A21 W91QVN22R0087.pdf
PDF 542 KB Posted
- Attached to
- REPAIR CHAPEL, B #30
- Solicitation number
- W91QVN22R0087
View the file
Other files
| File | Type | Posted |
|---|---|---|
| H1 Drawing files _ 245448 _ Arch.pdf | ||
| H1 Drawing files _ 245448 _ Mech.pdf | ||
| H1 Drawing files _ 245448 _ Elec.pdf | ||
| H1 Drawing files _ 245448 _ Stru.pdf | ||
| H1 Drawing files _ 245448 _ Civil.pdf | ||
| H1 Drawing files _ 245448 _ Title.pdf | ||
| H3 Submittal Register _ 245448.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011757061-0001
a. This is a Non-Work Plan Task Order for the follow ing MA IDIQ Contractors only. Contract Number: W91QVN-18-D-0027, 0028, 0042, 0044, 0046 and 0050.
b. If the contractor is unable to submit the proposal in response to this RFP, the contractor shall submit the “No-offer letter” by closing date and time specif ied in the solicitation.
c. Project No. 245448
d. Title: Repair chapel, building No. 30
e. Location: Camp Bonifas, Korea
MR. SOK, HAN OL 315-755-3400
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
19-Apr-2022
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section F
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________03 May 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
HUMPHREYS CONTRACTING DIVISION
UNIT 15289
APO AP 96271-5584
UNITED STATES
W91QVN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W91QVN22R0087 30
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W91QVN22R0087
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Repair chapel, building No. 30
FFP
WORK CLASS: K
FOB: Destination
PURCHASE REQUEST NUMBER: 0011757061-0001
PSC CD: Z2FE
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Each Estimated Cost for War Hazard
FFP
is zero (0).
FOB: Destination
PSC CD: Z2FE
NET AMT
Section C - Descriptions and Specifications
TECHNICAL PROVISIONS - I
STATEMENT OF WORK
PROJECT NO TITLE LOCATION
245448 Repair chapel, building No. 30 Camp Bonifas
1. DESCRIPTION: The work to be performed to repair chapel, building No. 30 is described below and executed by one or more of the groups.
1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.
1.2. Work by In-House Labor: Not applicable to this project.
1.3. Work by Troop Labor: Not applicable to this project.
2. PRINCIPAL FEATURES: This project includes the following principal features:
2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.
2.1.1. Civil Work
2.1.1.1. Replace concrete sidewalk.
2.1.1.2. Replace concrete sidewalk with step.
2.1.1.3. Replace existing concrete curb with granite curb.
2.1.1.4. Restore carpet sodding with top soil.
2.1.1.5. Replace concrete open ditch with 0.6m width steel grating ditch.
2.1.1.6. Replace concrete open ditch with 0.3m width steel grating ditch.
2.1.1.7. Replace 3.5m width concrete step.
2.1.1.8. Fill earth and cover with land scape stone masonry with bushes to protect slope.
2.1.1.9. Fill earth and cover with free standing block.
2.1.1.10. Install 150mm x 150mm x 50mm tapping sleeve.
2.1.1.11. Connect existing water line to the building.
2.1.1.12. Install 50mm tapping valve with box.
2.1.1.13. Install 50mm gate valve with box.
2.1.1.14. Construct concrete encasement.
2.1.1.15. Construct one (1) sewer manhole and connect sewer line with 100mm diameter Polyvinyl Chloride (PVC) pipe.
2.1.1.16. Restore Asphalt Concrete (AC) surface course.
2.1.2. Architectural Work
2.1.2.1. Floor work
2.1.2.1.1. Replace existing floor tile with new Polyvinyl Chloride Tile (PVCT) including Vinyl Cove Base (VCB) as shown on floor plan and interior finish schedule. The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall have been corrected for new flooring. Provide leveling concrete for existing concrete slab with government approval.
2.1.2.1.2. Replace existing Ceramic Mosaic Tile (CMT) with new ceramic floor tile including cement bond coat, waterproof membrane, and mortar bed as shown on floor plans, section and details drawings.
2.1.2.2. Interior and exterior wall work
2.1.2.2.1. Replace existing wall panels and Concrete Masonry Unit (CMU) walls with new concrete wall (See Structural Work drawing), Exterior Insulation and Finish System (EIFS) and red brick walls including Gypsum Wall Board (GWB) wall, metal studs, metal channels, and insulations as shown on floor plans, sections and detail drawings.
2.1.2.2.2. Paint required all interior wall surfaces.
2.1.2.2.3. Replace existing Glazed Ceramic Wall Tile (GCWT, full height) with new including cement bond coats, water proof membrane, plastering w/metal lath and waterproof GWB as shown on floor plans and sections.
2.1.2.2.4. Paint all exterior walls including EIFS, metal, woods, concrete surfaces, and other components of exterior surf ace of the building as shown on floor plan, elevations and finish schedule.
2.1.2.3. Interior and exterior ceiling and roof work
2.1.2.3.1. Replace existing roof with new standing including seam metal roofing system and protected metal fascia and soffit including insulations under the bottom of the roof with fluted metal linings.
2.1.2.3.2. Replace existing ceiling with new acoustical ceiling tiles including metal suspension systems as shown on floor plans and interior finish schedule.
2.1.2.3.3. Replace existing ceiling with new GWB (Normal or water resistant) ceiling including ceiling suspension system as shown on floor plans and finish schedule.
2.1.2.3.4. Paint all interior ceiling surfaces as shown on interior finish schedule and section.
2.1.2.3.5. Paint all existing exterior exposed metal, woods, fascia and soffit as shown on floor plan and elevations.
2.1.2.3.6. Replace existing canopy with new protected metal canopy including protected metal rain gutters, downspouts and concrete splash block as shown on floor plans and elevations.
2.1.2.4. Miscellaneous work
2.1.2.4.1. Replace existing all doors and door frames with new including hardware sets as shown on new floor plan and door schedule.
2.1.2.4.2. Replace existing all windows with new including insect screen, window blinds and metal flashings as shown on floor plans and window schedule.
2.1.2.4.3. Replace existing fire extinguisher cabinets with new as shown on floor plan.
2.1.2.4.4. Replace existing all toilet accessories with new as shown on floor plans and detail drawings.
2.1.2.4.5. Repair by installation of projection screen and projector universal mount at chapel hall ceiling as shown on floor plan and interior elevations.
2.1.2.4.6. Replace existing interior and exterior signages with new as shown on elevations and signage schedule.
2.1.2.4.7. Remove Asbestos Containing Materials (ACM) at the ceiling of existing mechanical room area. (Transit board: approximately 1.5SM) Contractor shall submit U.S. Certificates for asbestos removal workers and technicians in accordance with OMA Section 02 82 14.00 10 Asbestos Hazard Control Activities.
2.1.3. Mechanical Work
2.1.3.1. Replace heating and cooling system with new Variable Refrigerant Flow (VRF) duct-free split heat pump indoor and outdoor units, electric wall mounted heaters, pipes, valves, insulations, controls, access doors, equipment support (concrete pad), and all associated accessories for Heating, Ventilating, and Air Conditioning (HVAC) system as shown on drawings. Remote controller indicators and labels shall be in English.
2.1.3.2. Replace ventilation system with new exhaust fans, energy recovery ventilator, controls, CO2 sensor, controller, diffusers, grilles, dampers, ducts, insulations, access doors, equipment support, and all associated accessories for HVAC system as shown on drawings.
2.1.3.3. 3. Perform Duct Air Leakage Test (DALT) and Testing, Adjusting, and Balancing (T.A.B) after construction to verify that the HVAC system works properly.
2.1.3.4. Replace plumbing system with new domestic cold and hot water piping system, sewer and vent piping system including plumbing fixtures, instantaneous water heater, electric water cooler, valves, water hammer arresters, control, access doors, and all associated accessories as shown on drawings.
2.1.4. Electrical Work
2.1.4.1. Replace existing lighting fixtures, exit lights, exterior lights, toggle switches wires and conduits with new.
2.1.4.2. Replace panel board, receptacles and cover plates wires and conduits with new.
2.1.4.3. Replace existing safety switches, wires and conduits for HVAC system with new.
2.1.4.4. Replace existing fire alarm control system with new addressable fire alarm control and mass notification system panel, building transmitter, antenna, lighting arrester, manual pull stations, smoke detectors and relay modules, visual signal strobes, microphone, speaker devices and associated wiring and conduit.
2.1.4.5. Replace existing Telephone Terminal Cabinet (TTC), equipment rack, telephone/data outlets, associated wire and conduit with new.
2.1.4.6. Replace existing cable TV distribution system, CATV outlets, and associated wiring and conduit with new.
2.1.4.7. Replace existing exterior power and telecommunication distribution line with new.
2.1.5. Structural Work
2.1.5.1. Replace existing concrete slab.
2.1.5.2. Replace existing concrete stoop.
2.1.5.3. Replace existing wall with 200mm thickness concrete wall and foundation.
2.1.5.4. Replace existing roof with steel column and beam and standing seam metal roofing.
2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.
None
TECHNICAL PROVISIONS - II
TECHNICAL DETAIL SPECIFICATIONS
GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION- 1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.
The Standard Technical Detail Specifications:
The work shall conform to the most current version of the listed standards/specifications below.
DIVISION 01 – GENERAL REQUIREMENTS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00.00 10 QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED
MATERIAL
02 65 00 UNDERGROUND STORAGE TANK REMOVAL
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS
MATERIALS
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 83 19.00 10 LEAD BASED PAINT HAZARD ABATEMENT, TARGET
HOUSING & CHILD OCCUPIED FACILITIES
DIVISION 03 – CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 – MASONRY
http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION-1.pdf http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION-1.pdf
04 20 00 MASONRY
DIVISION 05 – METALS
05 05 23 WELDING, STRUCTURAL
05 12 00 STRUCTURAL STEEL
05 21 23 STEEL JOIST GIRDER FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 50 14 STRUCTURAL METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 BITUMINOUS DAMPPROOFING
07 21 16 MINERAL FIBER BLANKET INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 41 13 METAL ROOF PANELS
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 – FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 22 36 LATH
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE, QUARRY TILE AND PAVER TILE
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 – SPECIALTIES
10 14 01 EXTERIOR SIGNAGE
10 14 02 INTERIOR SIGNAGE
10 28 13 TOILET ACCESSORIES
DIVISION 12 – FURNISHINGS
12 21 00 WINDOW BLINDS
12 36 00 COUNTER TOPS
DIVISION 22 – PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 16.16 BASE COURSE FOR RIGID AND SUBBASE COURSE FOR
PERVIOUS PAVING
32 11 16 SUBBASES FOR FLEXIBLE PAVING
32 13 17 COMPRESSION JOINT SEAL FOR CONCRETE PAVEMENTS
32 16 13 CONCRETE SIDEWALK AND CURBS AND GUTTERS
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
TECHNICAL PROVISIONS - III
SPECIAL CONDITIONS
1. Material Approval Submittal:
1.1. The contractor shall submit a shop drawing submittal schedule and the material approval request with all supporting documents to the COR within 7 days after receipt of NTP.
1.2. Attached list of materials in Appendix “B” shall be included in the shop drawing submittal schedule and material approval request.
2. Extended warranty - FAR 52.246-21
2.1. Extended warranty list
No. Warranty Item Description Warranty Period (Yrs)
Certification (Yes / No)
Warranty Tag (Yes / No)
Repair Time after call
1 SSMR Metal Roof Material 10 Y Y 7 Days
2 VRF Heat Pump Outdoor Unit Product 3 Y Y 24 Hrs
3 VRF Heat Pump Indoor Unit, various capacity Product 3 Y Y 24 Hrs
4 Energy Recovery Ventilator Product 3 Y Y 24 Hrs
5 LED Light Product 10 Y Y 7 Days
2.2. Contractor shall submit to COR the Warranty Certification with 4025 for the listed items.
2.3. Contractor shall submit to COR Warranty management plan and approve it before 30 days of pre-warranty conference. (OMA Sec 01 78 00)
2.4. Contractor shall have the Pre-Warranty Conference before Contract Close Date. (OMA Sec 01 78)
2.5. Warranty Information and Data
2.5.1. Contractor shall submit Warranty tag design, COR shall review and approve it for the listed and shall install it for the listed items. (OMA Sec 01 78 00)
2.5.2. Submit the O&M Manual with Manufacture’s instruction for DPW training. (OMA Sec 01 78 00)
3. Environmental Requirements in Contract
The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.
In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.
All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.
Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.
The responsibilities of all contractor personnel include:
(1) Comply with all applicable environmental laws, regulations and installation environmental policies.
(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention
Plan.
(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.
(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.
(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.
(6) Open burning is prohibited on the Government premises IAW installation environmental policy.
(7) Participate in installation’s recycling program.
(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office.
Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.
(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.
(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.
(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 180 dys. ANP 1 W1FD USA GARRISON RED CLOUD
W1FD USA GARRISON RED CLOUD
CAMP RED CLOUD
UIJEONGBU 11770
011-82-53-470-65
W582LE
0002 180 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
W582LE
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calendar days after notice to proceed (NTP) is issued.
• The time stated for completion shall include final cleanup of the premises.
(End of clause)
Section H - Special Contract Requirements
AT/FP TRAINING REQUIREMENTS OF CONTRACTOR
A. AT Level I training. This standard language is for contractor employees with an area of performance within as Army controlled installation, facility or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete AT Level I awareness training within 30 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil
B. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area.
Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
B-a. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
C. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
D. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
http://jko.jten.mil/
Section J - List of Documents, Exhibits and Other Attachments
LIST OF APPLICABLE CONTRACT DRAWINGS
GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD-DETAIL-DRAWINGS- FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.
Ring No. Sheet No. Description Date
1 T-1 TITLE SHEET 22 FEB 22
CIVIL
2 C-1 LOCATION PLAN 22 FEB 22
3 C-2 REMOVAL PLAN 22 FEB 22
4 C-3 SITE LAYOUT PLAN AND SCOPE OF WORK 22 FEB 22
5 C-4 UTILITY PLAN 22 FEB 22
6 C-5 LANDSCAPE STONE MASONRY 22 FEB 22
7 C-6 SEWER M/H 22 FEB 22
8 C-7 MISC. DETAILS -1 22 FEB 22
9 C-8 MISC. DETAILS - 2 22 FEB 22
10 C-9 MISC. DETAILS - 3 22 FEB 22
STRUCTURAL
11 S-1 GENERAL NOTES, DESIGN DATA AND TYPICAL
DETAILS
22 FEB 22
12 S-2 EXISTING'REMOVAL FLOOR PLAN 22 FEB 22
13 S-3 FOUNDATION/GROUND FLOOR PLAN 22 FEB 22
14 S-4 ROOF FRAMING PLAN 22 FEB 22
15 S-5 CROSS SECTION -1 22 FEB 22
16 S-6 CROSS SECTION - 2 22 FEB 22
17 S-7 WALL SECTION 22 FEB 22
18 S-8 DETAILS 22 FEB 22
ARCHITECTURAL
19 A-1 EXISTING /REMOVAL & NEW FLOOR PLAN, GENERAL
NOTES AND LEGEND
22 FEB 22
20 A-2 NEW ROOF PLAN, ELEVATIONS AND SCOPE OF
WORK
22 FEB 22
21 A-3 TYPICAL CROSS SECTIONS 22 FEB 22
22 A-4 INTERIOR ELEVATIONS (HALL AREA) 22 FEB 22
23 A-5 TOILET ENLARGED PLAN, DETAILS AND TOILET
ACCESSORIES SCHEDULE
22 FEB 22
24 A-6 TYPICAL EXTERIOR WALL SECTIONS AND DETAILS 22 FEB 22
25 A-7 TYPICAL WALL SECTIONS AND DETAILS 22 FEB 22
26 A-8 ROOF DETAILS 22 FEB 22
27 A-9 MISC. DETAILS -1 22 FEB 22
28 A-10 MISC. DETAILS - 2 22 FEB 22
29 A-11 INTERIOR, EXTERIOR FINISH SCHEDULE AND
MATERIAL & COLOR SCHEDULE
22 FEB 22
30 A-12 DOOR /WINDOW SCHEDULE, ELEVATIONS,
HARDWARE SCHEDULE AND NOTES
22 FEB 22
31 A-13 SIGNAGES PLAN, SCHEDULE AND DETAILS 22 FEB 22
MECHANICAL
32 M-1 LEGEND AND ABBREVIATION 22 FEB 22
33 M-2 GENERAL NOTES AND SCOPE OF WORK 22 FEB 22
34 M-3 EQUIPMENT SCHEDULES 22 FEB 22
35 M-4 NEW H.V.A.C. PIPING ENLARGED PLAN 22 FEB 22
36 M-5 NEW H.V.A.C. ENLARGED PLAN 22 FEB 22
37 M-6 NEW DOMESTIC WATER AND SEWER & VENT PIPING
ENLARGED PARl AL PLANS
22 FEB 22
38 M-7 MECH. DETAILS -1 22 FEB 22
39 M-8 MECH. DETAILS - 2 22 FEB 22
ELECTRICAL
40 E-1 LEGEND, GENERAL NOTES AND SCOPE OF WORKS 22 FEB 22
41 E-2 EXIST/NEW EXTERIOR ELECTRICAL LINE
DISTRIBUTION PLAN
22 FEB 22
42 E-3 NEW LIGHTING PLAN 22 FEB 22
43 E-4 LIGHTING FIXTURE DETAILS AND SCHEDULE 22 FEB 22
44 E-5 NEW POWER PLAN 22 FEB 22
45 E-6 NEW POWER & CONTROL PLAN FOR MECHANICAL
EQUIPMENT
22 FEB 22
46 E-7 NEW PANELBOARD "P" LOAD SCHEDULE AND
POWER SINGLE LINE DIAGRAM
22 FEB 22
47 E-8 NEW FIRE ALARM/MASS NOTIFICATION SYSTEM
PLAN
22 FEB 22
48 E-9 FIRE ALARM/MASS NOTIFICATION SYSTEM DIAGRAM 22 FEB 22
49 E-10 NEW LAN/TEL/CATV PLAN 22 FEB 22
50 E-11 TEL SYSTEM AND CATV SYSTEM RISER DIAGRAM 22 FEB 22
List of materials for Material Approval Submittal
Submittal Identification Description of Submittal
LC-1 Ready mixed concrete, S/12cm, 240 kg/cm2 LC-2 Hot mixed Asphalt Concrete #67 LC-3 Gravel for Base Course LC-4 Sand for Subbase Course LC-5 Prime Coat MC-1 LC-6 Tack Coat RC-3 LC-7 Form lumber LC-8 Reinforcing steel bar LC-9 Expansion joint LC-10 Wire mesh LC-11 Carpet Sodding LC-12 Steel grating 300mm x 995mm LC-13 Steel grating 600mm x 995mm LC-14 Granite Curb 200x300 LC-15 High land stone free standing (W150~450, H150, D225) LC-16 Manhole LC-17 Landscape Stone (Including labor cost) OC-1 PVC Pipe 100mm dia for Water Line OC-2 150MMX150MMx100MM TAPPING SLEEVE
OC-3 100MM TAPPING VALVE W/ BOX
LS-1 Ready Mixed Conc. 280kg/cm2
LS-2 FORM
LS-3 #8-150x150 WWF
LS-4 REBAR D13
LS-5 REBAR D16
LS-6 REBAR D19
LS-7 H-200x200x8x12 LS-8 H-200x200x6x9 LS-9 H-150x100x6x9
LS-10 C-250x90x9x13 LS-11 LC-200x75x25x4.0
LS-12 CWB
LS-13 VAPOR BARRIER(P.E. FILM, 0.1MM, 2PLY)
LS-14 BACKFILL
LS-15 JOINT SEALANTS
LS-16 Scaffolding LA-1 Red Brick, 0.5B LA-2 Vapor barrier, 0.1mm
LA-3 EIFS, PB System incl. meshes, EPS board, base/finish coat and control joint
LA-4 Copper flashing 0.8T LA-5 Waterproofing wall membrane LA-6 Waterproofing (bath room floor)
LA-7 Steel insulated thermal blast door with steel frame door size; 915W. X 2133H. X 44.5 Thk.
LA-8 Wood solid core single door w/frame, 19mm under cut door size; 812W. X 2133H. X
44.5 Thk.
LA-9 Wood full louver door with wooden frame;914W. X 2033H. X 44.5 Thk.
LA-10 Door stop and holder, Exterior type w/Conc, H9", 3"x3"
LA-11 Aluminum blast window thermal break type, sliding window, 1000x1000, 26.75thk Low-e insulated glass, insect screen
LA-12 Aluminum blast window thermal break type, sliding window, 600x600, 26.75thk Low-e insulated glass, insect screen
LA-13 Horizontal blinds, 1" aluminum slats LA-14 Metal stud, 0.8 mm x 45 mm x90 mm W/expansion bolt LA-15 Metal stud, 0.8 mm x 45 mm x50 mm W/expansion bolt LA-16 Metal runner, 0.8 mm x 45 mm x202 mm W/expansion bolt LA-17 Metal runner, 0.8 mm x 45 mm x92 mm W/expansion bolt LA-18 Metal runner, 0.8 mm x 45 mm x52 mm W/expansion bolt LA-19 Metal ceiling suspension system for GWB LA-20 Acoustical ceiling suspension system, aluminum LA-21 Gypsum board, 15mm thk x1,200 x2,400, normal LA-22 Gypsum board, 15mm thk x1,200 x2,400, water resistant or X LA-23 Gypsum board, 12mm thk x1,200 x2,400, fire rated LA-24 Acoustical tile, 600x600x16mm thk.
LA-25 Self leveling, Sika-Korea, Level-25, 6mm THK LA-26 Floor ceramic tile
LA-27 Epoxy joint grout motor for 300 x 300 CMT LA-28 Glazed ceramic wall tile with accessories LA-29 Epoxy joint grout motor for 300 x 600 GCWT LA-30 PVC tile, KCC Neo Sense, 450 x 450 x 3Thk LA-31 Vinyl cove base w/adhesive LA-32 Adhesive for flooring LA-33 Paint, MPI 57, varnish LA-34 Paint, MPI 11, acrylic emulsion, exterior LA-35 Paint, Anti-mold and mildew, latex, interior, KCC Supro home & wellbeing, EX8816 LA-36 Paint, MPI 94, enamel, exterior LA-37 Paint, MPI 79, primer for metal LA-38 Toilet partition 1600 x 900 LA-39 Urinal partition, 1200 x 430 LA-40 Toilet tissue dispenser, Double Roll, Horizontal Type LA-41 Paper towel dispenser with receptacle LA-42 Soap holder, recessed type LA-43 Mirror, 1050 x 850 with plywood back board LA-44 Mop rack with STS shelf LA-45 Robe Hook, SST cover with wood LA-46 Signage, interior room, BB2 LA-47 Toilet signage LA-48 Signage, exterior
LA-49 Lavatory Base Cabinet W/PL Finish & Solid Surface Material Counter Top 1300 x 650 x 860H
LA-50 Window trim, oak, 110W x 90W x 18Thk LA-51 Wooden chair rail, oak, 90W x 20Thk LA-52 Fire extinguish cabinet LA-53 Access door, 600x600 LA-54 Projector electric screen, 3048 x 2134 LA-55 Projector bracket LA-56 SSMR roof panel only with ridge & hip LA-57 Protected metal sheet soffit, V-115 LA-58 Protected metal sheet fascia, V-115 LA-59 Protected metal sheet flashing LA-60 Fiber glass, blanket w/VB. FG. 24K. 100mmThk LA-61 Vapor retarder 1.8m x 45m 0.15mm Thk LA-62 Rigid insulation, T=100, 4.57K.SM/W
LA-63 Self-adhesive air & vapor barrier membrane LA-64 Rain gutter, protect MET, 150 x 100H, 24GA W/accessories LA-65 Downspout, protect MET, 100 x 75, 24GA W/accessories LA-66 Splash concrete block
LA-67 Metal canopy w/protected metal roof, lining, rain gutter w/flashing.Wall hung type (C-100x50x20x3.2, GALV. STL & EXP. Bolt 12DIA)
OA-1 Exit device, type 3, F-08, lever type OA-2 Lockset, 1000-1, F-04, lever type OA-3 Door closer, C02021 OA-4 Hinge, butt, A5112, 114 x 114 (NRP) OA-5 Hinge, butt, A5112, 114 x 114 OA-6 Door holder L01381 OA-7 Door stop , L02161 OA-8 Push plate, J301 OA-9 Pull plate, J401 OA-10 Kick plate, J102 OA-11 Threshold, aluminum, 150W, SGL, J39190 OA-12 Threshold, aluminum, 150W, SGL, J32100 OA-13 Threshold, aluminum, 150W DBL, J12180 OA-14 Weather proof seal R0Y165 for head and jamb.
OA-15 Weather proof seal R0Y415 for bottom OA-16 Cement board with nail and adhesive, 12THK LM-1 VRF Heat Pump Outdoor Unit LM-2 VRF Heat Pump Indoor Unit LM-3 Energy Recovery Ventilator, various capacity LM-4 Pipe flexible cellular insulation w/adhesive, various size LM-5 Gate valves, various size LM-6 Balancing valve, various size LM-7 Y-joint, various size LM-8 Diffusers, various size LM-9 Registers, various size LM-10 Duct w/accessories, various size LM-11 Duct insulation w/accessories, various size LM-12 Volume dampers, various size LM-13 Pipe flexible connector LM-14 Water closets LM-15 Lavatories w/ faucet
LM-16 Urinal LM-17 Water hammer arrester, various size LM-18 Galvanized steel pipe with fittings & hangers, various size LM-19 Copper tube water line, including fittings & pipe hangers, various size LM-20 Vent thru roof LM-21 Cast iron soil pipe with coupling incl accessories, various size LM-22 P-trap, cast iron soil pipe, various size LM-23 Floor cleanouts, various size LM-24 Floor drains OM-1 Electric Wall Heater OM-2 Ceiling mounted exhaust fan OM-3 Instantaneous Water Heater, various capacity OM-4 Water Meter LE-1 Lighting fixture, exit sign stencil face LED, red lamp, LED lamp, type "NS-3" LE-2 LED lighting fixture, 45 Watt, recessed mounted, type "NS-4a & 4b", power unit LE-3 LED lighting fixture, 50 Watt, recessed mounted, type "NS-5a & 5b", power unit LE-4 LED lighting fixture, 22 Watt, wall mounted, type "NS-6", power unit
LE-5 LED lighting fixture, 18 Watt , wall mounted, type "NS-7", power unit (AC to DC), power unit, mirror top
LE-6 Elec manhole set LE-7 Fiber optic cable, 12 core LE-8 Dual Jack Outlet for "Telephone/LAN" system LE-9 UTP telephone cable, CAT6
LE-10 Electric wires various LE-11 Rigid steel conduit various LE-12 CATV cable Coaxial Cable, RG11/U, RG6/U LE-13 Shop drawing for fire alarm control system OE-1 Toggle switch, w/plate, 1P-20A-120VAC OE-2 3-way switch, w/plate, 1P-20A-120VAC OE-3 Duplex receptacle, w/plate, 2P-20A-125VAC, gnd. Type OE-4 Duplex receptacle, w/plate, 2P-20A-125VAC, GFCI Type & with "WP" type OE-5 Quadplex receptacle, w/plate, 2P-20A-125VAC, gnd. Type OE-6 Single receptacle, w/plate, 2P-20A-4W-250VAC, gnd. Type OE-7 Safety switch (Various type) OE-8 Smart Watt hour meter w/CTs
OE-9 TRANSIENT VOLTAGE SURGE SUPPRESSOR
OE-10 Panelboard "p"
OE-11 Addressable fire alarm/mass notification control panel OE-12 Addressable smoke detector OE-13 Combination fire alarm & MNS Speaker/Strobe OE-14 Combination fire alarm & MNS Speaker "WP" OE-15 Addressable heat detecter OE-16 Addressable manual pull station OE-17 Building transmitter OE-18 Coaxial cable, w/connector, type 1 and 2 OE-19 Cable TV Outlets w/screw-tight cover OE-20 Telephone terminal cabinet (TTC) OE-21 CATV Distribuition cabinet OE-22 Equipment rack(LAN)
Submittal Register
1. See separately attached Submittal Register in the file name of “H3 Submittal Register _ 245448.xls”.
2. The Submittal Register identifies the documentation that will be made available for approval and review by the Government in the performance of this task order. It is the contractor's responsibility that this data is in compliance with the corresponding OMA specification that is referenced.
Section K - Representations, Certifications and Other Statements of Offerors
52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)
(a) The offeror certifies that --
(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –
(i) Those prices,
(ii) The intention to submit an offer, or
(iii) The methods of factors used to calculate the prices offered:
(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and
(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.
(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --
(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or
(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);
(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and
(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision.
(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.
(End of Provision)
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services-- Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications- Commercial Products and Commercial Services. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.
(a) Definitions. As used in this provision-
Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to--
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.
115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to--
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services."
(d) Representations. The Offeror represents that--
(1) It [ ___ ] will, [ ___ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that--
It [ ___ ] does, [ ___ ] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.
(e) Disclosures.
(1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment--
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(ii) For covered services--
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment--
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(ii) For covered services--
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(End of provision)
52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION (OCT
2020)
(a) Definitions. As used in this provision, “covered telecommunications equipment or services” and "reasonable inquiry" have the meaning provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for…