A5 51437078_CDRL A001-Contractor Preliminary Work Schedule.pdf

PDF 367 KB Posted

Attached to
Demineralizer-3 CU FT Federal contract opportunity
Solicitation number
N4523A25Q4106
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document is a Contract Data Requirements List (CDRL) Form DD 1423-1 for a Data Item A001 titled "Acquisition Support Documentation" with a subtitle of "Contractor Preliminary Work Schedule" for a 3 CU-FT Demineralizer system. The form is categorized under Management (MGMT) and is associated with a Naval Supply Systems Command solicitation (N4523A25Q4106).

Key details include requirements for the contractor to provide a preliminary work schedule in draft and final versions to the PSNS & IMF Contract Representative. The government will have 10 working days to evaluate and accept the draft proposal, with the contractor required to submit the draft copy of the preliminary work schedule for their projected delivery date prior to contract award. The form specifies distribution to PSNS & IMF Contract Representative (Code C238.0.2) with 1 draft and 1 final reproducible copy. The document was prepared on 2/20/24 and approved on 2/22/24.

View the file

Other files for this federal contract opportunity

Other files attached to Demineralizer-3 CU FT, newest first.
File Type Posted
DISTRO A_A5 51437078_DWG_M1217_REV D.pdf PDF
A5 51437078_CDRL A003-CERTIFICATE of AUTHORIZATION.pdf PDF
A5 51437078_CDRL A004-QUALITY CONTROL MANUAL.pdf PDF
A5 51437078_CDRL A006-LIFT LUG MATL TEST REPORT_REV1.pdf PDF
A5 51437078_CDRL A007-SKETCH_WELD MAP_FILM-REVIEW FORM_REV1.pdf PDF
A5 51437078_CDRL A011-WEIGHT REPORT-REV1.pdf PDF
A5 51437078_CDRL A016-SDS FOR PAINT-REV1.pdf PDF
A5 51437078_CDRL A002-CONTRACTOR DOC REPORT.pdf PDF
A5 51437078_CDRL A012-HYDROSTATIC TEST REPORT_REV1.pdf PDF
A5 51437078_CDRL A019-COC.pdf PDF
A5 51437078_CDRL A008-LOAD TEST PLAN NDT PROCEDURE.pdf PDF
A5 51437078_CDRL A009-MATL TEST REPORT FOR ALL STARTING MATL_REV1.pdf PDF
A5 51437078_CDRL A018-PT INSPECTION REPORT FOR PT WELD_REV1.pdf PDF
C2 25Q4106_Solicitation_Demineralizer.pdf PDF
Vendor Information Sheet-FILL IN - RETURN.docx DOCX document
A5 51437078_CDRL A005-LIFT LUG DESIGN_SKETCH-CALCULATIONS_REV1.pdf PDF
A5 51437078_CDRL A010-REPORT FOR UG-120 DOCUMENTATION_REV1.pdf PDF
A5 51437078_CDRL A013-LIFTING LUGS TEST REPORT-REV1.pdf PDF
A5 51437078_CDRL A014-PRE-POST LOAD TEST VT REPORT_REV1.pdf PDF
A5 51437078_CDRL A015-PRE-POST LOAD TEST PT REPORT_REV1.pdf PDF
A5 51437078_CDRL A017-CONTRACTING DRAWING_REV1.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A001
title: ACQUISITION SUPPORT DOCUMENTATION*
sub: CONTRACTOR PRELIMINARY WORK SCHEDULE
auth: DI-MGMT-81607*
ref: SEE BLOCK 16*
req_ofc: PSNS&IMF CODE 2380.2
dd250: DD
appcode: N/A
dist: A
freq: ASREQ*
asof: N/A
firstsub: ASREQ*
subsub: N/A
addressee1: PSNS&IMF C/2380.2*
draft1: 1
reg1: 1
repro1: 0
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 1
total_reg: 1
total_repro: 0
remarks: BLOCK 2: THE CONTRACTOR SHALL PROVIDE DATA ASSOCIATED WITH SELECTED PORTIONS OF DI-MGMT-81607 (DID) IN CONJUNCTION WITH THE CONTRACT.

BLOCK 4: TAILORED DATA ITEM DESCRIPTION (DID) SHALL BE PROVIDED BY THE GOVERNMENT.

BLOCK 5: TECHNICAL SPECIFICATION PARAGRAPH 7.1 & 7.2.

BLOCK 10 & 12: FINAL COPY OF THE CONTRACTOR PRELIMINARY WORK SCHEDULE REPORT FOR THEIR PROJECTED DELIVERY DATE SHALL BE PROVIDED TO THE GOVERNMENT AFTER GOVERNMENT ACCEPTANCE OF THE DRAFT COPY. THE CONTRACTOR DRAFT PROPOSAL SHALL BE SUBMITTED PRIOR TO AWARD OF CONTRACT.

BLOCK 14: THE GOVERNMENT REQUIRES AT LEAST 10 WORKING DAYS FOR EVALUATION AND ACCEPTANCE OF THE DRAFT PROPOSAL. GOVERNMENT ACCEPTANCE OF THE DRAFT PROPOSAL FULFILLS THE CONTRACT REFERENCE REQUIREMENTS DELINEATED HEREIN.

• THE CONTRACTOR SHALL PROVIDE THE (DRAFT) COPY FOR THE PELIMINARY WORK SCHEDULE REPORT FOR THEIR PROJECTED DELIVERY DATE TO THE PSNS & IMF CONTRACT REPRESENTATIVE; THE GOVERNMENT WILL EVALUATE THE DRAFT PROPOSAL AND PROVIDE ACCEPTANCE / REJECTION VIA REPLY-TO-ALL WITHIN 10 WORKING DAYS OF RECEIPT.

• (FINAL) COPY SHALL BE SUBMITTED TO PSNS & IMF CONTRACT REPRESENTATIVE.

group:
total_price:
prep_name: Kyle Benza
line_item: TBD
exhibit: A
xtdp: Off
xtm: Off
othercat: MGMT
system: 3 CU-FT DEMINERALIZER
ctr_no: TBD
contr: TBD
remarksb:
Page2:
Reset:
2024-02-20T06:37:46-0800
BENZA.KYLE.D.1249735660
prep_date: 2/20/24
app_by:
2024-02-22T10:45:29-0800
MOLDER.DENNIS.RAY.JR.1156875500
app_date: 2/22/24
Page: 1
of_pages: 1
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .