDING & INSPECTION PROCEDURES FOR
FABRICATING CONNECTOR PLUGS FOR SUBMARINE
OUTBOARD CABLES
PROCESS
PROCEDURE
MATERIAL
EQUIPMENT
4-1
GENERAL MOLDING PROCEDURES
INTRODUCTION
BECOME FAMILIAR WITH ALL REFERENCED SPECIFICATIONS, STANDARDS,
MATERIAL SAFETY DATA SHEETS (MSDS), AND THE CABLE ASSEMBLY
DRAWINGS FOR THE APPLICABLE SYSTEM.
PREPARE A SHOP TRAVELER FOR THE CABLE ASSEMBLY TO BE
FABRICATED. A SAMPLE GENERIC SHOP TRAVELER IS FOUND IN
APPENDIX II-B.
SHOP TRAVELER WILL ACCOMPANY CABLE ASSEMBLY AND BE UPDATED
THROUGHOUT FABRICATION PROCESS. IF CABLE ASSEMBLY FAILS TO
MEET REQUIREMENTS AT ANY POINT IN THE FABRICATION PROCESS,
NOTE FAILURE ON SHOP TRAVELER. REJECT AND/OR REPAIR, AS
REQUIRED. SHOP TRAVELER SHALL BE ANNOTATED AS A REWORK. AN
INSPECTION REPORT DETAILING CAUSE OF FAILURE, REWORK PROCEDURE
PERFORMED AND TESTING DONE TO SATISFY THE DISCREPANCY SHALL BE
ATTACHED AS WELL. CONTINUE FABRICATION PROCESS.
IF CABLE ASSEMBLY IS REJECTED AS BEING NON-REPAIRABLE, NEW CABLE
ASSEMBLY SHALL BE STARTED WITH NEW SHOP TRAVELER MAINTAINING
TRACEABILITY.
VERIFY THAT ALL CONSUMABLE MATERIALS ARE AVAILABLE,
WITHIN SHELF LIFE, AND MEET THE REQUIREMENTS OF THE
APPLICABLE TECHNICAL DATA SHEETS (TDS).
4-1
(CONT’D)
ANY DISCREPANCIES BETWEEN THE MOLDING MANUAL AND THE
APPLICABLE DRAWING SPECIFICATIONS SHOULD BE NOTED ON THE SHOP
TRAVELER. MOLDING MANUAL SHALL TAKE PRECEDENCE DURING
FABRICATION PROCESS ONLY.
ALL TEST REQUIREMENTS SHALL FOLLOW REQUIREMENTS OF APPLICABLE
DOCUMENTS. IF NOT SPECIFIED ELSEWHERE, MINIMUM TEST
REQUIREMENTS OF THIS MANUAL SHALL BE MET.
4-2
4-2.1
INSPECTION REQUIREMENTS:
CABLE INSPECTION (RECOMMENDED)
VISUALLY INSPECT BULK CABLE ON THE REEL TO DETERMINE THAT THE
CABLE MEETS REQUIRED SPECIFICATION AND IS THE TYPE REQUIRED BY
THE APPLICABLE CABLE ASSEMBLY DRAWING.
COMPLETE AND SIGN DATA SHEET (DS1), APPENDIX II-D, FOR THIS
SECTION.
REMOVE THE REQUIRED LENGTH OF CABLE FROM THE REEL.
IT IS RECOMMENDED THAT THE CABLE ASSEMBLY FABRICATOR INSPECT
THE ENTIRE LENGTH OF THE CABLE JACKET FOR IMPERFECTIONS. IF ANY
IMPERFECTIONS ARE FOUND, CUT NEW CABLE. REPEAT INSPECTION.
STRIP EACH END OF THE CABLE DOWN TO THE BARE WIRE SUFFICIENTLY
TO EXPOSE ENOUGH WIRE TO PERFORM ELECTRICAL TESTS.
PERFORM CONTINUITY TEST ON EACH CONDUCTOR AND/OR SHIELD
(Limit ≤ 1 Ω, OR AS REQUIRED BY CABLE SPECIFICATION OR CABLE
ASSEMBLY DRAWING).
CABLE
CABLE
CUTTERS
(OR EQUIV)
WIRE
STRIPPERS
OHMMETER
PERFORM DC INSULATION RESISTANCE @ 500 VDC (LIMIT: ≥ 1GΩ, OR AS
REQUIRED BY CABLE SPECIFICATION OR CABLE ASSEMBLY DRAWING).
TAG EACH CABLE WITH IDENTIFYING SERIAL NUMBER FROM THE
ACCOMPANYING SHOP TRAVELER.
TAG
MEGOHMETER
4-2.2 GENERAL CONNECTOR INSPECTION
REMOVE THE CONNECTOR ASSEMBLY FROM THE PROTECTIVE STORAGE
BAG.
DISASSEMBLE THE CONNECTOR ASSEMBLY TO COMPONENT LEVEL.
INSPECT CONNECTOR COMPONENTS FOR DAMAGE AND CONFORMANCE TO
APPLICABLE SPECIFICATIONS OR DRAWINGS.
PRE-FORMED POLYURETHANE CONNECTOR INSERTS, UTILIZED ON
MIL-C-24231 STYLE CONNECTORS, SHALL BE EITHER PROCURED OR
FABRICATED IN ACCORDANCE WITH MIL-C-24231. POLYURETHANE
INSERTS SHALL BE INSPECTED IN ACCORDANCE WITH APPENDIX II-C.
CONNECTOR
COMPONENTS
4-2.3
MOLD INSPECTION
OBTAIN MOLD FOR APPLICABLE SPECIFICATION OR CABLE ASSEMBLY
DRAWING.
DISASSEMBLE MOLD TO COMPONENT LEVEL. INSPECT MOLD FOR DAMAGE.
CLEAN ALL MOLD COMPONENTS, AS REQUIRED, USING SOLVENT.
LINT-FREE CLOTH
MEK, ACETONE,
ISOPROPYL
ALCOHOL (OR
MOLD
CAUTION:
CLEAN TEFLON COATED MOLDS WITH ISOPROPYL ALCOHOL ONLY.
RE-ASSEMBLE MOLD TO ENSURE PROPER FIT OF ALL COMPONENTS.
SET MOLD ASIDE UNTIL READY TO USE.
EQUIV)
4-3
4-3.1
INDIVIDUAL COMPONENT PREPARATION:
GENERIC CABLE PREPARATION:
CUT LENGTHS SHALL BE OBTAINED FROM APPLICABLE CABLE ASSEMBLY
DRAWINGS. AS A MINIMUM REQUIREMENT, THE MAXIMUM AMOUNT OF
CABLE JACKET POSSIBLE SHALL BE MAINTAINED WITHIN THE MOLDED
BOOT ENVELOPE.
REMOVE OUTER JACKET AS APPLICABLE.
REMOVE THE WIRE INSULATION ON THE INDIVIDUAL CONDUCTORS, AS
INDICATED ON APPROPRIATE SPECIFICATION OR CABLE ASSEMBLY
DRAWING.
CLEAN THE CONDUCTOR WITH A STIFF BRUSH AND APPROPRIATE
SOLVENT.
MEK, ACETONE
BOX/EXACTO
KNIFE
WIRE
STRIPPERS
W/FIXED DIE
ACID BRUSH
FIGURE 1. TYPICAL CABLE PREPARATION
FIGURE 1 SHOWS THE BASIC LAYOUT FOR CUT LENGTHS AND WIRE
PREPARATION. DIMENSIONS A THROUGH E WILL BE DETERMINED FROM
APPLICABLE CABLE ASSEMBLY DRAWINGS.
4-3.2
MIL-C-24231 STYLE CONNECTORS CABLE PREPARATION:
TIN THE STRIPPED WIRES OF THE CABLE WITH SOLDER. NON-ACID RESIN
FLUX SOLDER SHALL BE UTILIZED.
REMOVE THE FLUX FROM THE TINNED AREA WITH APPROPRIATE SOLVENT.
J-STD-006 SOLDER
(60/40, or SN63)
ALCOHOL, MEK,
ACETONE (OR
SOLDER
SYSTEM
4-3.3
SHIELDED CABLE PREPARATION:
REMOVE ENOUGH OF THE OUTER JACKET TO EXPOSE THE BRAIDED SHIELD
AND MAINTAIN PROPER CUT LENGTHS. IF CABLE BEING UTILIZED
CONTAINS MORE THAN ONE SHIELD, CRIMP RINGS SHALL BE STAGGERED
IN SUCH A MANNER AS TO ENSURE A STREAMLINED CONDUCTOR BUNDLE.
UNLESS OTHERWISE SPECIFIED IN DRAWINGS, SPECIFICATIONS, ETC.,
CRIMP RINGS SHALL BE UTILIZED WITH SHIELDED CABLES. CRIMP RINGS
SHALL BE INSTALLED USING CALIBRATED TOOLING AND IN ACCORDANCE
WITH MANUFACTURER’S SPECIFICATIONS.
FIGURES 2 & 3 SHOW THE TWO BASIC METHODS FOR INSTALLING CRIMP
RINGS.
THOMAS & BETTS
CRIMP RINGS (OR
KNIFE (OR
APPROPRIATE
CALIBRATED
CRIMP TOOL
EACH CRIMP RING SHALL BE INSULATED WITH SHRINK SLEEVING.
SHRINK SLEEVING HEAT GUN
FIGURE 2: INSTALLATION OF CRIMP RINGS (FOLD BACK METHOD).
FIGURE 3: INSTALLATION OF CRIMP RINGS (STRAIGHT METHOD)
4-3.4
GENERAL METAL AND GRE CONNECTOR PREPARATION:
ALL AREAS OF THE METAL/GRE CONNECTORS, WHICH ARE TO BE IN
CONTACT WITH EITHER POLYURETHANE OR EPOXY BACKFILL, SHALL BE
CLEANED IN PREPARATION FOR GRIT BLASTING.
VAPOR DEGREASING IS ONLY ALLOWED ON PLAIN METAL SHELL
CONNECTORS.
PROTECT ALL AREAS NOT TO BE GRIT BLASTED WITH EITHER A
PROTECTIVE RING OR TAPE.
GRIT BLAST ALL AREAS TO BE BONDED USING # 36 TO # 80 ALUMINUM
OXIDE (OR EQUIV., EXCLUDING ALL OTHER METAL OXIDE GRITS). CLEAN
AND DRY PROFILE. FIGURE 4 SHOWS THE GENERAL LOCATIONS FOR GRIT
BLASTING.
ALCOHOL
TAPE, PROTECTIVE
RING
ALUMINUM OXIDE
MIL-STD-1504
TYPE I GRADE A
BRUSH
GRIT BLASTER
FIGURE 4: CONNECTOR HOUSING PREPARATION.
NOTE:
PRIMER SHALL BE APPLIED TO OUTER SURFACES OF THE GRIT
BLASTED CONNECTORS WITHIN EIGHT HOURS OF GRIT BLASTING.
IF NOT USED WITHIN THIS TIME FRAME, THE ENTIRE CONNECTOR
PREP SHALL BE REDONE. SEE SECTION 4-6.
REMOVE GRIT BLAST DUST WITH CLEAN, DRY AIR AND LINT-FREE CLOTH.
LINT-FREE CLOTH
CLEAN, DRY
ALL GRIT BLASTED CONNECTORS SHALL BE PROTECTED FROM
ENVIRONMENT UNTIL READY FOR PRIMING.
AIR SUPPLY
4-3.5
NON-CONDUCTIVE COATED (PLASMA SPRAY COATED) BACKSHELLS:
DO NOT GRIT BLAST PLASMA SPRAY SURFACES!!
CLEAN WITH ISOPROPYL ALCOHOL ONLY.
IF REQUIRED, BY THE APPLICABLE SPECIFICATIONS, GRITBLAST THE
INNER DIAMETER (ID) OF CONNECTOR USING #36 TO #80 GRIT
ALUMINUM OXIDE. MAKE CERTAIN TO PROTECT ALL OTHER SURFACES.
ALUMINUM OXIDE
GRIT
MIL-STD-1504
TYPE I GRADE A
GRIT BLASTER
4-4
4-4.1
CONNECTORIZATION:
MIL-C-24231 STYLE CONNECTORIZATION
SLIDE THE COUPLING NUT ONTO THE CABLE. SLIDE CABLE
THROUGH THE CONNECTOR BODY. FIGURE 5 SHOWS PROPER
CONNECTORIZATION.
COUPLING NUT
FIGURE 5: CONNECTORIZATION OF A MIL-C-24231 STYLE CONNECTOR
CLEAN SOLDER CUPS ON PRE-FORMED CONNECTOR INSERT WITH
SOLVENT; LET AIR DRY. TIN SOLDER CUPS AND REMOVE ANY EXCESS
SOLDER. DO NOT USE ACID RESIN FLUX.
REMOVE REMAINING FLUX WITH ISOPROPYL ALCOHOL AND ACID BRUSH.
REFER TO APPLICABLE CABLE ASSEMBLY DRAWING FOR CONNECTOR
WIRING DIAGRAM.
SOLDER WIRE (S) TO APPROPRIATE CUP (S).
SELF CHECK: CHECK TINNED SOLDER CUPS FOR PROPER
COVERAGE, AS SHOWN IN FIGURE 6.
PROPERLY ALIGN INSERT INTO CONNECTOR.
CABLE SHALL BE PERMANENTLY IDENTIFIED WITH A UNIQUE CABLE
IDENTIFICATION NUMBER (FROM THE SHOP TRAVELER) AND THE CABLE
ISOPROPYL
ALCOHOL (OR
SYSTEM DESIGNATION NUMBER, AS APPLICABLE.
FIGURE 6: SOLDERING CRITERIA
4-4.2
CRIMP STYLE CONNECTORS (MIL-C-24217, OTHERS):
OBSERVE THE FOLLOWING PROCEDURES IN CRIMPING CONDUCTORS TO
SOCKET CONTACTS.
INSPECT THE SOCKET CONTACTS FOR DAMAGE. DISCARD DAMAGED
CONTACTS.
UTILIZE THE APPROPRIATE TURRET HEAD WITH THE BASIC CRIMPING
TOOL IN ACCORDANCE WITH MIL-C-22520 AND MANUFACTURER’S
INSTRUCTIONS.
INSERT THE STRIPPED CONDUCTORS INTO THE CONTACT CRIMP BARREL.
THE CONDUCTOR SHOULD BE VISIBLE IN THE INSPECTION HOLE AT THE
BOTTOM OF THE BARREL.
WITH THE CONDUCTOR IN THE CRIMP BARREL, INSERT THE FRONT END OF
THE CONTACT THROUGH THE INDENTOR OPENING INTO THE POSITIONER.
SQUEEZE THE TOOL HANDLES TOGETHER UNTIL THE POSITIVE STOP IS
REACHED. THE TOOL WILL THEN RELEASE AND RETURN TO THE FULLY
OPEN POSITION. REMOVE THE CRIMPED CONTACT FROM THE
POSITIONER.
INSERT CRIMPED SOCKET CONTACT INTO FRONT INSULATOR.
PROPERLY ALIGN FRONT INSULATOR INTO PLUG SHELL.
SOCKET CONTACTS
FRONT INSULATOR
APPROPRIATE
CALIBRATED
TURRET HEAD
CRIMP TOOL
PIN INSERTION
TOOL
QA-1
QA-1.1
VISUAL INSPECTION OF SOLDER JOINTS:
QUALITY CONTROL INSPECTION:
THIS SECTION IS HIGHLY RECOMMENDED THOUGH NOT ABSOLUTELY
REQUIRED. THESE ELECTRICAL CHECKS CAN BE USED AT THIS POINT IN
THE PROCESS TO DETECT ERRORS, WHICH CAN EASILY BE CORRECTED.
AFTER THIS POINT IN THE PROCESS, WIRING ERRORS WILL REQUIRE A
MAJOR REWORK TO REPAIR, RESULTING IN LOST TIME, AND POSSIBLY
LOSS OF SOME MATERIALS. TAKING ACTUAL DATA, AS OPPOSED TO
PASS/FAIL INFORMATION, CAN AID IN DETERMINING PROCESS ERRORS
AND/OR ENHANCEMENTS TO THE PROCESS. THIS SECTION IS HIGHLY
RECOMMENDED FOR FIRST TIME BUILDS AND TROUBLE SHOOTING OF THE
PROCESS.
QA-1.2
CONTINUITY:
CHECK CONTINUITY BETWEEN CONNECTOR SOCKETS AS LISTED BELOW.
LIMITS: ≤ 1Ω PIN TO PIN (UNLESS OTHERWISE SPECIFIED)
SIGN AND DATE DATA SHEET (DS2), APPENDIX II-D
CHECK CONFORMANCE TO WIRING DIAGRAM.
OHMETER (OR
QA-1.3
INSULATION RESISTANCE (IR):
****CAUTION****
VOLTAGES ASSOCIATED WITH THE MEGOHMETER CAN BE
HARMFUL. OBSERVE NORMAL SAFETY PRECAUTIONS.
UPON COMPLETION OF EACH READING, AND PRIOR TO
DISCONNECTING EACH LEAD, ENSURE THAT THE MEGGER
MEASURE/CHARGE/DISCHARGE SWITCH IS SET TO
DISCHARGE.
1. SET APPLIED VOLTAGE TO 500 VOLTS (OR AS REQUIRED).
2. SET RANGE AS NECESSARY.
3. MEASURE IR BETWEEN THE FOLLOWING:
A. PIN TO EVERY OTHER PIN
B. PIN TO CONNECTOR SHELL
LIMITS: INSULATION RESISTANCE SHALL BE >1GΩ
FOR ALL READINGS (UNLESS OTHERWISE SPECIFIED).
4. RECORD READINGS ON INSULATION RESISTANCE DATA SHEET
(DS3), APPENDIX II-D. RECORD EQUIPMENT USED, SERIAL
NUMBER, MODEL NUMBER, AND CALIBRATION DATE.
5. SIGN AND DATE THE RECORD SHEET.
6. SIGN AND DATE DATA SHEET (DS3), APPENDIX II-D.
MEGOHMMETER
4-5
ENCAPSULATING (BACKFILL) INNER DIAMETER (ID) OF
CONNECTOR:
ONLY THOSE BACKFILL MATERIALS DESIGNATED IN APPROVED
PRODUCTS LIST (APL), APPENDIX II-E OF THIS DOCUMENT, OR AS
SPECIFIED IN THE APPLICABLE SPECIFICATIONS OR DRAWINGS
SHALL BE UTILIZED.
DETERMINE PROPER AMOUNT BY WEIGHT OF MATERIAL TO COMPLETELY
FILL THE BACK SHELL. MIX IN SEPARATE, CLEAN, CONTAINER IN
ACCORDANCE WITH MANUFACTURER’S TECHNICAL DATA SHEETS (TDS).
MIX WITH PLASTIC OR METAL SPATULA ONLY (WOOD SPATULA
SHALL NOT BE USED). MIX IN CLEAN METAL OR PLASTIC
CONTAINER ONLY. FOR MIL-C-24217 STYLE CONNECTORS,
PROVISIONS SHOULD BE MADE TO PREVENT BACKFILL MATERIAL
FROM ENTERING SOCKET CONTACTS. DO NOT USE SILICONE-
CONTAINING MATERIALS.
DEGAS MIXED COMPOUND UNTIL FIRST FOAM COLUMN COLLAPSES.
FOLLOW MANUFACTURER’S INSTRUCTIONS FOR PROPER VACUUM.
POUR OR INJECT INTO CONNECTOR ID SO AS NOT TO INDUCE OR TRAP
AIR. FILL TO APPROXIMATELY 1/32" FROM THE TOP OF THE CONNECTOR
SHELL.
BACKFILL
MATERIALS
GRAM BALANCE
METAL OR
POLY-
PROPELENE
CONTAINER
METAL OR
PLASTIC
SPATULA
VACUUM
DEGAS SYSTEM
CURE BACKFILL MATERIAL IN ACCORDANCE WITH MANUFACTURER’S TDS.
4-6
PRIMING SYSTEM APPLICATION:
PRIOR TO ABRADING THE CABLE JACKET, CLEAN THE CABLE JACKET WITH
APPROPRIATE SOLVENT USING LINT-FREE CLOTH.
ABRADE CABLE JACKET USING #60-80 ABRASIVE CLOTH 1/2" TO 1" PAST
THE MOLDED BOOT ENVELOPE.
CLEAN AND REMOVE RESIDUAL GRIT WITH LINT-FREE CLOTH
CLEAN AREA OF CONNECTOR SHELL WHICH IS TO BE PRIMED WITH
ISOPROPYL ALCOHOL AND A LINT-FREE CLOTH.
ONLY THOSE PRIMING SYSTEMS LISTED IN THE APL OF THIS
DOCUMENT (APPENDIX II-E) SHALL BE UTILIZED.
PRIMING SYSTEM SHALL BE APPLIED TO BONDING SURFACE OF
CONNECTORS AND CABLES IN ACCORDANCE WITH MANUFACTURER’S TDS.
PRIMED CONNECTOR SHALL BE MOLDED WITHIN A MAXIMUM OF FOUR
HOURS OR LESS, IF SPECIFIED BY TDS.
MEK, ACETONE,
ALCOHOL, (OR
EQUIV)
# 60-80 ABRASIVE
CLOTH (OR EQUIV)
PRIMING SYSTEM
LINT-FREE
CLOTH
ABRADED AREA OF POLYURETHANE JACKETED CABLES SHALL BE
CLEANED WITH AN APPROPRIATE SOLVENT. NO PRIMER IS
REQUIRED FOR POLYURETHANE JACKETED CABLES.
DO NOT TOUCH PRIMED SURFACES WITH BARE HANDS FROM THIS
POINT ON. DO NOT ALLOW PRIMED SURFACES TO COME IN
CONTACT WITH MOLD-RELEASED SURFACE OR TO OTHERWISE
BECOME CONTAMINATED. DO NOT TOUCH MOLD-RELEASED
SURFACE WITH HANDS.
4-7
MOLD PREPARATION:
NO SILICONE BASED MOLD RELEASE SHALL BE ALLOWED.
APPLY MOLD RELEASE TO ALL MOLD CAVITIES.
PERMANENTLY APPLIED TEFLON COATED MOLDS ARE PREFERRED.
IF UTILIZED, NO ADDITIONAL MOLD RELEASE IS NECESSARY.
CAREFULLY PLACE PRIMED CABLE ASSEMBLY INTO MOLD. MAKE CERTAIN
THE KEYWAY IS ALIGNED IN SUCH A MANNER AS TO PROVIDE PROPER
EXIT ANGLE FOR THE CABLE. THE EXIT ANGLE FOR THE CABLE SHALL BE
OBTAINED FROM SPECIFICATIONS OR DRAWINGS PRIOR TO MOLDING.
MOLD RELEASE
MOLD
DO NOT TOUCH PRIMED SURFACES WITH BARE HANDS WHILE
ALIGNING WITHIN THE MOLD. DO NOT ALLOW PRIMED SURFACES
TO COME IN CONTACT WITH MOLD RELEASED SURFACE OR BECOME
OTHERWISE CONTAMINATED. DO NOT TOUCH MOLD RELEASED
SURFACE WITH HANDS.
REASSEMBLE ALL MOLD COMPONENTS. PREHEAT MOLD, IF REQUIRED BY
POLYURETHANE SYSTEM TDS.
OVEN (OR
4-8
POLYURETHANE PREPARATION:
ONLY THOSE POLYURETHANES DESIGNATED BY THE APL OF
THIS DOCUMENT (APPENDIX II-E) SHALL BE UTILIZED.
ENSURE THAT ALL EQUIPMENT NECESSARY FOR PREPARING
AND INJECTING POLYURETHANE IS ON HAND PRIOR TO MIXING.
SEE SECTION III OF THIS DOCUMENT.
4-8.1
TYPE I, TWO COMPONENT SYSTEMS:
IF EITHER OF THE TWO COMPONENTS HAVE SOLIDIFIED, CONSULT
MANUFACTURER’S TDS TO RELIQUIFY.
POLYURETHANE
ENSURE HOMOGENEITY OF PARTS A & B PRIOR TO COMBINING.
MIX THOROUGHLY.
ALLOW BOTH PARTS A & B TO STABILIZE TO ROOM TEMPERATURE PRIOR
TO COMBINING.
MIX PARTS A & B BY WEIGHT ACCORDING TO MANUFACTURER’S TDS IN A
SEPARATE, CLEAN, DRY CONTAINER. CONTAINER SHALL BE AT LEAST
THREE TIMES THE VOLUME OF THE TOTAL POLYURETHANE.
PARTS A & B SHALL BE COMBINED BY MIX RATIO ACCORDING TO
MANUFACTURER’S TDS USING METAL OR PLASTIC SPATULA.
DEGAS POLYURETHANE SYSTEM AT 30" OF MERCURY FOR A MINIMUM OF
FIVE MINUTES OR UNTIL FOAMING SUBSIDES.
CAP THE END OF THE INJECTION TUBE AND FIX IN AN INCLINED
POSITION.
POUR DEGASSED POLYURETHANE SYSTEM DOWN THE INSIDE WALL
OF THE INJECTION TUBE SO AS NOT TO INDUCE OR TRAP AIR
INTO THE SYSTEM.
IF AIR HAS BEEN ENTRAPPED DURING THIS PROCESS, A SECONDARY
DEGAS MAY BE NECESSARY.
INSERT PLUNGER INTO TUBE. TIP UPRIGHT, REMOVE CAP, SCREW IN
APPROPRIATE NOZZLE, AND DEPRESS PLUNGER BY HAND UNTIL
POLYURETHANE EXTRUDES OUT OF THE NOZZLE.
INSERT TUBE INTO INJECTION GUN AND PROCEED WITH INJECTION
MIXING CONTAINER
& SPATULA (METAL
OR PLASTIC)
SPATULA
INJECTION TUBE &
CAP
NOZZLE
GRAM BALANCE
VACUUM
DEGAS SYSTEM
INJECTION
GUN
4-8.2
TYPE II, FROZEN CARTRIDGES:
MANUFACTURER’S TDS SHOULD BE STRICTLY ADHERED TO FOR STORAGE
REQUIREMENTS, THAWING, AND USE OF FROZEN CARTRIDGES.
AFTER FROZEN CARTRIDGE HAS BEEN PREPARED, INSERT PROPER
INJECTION NOZZLE INTO CARTRIDGE AND BLEED AS NECESSARY TO
ELIMINATE TRAPPED AIR AND UNMIXED POLYURETHANE. PLACE IN
APPROPRIATE SIZE INJECTION GUN AND PROCEED WITH INJECTION
FROZEN
CARTRIDGES
GUN
4-8.3
INJECTION PROCESS:
INSERT NOZZLE INTO INJECTION PORT OF MOLD. INJECT UNTIL
POLYURETHANE FLOWS OUT OF VENT HOLES AND INTO OVERFLOW
RESERVOIR ON MOLD.
SOME MOLDS MAY HAVE A SECONDARY FILL PORT. WHEN THE
POLYURETHANE BEGINS TO FLOW FROM THE HIGHER OPPOSING
SIDE INJECTION PORT; PLUG THIS PORT. CONTINUE INJECTING
UNTIL POLYURETHANE FLOWS OUT OF THE VENT HOLES AND INTO
OVERFLOW RESERVOIR.
CURE POLYURETHANE IN ACCORDANCE WITH MANUFACTURER’S TDS.
IF SPECIFIED IN MANUFACTURER’S TDS, SHORTENED DEMOLD
TIMES ARE ACCEPTABLE. MOLDED PART MUST THEN COMPLETE
PROPER CURING CYCLE.
ALLOW MOLD TO COOL TO ROOM TEMPERATURE PRIOR TO DISASSEMBLY
OF MOLD AND REMOVAL OF PART. REMOVE PART FROM MOLD. TRIM AND
REMOVE FLASHING IN ACCORDANCE WITH MIL-C-24231/MIL-C-24217.
KNIFE (OR
QA-2
QA-2.1
QUALIFICATION TEST:
VISUAL INSPECTION:
VISUALLY INSPECT THE ASSEMBLY IN ACCORDANCE WITH MIL-C-24231 AS
FOLLOWS:
1. MOLDED PLUGS AND INSERTS SHALL BE FREE OF FLASH, BLOW HOLES,
OR OTHER IMPERFECTIONS.
2. SMALL GAS BUBBLES THAT FORM ON THE OUTER CIRCUMFERENTIAL
SURFACE OF THE MOLDED BOOT SHALL NOT BE CAUSE FOR REJECTION
PROVIDED THE MOLDED PARTS ARE IN ACCORDANCE WITH THE
REQUIREMENTS SPECIFIED.
3. THE FLASH SHALL BE REMOVED AND THE WIDTH OF THE FLASH EDGES
SHALL NOT BE GREATER THAN 1/32 INCH. FLASH EDGES SHALL BE
SMOOTH.
4. SIGN AND DATE THE DATA SHEET (DS4), APPENDIX II-D.
QA-2.2
ELECTRICAL CONTINUITY:
1. ELECTRICAL CONTINUITY SHALL BE MEASURED BETWEEN PINS
AS LISTED BELOW:
OHMMETER
LIMITS: ≤ 1 Ω (UNLESS OTHERWISE SPECIFIED)
PIN TO PIN
2. CABLE ASSEMBLY SHALL NOT HAVE CONTINUITY BETWEEN
THE FOLLOWING:
A. PIN TO EVERY OTHER PIN OF THE SAME CONNECTOR
B. PIN TO SHELL
3. RESULTS SHALL BE RECORDED ON THE APPROPRIATE SHOP
TRAVELER DATA SHEET.
4. RECORD EQUIPMENT USED, MODEL NUMBER, AND CALIBRATION
DATE.
5. SIGN AND DATE DATA SHEET (DS5).
QA-2.3
INSULATION RESISTANCE:
****WARNING****
VOLTAGES ASSOCIATED WITH THE MEGOHMMETER CAN BE
HARMFUL. OBSERVE NORMAL SAFETY PRECAUTIONS.
UPON COMPLETION OF EACH READING, AND PRIOR TO
DISCONNECTING EACH LEAD, ENSURE THAT THE MEGGER
MEASURE/CHARGE/DISCHARGE SWITCH IS SET TO DISCHARGE.
MEGOHMMETER
1. SET APPLIED VOLTAGE TO 500 VOLTS (OR AS REQUIRED).
2. SET RANGE AS NECESSARY.
3. MEASURE IR BETWEEN THE FOLLOWING:
A. PIN TO EVERY OTHER PIN
B. PIN TO CONNECTOR SHELL
LIMITS: INSULATION RESISTANCE SHALL BE ≥ 1GΩ, OR AS
REQUIRED BY CABLE SPECIFICATION OR CABLE ASSEMBLY
DRAWING.
4. SIGN AND DATE THE DATA SHEET (DS6).
QA-2.4
NON DESTRUCTIVE BOND TESTING:
DO NOT APPLY EXCESSIVE FORCE WHEN PERFORMING THIS TEST.
DO NOT USE A SCREWDRIVER.
1. BETWEEN MOLDED STRAIN RELIEF AND PLUG BODY
A. USING A ROUND EDGE PROBE (RIGID/ PLASTIC OR METAL
ROUND EDGE
[NOT A SCREWDRIVER]) WITH NO SHARP EDGES OR CORNERS,
LIFT (DO NOT PRY) IN AREA INDICATED IN FIGURE 7. REPEAT
TEST IN FOUR DIFFERENT EQUALLY SPACED LOCATIONS ABOUT
THE CIRCUMFERENTIAL BOND LINE OF THE CONNECTOR.
B. IF POLYURETHANE PEELS BACK TO REVEAL BARE CONNECTOR
MATERIAL, MOLDED BOOT SHALL BE REMOLDED/REPAIRED, AS
REQUIRED FOR CONFORMANCE TO THIS DOCUMENT.
PROBE
FIGURE 7: POLYURETHANE TO METAL NON-DESTRUCTIVE BOND TEST.
(DO NOT USE COUPLING NUT FOR LEVERAGE).
2. BETWEEN MOLDED STRAIN RELIEF AND CABLE JACKET:
A. SET UP NON-DESTRUCTIVE BOND TEST SYSTEM, AS INDICATED BY
FIGURE 8.
B. INSPECT THE BOND LINE WHILE BENDING THE CABLE OVER THE
MANDREL WITH FIVE-POUND LOAD APPLIED (TO AID IN
INSPECTION OF BOND LINE) AND ROTATING, AS SHOWN
IN FIGURE 8.
LOADING SHALL BE APPLIED IN SUCH A MANNER AS TO MAINTAIN
TENSION ON CABLE ASSEMBLY. LOADING OF MORE THAN 5 LBS MAY
BE NECESSARY DEPENDING ON CABLE SIZE AND STIFFNESS.
C. IF POLYURETHANE SEPARATES FROM CABLE JACKET, MOLDED
BOOT SHALL BE REMOLDED/REPAIRED, AS REQUIRED FOR
CONFORMANCE TO THIS DOCUMENT.
3. RECORD THE RESULTS OF STEP 1 AND STEP 2 ABOVE ON
THE DATA SHEET FOR NON-DESTRUCTIVE BOND TESTING.
4. SIGN AND DATE THE DATA SHEET FOR THIS TEST (DS7).
NON-
DESTRUCTIVE
BOND TEST
FIGURE 8: NONDESTRUCTIVE BOND TEST BETWEEN STRAIN RELIEF AND CABLE JACKET.
QA-2.5
HYDROSTATIC PRESSURE TEST:
WHEN MAINTENANCE IS CONDUCTED AT NAVAL INTERMEDIATE
LEVEL MAINTENANCE FACILITIES, THE HYDROSTATIC PRESSURE
TESTING REQUIREMENT IS WAIVED.
1. ENSURE THAT ALL O-RINGS ARE PROPERLY INSTALLED AND THAT
CONNECTORS ARE MATED PROPERLY TO THE FIRST FIXTURE
PRIOR TO TESTING.
2. HYDROSTATIC PRESSURE TESTING SHALL BE PERFORMED IN
ACCORDANCE WITH THE APPLICABLE PROCUREMENT
SPECIFICATION. IF NO SPECIFICATION, THE FOLLOWING
TESTS SHALL BE PERFORMED:
A. 0 TO 100 PSIG - HOLD FOR FIVE MINUTES AT 100 PSIG
CYCLE THREE TIMES.
B. 1000 PSIG - HOLD FOR ONE HOUR FOR ONE CYCLE.
C. THE PROFILE FOR THIS TEST IS SHOWN IN FIGURE 9 BELOW.
1. INSULATION RESISTANCE READINGS SHALL BE RECORDED AT 0 PSI,
PRIOR TO PRESSURE CYCLING; AT 1000 PSI; AND AGAIN AT 0 PSI,
PRIOR TO REMOVAL FROM THE TANK.
FIGURE 9: HYDROSTATIC PRESSURE PROFILE.
ALL INSULATION RESISTANCE READINGS SHALL BE RECORDED
WHILE CABLE ASSEMBLY IS SUBMERGED IN WATER WITHIN THE
PRESSURE TANK.
4. RECORD DATA ON TRAVELER DATA SHEET FOR THE CABLE
ASSEMBLY BEING TESTED.
5. REJECT ANY CABLE ASSEMBLY WHICH DOES NOT MEET
SPECIFICATION REQUIREMENTS.
6. SIGN AND DATE DATA SHEET (DS8).
4-9
PRESHIPMENT INSPECTION
PRE-PACKAGED O-RINGS, IF REQUIRED, SHALL BE PROVIDED WITH EACH
CABLE ASSEMBLY. DUST PROOF CAPS SHALL BE INSTALLED ON ALL
CONNECTORS.
ENSURE PROPER MARKINGS ARE FOUND ON CABLE ASSEMBLY.
ENSURE TEST INSPECTION REPORT (DS9), APPENDIX II-F, IS PROPERLY
COMPLETED AND IS PACKAGED WITH CABLE ASSEMBLY.
II-A1
APPENDIX II-A
VENDOR AUDIT REQUIREMENTS/
LIST OF APPROVED VENDORS
II-A2
APPENDIX II-A
VENDOR AUDIT REQUIREMENTS/LIST OF APPROVED VENDORS
PERSONNEL QUALIFICATION AND TRAINING:
Cable assembly fabricators shall establish and maintain a thorough, detailed training program for personnel charged with in-process and final inspection of cable assemblies. Further, cable assembly fabricators shall establish and maintain a rigorous qualification and certification/re-certification program for these personnel. The certification program shall be documented, and certification and qualification cited at the facility. All cable assemblies must be fabricated by qualified, certified personnel and inspected by qualified, certified personnel. Further, this program shall ensure that personnel will become proficient in the molding of cable assemblies in accordance with NAVSEA S9320-AM-PRO-010/MLDG Volume II.
WIRING AND MOLDING PERSONNEL QUALIFICATION:
General:
The personnel who perform wiring, molding inspection, and testing operations in fabricating a pressure-proof harness are the key to a reliable harness fabrication. The technician must handle all components (cables and connectors) very carefully at all times. The technician must use extreme care to not nick conductors. The contacts must be attached to the connectors in a very exacting fashion. Care must be exercised in mixing primers and potting materials as well as molding the connector assembly. Once molded, the harness assembly must be non-destructively tested using great care not to damage the assembly in handling.
In many respects, the technician must serve as his/her own inspector. There are no economical or sure methods for checking assembled harnesses for nicks in conductors, or voids in potting compounds. X-ray techniques are available but have not exposed possible problem areas with any degree of certainty.
The best method for assuring properly fabricated, reliable harness assemblies is to make use of well trained, conscientious, capable technicians who will closely follow prescribed procedures.
Qualification:
The technician qualification should be based on the successful completion of a short course embodying all of the procedural information contained in NAVSEA S9320-AM-PRO-010/MLDG Volume II.
II-A3
Course Descriptions:
The study course for technician qualification should include the following work topics:
Subject Approximate Days
(a) Procedures familiarization 1/2
(b) Specification familiarization 1/2
(c) Safety precautions 1/2
(d) Cable inspection 1/2
(e) Connector inspection 1/2
(f) Preparation of molding compounds 1/2
(g) Preparation of cables 1/2
(h) Soldering and crimping conductors to contacts 1/2
(I) Epoxy pre-potting connector 1/2
(j) Potting plug inserts with polyurethane 1/4
(k) Preparing the plug and receptacle sleeve 1/4
(l) Assembling and molding the conductor 1
(m) Inspection and test of fabricated harnesses 1/2
From the above, it is seen that a 5 day course should be mandatory in qualifying a technician for fabricating pressure-proof connector plugs.
VENTILATION:
The cable molding facility shall meet the minimum requirements of ventilation, as set forth in the MSDSs and TDSs of the chemicals used in the cable assembly fabrication and environmental requirements of OSHA regulations, as well as Section 2-1.6 of this manual.
PERSONAL PROTECTIVE EQUIPMENT:
The cable molding facility shall meet the minimum requirements of providing personal protective equipment (and training in its use) to assigned personnel, as set forth in the MSDSs and TDSs of the chemicals used in the cable assembly fabrication and the requirements of OSHA regulations, as well as Section 2-1.6 of this manual.
ELECTRICAL EQUIPMENT:
All electrical equipment utilized for cable assembly fabrication shall be calibrated. All safety requirements of Section II of the NAVSEA Manual S9086-KS-STM-000/CH 300, Electrical Safety Precautions, shall be followed.
WASTE:
All local, state, and federal requirements concerning chemical wastes shall be strictly followed.
II-A4
SOLDERING:
All soldering shall be performed by qualified personnel trained and certified to the requirements of the JOINT INDUSTRY STANDARD J-STD-001, Requirements for Soldered Electrical and Electronic Assemblies.
ENVIRONMENTAL CONTROL:
All requirements and standards of Section 2-1.6 of this manual shall be adhered to.
REFERENCE DOCUMENTS:
All reference documents listed in section 1-2 of this manual shall be readily available to cable assembly fabricators. The most recent revisions or applicable cable assembly drawings shall be on hand.
TRACEABILITY:
All cable assembly documentation, including the cable assembly traveler and QA records, at a minimum, shall be maintained at the cable assembly fabrication site for a minimum of seven years.
POSITIVE MATERIAL CONTROLS:
A system shall be established and maintained to coordinate and monitor material activities within the fabrication facility (Material Tracking) in accordance with the following:
Stores and Material Storage Control: To avoid improper storage and poor storage control which can result in damaged, unserviceable, or otherwise nonconforming material and equipment, the activity’s stores and material storage control will be examined during validation. The Validation Plan shall require general inspections of stores and storage facilities at the activity being validated with particular emphasis placed on those areas which are involved with the particular item for which the activity is being validated. These general inspections will ensure, as a minimum, that:
a. Stored material and equipment are properly marked to accurately indicate the identity of the material/equipment.
b. Stored items are adequately protected and controlled to prevent deterioration, damage, degradation, or unauthorized used or issue.
c. Shelf lives and dates of expiration are recorded and monitored.
d. Material condition status (i.e., serviceable, unserviceable, etc.) is plainly and prominently marked and items are physically segregated according to status.
e. A stored material inventory is kept and maintained in a current status.
f. Adequate material storage procedures/documentation is available and kept current.
g. Documents that are to remain with the items being stored are kept at a central point or with the appropriate item as applicable.
h. Material and equipment, which are susceptible to environmental deterioration, are stored in facilities capable of maintaining the required environment. (This includes cleanliness, humidity, temperature, pressure, vibration, radiation, etc.).
i. Adequate periodic stores and storage inspections are accomplished.
II-A5
j. Provisions are available for the disposal of unserviceable, unrepairable equipment and materials.
II-A6
LIST OF APPROVED VENDORS
VENDOR NAME
& ADDRESS
DATE CERTIFIED NEXT
CERTIFICATION
DUE DATE
POINT OF CONTACT
& TELEPHONE
NUMBER
II-B1
APPENDIX II-B
GENERIC ASSEMBLY TRAVELER
Appendix II-B GENERIC SHOP TRAVELER FOR S9320-AM-PRO-010/MLDG
II-B2
SERIAL NO. SYSTEM DESIGNATION NO.
PROC
COMPLETED
QA INSPECT.
INITIALS
STAMP
CABLE INSPECTION (DS1)
4-2.2
GENERAL CONNECTOR INSPECTION
MOLD INSPECTION
GENERIC CABLE PREPARATION (CUT LENGTH)
4-3.2
24231 CABLE PREPARATION
SHIELDED CABLE PREPARATION
GENERAL CONNECTOR PREPARATION
NCC CONNECTOR PREPARATION
CONNECTORIZATION (MIL-C-24231 STYLE)
SELF CHECK: TINNED SOLDER CUPS
WIRE IN ACCORDANCE WITH WIRING DIAGRAM
4-4.2
CRIMP STYLE CONNECTORS (MIL-C-24217)
WIRE IN ACCORDANCE WITH WIRING DIAGRAM
QA-1 QUALITY CONTROL INSPECTION
QA-1.1
ELECTRICAL CONTINUITY (VERIFY WIRING TO
DRAWING) (DS2)
QA-1.2
INSULATION RESISTANCE (DS3)
4-5
ENCAPSULATING ID OF CONNECTOR
BACKFILL MATERIAL:
EXPIRATION DATE:
LOT #:
PRIMING SYSTEM APPLICATION
PRIMING SYSTEM (CON):
PRIMING SYSTEM (CABLE):
LOT #: ________________________________
CAUTION: DO NOT TOUCH PRIMED SURFACES
II-B3
Appendix II-B GENERIC SHOP TRAVELER FOR S9320-AM-PRO-010/MLDG
PROC
COMPLETED
QA INSPECT.
INITIALS
STAMP
MOLD PREPARATION
CAUTION: DO NOT USE SILICON MOLD RELEASE
CAUTION: DO NOT TOUCH PRIMED SURFACES
4-8
POLYURETHANE PREPARATION
TYPE I, TWO COMPONENT SYSTEMS
POLYURETHANE SYSTEM:
TYPE II, FROZEN CARTRIDGES
4-8.3
INJECTION PROCESS
QA-2
QUALITY CONTROL INSPECTION
VISUAL INSPECTION (DS4)
ELECTRICAL CONTINUITY (PER DWG, DS5)
INSULATION RESISTANCE (DS6)
NONDESTRUCTIVE BOND TEST (DS7)
HYDROSTATIC PRESSURE TESTING (DS8)
4-9
PRESHIPMENT INSPECTION (DS9)
REMARKS:
II-C1
APPENDIX II-C
PREFORMED INSERTS - PRODUCTION AND INSPECTION
II-C2
APPENDIX II-C. PREFORMED INSERT INSPECTION REQUIREMENTS
ALL VISUAL INSPECTIONS ARE TO BE PERFORMED WITH THE NAKED EYE (WITHOUT THE
USE OF EXTERNAL MAGNIFICATION)
SECTION
4-2.2
INSPECTED
BY
A
ENSURE PROPER ALIGNMENT OF SOCKET CONTACTS.
ALL SHOULD BE EQUALLY SPACED, PERPENDICULAR
TO THE FACE AND THE SOLDER CUPS SHOULD BE
ALIGNED PROPERLY (PER MIL-C-24231).
B
THERE SHALL BE NO FOREIGN MATERIAL INSIDE OF
SOCKET CONTACTS.
C
ENSURE THAT THERE ARE NO SUSPENDED DEFECTS
(FLOWLINES, FOLDS, GEL CRACKS, POROSITY, AND
AIR BUBBLES) WHICH BRIDGE THE ELECTRICAL PINS.
D
NO SUSPENDED OR SURFACE DEFECTS (FLOWLINES,
FOLDS, GEL CRACKS, POROSITY, AND AIR BUBBLES)
LOCATED ON THE OUTSIDE, CIRCUMFERENTIAL LIP
OF THE MOLDED PREPOT ARE ALLOWED. THIS AREA
FORMS A SECONDARY WATER SEAL THROUGH
COMPRESSION CONTACT BETWEEN THE HULL INSERT
AND BODY OF THE CONNECTOR.
E
NO SURFACE DEFECTS (FLOWLINES, FOLDS, GEL
CRACKS, POROSITY, AND AIR BUBBLES) LOCATED ON
THE FACE OF THE PREPOT WHICH WOULD ALLOW THE
SPREAD OF SEAWATER BETWEEN CONNECTOR PINS
REGARDLESS OF LEAKPATH ARE ALLOWED.
F
NO BUBBLES OR VOIDS IN CONTACT WITH THE
ELECTRICAL PINS AT THE FACE OF THE INSERT OR
WITHIN THE MOLDED PART. (SMALL SURFACE
BUBBLES AT THE BACK OF THE INSERT AROUND THE
SOLDER CUPS OR ALONG THE SIDE ARE ACCEPTABLE.)
II-D1
APPENDIX II-D
DATA SHEETS FOR IN-HOUSE INSPECTIONS
II-D2
APPENDIX II-D
SERIAL NO. ________
4-2.1 INSPECTION DATA - DS1
INSPECTION
PASS/FAIL
INSPECTOR
VISUAL INSPECTION
VERIFY CUT LENGTH
CONTINUITY (≤ 1Ω) (RECORD ALL
READINGS)
PIN TO PIN (CONDUCTOR TO
CONDUCTOR)
INSULATION RESISTANCE (≥ 1GΩ)
(RECORD ALL READINGS)
PIN TO EVERY OTHER PIN
SHIELD TO EVERY PIN
TESTED BY: _______ DATE:
TEST EQUIPMENT: _________________________
CALIBRATION DATE: _________________________
II-D3
APPENDIX II-D (CONTINUED)
DATA SHEETS FOR IN-HOUSE INSPECTIONS (CONTINUED)
QA-1.1 INSPECTION DATA - DS2
CONTINUITY (≤ 1Ω)
NO CONTINUITY BETWEEN:
EVERY PIN TO SHIELD
WIRE STRIPPING INSPECTION
CHECK FOR NICKS AND GOUGES
STRIPPING MEASUREMENTS (FIGURE 1)
SOLDER (J-STD-0001)
TEST EQUIPMENT: _________________________
CALIBRATION DATE: _________________________
II-D4
QA-1.2 INSPECTION DATA - DS3
INSULATION RESISTANCE (APPLIED VOLTAGE - 500 VDC)
TEST CONDITION
INSULATION
RESISTANCE
(LIMIT: ≥ 1GΩ)
SHIELD TO EVERY PIN
TEST EQUIPMENT: _________________________
CALIBRATION DATE: _________________________
INSPECTION DATA - DS4
INSPECT RUBBER FOR VOIDS AND
IMPERFECTIONS
O-RING SURFACES
II-D5
II-D6
QA-2.2 INSPECTION DATA - DS5
ELECTRICAL CONTINUITY
READINGS
(LIMIT: ≤ 1 Ω)
CONTINUITY BETWEEN (CHECK TO DRAWING):
TEST EQUIPMENT: _________________________
CALIBRATION DATE: _________________________
QA-2.3 INSPECTION DATA - DS6
INSULATION RESISTANCE (APPLIED VOLTAGE - 500 VDC)
INSULATION
RESISTANCE
(LIMIT: ≥ 1GΩ)
EVERY PIN TO SHELL (BOTH ENDS)
TEST EQUIPMENT: _________________________
CALIBRATION DATE: _________________________
II-D7
QA-2.4 TEST INSPECTION - DS7
NON-DESTRUCTIVE BOND TESTING
BETWEEN MOLDED STRAIN RELIEF AND PLUG BODY
BETWEEN MOLDED STRAIN RELIEF AND CABLE JACKET
TEST EQUIPMENT: _________________________
CALIBRATION DATE: _________________________
II-D8
QA-2. 5 INSPECTION DATA - DS8
HYDROSTATIC PRESSURE TEST
TEST
INSULATION RESISTANCE (W/500VDC APPLIED VOLTAGE)
0 PSIG
(PRE PRESSURE)
>1 GΩ*
1000 PSIG
> 1 GΩ*
0 PSIG
(POST PRESSURE)
> 1 GΩ*
EVERY PIN TO SHELL (BOTH
ENDS)
TEST EQUIPMENT: _________________________
CALIBRATION DATE: _________________________
* OR AS SPECIFIED BY GOVERNING DOCUMENTS
II-E1
APPENDIX II-E
POLYURETHANE SYSTEM REQUIREMENTS/
BACKFILL MATERIAL REQUIREMENTS/
LISTS OF APPROVED PRODUCTS
ONLY THOSE POLYURETHANE/PRIMING SYSTEMS AND BACKFILL MATERIALS LISTED IN THE
LISTS OF APPROVED PRODUCTS OF THIS APPENDIX HAVE BEEN TESTED AND QUALIFIED TO
THIS SPECIFICATION.
APPENDIX II-E SHOULD BE USED IN LIEU OF MIL-M-24041
ONLY THOSE MATERIALS IN THE LIST OF APPROVED PRODUCTS OF THIS APPENDIX SHALL
BE USED IN FABRICATING SUBMARINE OUTBOARD CABLE ASSEMBLIES.
II-E2
APPENDIX II-E
THE FOLLOWING IS A LISTING OF THE PROPERTIES OF POLYURETHANES:
SCOPE: This specification covers the requirements of chemically cured, polyurethane compounds for the molding, encapsulating, and potting of watertight electrical connectors, cables, and cable end seals.
QUALIFICATION: The compounds furnished under this specification shall be products, which are qualified for listing on the applicable list of approved products contained herein.
COMPOSITION: Before mixing, the compound shall be a two-component, polyurethane system consisting of a prepolymer and a curing agent. The prepolymer shall cure by the addition of the curing agent, and shall not depend on solvent or moisture evaporation for curing.
Primer: The use of a primer to improve the adhesion of the compound shall be required. The primer/polyurethane system shall be tested and proven, per the requirements of this document, and these systems shall then be added to the list of approved products. The primer shall be applied in strict conformance with the manufacturer's recommendations.
Toxicity: The…