A6 Attachment 1 Schedule of Items.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 1158555
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items attachment for two separate Cibola National Forest roadwork contracts under solicitation number 1158555. The first schedule covers NFSR 10 in the Magdalena Ranger District with a total contract value of $103,631.60 and includes brushing and clearing obstructions (80 hours at $40/hour), dozer/blade work (12 hours at $400/hour), installation of a 10-gauge 60-inch diameter 35-foot long corrugated metal pipe culvert ($10,239.60), Class F and Class XX aggregate placement (280 tons at $92/ton and 72 tons at $85/ton respectively), Class B rip rap placement (196 tons at $172/ton), and mobilization costs of $23,000.
The second schedule encompasses Roads 547, 164, and 164Q road reconditioning on the Cibola National Forest and National Grasslands, Mount Taylor Ranger District, spanning 18.31 miles. The base contract includes road reconditioning (18.31 miles), culvert replacements (129 linear feet), and mobilization/bonding as a lump sum item. Three priced options are available: Option 1 covers aggregate surface course and shoulder stabilization with Gradation A subbase (60 tons) and Gradation C base aggregate (660 tons); Option 2 includes shoulder stabilization and culvert top cover with Gradation A aggregate (60 tons); and Option 3 provides road surface course with Gradation C aggregate (920 tons). Each option includes mobilization and bonding as a lump sum line item. Unit prices and total amounts for individual line items are not populated in the second schedule document, indicating this is a template awaiting pricing submission from contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 R3 Cibola NF & NG Roadwork Contract FY20-22 Schedule of Items
| Contractor: | From: | Cibola National Forest |
| Name: | 2113 Osuna Road NE | |
| Email: | Albuquerque, NM 87113-1001 | |
| Phone: |
| Contract Number: | |
| Item #: | Option #?: NFSR 10 Magdalena Ranger District |
| 19. | ||||||
| ITEM NO. | 20. | |||||
| SCHEDULE OF SUPPLIES/SERVICES OPTION #1 | 21. | |||||
| EST. QUANTITY | 22. | |||||
| UNIT | 23. | |||||
| UNIT PRICE | 24. TOTAL AMOUNT | |||||
| CNF & NG MAGDALENA DISTRICT NFSR 10 | ||||||
| PAYABLE SUB ITEM | ||||||
| 202 | Additional Clearing and Grubbing | |||||
| 202(1.1) | Brushing and clearing obstructions on road bed | 80 | Hour | 40 | $3,200.00 | |
| 303 | Road Work and Erosion Control Shaping | |||||
| 303(1.1) | Dozer/Blade | 12 | Hour | $400.00 | $4,800.00 | |
| 602 | Culvert Installation (includes bedding, equipment time, all associated pipe/hardware-including aprons and existing culvert removal/disposal costs) | |||||
| 602(1.1) | Install 10 gauge, 60" dia., 35' long CMP Culvert | 1 | Each | $10,239.60 | $10,239.60 | |
| 703 | Aggregate | |||||
| 703(1.1) | Class F Aggregate (Furnish, load, haul, and Place) | 280 | Ton | $92.00 | $25,760.00 | |
| 703(1.2) | Class XX Aggregate (Furnish, load, haul, and Place) | 72 | Ton | $85.00 | $6,120.00 | |
| 705 | Rock (Furnish, load, haul, and Place) | |||||
| 705(1.2) | Class B Rip Rap (Furnish, load, haul, and Place) | 196 | Ton | $172.00 | $33,712.00 | |
| 15101 | Mobilization | |||||
| 15101(1.1) | Mobilization for Option #? Items | 1 | All | $23,000.00 | $23,000.00 | |
| TOTAL | $ 103,631.60 |
Sheet2 Schedule of Items: Cibola National Forest Road 547, 164, 164Q Road Reconditioning
| Contractor: | From: | Cibola National Forest |
| Name: | 2113 Osuna Road NE | |
| Email: | Albuquerque, NM 87113-1001 | |
| Phone: |
Contract Number:
| BASE: NFSR 547, 164, and 164Q Road Reconditioning and Culvert Replacements | |||||
| ITEM NO. | SCHEDULE OF SUPPLIES/SERVICES | EST. QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| PAYABLE SUB ITEM | |||||
| 303 | Road Reconditioning | 18.31 | MILE | ||
| 602 | Culvert Replacements | 129 | LF | ||
| 15101 | Mobilization and Bonding | 1 | LUMP | ||
| TOTAL | |||||
| OPTION 1: NFSR 547 Aggregate Surface Courese and Shoulder Stabilization | |||||
| ITEM NO. | SCHEDULE OF SUPPLIES/SERVICES | EST. QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| PAYABLE SUB ITEM | |||||
| 301-1 | Gradation A (Subbase) Aggregate. | 60 | TON | ||
| 301-2 | Gradation C (Base) Aggregate | 660 | TON | ||
| 15101 | Mobilization and Bonding | 1 | LUMP | ||
| TOTAL |
| OPTION 2: NFSR 164 Shoulder Stabilization and Culvert Top Cover | |||||
| ITEM NO. | SCHEDULE OF SUPPLIES/SERVICES | EST. QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| PAYABLE SUB ITEM | |||||
| 301-1 | Gradation A (Subbase) Aggregate. | 60 | TON | ||
| 15101 | Mobilization and Bonding | 1 | LUMP | ||
| TOTAL |
| OPTION 3: NFSR 164Q Road Surface Course | |||||
| ITEM NO. | SCHEDULE OF SUPPLIES/SERVICES | EST. QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| PAYABLE SUB ITEM | |||||
| 301-2 | Gradation C (Base) Aggregate. | 920 | TON | ||
| 15101 | Mobilization and Bonding | 1 | LUMP | ||
| TOTAL |
TOTAL BASE + OPTIONS
File details come from the government source that posted it. Updated .