This sources sought notice provides information for an indefinite delivery indefinite quantity multiple award construction contract for communication facility maintenance and engineering services at various global Navy locations. The Naval Facilities Engineering Command Expeditionary Warfare Center seeks capabilities statements from firms demonstrating experience performing similar construction and engineering efforts within the last five years. The contract's North American Industry Classification System code is 237130, with a small business size standard of $39.5 million. The scope of work includes maintaining, repairing, replacing, modifying, and upgrading communication facilities, antenna towers, buildings and other structures along with associated mechanical, electrical and utility functions. The contract will have a 60-month base period and a six-month option period, with a cumulative $99 million ceiling and individual task orders ranging from $25,000 to $7 million. Incumbent firms need not respond. Questions may be directed to the provided point of contact.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION SERVICES FOR SPECIALIZED ANTENNAS, TOWERS AND

COMMUNICATION FACILITIES – WORLD-WIDE Work Order Number

Small Project Part 4 - Page 1 of 45

PART FOUR

Performance Technical Specifications

Small Project Part 4 - Page 2 of 45

Part 4 Minimum Materials, Engineering and Construction Requirements

1.0 GENERAL REQUIREMENTS

The requirements indicated here are minimum performance requirements. More specific project functional and performance requirements, scope items and expected quality levels over and above the standards in Part 4 are identified in Part 3 of the Request for Proposal or Basic Ordering Agreement. The Contractor is encouraged to exceed the minimum requirements. The Contractor's performance evaluation will be based in part on enhancements to materials, engineering, design and construction provided for the contract that exceed minimum requirements.

Part 4 is a general section. Not all items in Part 4 will be required for this project. See Part 3 for project-specific requirements. See "Order of Precedence" paragraph in Part 2 for relationships between all parts of the RFP.

In general, unless otherwise indicated, Contractor shall provide all labor, equipment and materials necessary to complete the work required for the contract. All work shall be in conformance with all applicable referenced criteria, construction standards, laws and regulations, including applicable building and fire, life safety codes.

Recycled Materials Considerations:

An Affirmative Procurement Program has been established within the Federal government to promote the purchase of products containing recovered materials. This program promotes the purchase of products containing materials recovered from the solid waste stream. The intent is to conserve resources and reduce solid waste by developing markets for recycled products and encouraging manufacturers to produce quality recycled content products. The contractors shall use products that meet or exceed the EPA guideline standards for recovered content as required by the Federal Acquisition Regulations (FAR).

Availability lists of manufacturers and EPA research on product usage are on the Construction Criteria Base (CCB) at http://www.ccb.org under Documents Library, NAVFAC Criteria. A partial list of products containing recycled materials for possible use is as follows:

• Cement and Concrete - Coal Fly Ash

• Reprocessed and Consolidated Latex Paint

• Crushed Concrete Aggregate for new asphalt, concrete or subgrade

1.1 MATERIALS AND METHODS OF CONSTRUCTION

Only new materials and equipment shall be installed in the work. All materials, equipment and appliances shall be of the current manufacturers' products. No obsolete or discontinued materials, equipment and appliances shall be used, except that construction materials containing recycled content as described in Paragraph 1 of this Part that completely comply with all materials http://www.ccb.org/

Small Project Part 4 - Page 3 of 45 specifications found elsewhere in this Part may be used.

1.2 APPLICABLE CODES AND STANDARDS

The design and construction shall be in accordance with established construction practices, and the latest revision/edition of the following referenced codes and standards. The term "Latest Revision/Edition" is defined as the version as of the project award date. References are available at www.wbdg.org/ndbm/ . The advisory provisions of all codes and standards shall be mandatory, as though the word "shall" had been substituted for "should" wherever it appears. Reference to the "authority having jurisdiction" shall be construed to mean "Contracting Officer". Comply with the required and advisory portions of the current edition of the standard at the time of contract award.

All work to comply with UFC 1-200-01, General Building Requirements, and IBC 2009 or later edition as modified by applicable NFPA Standard as well as codes and standards listed in RFP Part 2 Attachment A.

1.3 LOCATION-SPECIFIC CODES AND STANDARDS

See Part 3.

1.4 DISCREPANCIES

When discrepancies in the referenced standards and the contract requirements occur, the more stringent requirements shall govern. The word "should" in all NFPA publications shall be interpreted as a requirement. The Authority Having Jurisdiction in the interpretation of the codes and standards, and approving the exceptions allowed in the referenced standards, shall be the Contracting Officer, and the parties designated by the Contracting Officer.

2.0 PERFORMANCE TECHNICAL SPECIFICATIONS

Note: The paragraph numbers used correspond with the numbers used in UNIFORMAT II/Work Breakdown Structures (WBS) as listed in the Whole Building Design Guide, Navy Design Build Master, accessible at this website: www.wbdg.org/ndbm .

SECTION A. SUBSTRUCTURE

A10 FOUNDATION

Foundations shall be reinforced concrete slabs-on-grade with continuous strip footings or isolated spread footings unless dedailed differently. Concrete slabs shall not be less than 4 inches in thickness and footings shall not be less than 18 inches below the lowest adjacent grade.

Foundations shall be designed and constructed of reinforced concrete to meet the requirements of the SOW. All design and construction shall comply with IBC and with applicable requirements in Section B Shell. For the purposes of interpreting IBC Chapter 18, the "Owner" and "Building Official" shall mean the "Government", and the "Applicant" shall mean the "Contractor/Designer of Record".

1. Contractor-Foundation Design: The Designer of Record shall evaluate the RFP data, and obtain and evaluate all additional data as required to support the design and construction.

2. Geotechnical Site Data required in Design Drawings: The Contractor's final design http://www.wbdg.org/ndbm/ http://www.wbdg.org/ndbm

Small Project Part 4 - Page 4 of 45 drawings shall include:

a. Notes identifying the soil allowable bearing capacity used in design.

b. Subsurface soil information, be it Government provided or Contractor obtained, that represents subsurface conditions existing on the project site (such as boring logs, test pits, laboratory test results and groundwater observations). The locations of all borings shall be indicated on the drawings.

3. Performance Verification and Acceptance Testing: Verification of satisfactory construction and system performance shall be via Performance Verification Testing, as detailed in this part of the RFP.

a. Earthwork: Perform quality assurance for earthwork in accordance with IBC

Chapter 17. See Section G1030.

SECTION B. SHELL

Building shell may be of any materials and design allowed by applicable codes and standards, subject to specific requirements that may be applicable to a particular activity, such as the base exterior architecture plan (BEAP) and UFC 4-010-01.

B10 SUPERSTRUCTURES

Superstructure work includes structural frames, bearing walls, floors, roofs, roof canopies, and balcony construction. Unless otherwise specified in Part 3, superstructures may be designed and constructed using any materials or combination of different materials allowed by applicable codes and standards and in conformance with the RFP. All design and construction shall comply with IBC. Special inspection, testing, approvals, certifications, observations and quality assurance plans as prescribed in Chapter 17 of the IBC are required.

1. Concrete: All concrete shall be constructed in accordance with ACI 301. Concrete shall have a 28-day minimum compressive strength of 3,000 psi. Slump shall be between 2 and 4 inches in accordance with ASTM C143. Provide joints as required to minimize cracking. All concrete shall be reinforced. Provide joints as required by applicable ACI standards. Unless otherwise specified in Part 3 or as indicated by the contracting officer, provide steel trowel finish for all exposed floor surfaces.

2. Masonry:

a. All concrete masonry shall be constructed in accordance with ACI 530.1.

Concrete masonry shall have a minimum 28-day compressive strength of 1500 psi. Concrete masonry units shall conform to ASTM C90, grade A1. Broken blocks are not allowed. Use only standard size and shape blocks. Block may be cut when necessary. Mortar shall be Type S.

b. When used, brick shall conform to ASTM C216. In exposed construction, broken brick shall not be allowed. Standard size brick may be cut to fit job condition. Use Type S mortar.

c. Provide metal anchors for masonry and brick, including veneer construction as required by IBC.

6. Structural Steel: Structural steel exposed to weathering shall be adequately protected to prevent corrosion.

7. Steel deck: Steel form deck shall have a G90 galvanized finish, and must have a

Small Project Part 4 - Page 5 of 45 minimum 26-gage thickness. All other steel deck shall have a G90 galvanized finish, and must have a minimum 20-gage thickness.

8. Cold-formed metal framing: Cold-formed steel studs, joists and track shall be galvanized with a minimum thickness of 20-gage.

9. Wood framing: Wood framing members shall be new lumber, unless otherwise allowed by Part 3. Timber can be Douglas Fir, Douglas Fir-Larch, Hem-Fir, Southern Pine or other structurally competent species allowed by applicable codes and standards. Wood framing shall meet the following minimum grading requirements:

a. Studs - #3

b. Joists and rafters- #2

c. Beams, 4x and larger - #1

d. Posts, 4x and larger - #1

e. Blocking - #3

f. Fascia, trim - #1

g. Wood Structural Panel Sheathing (Exterior Glue)

h. Roof - APA rated with span index of 24/0 - minimum thickness 1/2 inch

i. Walls - APA rated with span index of 32/16 - minimum thickness 1/2 inch

j. Flooring- APA rated with span index of 48/24 - minimum thickness 3/4 inch

B20 EXTERIOR ENCLOSURE

B2010 EXTERIOR WALLS

1. Exterior Wall Performance:

a. Vapor Transmission Analysis: Perform a job specific vapor transmission analysis in accordance with ASHRAE 90.1 or WUFI. The conclusion of the analysis shall indicate the appropriate locations of needed vapor retarders, air barriers, and anticipated dew-point locations in the exterior enclosure during different critical times of the year.

b. Maximum Air Infiltration: The air leak flow rate must not exceed 0.25 CFM at 75 Pa per square foot (0.076 cm 75 Pa per square meter) of building envelope area including roof or ceiling, walls and floor as provided by the DOR.

Where required in RFP Part 3, provide air barrier testing. Perform testing as described in "U.S. Army Corps of Engineers Air Leakage Test Protocol for Building Envelopes Version 3, May 11, 2012". Repair leaks and repeat testing until prescribed maximum air leak flow rate is achieved. Provide intermediate and final reports.

c. Wind Loads: Provide wind load calculations for exterior cladding in accordance with ASCE-7 with comparative analysis of the cladding system to be provided.

d. Water Penetration: No water penetration shall occur at a pressure of 39 Kg/m2 (8 psf) of fixed area when tested in accordance with ASTM E 331.

e. Insulating Value: Provide complete thermal envelope in accordance with ASHRAE 90.1, Chapter 5 with improvements required to meet project energy goals.

Where required in RFP Part 3, provide infrared thermal envelope performance testing. Test the building envelope using Infrared Thermography in accordance

Small Project Part 4 - Page 6 of 45 with the requirements of ASTM C1060 (latest edition) and ISO 6781. The Contracting Officer will witness the testing. Provide thermography test report including thermographs in color and a color temperature scale to define the temperature indicated by the various colors. The report shall identify the high temperature reading, the outdoor air temperature, the building indoor air temperature, and the wind speed and direction. Report to note any areas of compromise in the building envelope, and note all actions required and taken to correct those areas. Repair and repeat testing until discrepancies are demonstrated to be resolved.

2. Masonry Veneer Exterior Wall Closure Components: Masonry veneer shall include load bearing and non-load bearing exterior walls of the structure, and shall include colored mortar, special shapes such as sills, headers, trim units and copings of brick masonry, precast concrete, concrete masonry units, or other approved material. Utilize BIA Technical Notes to design, detail, and construct brick masonry walls. Substitute directive language in the place of BIA suggestive language. The results of these wording substitutions change this document to required procedures. The veneer shall be tied to the backup wall system with a system that allows the veneer to move independently of the backup wall system, while being structurally supported. The masonry veneer shall allow for expansion and contraction of the veneer without cracking the exterior material.

a. Masonry Veneer Installation: Conform to ACI 530.1 for masonry veneer installation, including cold weather construction. Antifreeze admixtures are not to be used.

b. Mortar: Provide factory-tinted colored mortar conforming to ASTM C270, unless DOR directs otherwise.

c. Expansion/Control Joints: Locate expansion/control joints and seal with proper backing material and ASTM C 920 polyurethane sealant, or preformed foam or rubberized expansion joint closure. Conform to UFC 3-100-10 and BIA Technotes 18, 18A.

d. Brick: shall be ASTM C216, Grade SW, type FBS, or type FBX for detail work.

ASTM C67 test rating shall be "Not effloresced". Use FBA brick only for special architectural effects requiring a non-uniform size.

e. Split Faced or Ground Faced Masonry: ASTM C 90

f. Cast Stone Trim Units: Cast Stone shall meet or exceed the requirements of

ASTM C 1364.

g. Wall Cavity: shall Comply with the and BIA Technical Notes 21A, 21B, 21C, 28B

8. Through-Wall Flashing Components: Through-wall flashing with weep holes shall be incorporated in cavity wall construction. Flashing shall be 7 ounce copper flashing with a 3 ounce bituminous coating on each side or a fiberglass fabric bonded on each side of the copper sheet; 16-ounce uncoated copper, 28 gauge Type 302 or 304 stainless steel is also acceptable. 'Flexible membrane flashing, plastic or PVC-based membrane flashing is prohibited.

i. Reinforcing in Veneer Layer: Reinforcing in the veneer layer shall be galvanized in accordance with ASTM A 123/A123M, ASTM A153/A153M, or ASTM A653/A653M, Z275 (G90) coating, and be of sufficient size to eliminate damage to the veneer layer from wind and other live and dead loads imposed on the veneer layer.

j. Masonry Cleaning: Clean the masonry in accordance with manufacturer's instructions and BIA Technote 20.

3. Metal Wall Panel Exterior Closure

Panels shall have factory applied, baked coating to the exterior and interior of metal wall panels and metal accessories. Exterior finish topcoat shall be of 70 percent polyvinylidene fluoride (PVDF) resin with not less than 0.8 mil dry film thickness (DFT).

Small Project Part 4 - Page 7 of 45

Exterior primer shall be standard with panel manufacturer with not less than 0.8 mil dry film thickness (DFT).

Wall system and attachments shall resist wind loads as determined by ASCE 7, with a factor of safety appropriate for the material holding the anchor. Maximum deflection due to wind on aluminum wall panels shall be 1/60. Maximum deflection due to wind on steel wall panels and girts behind aluminum or steel wall panels shall be limited to 1/120 of their respective spans, except that when interior finishes are used the maximum allowable deflection shall be limited to 1/180 of their respective spans.

Conformations - Non-insulated steel or aluminum wall panels shall have configurations for overlapping adjacent sheets or interlocking ribs for securing adjacent sheets and shall be fastened to framework using concealed fasteners, or choose the option for exposed fasteners when exposed fasteners are acceptable at the installation. Length of sheets shall be sufficient to cover the entire height of any unbroken wall surface.

a. Steel Wall Panels:

1) Material and Coating: Form sheets from steel conforming to ASTM A 653/A 653M, Structural Grade 40, galvanized coating conforming to ASTM A 924/A 924M, Class G-90; aluminum-coated steel conforming to SAE AMS 5036; or steel-coated with aluminum-zinc alloy conforming to ASTM A 792/A 792M, except that coating chemical composition shall be approximately 55 percent aluminum, 1.6 percent silicon, and 43.4 percent zinc with minimum coating weight of 0.5 ounce per square foot.

2) Gage: Minimum 22 U.S. Standard Gage for wall panels, but in no case lighter than required to meet maximum deflection requirements specified.

b. Aluminum Wall Panels:

1) Material and Coating - Form sheets of Alloy 3004 or Alclad 3004 conforming to ASTM B 209 having proper temper to suit respective forming operations.

2) Thickness - Minimum 0.81 mm (0.032 inch) nominal, but in no case thinner than that required to meet maximum deflection requirements specified.

c. Insulated Aluminum or Steel Wall Panels: Insulated wall panels shall be steel or aluminum factory-fabricated units with insulating core between metal face sheets securely fastened together and uniformly separated with rigid spacers.

Panels shall have a factory color finish. Wall panels shall have edge configurations with interlocking ribs for securing adjacent panels. System shall utilize factory fabricated corners and trim pieces at intersections with other materials. Insulated wall panels shall be fastened to framework using concealed fasteners.

1) Insulated Steel Panels - Zinc-coated steel conforming to ASTM A 653/A 653M; or Aluminum-zinc alloy coated steel conforming to ASTM A 792/A 792M, AZ 55 coating. Uncoated wall panels shall be 0.61 mm (0.024 inch) thick minimum.

2) Insulated Aluminum Panels - Alloy conforming to ASTM B209, temper as required for the forming operation, minimum 0.81 mm (0.032 inch) thick.

4. Stucco Exterior Wall Closure

Portland Cement Plaster: ASTM C150, gray Portland cement Type II with 13 mm (1/2 inch) maximum chopped alkali resistant fiberglass strands, minimum 1.5 percent by weight to cement; .68 kg (1 1/2 pounds) per sack of

Small Project Part 4 - Page 8 of 45 cement. Lime shall conform to ASTM C206, Type S. System shall utilize stainless steel or zinc corner beads, J-beads and other accessories. Unless specifically deleted, the system shall utilize an acrylic admixture or coating to give additional moisture suppression to control fungus growth.

a. Exterior Insulation and Finish System (EIFS): EIMA TM 101 and 01 EIMA TM

101.86. EIFS shall be used as the non-primary or the primary exterior finish material only for projects where it is necessary to match existing EIFS.

5. Precast Concrete Wall Panels: ACI 211.1 and ACI 301. PCI MNL-116 or PCI MNL-117.

Concrete shall have a minimum 28-day compressive strength of 281 Kg/cm2 (4000 psi).

Joints shall include properly sized and placed backing material and fully loaded and tooled sealant joint of no less than 1/4 inch sealant material thickness.

6. Exterior Wall Backup Construction

a. Concrete Unit Masonry: Provide concrete unit masonry to comply with ACI

530.1. Load-bearing units: ASTM C90, Non-load bearing- units: ASTM C129, Type I or II. Provide ground face units, split-faced units, ground-faced units, or split-ribbed units for exposed exterior walls. Provide water repellent admixture to masonry units where the exterior face of the units will not receive a waterproof coating such as paint

b. Dampproofing: Dampproof the cavity-facing wythe of the backup masonry using asphaltic primer according to ASTM D 41, if dampproofing is not provided by a sprayed on foam or other DOR-approved membrane insulation system.

7. Load-Bearing Metal Framing System

If permitted, provide load-bearing metal framing including top and bottom tracks, bracing, fastenings, and other accessories necessary for complete installation. Framing members shall have the structural properties indicated. Where physical structural properties are not indicated, they shall be as necessary to withstand all imposed loads. Design framing in accordance with AISI SG-673. Installation shall be in accordance with DOR-approved shop drawings and manufacturer's installation instructions.

8. Exterior Studs:

Max. Deflection Criteria

Exterior Finish

L/360 Cement Plaster, Wood Veneer, Synthetic Plaster, Metal Panels, Brick Veneer, Stone Panels

L/600

Wall deflections shall be computed on the basis that studs withstand all lateral forces independent of any composite action from sheathing materials. Studs abutting windows or louvers shall also be designed not to exceed 1/4-inch maximum deflection and as required in UFC 4-010-01.1) Studs - ASTM A 1003/ASTM A 1003M, Structural Grade 50, Type H minimum; provide Z180 (G60) galvanized coating in accordance with ASTM A 653/ASTM A 653M. Do not expose studs to direct moisture contact2) Bracing - Provide horizontal bracing in accordance with design calculations and AISI SG-673, consisting of, as a minimum, runner channel cut to fit between and welded to the studs.3) Sheathing - Provide sheathing to withstand structural loads imposed on the wall structure. Cover sheathing with either a 15 pound asphalt-impregnated building paper, or air barrier as required by the wall moisture analysis. Sheathing shall be one of the following:

a) Plywood: C-D Grade, Exposure 1; b) Structural-Use and OSB Panels; c) Gypsum: ASTM C 79/C 79M and ASTM C 1177/C 1177M, 13 mm (1/2 inch) thick fire retardant (Type X) 15 mm (5/8 inch) thick; 1.2 meters (4 feet) wide with square edge for supports 400 mm (16 inches) o.c. with or without corner bracing of framing. Gypsum

Small Project Part 4 - Page 9 of 45 sheathing shall be faced with materials capable of resisting six months of weathering exposure without degradation of the covering or the gypsum. Seal all joints as recommended by the manufacturer.

10. Cast-in-place Concrete System: Concrete construction must be in accordance with ACI

301.

11. Insulation and Vapor Retarder: Insulation, Vapor Retarders, and Air Barrier Systems in or on Exterior Enclosure shall include: insulation, liquid, sheet or continuous film materials installed separately in or on wall assemblies to provide resistance to heat loss/gain, and vapor penetration.

a. Vapor retarder: Comply with ASTM C755. Incorporate in the exterior wall system where required by vapor transmission calculations or dew point analysis indicates the need or in conditions of high moisture exposure.

b. Bituminous Dampproofing: Bituminous Dampproofing shall be ASTM D449, Type I or Type II bituminous dampproofing on the exterior surface of the interior wythe of masonry in a cavity wall (back-up wall for masonry veneer).

c. Building Paper: FS UU-B-790, Type I, Grade D, Style 1.

d. Air Barrier: Building wrap consisting of air barrier sheeting complying with

ASTM E 1677, Type 1, not less than 3 mils thick with a permeance of not less than 575 ng/Pa x s x sq.m. (10 perms). Building wrap shall have a flame spread index of less than 25 in accordance with ASTM E 84. Provide building wrap over sheathing of wood or metal framed construction to reduce air penetration and airborne vapor penetration. Provide building wrap tape as recommended by the manufacturer for sealing all joints in the building wrap. Installation shall be in accordance with manufacturer's instructions. Air barrier installation at windows shall be in accordance with ASTM E 2112.

e. Insulation Systems: Vertical and horizontal polystyrene insulation conforming to ASTM C578 or rigid polyisocyanurate board wall insulating products conforming to ASTM C591 or mineral-fiber blanket insulation conforming to ASTM C 665 shall be provided.

12. Parapets: Avoid parapets when possible, but when necessary, provide parapets with the same materials as the exterior wall construction. Provide scuppers and wall edge according to SMACNA.

13. Exterior Louvers and Screens: If required, provide louvers for Screened Equipment

Enclosure or as louvers for exterior doors.

Storm shutters shall comply with ASTM E 1996-03.

14. Balcony Walls and Handrails: Balcony walls to match exterior construction. Handrails to comply with the IBC and OSHA.

15. Exterior Soffits: Exterior soffit system.

16. Exterior Painting and Special Finishes; All painting and coating materials shall be low

VOC. Painting practices shall comply with applicable federal, state and local laws enacted to insure compliance with Federal Clean Air Standards. Apply coating materials in accordance with SSPC PA 1. SSPC PA 1 methods are applicable to all substrates.

All paint shall be in accordance with the Master Painters Institute (MPI) standards for the exterior architectural surface being finished. The current MPI, "Approved Product List"

Small Project Part 4 - Page 10 of 45 which lists paint by brand, label, product name and product code as of the date of contract award, will be used to determine compliance with the submittal requirements of this specification. Provide paint systems tested to "Detailed Performance Level" standard as defined by MPI.

17. Exterior Joint Sealant: Sealant joint design, priming, tooling, masking, cleaning and application shall be in accordance with the general requirements of Sealants: A Professionals' Guide from the Sealant, Waterproofing & Restoration Institute (SWRI). All sealant shall conform to ASTM C 920.

B2020 EXTERIOR WINDOWS

All windows and doors in new or existing buildings, which are subject to Anti-terrorism Standards, must be blast-resistant as prescribed in UFC 4-010-01.

Unless otherwise allowed by Part 3, windows for new facilities shall be aluminum. In building additions or renovations windows shall match existing window materials. Exterior windows design, dimension, and construction shall meet or exceed the requirements for Anti Terrorism Force Protection requirements. In addition, exterior windows shall meet or exceed Energy Star requirements. The design and placement of exterior windows shall take into considerations view, natural light, privacy, and protection for the occupants of the facilities. Provide operable hardware and insect screen for exterior windows. Windows shall be fabricated by manufacturers normally involved in the manufacturing of windows and shall be of the current make and model. No obsolete or discontinued windows shall be used. Provide weather stripping, STC and IIC rating, commensurate with the intended use of the facility. Submit catalog information and manufacturer's specifications for approval by Contracting Officer prior to purchase of windows.

All window assemblies shall meet performance grade CW tested in accordance with AAMA/WDMA/CSA 101/I.S.2/A440-08 or most current edition of this standard.

Where windows separate conditioned spaces from non-conditioned spaces, provide windows bearing NFRC energy label indicating window exceeds current EnergyStar criteria. For storefront or curtainwall systems, provide thermally broken framing and insulating glazing with whole-assembly U-value of 0.40 or less. Provide windows exceeding requirements of ASHRAE 90.1, Table 5.5 for project climate zone.

Windows shall consist of fixed and operable sash used singly and in multiples. Provide operable sash in spaces occupied by people as a minimum. Include operating hardware, non-corroding framed metal screens for operable sash, integrated blinds set between glass panels and security grilles. Provide jamb support for larger windows where recommended by manufacturer.

1. Metal Windows: All windows shall conform to ANSI/AAMA/WDMA 101. Metal windows with insulating glass shall have thermally broken frames and sash. Factory finish aluminum windows and provide with aluminum frame screens with aluminum mesh at operable sash, hardware and locks, and tinted glazing. Aluminum screens shall comply with ANSI/SMA 1004.

2. Wood Windows: Clad wood and wood windows shall consist of complete units including sash, glass, frame, weatherstripping, insect screen, and hardware. Window units shall meet the requirements of AAMA 101, except maximum air infiltration shall not exceed

0.30 CFM per linear foot of sash crack when tested under uniform static air pressure difference of 7.66 Kg/m2 (1.57 psf).

Small Project Part 4 - Page 11 of 45

3. Storefronts: Provide one-story storefront system fabricated from formed and extruded aluminum and glass components for exterior use. Utilize the specific section of the Standard Design-Build Performance Technical Specifications Section B202002 for the storefront to be provided. Storefront framing shall meet or exceed the structural requirements, as measured in accordance with ANSI/ASTM E330: Design system to withstand this as a minimum and comply with design pressure established within the required ASCE 7-05 Wind Speed Calculations determined by the overall average opening within the project.

4. Glazing: All exterior glazing shall be insulating glass.

a. Clear Glass - Type I, Class 1 (clear), Quality q4 (A);

b. Heat-Absorbing Glass - ASTM 1036, Type I, Class 2 Quality q3 (select) ray frames;

c. Wire Glass - Type II, Class 1, Form 1, Quality q8 Mesh m1 or Form 2, Quality q7;

d. Laminated Glass - ASTM 1172, total thickness shall be nominally 6 mm (1/4 inch);

e. Insulating Glass Units - Typically ASTM C 1036, Type I, Class 1, Quality q4, minimum 6 mm;

f. Tempered Glass - ASTM C 1048, Kind FT (fully tempered);

g. Patterned Glass - ASTM 1036, Type II, Class 1 (translucent), Form 3 (patterned), Quality q7 (decorative), Finish f1 (patterned one side), Pattern p2 (geometric)

5.55 mm (7/32 inch) thick.

B2030 EXTERIOR DOORS

Exterior doors shall be heavy duty insulated steel doors and frames for service access. Door frames shall have welded corners. Use heavy-duty overhead holder and closer to protect doors from wind damage. Steel shall have G60 galvanized coating in accordance with ASTM A 924/A 924M and ASTM A 653/A 653M when the job site is located within 300 feet from a body of salt water. Provide commercial quality, coating Class A zinc coating in accordance with ASTM A591 for other steel or steel skin hollow metal doors at other locations. Provide kickplates on the inside face of all exterior doors. Weather-protect all exterior doors and related construction with low infiltration weatherstripping and sealants. Provide threshold with offset to stop water penetration while maintaining accessibility compliance. Conform to the design criteria of ASCE 7. See the hardware schedule for door hardware requirements.

Where doors separate conditioned spaces from non-conditioned spaces, provide doors and all related hardware to exceed current EnergyStar criteria. For storefront entrances, provide thermally broken door framing and insulating glazing with whole-assembly U-value of 0.67 or less.

Provide doors exceeding requirements of ASHRAE 90.1, Table 5.5 for project climate zone.

1. Steel Doors: Exterior doors shall comply with ANSI A250.8-1998 (SDI-100). Hardware preparation shall be in accordance with ANSI A250.6. Doors shall be hung in accordance with ANSI A115.16.

a. Doors Required:

1) Standard Duty Doors - Level 1, MSG # 20 (IP 0.032", 0.8 mm), physical performance Level C, Model 1 or 2.

2) Heavy Duty Doors - MSG # 18 (IP 0,042", 1 mm), physical performance Level B, Model 1 or 2.

Small Project Part 4 - Page 12 of 45

3) Extra Heavy Duty Doors - Level 3, MSG #16, (0.053", 1.3 mm) physical performance Level A, Model 1, 2, or 3.

4) Maximum Duty Doors - Level 4 (IP 0.067", 1.6 mm), physical performance Level A, Model 1 or 2.

b. Insulated steel doors and frames are required for entrances to dwelling units, and may also be specified as a Contractor's option to Level 1 standard hollow metal doors. Do not use wood doors for exterior doors, unless they are fully protected from the elements, an exterior grade species, and specially finished. If wood doors are used, provide in accordance with Standard Design-Build Performance Technical Specification Paragraph B203001 2.

2. Standard Steel Frames; ANSI A 250.8. Form frames with welded corners for installation in exterior walls. Form stops and beads of 20 gage steel. Frames shall be set in accordance with ASTM A250.11. Anchor all frames with a minimum of three jamb anchors and base steel anchors per frame, zinc-coated or painted with rust-inhibitive paint, not lighter than 18 gage. Mortar infill frames in masonry walls, and infill with gypsum board compound at each jamb anchor in metal frame walls. Only use surface exposed bolted anchors in concrete walls.

3. Door and Frame Finishes: a) Exterior Doors, Factory-Primed and Field Painted Finish -

Doors and frames shall be factory primed with a rust inhibitive coating as specified in ANSI A250.8. Factory prime doors on six sides of the door; b) Exterior Doors Galvanized Finish -- Shall be Commercial Quality, Coating Class A, zinc coating in accordance with ASTM A 591 when facility is located further than 91 meters (300 feet) from the ocean.

When facility is located within 91 meters (300 feet) of the ocean, provide G60 galvanized coating in accordance with ASTM A 924/A 924M and ASTM A 653/A 653M.

4. Upward Acting Doors: Upward acting doors shall be capable of withstanding the design wind loading of ASCE 7. Provide galvanized steel tracks not lighter than 14 gage for 50 mm (2 inch) tracks and not lighter than 12 gage for 75 mm (3 inch) track. Provide a positive locking device and cylinder lock with two keys on manually operated doors.

5. Overhead and Roll-up Doors: Large exterior overhead and roll-up doors system shall consist of manual or automatic exterior doors and door assemblies.

6. Rolling Service Doors and Grilles: Coiling overhead doors shall have minimum 22 gage thermal insulated slats. Electric operators shall have three-button switches conforming to NEMA MG 1, NEMA ICS 1, and NEMA ICS 2, and auxiliary hand chain operation, weather-stripping and wind-locks. Doors shall be capable of withstanding the design wind loading of ASCE 7 and still operate normally. Finish of the door shall be hot-dipped galvanized with a painted finish.

7. Sectional Overhead Doors: Sectional overhead doors shall conform to NAGDM 102, Residential or Commercial or Industrial door standards. If doors are electrically operated, pushbuttons shall be full-guarded to prevent accidental operation, and include limit switches to automatically stop doors at the fully open and closed positions. Limit switch positions shall be readily adjustable.

8. Hardware: Provide the services of a Certified Door Hardware Consultant to prepare the door hardware schedule.

Small Project Part 4 - Page 13 of 45

Provide all new hardware with satin chrome finish throughout. Hardware shall be commercial grade, suitable for the operational requirements and in compliance with life safety code and handicapped accessibility requirements, similar in quality to the hardware shown in C1020 Interior Doors and Hardware below.

Coordination: Provide a master keying system compatible with the existing base system. Provide an emergency access key box for exterior door fireman key access.Coordinate with the local authority and the Contracting Officer to determine the local requirements for hardware, keying and master keying.

B30 ROOFING

For repair of existing roofing, the cutting of the existing roof shall be kept to a minimum and, where necessary, shall be made in a clean and orderly manner to prevent the appearance of a patch.

Repair all damage to existing and new roofing caused by the work of this Contract at no additional cost to the Government. The work shall be executed in such a manner as to maintain the integrity of the existing roofing manufacturer's warranty.

1. Pre-Roofing Conference: Prior to beginning roofing work, the Contractor shall hold a

Pre-Roofing Conference with the personnel directly responsible for the roofing systems work, as well as the roofing manufacturer's technical representative.

2. Roof Design Assurance: If the roofing project is significant (Significant Roof - A single or group of buildings greater than 1,400 m2 (15,000 sf)), or where extenuating circumstances of the roof project such as building use, content, safety, or visibility require a roofing consultant, the Contractor shall utilize the services of a Registered Roof Consultant (RRC) certified by the Roof Consultant Institute, or a Registered Professional architect or Engineer who specializes in roofing, to approve the roof design. The roof consultant must be engaged in roofing design and roofing construction as his primary endeavor. The roof consultant shall verify in writing that the design for the project is in accordance with the current edition of NRCA Roofing and Waterproofing Manual, UFC's, and RFP, and standard industry practices and building codes.

If a Roof Design Assurance Consultant is needed, consider using a Registered Roof Observer as a QC specialist.

B3010 ROOF COVERINGS

Roof coverings and procedures shall comply with the requirements of UFC 3-110-03, Roofing, and NRCA, Roofing and Waterproofing Manual found at http://www.nrca.net/rp/technical/manual/manual.aspx as the primary NAVFAC roofing criteria.

Roof selection shall comply with UFC 3-330-02A, Design: Commentary on Roof Systems.

Determine wind uplift using wind speed in accordance with ASCE-7.

1. LOW SLOPE ROOF SYSTEMS: Low slope systems shall be roofs with a pitch 3 in 12 or less. Low slope roofing systems shall be built-up asphalt roofing (aggregate surfaced, with modified bituminous components), modified bituminous membrane roofing of a http://www.nrca.net/rp/technical/manual/manual.aspx

Small Project Part 4 - Page 14 of 45 minimum of 3 plies with aggregate surface or granular surface modified bitumen cap sheet, or structural standing seam metal roofing. Use single ply systems only to match existing construction.

2. ROOF COMPONENTS:

a. Insulation: For existing structures, provide insulation in accordance with ASHRAE 90.1. For new construction, provide R-30 insulation in the ceilings, attic spaces and soffit areas for interior spaces. Injected polyurethane and Urea Formaldehyde Foam field applied shall not be used. Provide acoustical insulation above walls separating bathroom/restrooms and corridor and adjacent occupied spaces, and between offices and corridors. Insulation shall have a minimum sound attenuation rating of STC-55.

Insulation shall be Polyisocyanurate Rigid Board Insulation , Mineral Fiber Blanket Insulation to conform to ASTM C 991, with Glass Mat Gypsum Roof Board for use above the deck or insulation conforming to ASTM C 1177/C 1177M, where necessary.

Only on portions of the roof where the sloping of structure does not allow the minimum slopes, provide a factory tapered roof insulation system to provide positive drainage of roof system, and to include drainage around curbs, penetrations, and projections through the roof plane.

Provide Glass Mat Protection Board meeting ASTM C 1177 for use as a thermal barrier (underlayment) or protection board for hot-mopped applications.

b. Vapor Retarder:-Determine the need and location in the roof assembly for a vapor retarder. Where the mean January temperature is 40 degrees Fahrenheit or less, and the expected interior relative humidity is 45% or greater, use a vapor retarder. Otherwise, use ASHRAE 90.1 for the determination.

1) Vapor Retarders as Integral Facing - Alloy conforming to ASTM B 209, or Vapor Retarders Separate from Insulation - Vapor retarder material shall be 10 mil polyethylene sheeting conforming to ASTM D 4397.

2) A slip sheet is required to separate the roofing panels from the insulation facing where the facing would be in direct contact with the roofing panels. If a slip sheet is necessary for use with a vapor retarder, use a 5 lb. per 100 square feet rosin-sized, unsaturated building paper.

c. EPDM Rubber Boots: Flashing devices around pipe penetrations shall be flexible, one-piece devices molded from weather-resistant EPDM rubber.

d. Prefabricated Curbs and Equipment Support: Provide Prefabricated curbs and equipment supports shall be of structural quality, hot-dipped galvanized or galvanized sheet steel, factory primed and prepared for painting with mitered and welded joints. Integral base plates and water diverter crickets shall be provided.

Minimum height of curb shall be 8 inches above finish roof.

e. Fasteners: Shall meet all requirements of the NRCA and Factory Mutual

f. Wood Nailers: Wood nailers shall be pressure-preservative-treated in accordance with AWPA M2 Standards, permanently marked or branded, and installed flush with the top of the adjacent insulation board.

g. Flashing and Sheet Metal: Provide flashing and sheet metal work including scuppers, splash pans, and sheet metal roofing. Flashing and sheet metal shall be provided in accordance with roof manufacturer's

Small Project Part 4 - Page 15 of 45 printed installation instructions and in compliance with NRCA and SMACNA recommendations. Fabricate Flashing and sheet metal components from Copper, Lead-Coated Copper sheet, Steel Sheet, Zinc- Coated (Galvanized) - ASTM A 653/ A 653M, Stainless Steel - ASTM A 167, Type 302 or 304, 2D finish, or Pre-Finished Aluminum.

h. Gutters and Downspouts: Provide gutters and downspouts compatible with roofing material and finish. Concealed (interior) gutters and downspouts are prohibited. Provide splash guards at points of discharge.

i. Roof Openings and Supports: Provide flashings for roof openings and supports as recommended by the NRCA. Assure all penetration flashings extend minimum 200 mm (8 inches) above the finished roof surface.

j. Roof Hatches: Provide roof hatch where required by OSHA, and as access to roof when roof mounted equipment is used or other routine roof maintenance is required.

k. Glazed Roof Openings: Skylights and other glazed roof openings shall be used only to supplement interior lighting levels (generally in steep slope or vertical applications), and otherwise, are discouraged from use.

l. Guards: Provide rails or guards as required by the OSHA, the International Building Code or other applicable safety standards.

m. Traffic Pads: Provide on roof system to protect roof from foot traffic. Provide traffic pads around roof mounted mechanical equipment and underneath removable mechanical equipment access panels. Traffic pads shall be of compatible material to roof.

3. OTHER ROOFING

a. Lightning Protection: Lightning protection component penetrations and attachments shall be sealed and flashed and anchored in a permanent manner and in a manner to avoid the degradation of the watertight integrity of the roof system.

b. Roof Drains (Existing): Where existing roof drains are to be reused in roof replacement construction, the contractor shall provide new, compatible flashing materials, a new drain clamping ring and new bolts for anchorage. Reuse of existing clamping ring and bolts is unacceptable. All details shall be in conformance with SMACNA and applicable NRCA manuals.

SECTION C. INTERIORS

C10 INTERIOR CONSTRUCTION

C1010 PARTITIONS

1. Fixed Partitions: wood frame; light gage steel frame; concrete masonry complying with

ACI 530.1/ASCE 6/TMS 602 and associated ASTM Standards; or cast-in-place concrete complying with UFC 1-200-01, ACI 117 and ACI 301/301M. In addition, interior partitions shall comply with tables for sound isolation and noise reduction in Chapter 1, "Architectural Graphic Standards". Include a statement of adherence to the applicable

Small Project Part 4 - Page 16 of 45 criteria.

Gypsum board/stud partitions may be standard gypsum board, moisture resistant, or impact resistant. Use cement board in showers and other wet areas. Reinforce points where doorknobs can strike a wall and anchorage points for wall mounted equipment.

2. Demountable or Removable Partitions: shall be of materials allowed by code and shall be anchored firmly to the structure to carry their own weight as well as impact forces and seismic lateral forces. Sound Transmission Class (STC) rating and Impact Isolation Class (IIC) rating shall be in accordance with ASTM E 90 or ASTM E 413 for frequency data, and shall meet the requirements of the intended use in Part 3.

3. Glazed Partitions and Interior Windows: shall be of the materials allowed by code

IBC, and shall comply with fire and smoke separation requirements. Provide safety glazing and fire resistant rating where they are required.

C1020 INTERIOR DOORS

1. Wood Doors: Stile and rail wood doors shall be WDMA I.S.6A-01, premium or custom grade, heavy duty or extra heavy duty. Flush wood doors shall be WDMA I.S.1A-04, premium or custom grade, heavy duty or extra heavy duty; or WDMA I.S.-97 (PC-5 5-ply particleboard core or SCLC-5 5-ply structural composite lumber core). Doors adjacent to paneling or millwork shall comply with corresponding AWI millwork grade. Provide interior fire doors.

2. Steel doors: shall be ANSI A 250.8, Level 1, (occasional use, low abuse types such as closet doors without locks); Level 2, (low use, moderate abuse types such as office/storeroom doors); Level 3, (moderate use, high abuse types such as BEQ sleeping room doors); Level 4, (high use, high abuse types such as corridors, stairways, assembly spaces, and main entry doors), with a physical performance level of 'A'. Maximum door undercut shall not exceed 19 mm (3/4 inch).

3. Sound Insulated Doors and Frames: Utilize Sound Insulated Doors and Frames with sound control weatherstripping in rooms requiring wall assemblies to be sound insulated with a Sound Transmission Class (STC) rating as required. The STC rating for the door and frame assembly shall be not less than the wall assembly STC rating.

4. Aluminum Doors and Frames: Provide swing-type aluminum doors and frames complete with framing members, transoms, side-lites, and accessories. Fabricate of ASTM B 221, Alloy 6063-TS for extrusions.

5. Steel Door Frames: ANSI A 250.8. Form frames with welded corners for installation in masonry partitions and knock-down field assembled corners for installation in metal stud and GWB partitions. Frames shall be set in accordance with SDI 105. Form stops and beads with 20 gauge steel.

Provide a minimum of three jamb anchors and base steel anchors per frame, zinc-coated or painted with rust-inhibitive paint, not lighter the 18 gauge. Secure frames to previously installed concrete or masonry with expansion bolts in accordance with SDI 11- F. Provide mortar infill of frames in masonry walls, and gypsum board compound infill at each jamb anchor in metal frame walls.

Fire doors: Provide in conformance with NFPA 80 an NFPA 105. Fire doors and frames shall bear the label of UL, FM or WHI attesting to the rating required. Door and frame assemblies shall be tested for conformance per NFPA 252 or UL 10B (for neutral 6. pressure) or UL 10C (for positive pressure). Wood fire doors shall also

Small Project Part 4 - Page 17 of 45 comply with ASTM E 152. Provide stainless steel astragals complying with NFPA 80 for fire-rated assemblies and NFPA 105 for smoke control assemblies.

6. Interior Door Hardware: Provide the services of a certified door hardware consultant to prepare the door hardware schedule. Unless otherwise noted, interior doors shall include latch, hinges, door stops and door silencers. Provide closers and kick plates for fire-rated, corridor, stairway and high-use non-residential doors.

a. Hinges - BHMA A156.1, Grade 1, 108 x 108 mm (4 1/2 x 4 1/2 inches) with non-removable pin or anti-friction bearing hinges.

b. Locks and Latches - For non-residential buildings use Series 1000, Operational

Grade 1, Security Grade 2 for stairways, building entrances, corridors, assembly spaces, and other high use interior doors. Use Series 4000, Grade 1 for non-residential locations not using Series 1000 hardware. For residential buildings use Series 4000, Grade 2 for interior doors. a) Mortise Locks and Latches - BHMA A 156.13, Series 1000, Operation Grade 1, Security Grade 2. b) Bored Locks and Latches - BHMA A 156.2, Series 4000, Grade 1, or Grade 2.

c. Exit Devices - BHMA A 156.3, Grade 1. Touch bars shall be provided in lieu of conventional crossbars and arms. Use manufacturer's integral touch bars in aluminum storefront doors.

d. Card Key Access - Provide card key type access units for specialized entries.

Provide lithium battery powered, magnetic stripe keycard locksets that are ANSI/BHMA A156.13, Series 1000, Grade 1, mortise or ANSI/BHMA A156.2, Series 4000, Grade 1, cylindrical locks, tamper resistant, UL listed with 25 mm (1 inch) throw deadbolt, 19 mm (3/4-inch) throw latch bolt, auxiliary dead-locking latch, and 68.75 mm (2-3/4 inch) backset.

Provide hardware keying compatible with the existing base-wide keying system.

Replacement interchangeable cores shall be compatible with the Best Lock system.

e. Key Cabinet: Provide a Key Cabinet with 30% over capacity.

C1030 SPECIALTIES

1. Compartments, Cubicles, & Toilet Partitions: FS A-A-60003. Provide toilet compartments at multi-fixture toilet rooms of Type I, Style B-Ceiling Hung, C-Overhead Braced, or F-Overhead braced-alcove. Reinforce panels to receive partition-mounted accessories. Urinal screens shall be FS A-A-60003. Type III, Style A, floor supported and wall hung or Style D, wall hung. Wall hung urinal screens shall be secured with continuous flanges to urinal screen and wall. Steel and Plastic toilet partitions shall have a recovered materials content of 20 to 30 percent. Chrome-plated or stainless steel door latches and coat hooks. Provide one coat hook per compartment door. Latches and hinges for handicapped compartments shall comply with UFAS & ADAAG.

2. Toilet and Bath Accessories: Provide toilet and bath accessories and install per

ADAAG and manufacturers' requirements.

3. Marker Boards and Tack Boards: Provide porcelain enamel marker boards fused to a nominal 28 gauge steel sheet and tack boards of cork, with a tensile strength of at least 40 psi when tested according to ASTM F 152, with woven or vinyl covering.

Small Project Part 4 - Page 18 of 45

4. Identifying Devices: All interior doors shall have an identifying device. All handicap accessible facilities shall utilize signage which meets current ADAAG requirements with regard to Braille, raised characters, finishes…

This is the start of the file's text. The full file is on GovTribe.