SOLICITATION W912PM23Q0027 - CONCRETE REPAIRS AT FALLS LAKE DAM, WAKE COUNTY, NORTH CAROLINA.
THIS SOLICITATION IS A REQUEST FOR QUOTE UNDER FAR PART 13 - SIMPLIFIED ACQUISITION PROCEDURES
THE MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $25,000.00 AND $100,000.00.
------------------- THIS IS A 100% SMALL BUSINESS SET ASIDE ------------------------
AWARD WILL BE MADE TO THE LOWEST PRICED, TECHNICALLY ACCEPTABLE OFFER.
NOTICE SECTION 00 45 00 - PROVISION 52.204-8, ANNUAL REPRESENTATIONS AND CERTIFICATIONS TO BE SUBMITTED VIA EMAIL WITH
QUOTE
REQUESTS FOR INFORMATION OR ANY QUESTIONS, MUST BE SUBMITTED BY 19 MAY 2023. 2:00 P.M. EST. REQUESTS FOR INFORMATION OR ANY QUESTIONS WILL NOT BE ACCEPTED AFTER 2:00 P.M. EST. ALL REQUESTS, QUESTIONS, AND QUOTE SUBMISSIONS SHALL BE VIA EMAIL DIRECTED TO BOTH DIANA.D.CURL@USACE.ARMY.MIL AND TROY.D.SMALL@USACE.ARMY.MIL.
QUOTES ARE DUE BY 2:00 PM, EST, MAY 26, 2023. SUBMIT YOUR QUOTES ELECTRONICALLY TO: DIANA.D.CURL@USACE.ARMY.MIL AND
TROY.D.SMALL@USACE.ARMY.MIL
DIANA D CURL (910) 251-4804
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
12-May-2023
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM
PAGE OF PAGES
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
910-251-4454FAX:TEL: 910-251-4711 TEL: FAX:
W912PM23Q0027 1 OF 63
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912PM23Q0027
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Repair Spalled Concrete in Intake -FFP
Repair Spalled Concrete in Intake Tower In accordance with the Statement of Work and specifications.
FOB: Destination
PSC CD: Z2KA
NET AMT
0002 1 Job Repair Spalled Concrete of Parapet -FFP
Repair Spalled Concrete of Parapet Wall
0003 1 Job Replace Joint Seal Material -FFP
Replace Joint Seal Material
TOTAL AMOUNTS
TOTAL AMOUNT OF LINE ITEMS 0001 – 0003 $___________________
STATEMENT OF WORK (SOW)
May 04, 2023
CONCRETE REPAIR,
FALLS DAM, WAKE COUNTY, NORTH CAROLINA
1.0 GENERAL:
The U.S. Army Corps of Engineers, Wilmington District requires a Contactor to perform concrete repairs for the Falls Project. The work will consist of three tasks: 1) repairing spalled concrete in the Intake Tower; 2) repairing spalled concrete on the parapet wall; and 3) replacing joint material in the parapet wall.
1.1 DESCRIPTION OF PROJECT:
Falls Lake Dam is a high hazard potential dam located in Wake County, North Carolina at 35°56'30" N, 78°34'58" W. The Dam is in the upper part of the Neuse River Basin one mile upstream from the village of Falls; approximately 10 miles north of Raleigh and 17 miles east-southeast of Durham. The main body of the reservoir is in Wake and Durham counties with some embankments extending into Granville County. Construction of the project was authorized by Public Law 88-298 enacted by Congress on 27 October 1965. The dam was constructed for the purpose of flood risk management, water supply, fish and wildlife enhancement, recreation, and augmentation of low flows to further pollution abatement and water quality control. The project consists of an earth embankment dam, an uncontrolled chute spillway, and a concrete outlet works. A construction contract was awarded in 1978, completed in 1981, and permanent impoundment began in 1983. Operations and Project’s personnel have recently raised concerns about degradation of the input towers concrete structure as well as the parapet wall that sits along the dam’s crest.
1.2 PERIOD OF PERFORMANCE:
The Period of Performance is 5 September 2023 through 23 May 2024. Work must be scheduled between 8:00AM and 4:30PM Monday through Friday excluding Federal Holidays. Any work performed outside this timeframe must be approved by the Government.
1.3 SAFETY:
The contractor is responsible for safeguarding the work site at all times. The contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. At the close of each workday, the contractor shall ensure all materials and equipment are locked and secure, and the worksite does not pose any potential hazards to the general public.
Applicable provisions of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, will govern all work performed under this task order. The safety manual may be found at:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM _385-1-1_2008_Consolidated.pdf?ver=2013-09-04-161030-210
Safety while at the project site will be in compliance with the Corps of Engineers Safety Manual EM 385-1-1. Use of appropriate safety equipment is mandatory and not limited to hard hats and safety-toe boots.
1.4 SECURITY:
1.4.1 ATOPSEC #1: General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts.
The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements;
all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations.
Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1_2008_Consolidated.pdf?ver=2013-09-04-161030-210 http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1_2008_Consolidated.pdf?ver=2013-09-04-161030-210 identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
1.4.2 ATOPSEC #2: Antiterrorism (AT) Level I Training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).
1.4.3 ATOPSEC #6: Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
1.4.4 ATOPSEC #9: Training requirements for the protection of sensitive information: All contract personnel with access to critical information (as identified in the RA's OPSEC Program) shall complete initial and annual refresher OPSEC Level I Awareness training, which is available at the following websites: https://www.iad.gov/ioss/, or http://www.cdse.edu/catalog/operations-security.html (websites subject to change). All contract personnel with access to Controlled Unclassified Information (CUI) shall complete initial and annual refresher CUI training in accordance with applicable Army policy.
1.4.5 ATOPSEC #13: Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.
1.4.6 ATOPSEC #14: Pre-screen candidates using E-Verify Program:
Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements.
Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/ eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
1.5 PRE-BID SITE VISIT
An organized site visit has been scheduled for 1100 EST 22 May 2023 Participants will meet at: Falls Dam Visitor Assistance Center Address: 11405 Falls of Neuse Rd, Wake Forest, NC 27614 POC: Mark Wilmes Telephone Number: 919-846-9332 x2226 Email Address: Mark.D.Wilmes@usace.army.mil
1.6 COORDINATION
The principal Wilmington District technical point of contact for this contract is the Contracting Officer’s Representative that will be specified at contract award.
Submittals shall be made to the Contracting Officer’s Representative. The Contractor shall designate a project manager who shall be the principal point of contact for the Wilmington District in administering this contract. The Contractor's project manager shall be responsible for all coordination to ensure the work is accomplished in a professional manner. Any directions given that are viewed by the Contractor as a change to the scope of work affecting contract fixed price and performance period shall be brought to the immediate attention of the Contracting Officer. Any errors, omissions, or conflictions with the scope of work and the work to be completed shall immediately be reported to the contracting officer.
1.7 AVAILABILITY AND USE OF UTILITY SERVICES
1.7.1 Temporary Utilities
Contractor shall provide temporary utilities required for construction.
Materials may be new or used, must be adequate for the required usage, not create unsafe conditions, and not violate applicable codes and standards.
1.7.2 Payment for Utility Services
(a) The responsibility shall be upon the Contractor to provide and maintain at his own expense an adequate supply of water for his use for construction and domestic consumption, and to install and maintain necessary supply connections and piping for same, but only at such locations and in such manner as may be approved by the Contracting Officer. Before final acceptance, temporary connections and piping installed by the Contractor shall be removed in a manner satisfactory to the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge
(b) All electric current required by the Contractor shall be furnished at his own expense. All temporary lines will be furnished, installed, connected, and maintained by the Contractor in a workmanlike manner satisfactory to the Contracting Officer and shall be removed by the Contractor in like manner at his expense prior to final acceptance of the construction.
1.7.3 Meters and Temporary Connections
The Contractor, at its expense and in a manner satisfactory to the Contracting Officer, shall provide and maintain necessary temporary connections, distribution lines, and meter bases.
1.7.4 Telephone
The Contractor shall make arrangements and pay all costs for telephone facilities desired.
1.8 PROTECTION OF EXISTING FACILITIES
The Contractor shall be responsible for protecting Government property and undisturbed land not intended for modification, from damage. The Contractor shall protect all existing structures, including but not limited to, roads, parking areas, bridges, roadway embankments, utilities and improvements from damage and, in the event of damage as a result of his operations, the Contractor shall be responsible for their repair, restoration, or for all cost of damage resulting therefrom. In addition, the Contractor shall be responsible for any damage to bridge or culvert structures caused by the unauthorized excavation or excavation beyond the project dimensions. The Contractor shall not inflict damage upon land outside the contract area by unwarranted entry upon, passage through, or disposal of material on such land. The Contractor shall repair all damage or disturbance caused by the Contractor’s operations to the satisfaction of the Contracting Officer and at the Contractor’s expense.
1.9 CONTRACTOR FACILITIES AND WORK AREAS
The Contractor shall propose and get approval for all lay down, staging, and access areas to be used outside the direct work areas. The Contractor's lay down, staging areas, stockpile storage, and temporary access areas shall be placed in approved areas as directed by the Contracting Officer. Temporary movement or relocation of Contractor facilities shall be made only when approved by the Contracting Officer.
1.10 PHYSICAL DATA
a. Weather conditions are reported by the U.S. Department of Commerce, National
Oceanic and Atmospheric Administration (NOAA) Environmental Data Service, Asheville, North Carolina, and information about weather condition(s) is available through the following Internet site:
http://www.nws.noaa.gov
It shall be the Contractor’s responsibility to obtain information concerning rainfall and wind conditions that could influence operations.
b. Transportation facilities: The project is accessible by public roads.
2.0 GENERAL REQUIREMENTS:
2.1 General.
The work consists of removing damaged concrete, cleaning exposed rebar, installing additional rebar when needed, replacing concrete to the structures original designed condition. The work also consists of replacing joint material in the parapet wall, where noted. All work shall be in accordance with the current ACI and ASTM standards. The Contractor shall furnish all services, labor, equipment, supplies, tools and incidentals necessary to complete all repairs of the Falls concrete intake tower and parapet wall structures per this scope of work. The concrete structure shall have the adequate repairs necessary to bring the structure back to its original design condition.
2.2 Responsibilities
The Contractor shall furnish qualified personnel to ensure the accomplishment of work specified in this SOW. Additionally, the Contractor shall furnish all services, equipment, personnel and travel required in connection with this SOW.
2.3 Concrete Repairs
A concrete spall exists on the under-side of the roof deck on the Intake Tower. The spall is located on the opening for the right-side access hatch and WQ4 hatch. The spall is roughly 2’x1½’x6” in size, due to the height of the spall an exact size of the spall was not determined and shall be field verified by the Contractor. The spall should be repaired and sealed. The area around the spall shall be checked for soundness, any unsound concrete shall be removed, and the area roughened to ¼ inch amplitude minimum roughness per ACI 318. The exposed reinforcement shall http://www.nws.noaa.gov/ be cleaned and coated to produce a proper bond with the new concrete. J-rods shall be drilled into the existing concrete when applicable to ensure the new concrete will not spall from the existing concrete. New concrete shall be placed to bring the outlook tower back to its original design condition.
The parapet wall has three concrete repairs to be made. All three areas are located at construction joints with the water stop exposed. The damaged concrete shall be removed down to sound concrete. The Contractor shall be sure to not damage the existing water stop or rebar during the concrete repairs. The Contractor shall be responsible for repairing any damages caused during construction, at no cost to the government. The sound concrete shall be roughened to ¼ inch amplitude minimum roughness per ACI 318. The exposed reinforcement shall be cleaned and coated to produce a proper bond with the new concrete. New concrete shall be placed to bring the parapet wall back to its original design condition. Areas of damage are indicated on the attached map.
The sealant of the construction joints on the parapet wall are over all in fair condition. Four joints have significant cracking and shall be replaced. One of the joint sections of the parapet wall on the left side of the dam has settled and pulled away causing the sealant to split, Photo 6. Areas of joint sealant needing replaced are indicated on the attached map.
2.4 Laboratory Testing Procedures
For each portion of the structure, select concrete mixture proportions so that the strength requirement is met. Submit concrete mixture proportions as determined by the Contractor and submitted for review. The submission shall be accompanied by test reports from a laboratory complying with ASTM C1077 showing that proportions thus selected will produce concrete of the qualities indicated. No substitution shall be made in the source or type of materials used in the work without additional tests to show that the quality of the new materials and concrete are satisfactory. The concrete mixture quantities of all ingredients per cubic yard and nominal maximum coarse aggregate size that will be used in the manufacture of each quality of concrete shall be stated. Proportions shall indicate the mass of cement, pozzolan and ground granulated blast-furnace (GGBF) slag when used, and water; the mass of aggregates in a saturated surface-dry condition; and the quantities of admixtures. In meeting the strength requirements, the selected mixture proportion shall produce a required average compressive strength f'cr exceeding 4500psi.
Laboratory testing shall be the responsibility of the Contractor. Laboratory tests shall be conducted by an ACI certified lab and shall following all ACI standards and regulations.
The following test procedures shall be performed:
• ASTM C143 – Standard Test Method for Slump of Hydraulic-Cement Concrete
• ASTM C231 – Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
• ASTM C39 – Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens. Compressive strength shall be completed for the following schedule:
o 2 cylinders at 5 days o 2 cylinders at 7 days o 2 cylinders at 28 days o 1 cylinder for hold
2.5 Material Estimates
The concrete repair quantities shall be treated as field estimates, and the contractor should verify all dimensions. The estimate for Damaged Concrete to be repaired in the Intake Tower, listed below, is only estimated for the concrete inside of the intake tower, and not the parapet wall. Concrete damage in the parapet wall is included in the Concrete Joints to be Repaired. Rebar replacement and rebar additions were not estimated.
Damaged Concrete to be repaired in the Intake Tower: 1.5 Square Feet Concrete Joints to be Repaired: 3 Each Joint Sealant to be Replaced: 4 Each
2.6 Disposal of Material
The contractor will remove all demolition debris and left-over construction debris to an approved offsite location licensed to receive/recycle construction debris and in accordance with all federal, state and local regulations. The contractor is responsible for any waste disposal and any permits and fees associated with disposal.
The contractor is responsible for paying any associated fees necessary to haul materials; repair and repave access trail and bulkhead area. All work shall be coordinated through the Government.
2.7 Warranty
The contractor shall furnish the Government with a minimum of 1-year warranty or standard warranty whichever is greatest on any labor/materials for any defect.
2.8 Direction
The Contractor shall accept direction only from the Wilmington District Contracting Officer (KO). Requests or desires of the Users, Using Agency, or any other party made directly to the Contractor shall be immediately brought to the attention of the KO for this Contract. Any changes to this SOW must be authorized in writing by the
KO.
3.0 Existing Conditions:
During an inspection in 2017, a concrete spall was noted on the underside of the roof deck on the Intake Tower. The roof area has exposed rebar which will continue to deteriorate and cause additional spalling, Photo 2. Dam personnel work beneath this roof so the spall needs repaired, to prevent any future spalling.
When an inspection was completed in 2019, deterioration of the parapet wall was noted. One area of concrete appears to have been damaged by impact from a vehicle, Photo 5. Other damaged areas appear to have spalled from deterioration or vandalism. The exposed concrete will continue to deteriorate and cause additional spalling. The exposed water stops will continue to breakdown from exposure to UV light. To prevent future damage, the spalled concrete needs to be repaired. Portions of the concrete have broken away exposing rebar and water stops.
Photos 3-5 show the deteriorated concrete.
4.0 Site Photos:
Photo 1: Falls Dam Intake Tower
Photo 2: Spall found on the Roof of the Intake Towers, location 1
Photo 3: Photo of Damage to the Parapet Wall at location 2
Photo 4: Photo of Damage to the Parapet Wall at location 4
Photo 5: Photo of Damage to the Parapet Wall at location 3
Photo 6: Photo of Damage to the Parapet Wall at location 5
5.0 Record Drawings and Project Location:
Photo 7: Record drawings parapet wall
Photo 8: Record drawings of the Reinforcement for the Intake Tower Roof
Photo 9: Area Photo of the Dam Crest
Photo 10: Site Map with Lay Down Area
Section 00 21 00 - Instructions
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-22 Alternative Line Item Proposal JAN 2017 52.211-6 Brand Name or Equal AUG 1999 52.232-13 Notice Of Progress Payments APR 1984 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation
DEC 2019
252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation
MAY 2021
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements MAR 2022
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a FIRM FIXED PRICE contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
22.8% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from
Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Wake County, North Carolina.
52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)
ALTERNATE I (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR
52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Mark Wilmes Participants will meet at: Falls Dam Visitor Assistance Center
Address: 11405 Falls of Neuse Rd, Wake Forest, NC 27614 Telephone: 919-846-9332 x2226
Email Address: Mark.D.Wilmes@usace.army.mil
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
www.acquisition.gov
INSTRUCTIONS TO OFFERORS:
TECHNICAL FACTORS:
The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
The Government intends to evaluate offers and award a contract without discussions with Offerors. Therefore, the Offeror’s initial offer should contain the Offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary.
http://www.acquisition.gov/
The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.
Evaluation Methodology: An award will be made to a single offeror. Any award to be made will be based on Lowest Price, Technically Acceptable (LPTA) procedures. No offer will be accepted that does not contain the total amount of work specified in this solicitation.
Quotes will be evaluated using informal source selection procedures.
The following factors shall be used to evaluate offers:
(i) Price. Contractor shall provide total pricing for all contract line items listed in “Section 00 10 00 – Solicitation, Contract Line Item (CLIN) Schedule” on the continuation sheet of the DD Form 1442. The Contractor shall sign Standard Form 1442 (complete Blocks 14 [include Unique Entity ID and Tax Identification Number], 30a, 30b and 30c).
(ii) Technical Capability/Past Performance.
Evaluation –Each item in the Technical Requirements Table will receive one of the adjectival ratings defined below.
Any criterion that receives “U” rating will result in an overall unacceptable rating for the factor and are not eligible for award.
ADJECTIVAL RATING
DEFINITION
Acceptable (A) Quote clearly meets the minimum requirements of the solicitation.
Unacceptable (U) Quote does not clearly meet the minimum requirements of the solicitation.
TECHNICAL CRITERIA A or U The offeror is registered and has no active or inactive exclusions listed in their Entity Record on the System for Award Management (SAM).
In accordance with FAR 42.15, the offeror does not have any relevant Past Performance Evaluations in which their performance was rated at “Unsatisfactory” or “Marginal” in the last five (5) years. Relevant evaluations may be obtained from the Contractor Performance Assessment Reporting System (CPARS), Past Performance Information Retrieval System (PPIRS), or Past Performance Questionnaires. Subfactor ratings to Past Performance that will be considered include, quality of product/service, cost, schedule, small business, and management.
Offerors are required to submit prior experience of recent and relevant contracts/projects at the time of quote. Contracts/Projects can be performed with Federal, State, local or private companies. Government contracts are preferred but not required.
Contracts/Projects that are relevant are defined as those that are similar to the requirements of the Statement of (SOW) for concrete repairs that are recent are defined as those that have been completed within the last five (5) years.
A minimum of two (2) contracts/projects shall be provided to include: contract number, title of project, detailed description of work performed, and Point of Contact.
Please do not submit more than five (5) contracts/projects. In order for an offeror to be determined technically acceptable, the offeror must show previous experience with the type of work described in the SOW. Offerors must show previous experience on a minimum of two (2) contracts/projects.
(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
DISCLOSURE OF MAGNITUDE
Disclosure of Magnitude of Construction (FAR 36.204 and DFARS 236.204) The estimated price range for this project is between $25,000 and $100,000.
Section 00 45 00 - Representations and Certifications
52.249-1 Alt I Termination for Convenience of the Government (Fixed-price) (Short Form) (Apr 1984) - Alternate I
APR 1984
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990.
(2) The small business size standard is $45,000,000.
(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition--
(i) Is set aside for small business and has a value above the simplified acquisition threshold;
(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or
(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
( ) Paragraph (d) applies.
( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.204-26, Covered Telecommunications Equipment or Services--Representation. This provision applies to all solicitations.
(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation.
(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(x) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.
(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).
(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial products or commercial services.
(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.
(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)
(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xxi) 52.225-4, Buy American-Free Trade Agreements-Israeli Trade Act Certificate. (Basic, Alternates II and III.)
This provision applies to solicitations containing the clause at 52.225-3.
(A) If the acquisition value is less than $50,000, the basic provision applies.
(B) If the acquisition value is $50,000 or more but is less than $92,319, the provision with its Alternate II applies.
(C) If the acquisition value is $92,319 or more but is less than $100,000, the provision with its Alternate III applies.
(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.
(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.
(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
X (i) 52.204-17, Ownership or Control of Offeror.
X (ii) 52.204-20, Predecessor of Offeror.
(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.
(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.
(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).
(vii) 52.227-6, Royalty Information.
(A) Basic.
(B) Alternate I.
(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [ offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any…