A21 - W912PM21Q0008 - Condition-Found-Report-(CFR)_Form-26.pdf
PDF 39 KB Posted
- Attached to
- REPAIRS ON CATERPILLAR C9 ENGINES & TRANSMISSIONS FOR THE SURVEY VESSEL SANDERSON, USACE, WILMINGTON
- Solicitation number
- W912PM21Q0008
About this file
This document is a condition found report and service cost estimate form for repairs to engines and transmissions on a survey vessel for the U.S. Army Corps of Engineers, Wilmington District. The contractor shall provide all labor, materials, and services to inspect, rebuild/overhaul, and repair two Caterpillar C9 engines and JA transmissions on the SV Sanderson, a 33.9 foot aluminum hull survey vessel built by Sea Ark in 1999. The delivery date for completion of repairs is 120 calendar days after notice of award. The form provides sections for describing inspection findings and required services, estimating labor hours and costs, listing recommendations, and providing total costs including parts, labor, mileage/travel, and freight. Signatures are also required for certification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENAO FORM 26, APR 2017 PREVIOUS EDITIONS ARE OBSOLETE. VERSION 1.1
U.S. ARMY CORPS OF ENGINEERS, NORFOLK DISTRICT
CONDITION FOUND REPORT, NAVIGATION SUPPORT AND SURVEY SECTION FLOATING PLANT
For use of this form, see ER 1130-2-500, EP 1130-2-500 and EM 385-1-1; the proponent agency is CENAO-WR-O.
SECTION II - DESCRIPTION OF INSPECTION
b. DATE (YYYYMMDD) c. COMPLETED BY SIGNATURE (CAC signing locks form)1a. COMPLETED BY (Last, First MI)
SECTION I - PREPARED FOR, U.S. ARMY CORPS OF ENGINEERS, NORFOLK DISTRICT / BY
1. COMPANY NAME 2. DATE (YYYYMMDD)
3. ADDRESS (Street, City, State and Zip Code) 4. TELEPHONE NUMBER
5. E-MAIL ADDRESS
1. DESCRIBE SYSTEM INSPECTED AND FINDINGS
1. DESCRIBE SERVICES REQUIRED FOR REPAIR
2. LABOR HOURS (round to nearest quarter (.25) hour) 3. LABOR COST PER HOUR 4. LABOR TOTAL COST (blocks 2 x3)
SECTION III - RECOMMENDATIONS
SECTION IV - SERVICE COST ESTIMATE
SECTION VI - SIGNATURE CERTIFICATION
SECTION V - COMMENTS
1. ADDITIONAL COMMENTS
1. PARTS 2. LABOR (Section III, block 4 total) 3. MILEAGE / TRAVEL 4. FREIGHT
5. TOTAL (Section IV, blocks 1-4) 6. PARTS LEAD TIME 7. LENGTH OF TIME REQUIRED FOR REPAIR
CENAO FORM 26, APR 2017 PREVIOUS EDITIONS ARE OBSOLETE. VERSION 1.1
U.S. ARMY CORPS OF ENGINEERS, NORFOLK DISTRICT
CONDITION FOUND REPORT, NAVIGATION SUPPORT AND SURVEY SECTION FLOATING PLANT
For use of this form, see ER 1130-2-500, EP 1130-2-500 and EM 385-1-1; the proponent agency is CENAO-WR-O.
SECTION II - DESCRIPTION OF INSPECTION
SECTION I - PREPARED FOR, U.S. ARMY CORPS OF ENGINEERS, NORFOLK DISTRICT / BY
SECTION III - RECOMMENDATIONS
SECTION IV - SERVICE COST ESTIMATE
SECTION VI - SIGNATURE CERTIFICATION
SECTION V - COMMENTS
1.1 Forms Design Team CEIT-OPI-PF CENAO FORM 26 Condition Found Report Mark Cooper CENAO FORM 26 Condition Found Report mark.a.cooper@usace.army.mil 20170410 20170410
| SaveAs: |
| PrintForm: |
| Email: |
| YYYYMMDD: |
| SIGNATURE: |
| CAPTIONS: |
| A1: |
| A2: |
| A3: |
| A4: |
| A5: |
| A6: |
| A7: |
| NUM1: |
| NUM2: |
| NUM3: |
| NUM4: |
| NUM5: |
| NUM6: |
| NUM7: |
| NUM8: |
| A8: |
| A9: |
File details come from the government source that posted it. Updated .