AB133F18RP0006_A0001.pdf
PDF 1 MB Posted
- Solicitation number
- AB133F18RP0006
About this file
Amendment A0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AB133F18RP0006_A0006.pdf | ||
| AB133F18RP0006_A0005.pdf | ||
| AB133F18RP0006_A0004.pdf | ||
| AB133F18RP0006_A0003.pdf | ||
| AB133F18RP0006_A0002.pdf | ||
| CBA-Observer_Services_AB133F18RP0006.pdf | ||
| AB133F18RP0006.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
See Attachment Page.
1 3
AB133F18RP0006A0001 DEC 08, 2017 NFFT5000-17-02092
AJ630031
WESTERN ACQUISITION DIVISION
CONTRACTS BRANCH
7600 SAND POINT WAY NE, SOU6
SEATTLE WA 98115-6349
See Block 6
AB133F18RP0006
NOV 30, 2017
See Schedule
Attachment Page
PAGE 2 OF 3 AB133F18RP0006A0001
AB133F18RP0006 AMENDMENT 0001
The following is a list of questions that the Government has received in response to the RFP. Similar questions have been combined and answered in one response.
1. Is the page limit inclusive of the title page, table of contents, list of figures, resumes, and letters of intent?
With regards to the page count of 20 pages, will the Table of
Contents, List of Tables and Figures, and Acronym list be included or excluded from the page count?
The page limit is inclusive of all items: tables, figures, title page, etc. However, resumes are not included in the page count.
2. Do the font type and size and line spacing restriction apply to graphics, tables, and figures? If not, what are the minimal font sizes and type we can use? In tables and charts, is it acceptable to single space the information and use 10-point font size to make them more compact and thereby improve their readability?
Offerors may use up to a minimum of 8-point font and single spacing for graphics, tables, and figures only.
3. Can the Draft Quality Control Plan be included in the appendices and be excluded from the page count?
The Draft Quality Control Plan is excluded to the page count and is limited to 20 pages. It must be typed, double-spaced, with one inch margins, using times new roman font, 12 font and printed, unreduced in size, on 8½" by 11" paper, not exceeding 20 pages, double-sided.
4. Page 108, Section E, (B), page 111 (ii) Can you confirm that proposals can be submitted via email and no hard copies are required?
The offeror shall submit 1 original, 1 copy, and 1 electronic copy via email for all requested volumes.
5. Page 53, 3rd paragraph. “ The contractor shall work a maximum of 4 hours per workday during the normal operating hours of the local facility, five (5) days per week.” We understand that the Government will monitor American Samoa fishing
Attachment Page
PAGE 3 OF 3 AB133F18RP0006A0001
activity and the Contractor will assist. Can you confirm that the Government is expecting a part-time coordinator to be based out of American Samoa?
The Government is not expecting a part-time coordinator. The referenced section is detailing shore side observer duties.
File details come from the government source that posted it.