This sources sought notice is for a design-bid-build construction project to perform renovations to critical building systems at a multi-story office building at Naval Support Activity Naples in Italy. The project scope includes major electrical upgrades, elevator replacement, chiller replacements, HVAC upgrades, and fire protection upgrades. The $25-100 million project will be completed over four phases while tenants move out and back into the building. A United States prime contractor is required to manage construction and have facility security clearance at the secret level, while local national labor may perform general construction with restrictions. Ten percent of work must be done by cleared United States citizens. Interested parties were to submit statements to the Navy by January 8, 2020. The contract period of performance is estimated at 37 months.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT NOTICE

Date:

Product Service Code: Z2AA

NAICS Code: 236220

NAVFAC EURAFCENT

PSC 817 BOX 51

FPO AE 09622

RFP No. ACQR# 5615714 – Repair Critical Building Systems - Naval Support Activity Naples (Capodichino)

Contact Points: Joshua Mentink, Contract Specialist, e-mail: Joshua.mentink@eu.navy.mil

Oscar Becerril, Contract Specialist, e-mail: Oscar.becerril@eu.navy.mil

Jasmine Lucht, Contract Specialist, e-mail: Jasmine.Lucht@eu.navy.mil

This notice does not constitute a request for proposal, request for quote, or an invitation for bid; it is solely used as a solicitation of interest notice. The magnitude of construction of this project is $25,000,000 to $100,000,000 per DFARS 236.204 (ii). The Government is soliciting interest from prime contractors with experience constructing and/or renovating single or multi-story administrative and communication facilities, data processing facilities, operations centers, intelligence centers or similar facilities that were 465 SM (5,000 SF) or greater at a base in Naples Italy. The project is Design-Bid-Build.

Project will perform renovations to a multi-story office building. Work consists of: Major electrical upgrades (critical electrical distribution, generator(s) replacement, grounding ring installation, UPS replacement, installation of surge protection), elevator replacement, chiller replacements, HVAC upgrades, fire protection upgrades (example: isolation valves and emergency electrical disconnects) and the demo/movement/construction of restrooms.

This project will be required to be phased: Phase 1 will consist of the renovation of sections of a

Bachelor Enlisted Quarters (BEQ) to be used as office space. This space will be used as a swing space for tenants in the multi-story office building. Additionally, Phase 1 will have the installation of a temporary modular work space and replacement of the elevators in the multi-story office building. Phase 2 will consist of electrical upgrades and mechanical upgrades. Phase 3 will consist of the decommissioning and removal of the modular installed in Phase 1, and demo/movement/ construction of restrooms.

Phase 4 will consist of mechanical, electrical and fire protection upgrades. During each of the phases, tenants in the multi-story office building will need to move out at the beginning of the phase and move back in at the end of the phase.

The prime contractor firm will be a United States (U.S.) Prime (Required) to manage and construct the facility with a Facility Clearance Level (FCL) and Safeguarding capability granted by the Defense Security

Service (DSS) at the SECRET level. Local National labor (Restrictions apply) may be used to build and perform general construction. Only U.S. Cleared worker will be authorized to complete finishing work.

The Government will have a pre-proposal conference approximately March 2020located in Naples, Italy.

mailto:Joshua.mentink@eu.navy.mil mailto:Oscar.becerril@eu.navy.mil mailto:Jasmine.Lucht@eu.navy.mil

SOURCES SOUGHT NOTICE

Project Site Access: It is estimated that 10% of the project scope must be performed by United States

(U.S.) Citizens (workers) with security clearances only. Other areas will not require United States

Citizens (workers) but will require escort during construction.

The contract period of performance is anticipated to be 37 months.

If you are interested in the above contract, please submit statements of interest to Joshua Mentink at joshua.mentink@eu.navy.mil and Jasmine.Lucht@eu.navy.mil no later than 08 January 2020.

mailto:joshua.mentink@eu.navy.mil mailto:Jasmine.Lucht@eu.navy.mil

File details come from the government source that posted it. Updated .