W582LE1295N040

PROJECT: CY21 LCS, 260184, REPAIR BARRACKS, BUILDING No. 823, CAMP HOVEY, KOREA

THIS A NON-WORK PLAN TASK ORDER FOR THE FOLLOWING MATOC CONTRACTORS ONLY.

ONLY Proposals for this requirement are being solicited from the MATOC contractors for the follow ing MATOC contracts issued by 411th Contracting Support Brigade (CSB). Proposals from offerors other than these MATOC Contractors w ill not be considered for aw ard.

CONTRACT NO: W91QVN-18-D-0100,0102, 0104, 0105, 0106, 0110, 0111, 0112, 0134, 0135, 0137, 0138, 0139, 0141, 0142, 0143, 0145, and 0146.

A. Site Visit: Offerors w ho intend to propose on this solicitation are strongly encouraged to attend site visit. See site visit clause FAR 52.236-27 in Section L. Offerors are required to have a valid Korean Identif ication card w hen attending the site visit orientation.

B. This solicitation is conducted under the LCS program and w ill result in a contract betw een the Government of the Republic of Korea (ROK) and the contractor. ROK w ill directly pay the contractor. No appropriated funds of the United States (US) shall be obligated for payment due under this contract. See Section L, Instructions to Offerors, for submission requirements related to LCS solicitations.

SFC SHAW, AMETRIUS S. 315-755-0617

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

08-Dec-2021

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________SECTION F

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________21 Dec 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

HUMPHREYS CONTRACTING DIVISION

UNIT #15289

APO AP 96271

UNITED STATES

W91QVN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W91QVN22R0024 52

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W91QVN22R0024

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Repair Barracks, BLDG No 823, Camp Hovey

FFP

Work Class: (K) Project No. 260184, Repair barracks, building No. 823, Camp Hovey FOB: Destination

PURCHASE REQUEST NUMBER: W582LE1295N040

PSC CD: 5680

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Each War Hazard

FFP

Estimated Cost for War Hazard Losses is Zero (0).

FOB: Destination

PSC CD: 5680

NET AMT

Section C - Descriptions and Specifications

DESCRIPTIONS & SPECIFICATIONS

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

PROJECT NO TITLE LOCATION

260184 Repair barracks, building No. 823 Camp Hovey

1. DESCRIPTION: The work to be performed to repair barracks, building No. 823 is described below and executed by one or more of the groups.

1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications. This Request for Proposal (RFP) is being conducted under the Logistics Cost Sharing (LCS) program. The contractor must not use off-shore materials other than those approved by ROK MND for the work (See the attached list in APPENDIX “C”) without Government approval.

1.2. Work by In-House Labor: Not applicable to this project.

1.3. Work by Troop Labor: Not applicable to this project.

2. PRINCIPAL FEATURES: This project includes the following principal features:

2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.

2.1.1. Civil Work

2.1.1.1. Replace concrete sidewalk.

2.1.1.2. Replace existing concrete curb with granite curb.

2.1.1.3. Extend concrete sidewalk.

2.1.1.4. Replace Asphalt Concrete (AC) surface course.

2.1.1.5. Restore carpet sodding with top soil.

2.1.1.6. Paint 150mm thickness reflective white parking line.

2.1.1.7. Fill the gaps with joint sealant.

2.1.1.8. Replace 1.35m width concrete step with handrail.

2.1.1.9. Replace 1.8m width concrete step with handrail.

2.1.1.10. Replace 2.5m width concrete step with handrail.

2.1.1.11. Extend handrail.

2.1.2. Architectural Work

2.1.2.1. Floor work

2.1.2.1.1. Replace existing floor tile and rubber tile with new Polyvinyl Chloride Tile (PVCT) including Vinyl Cove Base (VCB) and Rubber Base (RB) as shown on new floor plan and interior finish schedule. The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall be corrected for new flooring. Provide leveling concrete for existing concrete slab with government approval.

2.1.2.1.2. Replace existing quarry tile including quarry tile base with new as shown on floor plans and interior finish schedule.

2.1.2.1.3. Replace existing Ceramic Mosaic Tile (CMT) with new ceramic floor tile including cement bond coat, waterproof membrane, and mortar bed as shown on floor plans, section and details drawings.

2.1.2.1.4. Replace existing concrete slab at corridor, each bath rooms, toilet, laundry, and mud room on 1st floor for mechanical sewer line works as shown on floor plan and mechanical drawings.

2.1.2.1.5. Apply epoxy coating with non-slip grits on existing floors as shown on floor plan and interior finish schedule.

2.1.2.2. Interior and exterior wall work

2.1.2.2.1. Replace existing all Gypsum Wall Board (GWB) wall board walls with new GWB wall (Normal, water resistant or 'X' type) including metal studs as shown on floor plans, sections and detail drawings.

2.1.2.2.2. Paint all existing interior walls including Concrete Masonry Unit (CMU), metal, concrete surfaces, stairway, hand rails, and guard rails as shown on floor plan, detail drawings interior finish schedule.

2.1.2.2.3. Paint all existing exterior walls including Exterior Insulation and Finish System (EIFS), CMU, metal, woods, concrete surfaces, stairwells, hand rails, guard rails, and other components (bicycle rack, trash bin, pump house, and pavilion) of exterior surface of the building as shown on floor plan, detail drawings and pictures.

2.1.2.2.4. Apply texture coating with plastering on wall and ceiling at dressing rooms, closets, lobby and corridors as shown on floor plans, elevations and interior finish schedule.

2.1.2.2.5. Replace existing Glazed Ceramic Wall Tile (GCWT, full height) with new including cement bond coats, water proof membrane, plastering w/metal lath and waterproof GWB as shown on floor plans and sections.

2.1.2.2.6. Replace existing pipe chases and pipe cover with new CMU, waterproof type GWB pipe chases and metal cover including access door in each room for new mechanical piping system as per floor plans, sections and detail drawing.

2.1.2.2.7. Remove existing Acoustical Wall Panel (AWP) and apply texture coat on new GWB in multi-purpose room, kitchen, lounge, and game room as shown on floor plan and interior finish schedule.

2.1.2.3. Interior and exterior ceiling and roof work

2.1.2.3.1. Replace existing ceiling with new acoustical ceiling tiles including metal suspension systems as shown on floor plans and interior finish schedule.

2.1.2.3.2. Replace existing ceiling with new GWB (Normal, water resistant or 'X' type) ceiling including ceiling suspension system as shown on floor plans and finish schedule.

2.1.2.3.3. Paint all interior ceiling surfaces as shown on interior finish schedule and section.

2.1.2.3.4. Paint all existing exterior exposed metal, woods, fascia, and soffit as shown on floor plan and elevations.

2.1.2.3.5. Apply acrylic fluid-applied waterproofing coating on existing roof as shown on floor plans and sections.

2.1.2.4. Miscellaneous work

2.1.2.4.1. Replace existing doors and door frames with new including hardware sets as shown on new floor plan and door schedule.

2.1.2.4.2. Replace existing windows including insect screen with new aluminum thermal breaker type windows including glass as shown on floor plans, elevations and window schedule.

2.1.2.4.3. Replace existing window horizontal mini blinds with new, fireproof type.

2.1.2.4.4. Replace existing wooden head, jamb and sill for all windows with new as shown on door/window schedule. (Natural color, oak)

2.1.2.4.5. Replace existing aluminum louver with new as shown on floor plans and louver schedule.

2.1.2.4.6. Remove Fire Extinguisher Cabinet (FEC) and block up the opening with cement plaster and metal lath as shown on floor plans.

2.1.2.4.7. Replace existing all toilet accessories with new as shown on floor plans and detail drawings.

2.1.2.4.8. Replace existing all access doors on wall and ceiling with new as shown on floor plan and enlarged floor plan.

2.1.2.4.9. Replace existing kitchenette with new including base cabinet and upper cabinet as shown on floor plan, elevation and detail drawings.

2.1.2.4.10. Replace interior and exterior signages with new for all rooms as shown on floor plan, elevations and signage schedule.

2.1.2.4.11. Replace existing metal shelf with mop rack with new in janitor room.

2.1.2.4.12. Replace existing gravel bed and concrete curb with new 100mm deep gravel bed including granite curb around building as shown on floor plan and detail drawing.

2.1.2.4.13. Replace existing trench covers, hooks, and hose bib with new, and checked metal cover at mud room as shown on floor plan and detail drawing.

2.1.2.4.14. Replace existing al grating covers with new for each vest as shown on floor plan and detail drawing.

2.1.2.4.15. Replace existing counter top and Stainless Steel (SST) shelves with new at laundry as shown on floor plan and detail drawing.

2.1.2.4.16. Replace existing iron board cabinet with new as shown on floor plan pictures and detail drawing.

2.1.2.4.17. Replace existing exterior and interior bulletin boards, card holder and flexi info with new as shown on floor plan, detail drawing and signage schedule.

2.1.2.4.18. Replace existing aluminum louvers with new as shown on floor plans and detail drawings.

2.1.2.4.19. Replace wooden shelf, SST rod, and drawer cabinet with new in each closet as shown on floor plan and details.

2.1.2.4.20. Replace existing fire rated access doors (1-1/2hrs) with new at laundry room and stairwell as shown on floor plans.

2.1.2.4.21. Replace existing wooden chair rails, wooden trims, and wooden hanger rails at each bed room, kitchen, lounge, and game room with new as shown on floor plans, elevations and detail drawings.

2.1.2.4.22. Replace existing vanity cabinets including wall hung cabinet with new in all dressing room as shown on new floor plans and detail drawing.

2.1.2.4.23. Replace existing concrete stoops with new as shown on floor plan.

2.1.2.4.24. Replace existing 18mm thickness plywood shelves including plastic laminate at each storage bin as shown on floor plans and elevations.

2.1.2.4.25. Replace existing SST splash guards with new as shown on floor plans and exterior elevations.

2.1.2.4.26. Replace existing removal guard rails at mechanical room with new as shown on floor plans, section, details and pictures.

2.1.2.4.27. Replace existing nonslip safety nosing w/abrasive surface at exterior stair - 2 & 3 as shown on floor plan and picture.

2.1.3. Mechanical Work

2.1.3.1. Repair Heating, Ventilating, and Air Conditioning (HVAC) system by replacing existing air handling units, heating and ventilating units, fan coil units, exhaust fans, range hood, pumps, expansion tank, air separator, air conditioning units, unit heater, ducts, louvers, diffusers, grilles, range hood, valves, dampers, pipes, insulations, control work, room thermostat, equipment support (concrete pad), and all associated accessories as shown on drawings. (Existing boiler excluded)

2.1.3.2. Provide new electrical unit heater and ceiling mounted exhaust fans for HVAC system as shown on drawings.

2.1.3.3. Perform Duct Air Leakage Test (DALT and Testing, Adjusting, and Balancing (TAB) after construction to verify if the HVAC system works properly.

2.1.3.4. Replace existing all dryer vent and caps with new.

2.1.3.5. Perform commissioning after construction to verify that the HVAC system is fully operational, such as equipments and controls.

2.1.3.6. Repair plumbing system by replacing domestic cold and hot water piping system, sewer and vent piping system including domestic hot water storage tanks, pumps, expansion tank, plumbing fixtures, electric water coolers, valve boxes for washing machines, valves, pipes, insulations, control work, equipment support, and all associated accessories as shown on drawings. (Existing domestic hot water heater excluded)

2.1.3.7. Replace existing automatic fire protection sprinkler system and all associated accessories for fire protection system as shown on drawings.

2.1.3.8. Pre-air leaking test is required prior to repair infiltration and sealing at mechanical room. Repair infiltration and seal air leaking portions including clearance between wall, ceiling and penetrators (duct, water piping, conduct pipe, and flue vent pipe) at mechanical room. Provide final-air leakage test report.

2.1.4. Electrical Work

2.1.4.1. Replace existing lighting fixtures, exit lights, exterior lights, toggle switches, 3-way switches, photocell, wires and conduits with new.

2.1.4.2. Replace existing receptacles and cover plates with new.

2.1.4.3. Replace existing safety switches, combination motor starters, magnetic motor starters, manual motor starters, junction boxes, control system, wires and conduits for HVAC system with new.

2.1.4.4. Replace existing fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector and relay module, visual signal strobes, microphone, speaker device, and associated wiring and conduit.

2.1.4.5. Remove and reinstall existing fire alarm building transmitter, antenna, lighting arrester and CO detectors with new wiring and conduit.

2.1.4.6. Replace existing telephone outlets and cover plates with new.

2.1.4.7. Replace existing CATV outlets and cover plates with new.

2.1.4.8. Remove/reinstall existing CCTV system, cameras, and LCD television. Replace CCTV wiring and conduit with new.

2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.

None

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA- SPECS_REVISION-1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.

The Standard Technical Detail Specifications:

The work shall conform to the most current version of the listed standards/specifications below.

DIVISION 01 – GENERAL REQUIREMENTS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00.00 10 QUALITY CONTROL

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED

MATERIAL

02 65 00 UNDERGROUND STORAGE TANK REMOVAL

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS

MATERIALS

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

02 83 19.00 10 LEAD BASED PAINT HAZARD ABATEMENT, TARGET

HOUSING & CHILD OCCUPIED FACILITIES

DIVISION 03 – CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 – MASONRY

04 20 00 MASONRY

DIVISION 05 – METALS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 14 00 FLUID-APPLIED WATERPROOFING

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 – OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

DIVISION 09 – FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 22 36 LATH

09 29 00 GYPSUM BOARD

09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 – SPECIALTIES

10 14 01 EXTERIOR SIGNAGE

10 14 02 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

DIVISION 12 – FURNISHINGS

12 21 00 WINDOW BLINDS

12 32 00 MANUFACTURED WOOD CASEWORK

12 36 00 COUNTERTOPS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 – PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS

23 52 00 HEATING BOILERS

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 – ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE

28 31 49 CARBON MONOXIDE DETECTORS

28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 – EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 11 16.16 BASE COURSE FOR RIGID AND SUBBASE COURSE FOR

PERVIOUS PAVING

32 11 16 SUBBASES FOR FLEXIBLE PAVING

32 12 11 BITUMINOUS SURFACE TREATMENT

32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 17 COMPRESSION JOINT SEAL FOR CONCRETE PAVEMENTS

32 16 13 CONCRETE SIDEWALK AND CURBS AND GUTTERS

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

TECHNICAL PROVISIONS - III

SPECIAL CONDITIONS

1. Material Approval Submittal:

(1) The contractor shall submit a shop drawing submittal schedule and the material approval request with all supporting documents to the COR within 14 days after receipt of NTP.

(2) Attached list of materials in Appendix “B” shall be included in the shop drawing submittal schedule and material approval request.

2. Extended warranty - FAR 52.246-21

2.1. Extended warranty list

Warranty Item Description Warranty

Period (Yrs) Certification (Yes / No)

Warranty Tag (Yes / No)

Repair Time after call

Acrylic fluid-applied proofing Installer 2 Y N 72 Hrs

Heating & ventilation Unit Product 3 Y Y 24 Hrs

Fan Coil Unit Product 3 Y Y 24 Hrs

Air Handling unit Product 3 Y Y 24 Hrs

LED Light-Interior Product 10 Y Y 7 Days

LED Light-Exterior Product 10 Y Y 7 Days

2.2. Contractor shall submit to COR the Warranty Certification with 4025 for the listed items.

2.3. Contractor shall submit to COR Warranty management plan and approve it before 30 days of pre-warranty conference. (OMA Sec 01 78 00)

2.4. Contractor shall have the Pre-Warranty Conference before Contract Close Date. (OMA Sec 01 78)

2.5. Warranty Information and Data

2.5.1. Contractor shall submit Warranty tag design, COR shall review and approve it for the listed and shall install it for the listed items. (OMA Sec 01 78 00)

2.5.2. Submit the O&M Manual with Manufacture’s instruction for DPW training. (OMA Sec 01 78 00)

3. The contractor shall have personnel on site for the sprinkler work and the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificates in Korea are the followings which are issued by the Human Resource Development Service of Korea. If the contractor doesn’t have personnel who are certified by NICET, the contractor shall have two personnel that one is certified for (1) and the other for (2) below.

(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)

(2) Engineer Fire Fighting Facilities - Mechanical (소방설비기사 -기계)

4. Environmental Requirements in Contract

The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.

In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.

All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.

Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.

The responsibilities of all contractor personnel include:

(1) Comply with all applicable environmental laws, regulations and installation environmental policies.

(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention Plan.

(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.

(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.

(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.

(6) Open burning is prohibited on the Government premises IAW installation environmental policy.

(7) Participate in installation’s recycling program.

(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office. Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.

(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.

(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.

(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.

4. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW

COVER SHEET

A. AT Level I training. This standard language is for contractor employees with an area of performance within as Army controlled installation, facility or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete AT Level I awareness training within 30 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil

B. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

B-a. For contractors that do not require CAC, but require access to a DoD facility or installation.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

C. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

D. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 180 dys. ANP 1 KIM, PYONG WON, 730-5444

CPBO, LRC-RC, 403RD AFSB, AREA 1

UNIT #15707, APO AP 96224-5707

W582LE

0002 180 dys. ANP 1 KIM, PYONG WON, 730-5444

KIM, PYONG WON, 730-5444

CPBO, LRC-RC, 403RD AFSB, AREA I

UNIT #15707, APO AP 96224-5707

KOREA, SOUTH

W582LE

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calendar days after Notice to Oriceed (NTP) is issued. The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

AUG 2020

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least not less then 50 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of clause)

5152.232-4028 – Funding of ROK MND Funded Contracts

FUNDING OF ROK MND FUNDED CONTRACTS

(a) Funding advisement: This contract, any modifications (including exercise of option(s)) thereto, and any delivery or task orders thereunder, shall be paid with ROK funds and shall cite “MOA Contract

- funded by ROK MND” (in lieu of citing appropriations and accounting data). No U.S. funds, appropriated or other, are or will be obligated under this contract.

(b) Limitation of US liability: The U.S. Government shall incur no liability, and no appropriated or other funds of the United States shall be obligated, for payment for services, supplies, claims, or other costs arising out of or under this contracts, delivery or service orders, exercises of options, or other modifications.

(c) Identification of invoices: Contractor shall state clearly “MOA Contract - funded by ROK MND” on all invoices for performance under contracts, delivery or service orders that are designated as “MOA Contract - funded by ROK

MND.”

(d) Funding carry-over:

(1) The Contractor will make every reasonable effort to obtain completion of all performance under the contract and to obtain, approve, and forward Contractor’s invoices under the contract before the end of the calendar year of the contract. In the event that any work initiated under the contract cannot be completed by the end of the calendar year, the Contractor shall furnish the Contracting Officer and USFK, ATTN: FKJ4-P-G, not later than 30 November, the following information:

(i) A list of work that apparently will not be completed and invoiced by, and apparently will require payments after, the end of the calendar year;

(ii) Estimated price of work that apparently will be carried beyond the calendar year; and

(iii) Date of anticipated completion of the work.

(2) The ROK MND shall seek mutually agreeable procedures for payment for work carried over to the next calendar year.

(e) Availability of ROK Funds for the Next Calendar Year:

(1) This contract is funded with calendar year ROK MND funds, from date of award through 31 December of the year in which the contract is awarded and/or into which the contract is extended. ROK MND funds are not available for performance, under this contract, beyond 31 December of the current contract’s calendar year period. Any obligation and/or legal liability on the part of ROK MND for the next calendar year’s performance, including exercise of any option to extend the services/contract, is contingent upon the Contracting Officer’s explicit notification to the Contractor of availability of that new calendar year’s ROK MND funds, from which contractual payment(s) can be made.

(2) Unavailability of ROK MND funds until a few months into the new calendar year may necessitate a break in performance of the contract until those funds become available. In the event of a break in performance because of unavailability of the new calendar year’s ROK MND funds for obligation under the contract, that break in performance shall not be deemed a breach or default of the contract.

5152.232-4030 – Payments of ROK MND Funded Contracts

PAYMENTS OF ROK MND FUNDED CONTRACTS

(a) Responsibility for Payment: The ROK Government shall make payment directly to the contractor for performance rendered and accepted under any contract part, or delivery or service order identified as “MOA contract

– funded by ROK MND.” Payments shall be made at the prices specified in the contract.

(b) Performance Certification and Contract Administration: The U.S. Government has sole authority to administer this contract. The U.S. Government, through its designated USFK official(s), has sole authority to inspect and accept goods and services and to determine the Contractor’s entitlement to payment under this contract. The administering U.S. Government Contracting Officer will resolve all disputes, claims, and appeals before certifying invoices for payment. Neither ROK MND nor ROK Defense Logistics Agency will pay any invoice or claim under this contract without prior U.S. Government certification.

(c) Payment for Partial Deliveries: Unless otherwise specified in this contract, payment shall be made on partial deliveries accepted by the U.S. Government, IF (1) the amount due on the deliveries warrants it, or (2) the Contractor requests it and the amount due on the deliveries is at least either the local currency equivalent of $1,000.00 or 50% of the total contract price.

(d) Invoices: An invoice is a written request for payment for supplies rendered. In order to be proper, an invoice must include as applicable the following:

(1) Invoice date;

(2) Name and address of contractor;

(3) Contract number or other authorization for supplies delivered or service performed (including order number and contract line item number);

(4) Description, quantity, unit of measure, unit price and extended price of supplies delivered or services performed;

(5) Shipping and payment terms (e.g. shipment number and date of shipment, prompt payment discount terms). Bill of lading number and weight of shipment will be shown for shipments on Government bills of lading;

(6) Name and address to which payment is to be sent (which must be the same as that in the contract or on a proper notice of assignment);

(7) Name, title, phone number and mailing address of person to be notified in event of a defective invoice; and

(8) Any other information or documentation required by other provisions of the contract (such as evidence of shipment).

(9) Invoices shall be prepared and submitted in five (5) copies (one copy of the invoice shall be marked “Original”) unless otherwise specified.

(e) Procedures for Payment by ROK MND:

(1) The Contractor shall forward to the Contracting Officer’s Representative (COR), for certification of inspection and acceptance, all invoices in five (5) copies.

(2) If the contractor doesn’t receive payment within 35 days of the government’s receipt of the invoices, the contractor should contact the COR.

(f) Payment Addresses:

ROK Ministry of National Defense Defense Logistics Agency (DLA) Seoul, Korea

5152.233-4008 – Choice of Law and Disputes under ROK MND Funded Contracts

CHOICE OF LAW AND DISPUTES, ROK MND FUNDED CONTRACTS

(a) This contract shall be construed and interpreted in accordance with the substantive laws of the United States of America. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with U.S.

law.

(b) All disputes arising under, or relating to, this contract shall be resolved under this clause.

(c) “Claim,” as used in this clause, means a written demand or written assertion by one of the contracting parties seeking, as a matter of right, the payment of money in a sum certain, the adjustment or interpretation of contract terms, or other relief arising under or relating to this contract. A claim arising under a contract, unlike a claim relating to that contract, is a claim that can be resolved under a contract clause that provides for the relief sought by the claimant; however, a written demand or written assertion by the Contractor seeking the payment of money exceeding $100,000 is not a claim under the clause until certified as required by subparagraph (d)(2) below. A voucher, invoice, or other routine request for payment that is not in dispute when submitted is not a claim under the clause. The submission may be converted to a claim under the clause, by complying with the submission and certification requirements of this clause, if it is disputed either as to liability or amount or is not acted upon in a reasonable time.

(d) The contractor shall have the right to submit to the Contracting Officer, disputes, demands, and/or claims, relating to or arising under this contract, only on the issue of whether the Government should and will certify performance, for payment by the ROK Government. The contractor shall not submit to the U.S. Government, nor will the Contracting Officer accept, any disputes, demands, or claims for compensation for work, which the U.S.

Government has certified as completed.

(e) Procedures

(1) A claim by the contractor shall be made in writing and submitted to the Contracting Officer for a written decision. A claim by the Government against the Contractor shall be subject to a decision by the Contracting Officer.

(2) For contractor’s claims exceeding $100,000, the contractor shall submit with the claim a certification that –

(i) The claim is made in good faith;

(ii) Supporting data are accurate and complete to the best of the contractor's knowledge and belief; and

(iii) The amount requested accurately reflects the contract adjustment for which the contractor believes the Government is liable.

(3) Individuals

(i) If the contractor is an individual, the certification shall be executed by that individual.

(ii) If the contractor is not an individual, the certification shall be executed by –

(A) A senior company official in charge at the contractor's plant or location involved; or

(B) An officer or general partner of the contractor having overall responsibility for the conduct of the contractor's affairs.

(f) For contractor’s claims of $100,000 or less, the Contracting Officer will, if requested in writing by the contractor, render a decision within 60 days of the request. For contractor-certified claims over $100,000, the Contracting Officer will, within 60 days, decide the claim or notify the contractor of the date by which the decision will be made.

(g) The Contracting Officer's decision shall be final unless the contractor appeals the decision within 30 days of the Contracting Officer's decision, to the Principal Assistant Responsible for Contracting (PARC). In the event that the contractor does appeal the decision of the Contracting Officer, the appeal shall be heard by and decided by the PARC and/or a panel of U.S. officials, chaired by the PARC. The decision of this panel shall be final.

(h) The contractor shall proceed diligently with performance of this contract, pending final resolution of any request for relief, claim, or action arising under the contract, and comply with any decision of the Contracting Officer.

(i) This contract is not subject to the Contract Disputes Act of 1978, as amended (41 U.S. Code, Sections 601-613).

Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with this local clause, 5152.233-4008.

Section J - List of Documents, Exhibits and Other Attachments

APPENDIX "A"

LIST OF APPLICABLE CONTRACT DRAWINGS

GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD- DETAIL-DRAWINGS-FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.

Ring No. Sheet No. Description Date

1 T-1 TITLE SHEET 19 OCT 21

2 T-2 TITLE SHEET 19 OCT 21

CIVIL

3 C-1 LOCATION PLAN AND GENERAL NOTES 19 OCT 21

4 C-2 REMOVAL PLAN 19 OCT 21

5 C-3 SITE LAYOUT PLAN AND SCOPE OF WORK 19 OCT 21

6 C-4 MISC. DETAILS 19 OCT 21

ARCHITECTURAL

7 A-1 1ST FLOOR PLANS AND GENERAL NOTES 19 OCT 21

8 A-2 2ND - 4TH FLOOR PLANS AND SCOPE OF WORK 19 OCT 21

9 A-3 ELEVATIONS AND SCOPE OF WORK 19 OCT 21

10 A-4 ELEVATIONS AND PICTURES 19 OCT 21

11 A-5 GENERAL SECTIONS 19 OCT 21

12 A-6 INTERIOR WALL SECTIONS-1 19 OCT 21

13 A-7 INTERIOR WALL SECTIONS-2 19 OCT 21

14 A-8 TYPICAL ENLARGED FLOOR PLANS 19 OCT 21

15 A-9 ENLARGED FLOOR PLANS AND FIRE RATED ACCESS

DOOR NOTES

19 OCT 21

16 A-10 INTERIOR ELEVATIONS-1 19 OCT 21

17 A-11 INTERIOR ELEVATIONS-2 19 OCT 21

18 A-12 INTERIOR ELEVATIONS-3 19 OCT 21

19 A-13 INTERIOR ELEVATIONS-4 AND DETAILS-1 19 OCT 21

20 A-14 DETAILS-2 19 OCT 21

21 A-15 DETAILS-3 19 OCT 21

22 A-16 DETAILS-4 19 OCT 21

23 A-17 DETAILS-5 19 OCT 21

24 A-18 KITCHEN CABINET DETAILS 19 OCT 21

25 A-19 CLOSET DETAILS 19 OCT 21

26 A-20 INTERIOR, EXTERIOR FINISH SCHEDULE AND

MATERIAL & COLOR SCHEDULE

19 OCT 21

27 A-21 DOOR, WINDOW & LOUVER SCHEDULE AND

HARDWARE SCHEDULE

19 OCT 21

28 A-22 DOOR, WINDOW & LOUVER ELEVATIONS, NOTES AND

DETAILS

19 OCT 21

29 A-23 SIGNAGES SCHEDULE 19 OCT 21

MECHANICAL

30 M-1 LEGEND & ABBREVIATION 19 OCT 21

31 M-2 GENERAL NOTES & SCOPE OF WORK 19 OCT 21

32 M-3 EQUIPMENT SCHEDULES - 1 19 OCT 21

33 M-4 EQUIPMENT SCHEDULES - 2 19 OCT 21

34 M-5 EXISTING AND REMOVAL MECHANICAL PLAN 19 OCT 21

35 M-6 NEW H.V.A.C PLAN (1st FLOOR), AIR DEVICE

SCHEDULE AND NOTE

19 OCT 21

36 M-7 NEW H.V.A.C PLAN (2nd - 3rd FLOOR) & EXHAUST

DUCT ISOMETRIC DIAGRAM AND NOTE

19 OCT 21

37 M-8 NEW H.V.A.C PLAN (4th FLOOR) AND NOTE 19 OCT 21

38 M-9 MECH. ROOM DUCT PARTIAL PLAN, LAUNDRY

EXHAUST DUCT PARTIAL PLAN, MECH. ROOM GAS

PIPING PLAN

19 OCT 21

39 M-10 NEW H.V.A.C PIPING PLAN (1st FLOOR) 19 OCT 21

40 M-11 NEW H.V.A.C PIPING PLAN (2nd - 3rd FLOOR) 19 OCT 21

41 M-12 NEW H.V.A.C PIPING PLAN (4th FLOOR) 19 OCT 21

42 M-13 MECH. ROOM PIPING PARTIAL PLAN, LAUNDRY &

MUD ROOM PLUMBING PIPING PARTIAL PLAN

19 OCT 21

43 M-14 NEW PLUMBING PIPING PLAN (1st FLOOR), NOTE ON

INSTALLATION OF PIPE INSULATION, DETAIL OF A

PIPE PASSING OVER A LIGHT FIXTURE AND NOTE

19 OCT 21

44 M-15 NEW PLUMBING PIPING PLAN (2nd FLOOR), NOTE ON

INSTALLATION OF PIPE INSULATION, WATER

HAMMER ARRESTER SCHEDULE PLUMBING FIXTURE

SCHEDULE AND NOTE

19 OCT 21

45 M-16 NEW PLUMBING PIPING PLAN (3rd FLOOR), NOTE ON

INSTALLATION OF PIPE INSULATION, AND NOTE

19 OCT 21

46 M-17 NEW PLUMBING PIPING PLAN (4th FLOOR), NOTE ON

INSTALLATION OF PIPE INSULATION, AND NOTE

47 M-18 BATH RM PLUMB. PIPING PARTIAL PLAN, LAUNDRY &

MUD ROOM PLUMBING PIPING ISOMETRIC DIAGRAM

19 OCT 21

48 M-19 BATH. RM. PLUMBING PIPING ISOMETRIC DIAGRAM 19 OCT 21

49 M-20 NEW FIRE PROTECTION PIPING PLAN (1st FLOOR) AND

NEW FIRE PROTECTION PIPING ENLARGED PARTIAL

PLAN (MECH RM)

50 M-21 NEW FIRE PROTECTION PIPING PLAN (2nd FLOOR)

AND AUTOMATIC FIRE SUPPRESSION GENERAL

NOTES

19 OCT 21

51 M-22 NEW FIRE PROTECTION PIPING PLAN (3rd FLOOR) AND

FIRE PROTECTION REQUIREMENTS

19 OCT 21

52 M-23 NEW FIRE PROTECTION PIPING PLAN (4th FLOOR), SPRINKLER Q'TY LIST AND NOTE

19 OCT 21

53 M-24 CONTROLS - 1 19 OCT 21

54 M-25 CONTROLS - 2 19 OCT 21

55 M-26 CONTROLS - 3 19 OCT 21

56 M-27 CONTROLS - 4 19 OCT 21

57 M-28 MECH ROOM AIR LEAKAGE TEST FLOW CHART AND

QUALIFICATION OF AIR LEAKAGE TESTING

19 OCT 21

58 M-29 MECH. DETAILS - 1 19 OCT 21

59 M-30 MECH. DETAILS - 2 19 OCT 21

60 M-31 MECH. DETAILS - 3 19 OCT 21

61 M-32 MECH. DETAILS - 4 19 OCT 21

62 M-33 FIRE DETAILS 19 OCT 21

ELECTRICAL

63 E-1 LEGEND, GENERAL NOTES AND SCOPE OF WORKS 19 OCT 21

64 E-2 NEW 1ST FL LIGHTING PLAN 19 OCT 21

65 E-3 NEW 2ND-4TH FL LIGHTING PLAN 19 OCT 21

66 E-4 LIGHTING FIXTURE DETAILS-1 19 OCT 21

67 E-5 LIGHTING FIXTURE SCHEDULE & LIGHTING FIXTURE

DETAILS-2

19 OCT 21

68 E-6 NEW 1ST FL POWER PLAN 19 OCT 21

69 E-7 NEW 2ND-4TH FL POWER PLAN 19 OCT 21

70 E-8 TYPICAL MODULE ELEC. PLAN-A & PLAN-B, MECH.

ROOM POWER & CONTROL PLAN

19 OCT 21

71 E-9 NEW 1ST FL FIRE ALARM/MASS NOTIFIACATION

SYSTEM PLAN

19 OCT 21

72 E-10 NEW 2ND-4TH FL FIRE ALARM/MASS NOTIFIACATION

SYSTEM PLAN

19 OCT 21

73 E-11 NEW FIRE ALARM/MASS NOTIFICATION SYSTEM

DIAGRAM

74 E-12 NEW 1ST FL CCTV/CATV/TEL PLAN 19 OCT 21

75 E-13 NEW 2ND-4TH FL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .