A5 PWS for Swagelok_Redacted.pdf
PDF 435 KB Posted
- Solicitation number
- N4523A26Q1330
About this file
This is a Performance Work Statement for Swagelok onsite orbital welder training to be provided to Puget Sound Naval Shipyard (PSNS) personnel. The contractor shall provide a one-time, five-day orbital welding training course scheduled for September 14-18, with attendee qualifications lasting six months after course completion. The contract is classified as non-personal services, meaning the government will not exercise direct supervision or control over contractor employees, though the contractor must ensure compliance with all PWS requirements.
The contractor is responsible for furnishing all personnel, equipment, supplies, facilities, transportation, tools, materials, and supervision necessary to conduct the training. Specific contractor-furnished items include welding materials and equipment such as cabling and mounts for operating the Swagelok orbital welder. The government furnishes no property, equipment, or services. The primary objectives are to familiarize PSNS employees with Swagelok orbital welder operation and to qualify all attendees to operate the equipment in accordance with ASME BVPC Section IX standards. The performance requirement specifies zero deviation from standard, with attendance by PSNS employees serving as the method of surveillance. The contract includes requirements for a designated contract manager with full authority to act on contract matters, and all contractor personnel must obtain badges and identify themselves as contractors to avoid creating an impression of government employment.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Swagelok Onsite Orbital Welder Training.
PART 1
GENERAL INFORMATION
1. GENERAL: This is a non-personal services contract to provide orbital welding training and qualification. The Government shall not exercise direct supervision or control over any contractor employees. Notwithstanding, contractor shall ensure employees comply with all requirements of this Performance Work Statement (PWS) and contract.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform orbital welding training and qualification as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: The Swagelok orbital welding program at PSNS is slowly being revived to be used in production work. With new engineers and technicians involved in the program, attending the Swagelok orbital welding training hosted by Swagelok Northwest will greatly benefit the Swagelok orbital welding program at PSNS.
1.3 Objectives:
• Familiarize the attendees on how to operate the Swagelok orbital welder.
• Qualify all attendees to operate the Swagelok orbital welder.
1.4 Scope: Attending the Swagelok orbital welding class.
1.5 Period of Performance: This will be a one-time, five-day course from September 14th to September 18th.
Once qualified, the qualification will last 6 months.
1.6 Quality Control: N/A
1.6.1 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.7 Location:
1.7.1 Place of Performance:
1.7.3 Recognized Holidays: Contractor is not required to perform services on federal holidays. The list of current federal holidays can be found here: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
In addition to the above listed holidays, Puget Sound Naval Shipyard is normally closed for all except necessary services during the week between Christmas Day and New Year's Day (curtailment). Necessary services/ frequencies for various facilities are noted on the detail sheets and work contracted for shall be performed during this period unless otherwise directed by the Contracting Officer. Exact number of closure days may vary from year to year. Actual requirements will be determined in advance of the closure. On site work performed by the Contractor for the Contractor's convenience during this time must also be specifically requested by the Contractor in writing and approved by the Contracting Officer in advance.
1.11 Contract Manager: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to execution of this contract.
1.11.1 Identification of Contractor Employees: All contractor personnel working in situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government officials. All contractor personnel on a government installation will be required to obtain and wear badges in the performance of this contract.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. COMMON DEFINITIONS: Per Clause 52.212-4(e), clause 52.202-1 is incorporated by reference to this contract.
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. None
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2. Materials: The Contractor shall provide the material needed to weld and operate the Swagelok orbital welder.
4.3. Equipment: The Contractor shall provide the cabling and mounts for operating the Swagelok orbital welder.
PART 5
SPECIFIC TASKS
5. SPECIFIC TASKS:
5.1. Basic Services: The contractor shall provide services for the training and qualification of the Swagelok orbital welder. Such as host PSNS employees at the to addend the orbital welder class.
File details come from the government source that posted it. Updated .