This document is a set of Questions and Answers related to the MACA-REHAB FROZEN NIAGARA SHELTER federal contract opportunity, Solicitation Number 140P5324R0015. The key details are:

The Mammoth Cave National Park rehabilitation project involves upgrading an existing outdoor shelter area, including a new foundation, columns, metal roof, drainage system, natural stone veneer, and composite bench seating. Infrastructure improvements for bus traffic and pick-up/drop-off are also included. Environmental considerations focus on surface water management and maintaining cave access during construction. The period of performance is 8/1/2024 to 4/28/2025. This is a 100% Small Business set-aside, with a contract value estimated between $500,000 and $1,000,000. The contract type is Firm-Fixed Price Construction. The RFP closes on 7/25/2024 and a site visit is scheduled for 7/10/2024. The agency is the Department of the Interior National Park Service Southeast Region.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MACA-REHAB FROZEN NIAGARA SHELTER

140P5324R0015 – Amendment 1 Q&A

1. Question: Will a new price schedule be provided.

Answer: No.

2. Question: Can a copy of the site visit sign-in sheet be provided.

Answer: Sign-in sheet has been attached

3. Question: How will the "bat habitat protection" affect contract completion/start dates.

Answer: This will not be a factor for this project.

4. Question: Will a complete set of specifications be made available?

Answer: The specifications are included with the solicitation.

5. Question: Who's responsible for tree clearing?

Answer: The Contractor is responsible; the trees indicated on the drawings have already been approved to remove.

6. Questions: Are there any animal species affected with tree removal?

Answer: No

7. Question: (Sheet 19 - Material Schedule) The locally sourced sandstone is scheduled to match the visitor center. Is a local supplier or specification available?

Answer: We cannot dictate where the sandstone is purchased. However, KY Kolor Building Stone in Russellville, KY, has been used before. They can be contacted at (270) 726-0556. As you are aware, the sandstone must meet the specified standards.

8. Question: Is there a water standpipe close to the site or will water need to be trucked in?

Answer: Water will need to be trucked in as there is no available source at the site.

9. Question: Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?

Answer: No, they do not need to be separate individuals

10. Question: Can the period of performance be extended after award once the material lead times are confirmed due to current market conditions for the material for this project?

Answer: Yes, if necessary.