The file is a Schedule of Material Submittals for a boiler repair project at Jefferson Barracks Air National Guard Station. The document outlines a detailed submittal process for five key components: boiler, circulating pump and motor, hot water quality monitoring system, copper piping, and backflow preventer. Each item requires multiple documentation types including shop drawings, samples, manufacturer's recommendations, warranties, and technical data, with a standard submission timeline of 2 weeks after Notice to Proceed (NTP).

The related federal contract opportunity is a small business set-aside solicitation (W50S8K26RA001) issued by the Department of the Army Missouri Army National Guard for replacing a 1988 model hot water boiler in Building 290. The project involves installing a new high-efficiency condensing boiler, associated piping, valves, water treatment system, boiler controls, and pump motor replacement. The contract is valued at approximately $60,000, has a 60-calendar day completion timeline, and uses NAICS code 238220 with a small business size standard of $19 million. A pre-proposal conference and site visit is scheduled for 7 January 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER LTUY202129 PROJECT TITLE Repair Boiler B290 SOLICITATION / CONTRACT NO.

W50S8K26RA001

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

fergusog: Enter any comments pertaining to the submittal

1Boiler11111112 weeks after NTP
2Circulating Pump and Motor11111112 weeks after NTP
3HW Quality Monitoring System111111112 weeks after NTP
4Copper Piping1112 weeks after NTP
5Backflow Preventer111112 weeks after NTP

Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)