A22 21Q77 Stugeon Lk Scope of Work Attachments.pdf
PDF 14 MB Posted
- Solicitation number
- W912ES21Q0077
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A22 21Q77 Stugeon Lk RFQ number W912ES21Q0077.pdf | ||
| A22 21Q77 Stugeon Lk Scope of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENTS
Attachment 1 – ENG Form 4025, Submittal Transmittal Form
Attachment 2 – R45 Gradation Curve
Attachment 3 – Riprap Gradation Analysis Worksheet, Method A
Attachment 4 – Riprap Gradation Analysis Worksheet, Method B
Attachment 5 – Sample Submittal Register
Attachment 6 – USGS Diamond Bluff West Quadrangle Sheet
Attachment 1 – ENG Form 4025, Submittal Transmittal Form
ENG FORM 4025, MAY 2017 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2
U.S. Army Corps of Engineers (USACE)
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR
MANUFACTURER'S CERTIFICATES OF COMPLIANCE
For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.
DATE TRANSMITTAL NO.
SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)
TO:
PROJECT TITLE AND LOCATIONSPECIFICATION SEC. NO. (Cover only one section with each transmittal)
FROM: CONTRACT NO. CHECK ONE:
THIS TRANSMITTAL IS FOR: (Check one)
THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL OF
TRANSMITTAL
FIO GA DA CR DA/CR DA/GA
ITEM
NO.
(See
Note 3)
USACE
ACTION
CODE
(Note 9)
SUBMITTAL
TYPE CODE
(See Note 8)
NO.
OF
COPIES
SPEC.
PARA. NO.
DRAWING
SHEET NO.
CONTRACTOR
REVIEW
CODE
VARIATION
Enter "Y" if requesting a variation
(See Note 6)
DESCRIPTION OF SUBMITTAL ITEM
(Type size, model number/etc.)
a. i.c. d. e. f. g. h.b.
CONTRACT DOCUMENT
REFERENCE
REMARKS
SECTION II - APPROVAL ACTION
I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.
NAME OF CONTRACTOR SIGNATURE OF CONTRACTOR
NAME AND TITLE OF APPROVING AUTHORITY SIGNATURE OF APPROVING AUTHORITY DATEENCLOSURES RETURNED (List by item No.)
ENG FORM 4025, MAY 2017 Page 2 of 2
INSTRUCTIONS
1. Section I will be initiated by the Contractor in the required number of copies.
2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.
3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.
4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.
5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.
6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.
7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.
8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.
Submittal types are the following:
SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports
SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout
9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal
Action Codes in column i of Section I. The Submittal Action Codes are:
A -- Approved as submitted.
B -- Approved, except as noted on drawings. Resubmission not required.
C -- Approved, except as noted on drawings. Refer to attached comments.
Resubmission required.
D -- Will be returned by separate correspondence.
E -- Disapproved. Refer to attached comments.
10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.
F -- Receipt acknowledged.
X -- Receipt acknowledged, does not comply with contract requirements, as noted.
G -- Other action required (Specify)
K -- Government concurs with intermediate design. (For D-B contracts)
R -- Design submittal is acceptable for release for construction. (For D-B contracts)
Attachment 2 – R45 Gradation Curve
Attachment 3 – Riprap Gradation Analysis Worksheet, Method A
WORK SHEET FOR GRADATION ANALYSIS OF RIPRAP
METHOD A
Project Name: Date:
Riprap Type: Test No.
Source, Quarry, or Pit:
Sample Location: Test Made By:
Part 1. Weigh all stones larger than 5 pounds and record.
(1) PASSING WT. 5 lbs.
(2) RETAINED WT. 5 lbs. PAN
(3) ------- -------
(4) TOTALS
Rows (1) & (2) Enter 5 to 7 weight classes to yield approx. 75%, 50%, 30%, and 15% finer points.
Row (3) List weight of each stone. Attach additional sheets if necessary.
Row (4) Add all individual stone weights listed in each column.
Part 2. Summary Table.
(5) WEIGHT CLASSES (6) (7) (8)
PASSING RETAINED TOTAL WEIGHT CUMMULATIVE TOTAL PERCENT
(stone wt. (stone wt. EACH CLASS WEIGHT PASSING PASSING in lbs.) in lbs.) (lbs.) (lbs.) (%)
5 lbs.
5 lbs. PAN
SAMPLE TOTAL -------- --------
Column (5) Enter same weight classes used in Rows (1) and (2).
Column (6) Enter weights of material from Row (4) Column (7) Add column (6) from bottom up to get cumulative weight passing.
Column (8) Divide column (7) by sample total to get total percent passing.
Attachment 4 – Riprap Gradation Analysis Worksheet, Method B
WORK SHEET FOR GRADATION ANALYSIS OF RIPRAP
METHOD B
Project Name: Date:
Riprap Type: Test No.
Source, Quarry, or Pit:
Sample Location: Test Made By:
Part 1. Separate rock into 5 to 7 piles, ordered by size. The largest pile should contain 2 to 5 stones. Intermediate piles between the largest stones and those smaller than 5 pounds should be approximately equal in total weight. Separate all stones before weighing.
Part 2. Summary Table.
(1) WEIGHT CLASSES (2) (3) (4)
PASSING RETAINED TOTAL WEIGHT CUMMULATIVE TOTAL PERCENT
(stone wt. (stone wt. EACH CLASS WEIGHT PASSING PASSING in lbs.) in lbs.) (lbs.) (lbs.) (%)
5 lbs.
5 lbs. PAN
SAMPLE TOTAL -------- --------
Column (1) Weight the smallest and largest stone in each pile. If weight classes overlap, adjust stones as necessary and repeat.
Column (2) Weigh the total amount of rock in each pile and record.
Column (3) Add column (2) from bottom up to get cumulative weight passing.
Column (4) Divide column (3) by sample total to get total percent passing.
Attachment 5 – Sample Submittal Register
SUBMIT
APPROVAL
NEEDED BY
MATERIAL
NEEDED BY
A
C
T
I
O
N
C
D
E
DATE OF
ACTION
DATE
FWD
TO
APPR
AUTH/
DATE
RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A
C
T
I
D
E
DATE OF
ACTION
(a) (b) (c ) (d) (e ) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r )
Submittal Register 1.3.3 G
Material Source 2.2.1 G
Method of Processing Riprap 2.1.5 G
Gradation Test Results 2.4 G
Weighing Operation Plan 1.4.3 G
Delivery Tickets 1.4.2 G
Scale Accuracy Certification 1.4.1 G
Daily Delivery Report 1.4.2 G
Pre‐Delivery Site Survey 3.7 G
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SAMPLE SUBMITTAL REGISTER CONTRACT NO.
CONTRACTOR: TITLE AND LOCATION
Sturgeon Island Erosion Project ‐ Rock Supply
P
A
R
A
G
R
A
P
H
C
L
A
S
S
I
F
I
C
A
T
I
G
V
T
R
A
E
R
V
W
R
CONTRACTOR
SCHEDULE DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
S
P
S
C
T
DESCRIPTION
ITEM SUBMITTED
Attachment 6 – USGS Diamond Bluff West Quadrangle Sheet
564TH AVE
560TH AVE
AS
HB
OU
GH
R D
CO
R
D
QQ12
TH
ST
570TH AVE
TH
S T
RH
OD
A A
VE
490TH AVE
¬«35
¬«35
CO
R
D E
1220TH ST
1180TH ST
CH
AK
YA
ST
CO RD 54
470TH AVE
BU
FF
A L O
SL
OU
GH
TR
L
1130TH ST
TH
ST
218TH ST E
RE
SV
N
HW
Y
R AVENNA
TRL
WAKONADEDR
155TH AVENUE WAY
5T
H
AV
EN
UE
WA
Y
375TH AVE
200TH ST E
ST
AVE
OT
HE
R
DA
Y
RD
522ND AVE
¬«35
TH
ST
CO
B
LV
D
1050TH ST
¬«35
205TH ST E
HOLST RD
320TH AVE
CHURCH RD
468TH AVE
¬«35
RO
WA
N
AV
E
OL
D
D E
ER
FIE
LD
RD
FR
AZ
IER
ST
CO 18 BLVD
500TH AVE
478TH ST
497TH AVE
TH
AVE
5T
H S T
PRAIRIE ISLAND BLVD
TH
ST
1115TH ST
1208TH ST
435TH AVE
STURGEON LAKE RD
4T
H AVE
145TH AVE
1055TH ST
DAKOTA
CIR
290TH AVE
NSP RD
ED
OK
A
ST
HO
LM
QU
IST
R D
530TH AVE
CO
RD
190TH STREET WAY
550TH AVE
CROSS TOWN RD
£¤10
560TH AVE
566TH AVE
TH
ST
CO
RD
E
MISSISSIPPI NATIONAL
RIVER AND
RECREATION AREA
DAKOTA CO
DA KO TA CO
PIERCE CO
GOODHUE CO
PIERCE CO
GOODHUE CO
WISCONSIN
MINNESOTA
Hardy Run
Rattling Springs
Buffalo Slough
Wood Slough
Sharp Muskrat
Lake
Twin Lakes
.20 Reservoir
Mud Hen Lake
Big Rive r
Vermillion River
0.22 Reservoir
Sturgeon Lake
Lower Rattling
Springs Lake
Vermillion River Spring
Banks Lake
Ja ckson Run
Larson Lake
Mississippi River
W ind River
North Lake
W ind River
Carter Slough
Mississippi Riv er
Brewer Lake
Mississippi River
Miley Run
Bi g R iv e r
Upper Rattling Springs Lake
Mississippi River
Clear Lake
Prairie Island Cem
M o r g a n C o u l e e
RED WING
Eagle Point
Dry Run
Coul ee
Prairie Island
Stroms
Etter
4955000mN
4942000mN
21 22 23 24 25 26 27 2820 529000mE
21 22 23 24 25 26 27 28520000mE 29
44.6250°
44.7500° -92.7500° -92.6250°
44.7500°
44.6250°-92.6250°-92.7500°
4 2
117 10
T113N R15W
T113N R15WT113N R16W
T115N R16W
T114N R15W
T114N R16W
QUADRANGLE LOCATION
DIAMOND BLUFF WEST QUADRANGLE
WISCONSIN - MINNESOTA
7.5-MINUTE SERIES
DIAMOND BLUFF WEST, WI, MN
Expressway Local Connector
ROAD CLASSIFICATION
Ramp 4WD Secondary Hwy Local Road
Interstate Route State RouteUS RouteWX ./ H
U.S. DEPARTMENT OF THE INTERIOR
U.S. GEOLOGICAL SURVEY
This map was produced to conform with the National Geospatial Program US Topo Product Standard, 2011.
A metadata file associated with this product is draft version 0.6.18
CONTOUR INTERVAL 20 FEET
NORTH AMERICAN VERTICAL DATUM OF 1988
SCALE 1:24 000
1000 500 0 METERS 1000 2000
21KILOMETERS00.51
1 0.5 0
MILES
1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
FEET
Ø
GN
MN
0°13´
4 MILS
0°20´
6 MILS
UTM GRID AND 2019 MAGNETIC NORTH
DECLINATION AT CENTER OF SHEET
WK
Grid Zone Designation 15T
U.S. National Grid 100,000 - m Square ID
WISCONSIN
1 Prescott
8 Red Wing
2 River Falls West 3 River Falls East 4 Hastings 5 Diamond Bluff East 6 Miesville 7 Welch
ADJOINING QUADRANGLES
Imagery.....................................................NAIP, July 2017 - November 2017 Roads......................................... U.S. Census Bureau, 2015 - 2018 Names............................................................................GNIS, 1980 - 2018 Hydrography...............................National Hydrography Dataset, 2002 - 2018 Contours............................................National Elevation Dataset, 1998 - 2016 Boundaries..............Multiple sources; see metadata file 2016 - 2017 Public Land Survey System................................................BLM, 2015 - 2018 Wetlands.................FWS National Wetlands Inventory 2001 - 2010
North American Datum of 1983 (NAD83) World Geodetic System of 1984 (WGS84). Projection and 1 000-meter grid:Universal Transverse Mercator, Zone 15T
Produced by the United States Geological Survey
This map is not a legal document. Boundaries may be generalized for this map scale. Private lands within government reservations may not be shown. Obtain permission before entering private lands.
N
SN
N G
A R
EF
N
O
U S
G S
X
K b6edjru1 Inserted Text b6edjru1 Text Box Sturgeon Lake Boat Ramp b6edjru1 Line b6edjru1 Oval
File details come from the government source that posted it. Updated .