This document is a Contract Price Schedule Template from the National Park Service (NPS) - Denver Service Center (DSC) for a solicitation to rehabilitate and update the Frozen Niagara Shelter at Mammoth Cave National Park.

The solicitation requires offerors to submit a price proposal conforming to the line items provided, including a base price and all optional line items. The line items cover demolition, substructure, shell, interiors, and site work including a temporary walkway. The total base price and total price for all options must be provided.

The related federal contract opportunity has a solicitation number of 140P5324R0015, a period of performance from 8/1/2024 to 4/28/2025, and an estimated construction value between $500,000 and $1,000,000. This is a 100% small business set-aside with a NAICS code of 238190 and 238990. The request for proposals is due by 7/25/2024 at 1pm EST, with a site visit scheduled for 7/10/2024 at 8am CT.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Price Schedule Template National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18

Solicitation Number:

PARK - PMIS: MACA 190350

(Project Management Information System)

Developed Area:

Project Title: Rehabilitate and Update the Frozen Niagara Shelter

Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.

Contract Line

Item Number

(CLIN)

Contract Line Item (CLI) Title Quantity Unit of Measure Unit Price Total Price

1 Frozen Niagara Shelter Demolition 1 Lump Sum

2 Substructure 1 Lump Sum

3 Shell 1 Lump Sum

4 Interiors 1 Lump Sum

5 Site+Temporary Walkway to Cave 1 Lump Sum

TOTAL BASE PRICE (Contract Line Item Number 1 through X) ---------------------------------------------------------------------------------

3 OPTION A, (CLI Title)

4 OPTION B, (CLI Title) -

5 OPTION C, (CLI Title) -

6 OPTION D, (CLI Title) -

TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3 through XX) -----------------------------------------------------------

TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through XX) --------------------------

All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.