A8+-+Air+Clearanc+SAP+Outline.docx
DOCX document 35 KB Posted
- Attached to
- Asbestos Abatement at the former Renville-Bottineau Memorial Hospital located in Mohall, ND (101 4th Ave SE)
- Solicitation number
- 303-23-012
- Issued by
- Renville County, Milton City, North Dakota
About this file
This document is a Sampling and Analysis Plan (SAP) prepared for the North Dakota Brownfields State Response Program to provide final asbestos air clearance at the former Renville-Bottineau Memorial Hospital located in Mohall, North Dakota. The SAP outlines the scope of work to conduct asbestos air sampling and analysis using Phase Contrast Microscopy (PCM) to detect any remaining airborne asbestos fibers after abatement activities. The objective is to ensure the containment area is properly cleaned before it is removed. The contractor must comply with all applicable regulations from the EPA, OSHA, and NIOSH, and the final air clearance criteria is 0.01 fibers per cubic centimeter.
The related state and local contract opportunity is for the asbestos abatement and proper disposal at the former Renville-Bottineau Memorial Hospital located in Mohall, North Dakota. The North Dakota Department of Environmental Quality is soliciting bids for this work, which is located in Renville County and the city of Milton. No additional details are provided regarding pricing, set asides, incumbents, funding sources, or contract term.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A7+-+NDDEQ+PCM+Clearance+Testing+June24.docx | DOCX document | |
| A1+-+Asbestos+and+Hazardous+Mat+Survey.pdf | ||
| A3+-+Building+Maps.pdf | ||
| A2+-+Site+Photographs.pdf | ||
| Renville+Bottineau+Hosp+Asbestos+IFB.docx | DOCX document | |
| A6+-+SFN17987.pdf | ||
| A5+-Guidline+12.pdf | ||
| A4+-+PSA.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAMPLING AND ANALYSIS PLAN
for
FORMER RENVILLE-BOTTINEAU MEMORIAL HOSPITAL
ASBESTOS FINAL AIR-CLEARANCE
Prepared by:
<enter date> Revision No. 1.0
Table of Contents
A. INTRODUCTION……………………………………………………………………………………………………………………..3
| A1. | Site Location | 3 |
| A2. | Health and Safety | 3 |
| A3. | Contaminants of Concern | 3 |
| A4. | Scope of Work | 4 |
| A5. | Project Objectives | 4 |
| B. | QUALITY ASSURANCE/CONTROL | 4 |
| B1. | Sampling Methods | 4 |
| B2. | Instrumentation | 4 |
| C. | REGULATORY CRITERIA | 4 |
| C1. | Asbestos | 5 |
| D. | REPORTING | 5 |
Attachments Attachment A: Site Map Attachment B: Phase Contrast Microscopy (PCM) Clearance Testing Attachment C: Copy of Consultant Sampling Instrument Certifications/Training (if applicable) Attachment D: Asbestos Sampling Instrument Calibration and Inspection Plan
A. INTRODUCTION
This Sampling and Analysis Plan (SAP) was prepared in accordance with and as part of the North Dakota Brownfields State Response Program (Program) Quality Assurance Project Plan (QAPP).
A1. Site Description Site Name: Former Renville-Bottineau Memorial Hospital Address: 101 4th Ave SE; Mohall, ND 58761 County: Renville Site Area: 23,100 Square Feet Latitude/Longitude: 48.7628, -101.5053 A2. Health and Safety <Name of Contractor> (contractor) is responsible for making sure all required certifications, depending upon the contaminates of concern, are up to date. Compliance with all Occupational Safety and Health Administration (OSHA) rules onsite and providing employees with the correct Personal Protective Equipment (PPE) are also the responsibility of the contractor.
A3. Contaminants of Concern The main contaminant of concern at this site as it relates to this SAP is air-borne asbestos fibers.
A4. Scope of Work Provide final Asbestos Air-clearance utilizing the Phase Contrast Microscopy (PCM) method for the entire building.
A5. Project Objectives The objective of asbestos continuous air-monitoring is to conduct sampling in order to detect air-borne asbestos fibers that may have escaped the containment area during asbestos abatement activities and to limit exposure air-borne asbestos fibers to people outside the containment area. The objective of asbestos final air-clearance is to conduct sampling in order to detect any remaining air-borne asbestos fibers that may not have been completely cleaned up in the containment area during asbestos abatement activities and to determine where additional cleaning may be required before the containment is removed.
B. QUALITY ASSURANCE/CONTROL
Contractor will conduct all sampling and reporting activities, as determined by the NDDEQ Bid request and Asbestos continuous air-monitoring and final air-clearance contract. Contractor will comply with any sample handling, quality control, and custody procedures required by the receiving laboratory.
B1. Sampling Methods Final Asbestos Air-clearance using the PCM method (see Attachment B).
<This air clearance contractor must follow this guidance for inspection, sampling, and sample analysis> B2. Instrumentation If instruments are needed for sampling the instrument(s) must be calibrated, deployed, operated, and maintained to avoid cross-contamination and to ensure reliable information is collected.
<describe sampling instruments used> <attach copy of Consultant Sampling Instrument Certifications/Training (if applicable) as attachment C> <attach Instrument Calibration and Inspection Plan (mandatory) for any sampling instrument used onsite as attachment D>
C. REGULATORY CRITERIA
The contractor must comply with all applicable government regulations with regards to asbestos air monitoring and air-clearance including all Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA), and National Institute for Occupational Safety and Health (NIOSH).
C1. Asbestos Laboratories that analyze asbestos samples must be certified by the National Institute of Standards and Technology (NIST) National Voluntary Laboratory Accreditation Program. All asbestos analysis must be conducted pursuant to the methods listed in NDAC 33.1-15-24; 40 CFR § 745.227; and 40 CFR § 763.87.
C2. Final Air Clearance Criteria The final air clearance criteria that must be made after all abatement and clean-up activities is 0.01 fibers per cubic centimeter (f/cc).
D. REPORTING
Final air clearance results for the site must be submitted to the NDDEQ Brownfields program within 48 hours of testing.