005_SMV2006_RCN12_2009-11.pdf

PDF 273 KB Posted

Attached to
DRYDOCK REPAIR FOR NOAA SHIP FAIRWEATHER
Solicitation number
AB133M-12-RB-0003
Issued by

About this file

Tech Data

View the file

Other files

File Type Posted
SOW Amendment 2.pdf PDF
Amendment 0004.pdf PDF
Amendment 003.pdf PDF
Amendment 002.pdf PDF
Amendment 1.pdf PDF
Package 3.zip ZIP file
SOW Amendment 1.pdf PDF
S0100.pdf PDF
S0100 —
FA-S0501-1 ALT 2 SHEET 12 OF 29.PDF PDF
s0100.docx DOCX document
FA-S0501-1 ALT 2 SHEET 16 OF 29.PDF PDF
FA-S0501-1 ALT 2 SHEET 02 OF 29.PDF PDF
005_SMV2006_RCN06_2007-11.pdf PDF
S1205.pdf PDF
FA-S2201-1 Alt 1 Rudder Full.pdf PDF
PMC Sketch 1400.pdf PDF
FA-S0501-1 ALT 2 SHEET 11 OF 29.PDF PDF
FA-S0501-1 ALT 2 SHEET 04 OF 29.PDF PDF
AB133M-12-RB-0003.pdf PDF
FA-S6100-02.pdf PDF
005_SMV2006_RCN13_2010-07.pdf PDF
FA-S0501-1 ALT 2 MOLD LOFT OFFSETS FULL.PDF PDF
S4800-2.docx DOCX document
FA-S1101-2.pdf PDF
FA-S0501-1 ALT 2 SHEET 17 OF 29.PDF PDF
FA-S0501-1 ALT 2 SHEET 14 OF 29.PDF PDF
IEEE 45-2002.pdf PDF
FA-S0501-1 ALT 2 SHEET 13 OF 29.PDF PDF
FA-S0501-1 ALT 2 SHEET 03 OF 29.PDF PDF
FA-S0501-1 ALT 2 SHEET 25 OF 29.PDF PDF
005_SMV2006_RCN09_2008-07.pdf PDF
FA-S0501-1 ALT 2 SHEET 18 OF 29.PDF PDF
FA-S0501-1 ALT 2 SHEET 15 OF 29.PDF PDF
FA-S0501-1 ALT 2 SHEET 01 OF 29 MOLD LOFT OFFSETS.PDF PDF
FA-S0501-1 ALT 2 SHEET 09C OF 29 AFT.PDF PDF
FA-S0501-1 ALT 2 SHEET 06 OF 29.PDF PDF
9997-4.doc DOC document
FA-S0501-1 ALT 2 SHEET 09B OF 29 MID.PDF PDF
Fairweather SOW.pdf PDF
FA-S6700-23_Rev2.pdf PDF
FA-S4801-12.pdf PDF
FA-S0501-1 ALT 2 SHEET 10 OF 29.PDF PDF
005_Pt7SurveyAfterConstruction_2012-01.pdf PDF
FA-S0501-1 ALT 2 SHEET 27 OF 29.PDF PDF
S1901-4-1.pdf PDF
FA-S1905-8 Cathodic Protection System.pdf PDF
005_SMV2006_RCN08_2008-01.pdf PDF
FA-S0501-1 ALT 2 SHEET 21 OF 29.PDF PDF
FA-S0501-1 ALT 2 SHEET 29 OF 29.PDF PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006 1

RULES FOR BUILDING AND CLASSING

STEEL VESSELS UNDER 90 METERS (295 FEET)

IN LENGTH

NOTICE NO. 12 – November 2009

The following Rule Changes were approved by the ABS Rules Committee on 18 June 2009 and become EFFECTIVE AS OF 1 JANUARY 2010.

(See http://www.eagle.org for the consolidated version of the Rules for Building and Classing Steel Vessels Under 90 meters (295 feet) in Length 2006, with all Notices and Corrigenda incorporated.)

Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction, unless otherwise noted. (See 1-1-4/3.3 of the ABS Rules for Conditions of Classification (Part 1).)

PART 3 HULL CONSTRUCTION AND EQUIPMENT

CHAPTER 2 HULL STRUCTURES AND ARRANGEMENTS

SECTION 11 RUDDERS

11 Tapered Stock Couplings

(Revise Paragraph 3-2-11/11.3, as follows.)

11.3 Keyed Fitting (2010)

Where the stock is keyed, the key is to be fitted in accordance with the following:

i) The top of the keyway is to be located well below the top of the rudder.

ii) Torsional strength of the key equivalent to that of the required upper stock is to be provided.

iii) The effective shear area* of the key is not to be less than Ak, given below.

K

S md k Y

Y r

SA ⋅=

1.5 where

Ak = shear area of key; mm2 (in2) S = required upper stock diameter; mm (in.); as determined by 3-2-11/7.1 rmd = offered radius of tapered stock at mid length of the bearing surface of the key; mm (in.)

Notice No. 12 – November 2009

2 ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006

YS = specified minimum yield strength of keyway material; N/mm2 (kgf/mm2, psi)

YK = specified minimum yield strength of key material; N/mm2 (kgf/mm2, psi)

iv) In general, the key material is to be at least of equal strength to the keyway material. For keys of higher strength materials, shear and bearing areas of keys and keyways may be based on the respective material properties of the keys and the keyways, provided that compatibilities in mechanical properties of both components are fully considered. In no case, is the bearing stress of the key on the keyway to exceed 90% of the specified minimum yield strength of the keyway material.

* Note: The effective area is to be the gross area reduced by any area removed by saw cuts, set screw holes, chamfer, etc., and is to exclude the portion of the key in way of spooning of the key way.

PART 4 VESSELS SYSTEMS AND MACHINERY

CHAPTER 1 GENERAL

SECTION 1 CONDITIONS OF CLASSIFICATION OF MACHINERY

7 Machinery Plans and Data

(Revise Paragraph 4-1-1/7.9, as follows.)

7.9 Fire Safety (2010)

Arrangement and details of control station for emergency closing of openings and stopping machinery

Details and location of fireman’s outfits

Details of fire extinguishing appliances

Fire control plans (see 4-5-1/1.9)

Plans of the following systems:

• Fire main system

• Foam smothering system

• Fire detection systems

• Fixed gas extinguishing system

• Fixed water spraying system

Other fire extinguishing arrangements

For vessels 500 GRT and over, the most severe service condition for the operation of the emergency fire pump (e.g. lightest draft as shown in Trim and Stability Booklet, etc.), For vessels 500 GRT and over, calculations and pump data demonstrating that the emergency fire pump system can meet the operational requirements specified in 4-5-2/5.3.3 and 4-5-2/5.3.6 with the proposed pump location and piping arrangements (e.g. adequate suction lift, discharge pressure, capacity, etc.)

at the most severe service condition.

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006 3

CHAPTER 3 PROPULSION AND MANEUVERING MACHINERY

SECTION 1 PROPULSION SHAFTING

7 Design and Construction (2004)

7.1 Shaft Diameters (2010)

(Revise definition of “U”, as follows. Remainder of Paragraph 4-3-1/7.1 is unchanged.)

U = minimum specified ultimate tensile strength of the material, in N/mm2 (kgf/mm2, psi). For calculation purposes, U is not to be taken as more than the following:

= 415 N/mm2 (42.2 kgf/mm2, 60,000 psi) for carbon, and alloy steel tail shafts fitted with salt-water lubricated bearings and non-continuous shaft liners.

= 600 N/mm2 (61.2 kgf/mm2, 87,000 psi) for carbon, alloy and austenitic stainless steel tail shafts fitted with oil lubricated bearings or with continuous shaft liners or equivalent.

= 930 N/mm2 (95.0 kgf/mm2, 135,000 psi) for other shaft sections and for tail shafts manufactured of age-hardened martensitic stainless steels, higher-strength austenitic stainless steels such as ASTM Type XM-19, XM-21, or XM-28, or other high strength alloy materials.

CHAPTER 3 PROPULSION AND MANEUVERING MACHINERY

SECTION 3 STEERING GEAR

3 Materials

(Revise last paragraph of Paragraph 4-3-3/3.3, as follows.)

3.3 Material Testing (2010)

Except as modified below, materials for the parts and components mentioned in 4-3-3/3.1 are to be tested in the presence of the Surveyor in accordance with the requirements of Chapter 3 of the ABS Rules for Materials and Welding (Part 2).

Material tests for steering gear coupling bolts and torque transmitting keys need not be witnessed by the Surveyor.

Material tests for commercially supplied tie-rod nuts need not be witnessed by the Surveyor, provided the nuts are in compliance with the approved steering gear drawings and are appropriately marked and identified in accordance with a recognized industry standard. Mill test reports for the tie-rod nuts are to be made available to the Surveyor upon request. For all non-standard tie-rod nuts, material testing is required to be performed in the presence of the Surveyor.

4 ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006

Material tests for forged, welded or seamless steel parts (including the internal components) and all non-ferrous parts of rudder actuators that are under 150 mm (6 in.) in internal diameter need not be carried out in the presence of the Surveyor. Such parts are to comply with the requirements of Chapter 3 of the above referenced Part 2, or such other appropriate material specifications as may be approved in connection with a particular design, and will be accepted on the basis of presentation of mill certificates to the Surveyor for verification.

5 Design

(Revise Paragraph 4-3-3/5.1, as follows.)

5.1 Power Gear Stops (2010)

Power-operated steering gears are to be provided with arrangements, such as limit switches, for stopping the steering gear before the structural rudder stops (see 3-2-11/1.7) or positive mechanical stops within the steering gear are reached. These arrangements are to be synchronized with the rudder stock or position of the steering gear itself rather than with the steering-gear control system.

7 Hydraulic System (Replace existing text of Paragraph 4-3-3/7.3 with the following:)

7.3 Relief Valves (2010)

Relief valves are to be provided for the protection of the hydraulic system at any part which can be isolated and in which pressure can be generated from the power source or from external forces. Each relief valve is to be capable of relieving not less than 110% of the full flow of the pump(s) which can discharge through it. With this flow condition, the maximum pressure rise is not to exceed 10% of the relief valve setting, taking into consideration increase in oil viscosity for extreme ambient conditions.

The relief valve setting is to be at least 1.25 times the maximum working pressure (see 4-3-3/1.3.7), but is not to exceed the maximum design pressure (see 4-3-3/7.1).

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006 5

CHAPTER 4 PUMPS AND PIPING SYSTEMS

SECTION 3 BILGE AND BALLAST SYSTEMS AND TANKS

9 Vent Pipes

(Revise title and replace existing text of Paragraph 4-4-3/9.3 with the following:)

9.3 Height and Wall Thickness (2010)

9.3.1 Vents Exposed to Weather

Vent pipes on decks exposed to the weather are to have the following heights:

i) 760 mm (30 in.) for those on the freeboard deck; and

ii) 450 mm (17.5 in.) for those on the superstructure deck.

The height is to be measured from the deck to the point where water may have access below.

Where these heights may interfere with the working of the vessel, a lower height may be accepted, provided that the Bureau is satisfied that the closing arrangements and other circumstances justify a lower height.

The wall thicknesses of vent pipes where exposed to the weather are to be not less than that specified below. For vent pipes located on the fore deck, as defined in 3-2-14/11.7.1, the strength and wall thickness requirements are to also comply with 3-2-14/11.7.2 and 3-2-14/11.7.3:

Nominal Size, d Min. Wall Thickness d ≤ 65 mm (2.5 in.) 6.0 mm (0.24 in.)

65 mm (2.5 in.) < d < 150 mm (6 in.) by interpolation (1) d ≥ 150 mm (6 in.) 8.5 mm (0.33 in.)

Note:

1 6 + 0.029(d – 65) mm or 0.24 + 0.026(d – 2.5) in.

9.3.2 Vents not Exposed to Weather

Vent pipes not exposed to the weather need not comply with the height and wall thickness required by 4-4-3/9.3.1.

9.9 Vent Outlets

(Revise title and replace existing text of Subparagraph 4-4-3/9.9.2 with the following:)

9.9.2 Vent Closure (2010)

All vents terminating in the weather are to be fitted with return bends (gooseneck), or equivalent, and the vent outlet is to be provided with an automatic means of closure type i.e., close automatically upon submergence (e.g., ball float or equivalent), complying with 4-4-3/9.9.3.

6 ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006

11 Overflow Pipes (1998)

(Break Subsection 4-4-3/11 into Paragraphs and revise Paragraph 4-4-3/11.3, as follows.)

11.1 General Requirements

Overflow pipes discharging through the vessel’s side are to be located as far above the deepest load line as practicable and are to be provided with nonreturn valves located on the vessel’s side. Where the overflow does not extend above the freeboard deck, there is to be provided, in addition, an efficient and accessible means for preventing water from passing inboard. Such means may consist of another nonreturn valve located in an accessible position above the deepest load line.

Where it is impracticable to locate the inner valve in an accessible position, one nonreturn valve with positive means for closing from an accessible position above the freeboard or bulkhead deck will be acceptable, provided there are suitable arrangements to insure the valve not being closed by unauthorized persons and provided a notice is posted in a conspicuous place at the operating station to the effect that the valve is never to be closed, except as may be required in an emergency.

11.3 Overflows from Combustible and Flammable Liquid Tanks (2010) Overflow pipes from combustible and flammable liquid tanks are to be led to an overflow tank or to a storage tank with sufficient excess capacity (normally 10 minutes at transfer pump capacity) to accommodate the overflow. An alarm device is to be provided to give warning when the liquid reaches a predetermined level in the overflow tank. If a sight flow glass is also provided in the overflow pipe, then such sight glasses are to be fitted only in vertical sections of overflow pipes and be in readily visible positions.

11.5 Overflow Common Header

Where overflows from the tanks in more than one watertight subdivision are connected to a common header below the freeboard or bulkhead deck, the arrangement is to be such as to prevent fore-and-aft flooding of one watertight bulkhead subdivision from another in the event of damage.

CHAPTER 4 PUMPS AND PIPING SYSTEMS

SECTION 4 FUEL OIL AND LUBRICATING OIL SYSTEMS AND TANKS

1 Fuel Oil Piping Systems

(Add new Paragraph 4-4-4/1.9, as follows:)

1.9 Overflows from Combustible and Flammable Liquid Tanks (2010) For overflow pipes from combustible and flammable liquid tanks, see 4-4-3/11.3.

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006 7

CHAPTER 4 PUMPS AND PIPING SYSTEMS

SECTION 6 HYDRAULIC AND PNEUMATIC SYSTEMS

5 Pneumatic Systems (2005)

5.5 Pneumatic System Requirements

(Revise title and text of Subparagraph 4-4-6/5.5.2, as follows.)

5.5.2 Air Quality (2010)

5.5.2(a) General. Provisions are to be made to minimize the entry of oil or water into the compressed air system. Suitable separation and drainage arrangements are to be provided before the air enters the reservoirs.

5.5.2(b) Safety and Control Air Systems. For requirements regarding the quality of the air supplied to safety and control air systems, see 4-7-2/11.1.4.

CHAPTER 4 PUMPS AND PIPING SYSTEMS

SECTION 8 OTHER PIPING SYSTEMS AND TANKS

1 Fixed Oxygen-Acetylene Installations (2003)

1.5 Piping System Components

1.5.1 Pipe and Fittings

(Revise Item 4-4-8/1.5.1(b), as follows.)

1.5.1(b) Piping materials (2010). Materials for acetylene on the high-pressure side between the cylinders and the regulator are to be steel. Copper or copper alloys containing more than 65% copper are not to be used in acetylene piping (high or low pressure). Materials for oxygen on the high-pressure side are to be steel or copper. All pipes, both high- and low-pressure sides, are to be seamless.

8 ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006

CHAPTER 6 ELECTRICAL INSTALLATIONS

SECTION 1 GENERAL

(Revise 4-6-1/Table 4, as follows.)

TABLE 4

Primary Essential Services (2010)

(a) Steering gears

(b) Pumps for controllable pitch propellers

(c) (2010) Scavenging air blower, fuel oil supply pumps, fuel valve cooling pumps, lubricating oil pumps and cooling water pumps for main and auxiliary engines, turbines and shafting necessary for propulsion.

(d) Ventilation necessary to maintain propulsion

(e) Forced draft fans, feed water pumps, water circulating pumps, vacuum pumps and condensate pumps for steam plants on steam turbine ships, and also for auxiliary boilers on vessels where steam is used for equipment supplying primary essential services

(f) Oil burning installations for steam plants on steam turbine vessels and for auxiliary boilers where steam is used for equipment supplying primary essential services

(g) (2010) Low duty gas compressor and other boil-off gas treatment facilities supporting boil-off gas usage as fuel to main propulsion or electric power generation machinery.

(h) Azimuth thrusters which are the sole means for propulsion/steering with lubricating oil pumps, cooling water pumps, etc.

(i) Electrical equipment for electric propulsion plant with lubricating oil pumps and cooling water pumps

(j) Electric generators and associated power sources supplying primary essential equipment

(k) Hydraulic pumps supplying primary essential equipment

(l) Viscosity control equipment for heavy fuel oil

(m) Control, monitoring and safety devices/systems of equipment for primary essential services.

(Revise 4-6-1/Table 5, as follows.)

TABLE 5

Secondary Essential Services (2010)

(a) Windlass

(b) Fuel oil transfer pumps and fuel oil treatment equipment

(c) Lubrication oil transfer pumps and lubrication oil treatment equipment

(d) Pre-heaters for heavy fuel oil

(e) Starting air and control air compressors

(f) Bilge, ballast and heeling pumps

(g) Fire pumps and other fire extinguishing medium pumps

(h) Ventilating fans for engine and boiler rooms

(i) Services considered necessary to maintain dangerous spaces in a safe condition (inert gas system of an oil carrier, ventilation for Ro-Ro cargo spaces, etc.)

(j) (2010) Re-liquefaction plant on liquefied gas carriers

(k) Navigation lights, aids and signals

(l) Internal communication equipment required by 4-6-2/15

(m) Fire detection and alarm system

(n) Lighting system

(o) Electrical equipment for watertight and fire-tight closing appliances

(p) Electric generators and associated power sources supplying secondary essential equipment

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006 9

(q) Hydraulic pumps supplying secondary essential equipment

(r) Control, monitoring and safety systems for cargo containment systems

(s) Control, monitoring and safety devices/systems of equipment for secondary essential services.

(t) (2005) Ambient temperature control equipment required by 4-6-1/17.3

(u) (2010) Watertight Doors (see Sections 3-2-7, 3-2-12 and 3-2-13)

CHAPTER 6 ELECTRICAL INSTALLATIONS

SECTION 4 MACHINERY AND EQUIPMENT

(Revise Subsection 4-6-4/1, as follows.)

1 Plans and Data to Be Submitted (2010)

1.1 Rotating Machines of 100 kW and Over

For rotating machines of 100 kW and over intended for essential services (primary and secondary) or for services indicated in 4-6-4/Table 11, drawings showing the following particulars are to be submitted: assembly, seating arrangements, terminal arrangements, shafts, coupling, coupling bolts, stator and rotor details together with data for complete rating, class of insulation, designed ambient temperature, temperature rise, degree of protection for enclosures, weights and speeds for rotating parts. Plans to be submitted for generator prime movers are given in 4-2-3/1.5, 4-2-4/1.5 and 4-2-1/1.9 of the Steel Vessel Rules.

1.3 Switchboards, Distribution Boards, Controllers, etc.

For switchboards, distribution boards, battery charger units, uninterruptible power system (UPS) units, motor control centers, and motor controllers intended for essential services (primary and secondary) or for services indicated in 4-6-4/Table 11, drawings showing arrangements and details, front view, and installation arrangements are to be submitted for review together with data for protective device rating and setting, type of internal wiring, and size and rated current carrying capacity (together with short-circuit current data) of bus bars and internal wiring for power circuit. In addition, a schematic or logic diagram with a written description giving the sequence of events and system operating procedures for electrical power supply management on switchboards and sequential or automatic change-over of the motors are also to be submitted for review.

3 Rotating Machines

3.1 General

(Revise Subparagraph 4-6-4/3.1.1, as follows.)

3.1.1 Applications (2010)

All rotating electrical machines of 100 kW and over intended for essential services (see 4-6-1/3.3) or for services indicated in 4-6-4/Table 11 are to be designed, constructed and tested in accordance with the requirements of 4-6-4/3.

10 ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006

All other rotating electrical machines are to be designed, constructed, and tested in accordance with established industrial practices and manufacturer’s specifications. Manufacturer’s tests for rotating electric machines less than 100 kW for essential services or for services indicated in 4-6-4/Table 11 are to include at least the tests described in 4-6-4/3.3.1(b), regardless of the standard of construction The test certificates are to be made available when requested by the Surveyor. Acceptance of machines will be based on satisfactory performance test after installation.

3.3 Testing and Inspection

(Revise Subparagraph 4-6-4/3.3.1, as follows.)

3.3.1 Applications (2010)

3.3.1(a) Machines of 100 kW and Over. All rotating machines of 100 kW and over intended for essential services (see 4-6-1/3.3) or for services indicated in 4-6-4/Table 11 are to be tested in accordance with 4-6-4/Table 1 in the presence of and inspected by the Surveyor, preferably at the plant of the manufacturer.

3.3.1(b) Machines Below 100 kW. All rotating machines of less than 100 kW intended for essential services or for services indicated in 4-6-4/Table 11 are to be tested in accordance with 4-6-4/Table 1 (item 2 through item 10 and item 12). The tests may be carried out by the manufacturer whose certificate of tests will be acceptable and is to be submitted upon request from the Bureau.

3.3.1(c) Other Machines. For machines not intended for essential services or for services indicated in 4-6-4/Table 11, the tests may be carried out by the manufacturer whose certificate of tests will be acceptable and is to be submitted upon request from the Bureau.

7 Switchboards, Distribution Boards, Controllers, etc.

7.1 General

(Revise Subparagraph 4-6-4/7.1.1, as follows.)

7.1.1 Applications (2010)

Switchboards are to provide adequate control of the generation and distribution of electric power. The following equipment are to be constructed and tested in accordance with the following requirements to the satisfaction of the Surveyor.

7.1.1(a) Switchboards. Switchboards for essential services or for services indicated in 4-6-4/Table 11.

7.1.1(b) Motor Controllers. Motor Controllers of 100 kW and over intended for essential services or for services indicated in 4-6-4/Table 11.

7.1.1(c) Motor Control Centers. Motor control centers with aggregate loads of 100 kW or more intended for essential services or for services indicated in 4-6-4/Table 11.

7.1.1(d) Battery Charger Units and Uninterruptible Power System (UPS) Units. Battery charger units of 25 kW and over and uninterruptible power system (UPS) units of 50 kVA intended for essential services, services indicated in 4-6-4/Table 11, emergency source of power or transitional source of power.

7.1.1(e) Distribution Boards. Distribution boards associated with the charging or discharging of the battery system or uninterruptible power system (UPS) in 4-6-4/7.1.1(d).

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006 11

Switchboard, distribution board, battery charger units, uninterruptible power system (UPS) units, motor control centers and motor controllers not covered by the above paragraph are to be constructed and equipped in accordance with good commercial practice, and will be accepted subject to a satisfactory performance test conducted after installation to the satisfaction of the Surveyor.

7.3 Testing and Inspection

7.3.1 Applications

(Revise Items 4-6-47.3.1(a), 4-6-4/7.3.1(b), 4-6-4/7.3.1(c), and 4-6-4/7.3.1(d), as follows.)

7.3.1(a) Switchboards (2010). All switchboards intended for essential services or for services indicated in 4-6-4/Table 11, are to be tested in the presence of and inspected by the Surveyor, preferably at the plant of the manufacturer. For other switchboards, the tests may be carried out by the manufacturer whose certificate of tests will be acceptable and is to be submitted upon request from the Bureau.

7.3.1(b) Motor Controllers (2010). All motor controllers of 100 kW and over intended for essential services or for services indicated in 4-6-4/Table 11 are to be tested in the presence of and inspected by the Surveyor, preferably at the plant of the manufacturer. For other motor controllers, the tests may be carried out by the manufacturer whose certificate of tests will be acceptable and is to be submitted upon request from the Bureau.

7.3.1(c) Motor Control Centers (2010). All motor control centers with aggregate loads of 100 kW and over intended for essential services or for services indicated in 4-6-4/Table 11 are to be tested in the presence of and inspected by the Surveyor, preferably at the plant of the manufacturer. For other motor control centers, the tests may be carried out by the manufacturer whose certificate of tests will be acceptable and is to be submitted upon request from the Bureau.

7.3.1(d) Battery Charger Units, Uninterruptible Power System (UPS) Units, and Distribution Boards (2010). Battery charger units of 25 kW and over, uninterruptible power system (UPS) units of 50 kW and over, and distribution boards [associated with the charging or discharging of the battery system or uninterruptible power system (UPS)] are used for essential services (see 4-6-1/3.3), services indicated in 4-6-4/Table 11, emergency source of power (see 4-6-2/5), and transitional source of power (see 4-6-2/5.7) are to be tested in the presence of and inspected by the Surveyor, preferably at the plant of the manufacturer. For all other battery charger units, uninterruptible power system (UPS) units, and distribution boards, the tests may be carried out by the manufacturer whose certificate of tests will be acceptable and is to be submitted upon request from the Bureau.

7.3.1(e) Test Items. Tests are to be carried out in accordance with the requirements in 4-6-4/Table 5.

12 ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006

13 Cables and Wires

13.1 Cable Construction

(Revise Subparagraph 4-6-4/13.1.1, as follows.)

13.1.1 General (2010)

Electric cables are to have conductors, insulation and moisture-resistant jackets, in accordance with IEC Publication 60092-350, 60092-351, 60092-352, 60092-353, 60092-354, 60092-359, 60092-373, 60092-374, 60092-375, 60092-376, or IEEE Std. 45. Other recognized marine standards will also be considered. The tests may be carried out by the manufacturer whose certificate of tests will be acceptable and is to be submitted upon request from the Bureau.

Network cables are to comply with a recognized industry standard. Conductors are to be of copper and stranded in all sizes. Conductors are not to be less than the following in cross sectional size:

• 1.0 mm2 (1,973.5 circ. mils) for power and lighting,

• 0.5 mm2 (986.8 circ. mils) for control cables,

• 0.5 mm2 (986.8 circ. mils) for essential or emergency signaling and communications cables, except for those assembled by the equipment manufacturer, and

• 0.35 mm2 (690.8 circ. mils) for telephone cables for nonessential communication services, except for those assembled by the equipment manufacturer.

See 4-6-4/Table 10 for current carrying capacity for insulated copper wires and cables.

For electric cables in hazardous areas, the electric cable construction and the cable glands are to achieve the appropriate seal, such that gas can not migrate through the cable.

Note: See clause 3.16 and clause 4.6 of IEC 60092-350 concerning the provision of an extruded impervious inner sheath that will prevent the migration of gas through the cable.

(Add new 4-6-4/Table 11, as follows.)

TABLE 11

Additional Services Requiring Electrical Equipment to be Designed, Constructed and Tested to the Requirements in Section 4-6-4 [See 4-6-4/1, 4-6-4/3.1.1, 4-6-4/3.3.1, 4-6-4/7.1.1 and 4-6-4/7.3.1] (2010)

(a) Equipment necessary for specific class notations (Such as refrigerated cargo notations, dynamic positioning systems, etc.). See Note.

(b) Cargo Pump Motors (oil carriers, gas carriers, chemical carriers, liquefied gas carriers, etc.)

(c) Motors for hydraulic power unit for hydraulically driven cargo pump motors

(d) High duty gas compressors on liquefied gas carriers

Note: See 6-2-1/7 of the Steel Vessel Rules for refrigerated cargo notations and 4-3-5/15 of the Steel Vessel Rules for dynamic positioning notations.

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006 13

CHAPTER 7 SHIPBOARD AUTOMATIC OR REMOTE CONTROL AND

MONITORING SYSTEMS

SECTION 2 GENERAL SYSTEMS DESIGN AND ARRANGEMENT

REQUIREMENTS

5 Alarm Systems

(Revise Paragraph 4-7-2/5.9, as follows.)

5.9 Disconnection and Resumption of Alarm Functions (2010)

Alarm circuits may be temporarily disabled for maintenance purposes or during initial start-up of machinery, provided that such action is clearly indicated at the associated station in control. For ACCU fire alarm system, see 4-7-4/29.5.2.

11 Supply, Arrangement and System Protection of Automatic or Remote Control and Monitoring System

11.1 Supply and Arrangement

(Revise Subparagraph 4-7-2/11.1.4, as follows.)

11.1.4 Pneumatic (2010)

Compressed air for control and monitoring systems is to be supplied from at least two air compressors. The starting air system, where consisting of two air compressors, may be used for this purpose. The system is to be arranged such that a single failure will not result in the loss of air supply. The required air pressure is to be automatically maintained.

Means are to be provided to assure that the compressed air for control and monitoring systems is clean, dry and oil-free to a specification compatible with the control and monitoring equipment.

In this regard, the compressors, cooling equipment, filters and dryers are to be selected and arranged as necessary to ensure the quality of the air supplied will comply with the standards or criteria identified by the manufacturers of the pneumatic equipment being installed in the system (e.g., max. solid particle size/density, max. dew point, max. oil content, etc.).

Air supplies to safety systems and control systems may be derived from the same source, but are to be by separate lines incorporating shutoff valves.

14 ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006

CHAPTER 7 SHIPBOARD AUTOMATIC OR REMOTE CONTROL AND

MONITORING SYSTEMS

SECTION 4 VESSELS CLASSED WITH ACCU NOTATION

29 Arrangement and Monitoring of Machinery Space

(Revise Paragraph 4-7-4/29.5, as follows.)

29.5 Fire Detection and Alarm (2010)

29.5.1 General

The propulsion-machinery space is to be provided with a fixed fire detection and alarm system complying with Regulation II-2/14 of SOLAS 1974, as amended. This fixed fire detection and alarm system may be combined with other fire detection and alarm systems required onboard the vessel. The fire control panel is to be located on the navigation bridge or in the fire fighting station. If located in the fire fighting station, a repeater panel is to be fitted on the navigation bridge. Propulsion machinery space fire is to be alarmed in the centralized control station.

29.5.2 Temporarily Disconnecting Alarms

A fire detector loop or detector(s) covering the unattended machinery space may be temporarily disabled, for example, for maintenance purposes and such action is to be clearly indicated at the fire control panel and at the centralized control station described in 4-7-4/29.5.1. Disabled loop or detectors are to be reactivated automatically after a preset time period.

33 Firefighting Arrangements for Propulsion Machinery Space Fires

(Revise Subparagraphs 4-7-4/33.3.1, 4-7-4/33.3.2 and 4-7-4/33.3.5, add new Subparagraph 4-7-4/33.3.3, and renumber subsequent Subparagraphs accordingly, as follows.)

33.3 Fire-fighting Controls

Firefighting arrangements are to be provided with remote manual controls for the operations detailed in the following list. These controls are to be capable of being tested to the satisfaction of the Surveyor.

33.3.1 (2010) Stopping of ventilation fans serving the machinery-space. See 4-6-2/19.1.1.

33.3.2 (2010) Stopping of fuel oil, lubricating oil and thermal oil system pumps. See 4-6-2/19.1.2.

33.3.3 (2010) Stopping of forced and induced draft fans of boilers, inert gas generators and incinerators, and of auxiliary blowers of propulsion diesel engines. See 4-6-2/19.1.2.

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006 15

33.3.4 Closing propulsion-machinery space fuel oil tanks suction valves. (See 4-5-1/5.5).

33.3.5 (2010) Closing machinery-space skylights, openings in funnels, ventilator dampers and other openings.

33.3.6 Closing machinery-space watertight and fire-resistant doors.

33.3.7 Starting the emergency generator or connecting a source of emergency power, unless automatic operation is provided.

33.3.8 (2004) Operation of a fire pump located outside of the propulsion-machinery space, including associated valves necessary to deliver the required capacity to the fire main. However, valves located near the pump need not be provided with remote operation from the fire fighting station if they are kept locked open (LO) or closed (LC), as appropriate, to provide immediate water supply to the fire main. The position of the valves (open or closed) is to be clearly marked. Where the sea chest valve is located in the same compartment as the fire pump and the sea chest valve is kept locked open, a high-level bilge alarm is to be fitted in the fire pump space. If the sea chest is located in a different space than the compartment containing the fire pump, then a high-level bilge alarm is to be fitted in the fire pump space, as well as the compartment containing the sea chest, in order to detect possible flooding in each of these spaces. The high-level bilge alarm is to sound in the centralized control station.

33.3.9 Releasing of the fire-fighting media for the propulsion-machinery space. This release is to be manual and not initiated automatically by signals from the fire-detecting system.

16 ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006

(Add new rows A5 and B10, revise rows C1, C 2, and D3 of 4-7-4/Table 4A and add new Notes 13, 14, and 15, as follows. Remainder of Table and Notes are unchanged.)

TABLE 4A

Monitoring of Propulsion Machinery –

Slow Speed (Crosshead) Diesel Engines (See also 4-7-4/Table 3) (2010)

Item (11) Alarm

(1) Display

Automatic Start of Required

Standby Vital Auxiliary Pump with Alarm (1) Remarks (12)

Fuel Oil System

A5 (2010) Common rail fuel oil pressure – low x

Lube Oil System

B10 (2010) Common rail servo oil

C1 (2010) Lube oil inlet, pressure – low x See Note 13 Turbocharger

System C2 (2010) Lube oil outlet (each bearing), temperature – high x See Note 14

Piston Cooling

D3 (2010) Coolant outlet (each cylinder), flow – low x Automatic engine slowdown (2, 15)

Notes:

13 (2010) Unless provided with a self-contained lubricating oil system integrated with the turbocharger.

14 (2010) Where outlet temperature from each bearing cannot be monitored due to the engine/turbocharger design alternative arrangements may be accepted. Continuous monitoring of inlet pressure and inlet temperature in combination with specific intervals for bearing inspection in accordance with the turbocharger manufacturer’s instructions may be accepted as an alternative.

15 (2010) Where outlet flow cannot be monitored due to engine design, alternative arrangements may be accepted.

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006 17

(Add new rows A5, B6, and C2 to 4-7-4/Table 4B, revise Note 7, and add new Note 13, as follows.

Remainder of Table and Notes are unchanged.)

TABLE 4B

Monitoring of Propulsion Machinery –

Medium/High (Trunk Piston) Speed Diesel Engines (See also 4-7-4/Table 3) (2010)

Item (11) Alarm (1) Display

Automatic Start of Required

Standby Vital Auxiliary Pump with Alarm (1) Remarks (12)

Fuel Oil System

A5 (2010) Common rail fuel oil

Lube Oil

B6 (2010) Common rail servo oil

Turbocharger C2 (2010) Turbocharger oil temp., each bearing – high x Temp. See Note 13

Notes:

7 (2010) Unless provided with a self-contained lubricating oil system integrated with the turbocharger.

13 (2010) Where outlet temperature from each bearing cannot be monitored due to the engine/turbocharger design alternative arrangements may be accepted. Continuous monitoring of inlet pressure and inlet temperature in combination with specific intervals for bearing inspection in accordance with the turbocharger manufacturer’s instructions may be accepted as an alternative.

18 ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006

(Add new rows E6, F6, L1, and L2 to 4-7-4/Table 6B, as follows. Renumber existing Rows L1, M1, M2, N1, and N2 as M1, N1, N2, O1, and O2, respectively. Remainder of Table is unchanged.)

TABLE 6B

Instrumentation and Safety System Functions in Centralized Control

Station – Generator Prime Mover for Electric Propulsion (2010)

Systems Monitored parameters A D Auto start

Auto shut down

Notes [ A = alarm. D = display. x = apply. ]

Trunk Piston Type Diesel Engines

Fuel Oil

E6 (2010) Common rail fuel oil

Lubricating Oil

F6 (2010) Common rail servo oil pressure - low

L1 Turbocharger oil inlet pressure – low x Unless provided with a self-contained lubricating oil system integrated with the turbocharger

(2010) Turbocharger

L2 Turbocharger oil temp., each bearing – high x Where outlet temperature from each bearing cannot be monitored due to the engine/ turbocharger design, alternative arrangements may be accepted. Continuous monitoring of inlet pressure and inlet temperature in combination with specific intervals for bearing inspection in accordance with the turbocharger manufacturer’s instructions may be accepted as an alternative.

Engine M1 Over speed x x N1 Main x x Power

Supply N2 Emergency x O1 Pressure or flow – low x x Fuel Oil O2 Temperature – high and low (or viscosity – low and high) x x For heavy fuel oil.

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006 19

(Add new rows A3 and C3 to 4-7-4/Table 7, as follows. Remainder of Table is unchanged.)

TABLE 7

Monitoring of Auxiliary Prime-movers and Electrical Generators

(See also 4-7-4/Table 3) (2010)

Item Alarm (1)

Display Remarks

A1 Pressure, lube oil inlet – low x Pressure Automatic engine shutdown A2 Temperature, inlet – high x Temperature Lube Oil A3 (2010) Common rail servo oil pressure – low x

B1 Pressure or flow – low x Pressure, or flow

B2 Temperature, outlet – high x Cooling Medium

B3 Level, expansion tank – low x If separate from main system C1 Fuel oil leakage from pressure pipe x C2 Level, in fuel oil daily service tank – low x See also 4-7-4/25

Diesel Engine

Fuel Oil

C3 (2010) Common rail fuel oil

PART 5 SPECIALIZED VESSELS AND SERVICES

CHAPTER 9 FIRE FIGHTING VESSELS

SECTION 4 FIRE FIGHTING SYSTEMS

5 Prime Movers, Pumps and Piping for Water Monitors and Water Spray

(Revise title of Subsection 5-9-4/5, as shown above.)

(Revise Paragraph 5-9-4/5.3, as follows.)

5.3 Pumps (2010)

Where two pumps are provided, they are to have equal or near equal capacity. Minimum total pump capacity requirements are given in 5-9-1/Table 1. Pumps are to have piping arrangements that will prevent overheating at low pump delivery rates. For fixed water-spray systems, see 5-9-5/1. Pumps for the fire fighting systems are to be tested in accordance with 4-4-2/1, regardless of vessel tonnage.

20 ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006

(Add new Paragraph 5-9-4/5.9, as follows.)

5.9 Prime Movers (2010)

5.9.1 Internal Combustion Engines

Internal combustion engines of 100 kW (135 hp) and over that are associated with the fire fighting pumps are to comply with Part 4, Chapter 2 of the Steel Vessel Rules as applicable to engines intended for propulsion and for auxiliary services essential for propulsion, maneuvering and safety of the vessel.

5.9.2 Electric Motors

Electric motors of 100 kW (135 hp) and over that are associated with the fire fighting pumps are to comply with 4-6-4/3.

CHAPTER 10 VESSELS INTENDED FOR SUPPORT SERVICES TO OFFSHORE

INSTALLATIONS

APPENDIX 2 DAMAGE STABILITY GUIDELINES FOR OFFSHORE SUPPORT

VESSELS

(Revise Item i) of Subsection 5-10-A2/3, and add new Note 5, as follows.)

3 (2010)

The following damage assumptions are to be applied:

i) Damage is to be assumed to occur anywhere in the vessel’s length between transverse watertight bulkheads. The longitudinal extent of damage is:

a) 3 m (9.84 ft) plus 3% of the vessel’s length (L), when the length is greater than 43 m (141 ft)

b) 10% of the vessel’s length (L), when the length not is greater than 43 m (141 ft)

ii) The vertical extent of damage is to be assumed from the underside of the cargo deck, or the continuation thereof, for the full depth of the vessel.

iii) The transverse extent of damage is to be assumed as 760 mm (30 in.), measured inboard from the side of the vessel perpendicularly to the centerline at the level of the summer load waterline.

Note: 1. A transverse watertight bulkhead extending from the vessel’s side to a distance inboard of 760 mm (30 in.) or more at the level of the summer load line joining longitudinal watertight bulkheads is to be considered as a transverse watertight bulkhead for the purpose of the damage calculations.

2. If pipes, ducts or tunnels are situated within the assumed extent of damage, arrangements are to be made to ensure that progressive flooding cannot thereby extend to compartments other than those assumed to be floodable for each case of damage.

3. If damage of a lesser extent than that specified in 5-10-A2/3i), 5-10-A2/3ii) and 5-10-A2/3iii) results in a more severe condition, such lesser extent is to be assumed.

4. Where a transverse watertight bulkhead is located within the transverse extent of assumed damage and is stepped in way of a double bottom or side tank by more than 3.05 m (10 ft), the double bottom or side tanks adjacent to the stepped portion of the transverse watertight bulkhead is to be considered as flooded simultaneously.

ABS RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH . 2006 21

5. If the distance between adjacent transverse watertight bulkheads or the distance between the transverse planes passing through the nearest stepped portions of the bulkheads is less than the longitudinal extent of damage given in i), only one of these bulkheads should be regarded as effective.

6. For a vessel exclusively operating for well stimulation service, assumed damage occurs anywhere in the vessel’s length at any transverse watertight bulkhead.

APPENDIX 1 REQUIREMENTS FOR BUILDING AND CLASSING VESSELS

INTENDED FOR SERVICE IN DOMESTIC WATERS

3 Requirements Replaced with National Regulations

(Revise Paragraph 5-A1/3.1, as follows.)

3.1 Basic Construction (2010)

Section/Paragraph Requirement

3-2-4/1 Section 3-2-7, 5-10-2/3 3-2-7/7 Section 3-4-1 4-5-2/9, 4-5-2/11 & 4-5-3/3.1 4-6-2/5 5-10-3/5

Double Bottom Extra Bulkheads for Subdivision Watertight Door on W.T. Bulkhead Structural Fire Protection Fixed Fire Fighting System in Engine Room Emergency Generator Room Liquid Cargo Tank – Capacity Limit

Rules for Building and Classing Steel Vessels Under 90 meters (295 feet) in Length - Notice No. 12
PART 3: HULL CONSTRUCTION AND EQUIPMENT
Section 3-2-11: Rudders
PART 4: VESSELS SYSTEMS AND MACHINERY
Section 4-1-1: Conditions of Classification of Machinery
Section 4-3-1: Propulsion Shafting
Section 4-3-3: Steering Gear
Section 4-4-3: Bilge and Ballast Systems and Tanks
Section 4-4-4: Fuel Oil and Lubricating Oil Systems and Tanks
Section 4-4-6: Hydraulic and Pneumatic Systems
Section 4-4-8: Other Piping Systems and Tanks
Section 4-6-1: Electrical Installations - General
Section 4-6-4: Machinery and Equipment
Section 4-7-2: General Systems Design and Arrangement Requirements
Section 4-7-4: Vessels Classed with ACCU Notation
PART 5: SPECIALIZED VESSELS AND SERVICES
Section 5-9-4: Fire Fighting Systems
Appendix 5-10-A2: Damage Stability Guidelines for Offshore Support Vessels
Appendix 5-A1: Requirements for Building and Classing Vessels Intended for Service in Domestic Waters

/ASCII85EncodePages false /AllowTransparency false /AutoPositionEPSFiles true /AutoRotatePages /None /Binding /Left /CalGrayProfile (Dot Gain 20%) /CalRGBProfile (sRGB IEC61966-2.1) /CalCMYKProfile (U.S. Web Coated \050SWOP\051 v2) /sRGBProfile (sRGB IEC61966-2.1) /CannotEmbedFontPolicy /Error /CompatibilityLevel 1.4 /CompressObjects /Tags /CompressPages true /ConvertImagesToIndexed true /PassThroughJPEGImages true /CreateJobTicket false /DefaultRenderingIntent /Default /DetectBlends true /DetectCurves 0.0000 /ColorConversionStrategy /LeaveColorUnchanged /DoThumbnails false /EmbedAllFonts true /EmbedOpenType false /ParseICCProfilesInComments true /EmbedJobOptions true /DSCReportingLevel 0 /EmitDSCWarnings false /EndPage -1 /ImageMemory 1048576 /LockDistillerParams false /MaxSubsetPct 100 /Optimize true

/OPM 1

/ParseDSCComments true /ParseDSCCommentsForDocInfo true /PreserveCopyPage true /PreserveDICMYKValues true /PreserveEPSInfo true /PreserveFlatness true /PreserveHalftoneInfo false /PreserveOPIComments true /PreserveOverprintSettings true /StartPage 1 /SubsetFonts true /TransferFunctionInfo /Apply /UCRandBGInfo /Preserve /UsePrologue false /ColorSettingsFile () /AlwaysEmbed [ true /NeverEmbed [ true /AntiAliasColorImages false /CropColorImages true /ColorImageMinResolution 300 /ColorImageMinResolutionPolicy /OK /DownsampleColorImages true /ColorImageDownsampleType /Bicubic /ColorImageResolution 300 /ColorImageDepth -1 /ColorImageMinDownsampleDepth 1 /ColorImageDownsampleThreshold 1.50000 /EncodeColorImages true /ColorImageFilter /DCTEncode /AutoFilterColorImages true /ColorImageAutoFilterStrategy /JPEG /ColorACSImageDict << /QFactor 0.15 /HSamples [1 1 1 1] /VSamples [1 1 1 1] /ColorImageDict << /QFactor 0.15 /HSamples [1 1 1 1] /VSamples [1 1 1 1] /JPEG2000ColorACSImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 /JPEG2000ColorImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 /AntiAliasGrayImages false /CropGrayImages true /GrayImageMinResolution 300 /GrayImageMinResolutionPolicy /OK /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 300 /GrayImageDepth -1 /GrayImageMinDownsampleDepth 2 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict << /QFactor 0.15 /HSamples [1 1 1 1] /VSamples [1 1 1 1] /GrayImageDict << /QFactor 0.15 /HSamples [1 1 1 1] /VSamples [1 1 1 1] /JPEG2000GrayACSImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 /JPEG2000GrayImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 /AntiAliasMonoImages false /CropMonoImages true /MonoImageMinResolution 1200 /MonoImageMinResolutionPolicy /OK /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 1200 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict << /K -1 /AllowPSXObjects false /CheckCompliance [ /None /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 /PDFXOutputIntentProfile (None) /PDFXOutputConditionIdentifier () /PDFXOutputCondition () /PDFXRegistryName () /PDFXTrapped /False

/CreateJDFFile false…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .